Virginia Pai and Janet Dietz
June 2007
CIM Implementation at PacifiCorp
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
Agenda
– What is the CIM?
– Company Background
– PacifiCorp’s CIM “Scorecard”
– Four Case Studies
– Other Examples
– Lessons Learned
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 3
What is the CIM?
– Common Information Model sponsored by the International Electrotechnical commission A unified modeling language (UML) based information model Specific to the electric power industry Represents real-world objects and information entities
– Designed to enable integration of applications Provides a common model behind all messages exchanged among applications Provides definitions for common data classes
–
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 4
A view of the core CIM model
ControlHouseEquipmentCurveSchedData
CurveSchedFormula
CurveSchedule
0..n
0..1
+CurveScheduleDatas0..n
+CurveSchedule
0..1
0..n
0..1
+CurveScheduleFormula
0..n
+CurveSchedule
0..1
Naming
EquipmentContainer
Equipment
0..1
0..n
+MemberOf_EquipmentContainer
0..1
+Contains_Equipments0..n
CompanyPSRType
PowerSystemResource
0..n
0..n
+OperatedBy_Companies0..n
+Operates_PSRs
0..n
0..1
0..n
+PSRType
0..1
+PowerSystemResource 0..n
SubControlArea
Substation
0..1
1..n
+MemberOf_SubControlArea
0..1
+Contain_Substations1..n
Bay0..n
0..1
+Contains_Bays
0..n
+MemberOf_Substation
0..1
Terminal
BasePower
VoltageLevel
1
0..n
+MemberOf_Substation1
+Contains_VoltageLevels0..n
0..1
0..n
+MemberOf_VoltageLevel0..1
+Contains_Bays
0..n
ConductingEquipment
0..n
1
+Terminals0..n
+ConductingEquipment1
BaseVoltage
0..n
0..1
+BaseVoltage0..n
+BasePower
0..1
0..n
1+VoltageLevel
0..n +BaseVoltage
1
0..n
0..1
+ConductingEquipment
0..n
+BaseVoltage
0..1
CoreVersion
version = Core_v003date = 2004-07-02
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 5
How can CIM be used in the Utility Enterprise?
– The CIM is more than an information model standard in UML
– The CIM can be expressed in XML to create interface messages
– The CIM helps data preparation Provides common set of semantics and data representation regardless
of source of data Improves data quality and enables data validation
– The CIM promotes data exchange Provides a common language and format Provides a common set of services for sharing data
– The CIM enables application integration Provides the basis for a standards-based integration format
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 6
Why have standards-based integration?
– Improves the ability to integrate business processes with Commercial-Off-The-Shelf applications
– Provides a mechanism to leverage effort and lower risk by working on common functionality with other companies and vendors
– Positions a company to benefit from an evolving marketplace of conforming applications
– Lowers effort for integrating legacy systems with other enterprise systems
– Improves enterprise data quality and facilitates enterprise decision support processes
– Improves the consistency and reuse of data models and messages
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 7
CIM is PacifiCorp’s Integration Strategy
– PacifiCorp is successfully using CIM to design both interfaces and databases
CIM was adopted in 1999 as PacifiCorp’s application integration standard
Used for both messaging and database design for new projects Existing interfaces are reworked when the need arises
– CIM-based integration viewed internally as “Best Practice” Having a common vocabulary reduces semantic misinterpretation Reusing messages minimizes integration costs Minimal knowledge of internal application designs required
– CIM is here to stay CIM is standard design practice PacifiCorp vendors are getting used to the idea PacifiCorp’s data warehouse is based on the CIM EMS/SCADA system (Ranger) uses a CIM-based data maintenance tool
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 8
Key Facts about PacifiCorp
– Headquarters in Portland, Oregon– 1.6 million customers in six states– Service area covers 136,000 square miles– 15,580 miles of transmission line – 59,510 miles of distribution line – 908 substations– Three divisions:
Pacific Power – Oregon, Washington and California Rocky Mountain Power – Utah, Wyoming and Idaho PacifiCorp Energy – generation and mining
• 69 generating plants across West; net capability of 8,470 MW– Owned by Mid-American Energy Holdings Company (MEHC)
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 9
PacifiCorp Service Area and Plants
CA
NV
AZ
UT
WY
IDOR
WA
MT
CO
PacifiCorp Service Territory
Thermal Plants
Gas-Fueled Thermal Plants
Wind Projects
Geothermal Plants
Coal Mines
Hydro Systems
Generation Developments
500 kV Transmission Lines
345 kV Transmission Lines
230 kV Transmission Lines
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
0
CIM Scorecard – Examples of CIM use
Business Units
Application/Project
Message(s) CIM Pct of message that is CIM
Power Delivery
Substation Measurements
IntervalRead, SubstationEquipment.Measurement MeasurementList 90%
Outage Center Call Handing
TroubleCalls, TroubleReportAlerts, TroubleReportDetails, TroubleReportSummary, Customer Info, Customer Balance, Customer Account Balance
OutageManagement 80%
Retail Access Project
RegisterReadRequest, BillDeterminant, CustDrop, Enroll.DACust, EnrollmentChange, NonDACust, Reg.ESSRegister, Register.ESS, ESStatusChange, SESSESSRelationshipChange, RegisterReadResponse, CnIConsumption, DAEnrollConsumption, EnrollmentChange, NonDAEnrollConsumption, ESSStatusChange
CustomerMeterDataSet,CustomerServiceAgreement,MeasurmentList,Document, ActivityRecord, CustomerBilling, BillingDeterminant
80%
Pole Attachment System
FacilityPoint, JointUse.Agreement, JointUse.Attachment, JointUse.Notice, JointNoticeRequest, FacilityPoint
AssetList 70%
Transmission Transmission Planned Outages
PlannedOutage.Change PlannedOutageNotification 50%
Transmission Wholesale Billing System
TransmissionData, STLossData, LTLossData, Scheduling.LoadData,ConsumptionData, InvoiceData
Settlement and MarketClearing
70%
EMS SCADA WeatherData MeasurementList 100%
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
1
CIM Scorecard Cont’d
Business Units
Application/Project
Message(s) CIM Pct of message that is CIM
Power Supply/Generation
Availability Information System
GeoThermalPlantGeneration MeasurementList 60%
Hydro Information Website
FlowDisplay MeasurementList 100%
Generation Equipment Performance Work Management
SolutionNotification, Performance, SolutionProject, EquipmentGroupRepetitiveTasks, Inventory.StockingPlan, WorkHistoryDocument
WorkWorkHistory
90%
Commercial & Trading
CRS MarkToMarketData MarkToMarket (Not in CIM) 80%
California ISO interface
EDI810 Settlement 50%
Corporate Giving Campaign
EmployeeDetails, ContributionPayrollDetails Employee (erpPerson) 70%
Sarbanes Oxley Audit
ChangeAuditReport ChangeAudit (Not in CIM) 90%
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
2
CIM Implementation Examples
– Case Studies Discussed Today Handling Customer IVR and Outage Calls Managing Substation and Circuit Load History (OSIsoft PI) Ranger CIM data maintenance tool Billing Wholesale Transmission Transactions
– Other Implementation Examples Scheduling Single-Person Work (SPS) Providing Enterprise Reports (Data Warehouse) Integrating EMS/SCADA (ABB Ranger) Forecasting and Risk Management (K2) Managing Distribution Facilities Joint Use (PADMS - GIS) Monitoring Application Activity for SOX (TripWire) Retail Access
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
3
Model-driven integration process
– Step 1: define integration scenario according to business process needs
– Step 2: identify message types and their contents required to support integration scenarios
– Step 3: extend PacifiCorp’s information model to incorporate new types of information
– Step 4: define new or customize pre-defined message types based on the CIM
– Step 5: map message field names to application and database field names
Step 1: What data flow isneeded?
Reqirements Specs, withUse Cases,
Integration Scenarios,and/or Event Sequence
Diagrams
Step 2: What is in eachmessage?
Step 3: Re-use existingmessages where
possible, extend CIMwhere not
Identified CIMExtensions: Classes Attributes Relations
Begin Here For EachBusiness Process
Curre
nt IE
C TC
57CI
M (C
omm
onIn
form
atio
n M
odel
)
Paci
fiCor
pIn
form
atio
n M
odel
(CIM
Bas
ed)
Step 4: Define New OrCustomize Pre-Defined
Message Types
New MessageTypes Specified
in XML
Step 6: SupportImplementation
Team
Information ExchangeModeling Complete
Step 5: Map MessageField Names
TransformationMap
Pre-definedMessage Types: Internal IEC OAG
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
4
Outage Call and Customer Call Handling
– Automated handling of customer account balance check– Automated handling of remote customer meter reading – Automated handling of customer outage calls between call center
and dispatch applications– Used CIM-based messaging to integrate
Customer phone number recognition between IVR and customer directory
Outage detail lookup between IVR and CADOPS Outage detail lookup between GTx and CADOPS Outage creation between IVR, TroubleUP (also called DMS) and
CADOPS All communications between off-site third party provider (TFCC) and
PacifiCorp are handled through the message bus All IVR steps are stored in IVR log for performance analysis
– Much testing around performance and handling of large load.
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
5
Outage/IVR Architecture
IVR Environment
Customers
CADOPS Environment
OCHIP EnvironmentMainfame
GTX Info
PhoneCalls (Outage, Check Acct Balance,Send Meter Read)
Corporate Environment
CSSDatabase
IVR System
CADOPS PDX
CADOPSSLC
CADOPS WYO
EAI Environment
EAI Servers
Outage Status Outage StatusOutage Status
DMS Database
Outage Info
Acct Balance,Outage Status
Web Environment
Web Server
Outage Info
Outage Info Via Trouble Viewer
WebPage
TFCC
Excess Outage calls go to vendor during a major storm
Outage Info
DMZ Environment
TFCC Call CenterAll interfaces are
based on the CIM
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
6
OUTAGE/IVR: UML model for outage notification
OutageStep
OutageRecord
+OutageSteps
+OutageRecord1
1..n
1
1..n
ErpPerson(f rom ERP_Support)
Document(f rom DocumentInheritance)
0..n
0..n
+fromDocuments
0..n
+toDocuments0..n
+ErpPersons
+Documents0..n
0..n
0..n
0..n
CustomerAccount(f rom Consumers)
CustomerAgreement(f rom Consumers)
1
0..n
+CustomerAccount1
+CustomerAgreements0..n
OutageNotification(f rom TroubleTickets)
TroubleTicket(f rom TroubleTickets)
ServiceLocation
(from Locatio...0..11..n
+CustomerAreement
0..1
+ServiceLocations
1..n
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
7
Outage example: CIM-based XML schema
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
8
Outage example: CIM-based XML schema
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 1
9
SCHOOL (PI) - Substation and Circuit Historian– Successful implementation of CIM network model structure for
managing substation measurements – both interfaces and database design
– System combines several older applications for storing substation measurements
– CIM used to design configuration database that shows configuration of substations and measurements
– CIM used in XML schemas for messaging among Ranger EMS PI Servers MVStar – Interval meter readings from Itron MV/90 Configuration Admin Utility Application
– Reused interface from legacy system when we moved to Ranger– CIM quite complete in Power Systems resource area; few model
extensions needed– System not used for network modeling
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
0
SCHOOL: UML model for measurement data
Equipment(f rom Core)
EquipmentContainer(f rom Core)
+Contains_Equipments
+MemberOf_EquipmentContainer
0..1
0..n
0..1
0..n
Substation(f rom Core)
PSRType(f rom Core)
ConductingEquipment(f rom Core)
PowerSystemResource(f rom Core)
0..n
0..1
+PowerSystemResource 0..n+PSRType
0..1
PowerTransformer(f rom Wires)
MeasurementType(f rom Meas)
MeasurementValueQuality(f rom Meas)
MeasurementValue(f rom Meas)
1
1
+MeasurementValueQuality1
1
MeasurementValueSource(f rom Meas)
+MeasurementValueSource1
0..n
1
0..n
Compensator(f rom Wires)
ACLineSegment(f rom Wires)
Line(f rom Wires)
0..1
0..n
+MemberOf_Line
0..1
+Contains_ACLineSegments0..n
RegulatingCondEq(f rom Wires)
Measurement(f rom Meas)
1
0..n
+MemberOf_PSR1
+Contains_Measurements
0..n0..n
1
+Measurements
0..n
+MeasurementType
1
AnalogValue(f rom Meas)
Analog(f rom Meas)
+Contain_MeasurementValues
+MemberOf_Measurement1
1..*
1
1..*
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
1
SCHOOL Example: CIM-based XML schema
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
2
Control Center
Ranger Historian PDX
Ranger Historian SLC
SCHOOL PI Server
Hand Held Terminals
GridSense LineTrackers
Corporate Environment
Reports
<<RDAS>>PCC
Primary Ranger
AppServer
<<RDAS>>WCC
<<RDAS>>SCC
DMZRanger Corporate PI Servers
MV-STAR
Ranger Historian SLC
Ranger Historian PDX
`
PlanningTechnologies
`
AreaPlanning
`
Field Engineering
`
TransmissionPlanning
`
Regulation
`
GLOMESMaster Station
`
PI Manual Logger Workstations
SCHOOL Configuration
UtilityModel Config (Oracle
CIM)
SCHOOL Configuration Utility
This is the SCHOOL Configuration Utility application, used to maintain the SCHOOL
Configuration Database. This is an Oracle CIM database used to
manage all load measurementsused in T&D planning at
PacifiCorp.
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
3
Ranger CIM data maintenance tool
– CIM Data Engineering Toolkit Based on the CIM, not on not a translation from CIM to a proprietary
data engineering schema Based on ESRI ArcGIS technology ArcSDE – Spatial Database Engine
• Oracle application• Multi-user, versioned database server
ArcCatalog – GDB schema maintenance• Schema generation based on UML created in Visio• Schema maintenance of attributes, classes, relationships
ArcMap – main graphical editing client application• Graphical/tabular data engineering environment• Many ABB custom add-ins
Multi-user database manager, supporting maintenance of all RANGER configuration data
Imports and exports CIM XML for model exchange
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
4
Ranger CIM data entry paths (ABB)
Graphic courtesy of ABB
Tool accepts CIM XML as import
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
5
Ranger CIM tool example
Graphic courtesy of
ABB
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
6
Ranger CIM measurement editor
Graphic courtesy of
ABB
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
7
Transmission Wholesale Billing System
– TWBS produces invoices for PacifiCorp’s 34 largest wholesale customers (collects over $30 Million of the company’s revenue per year).
– CIM used for all interface messages OASIS – sends transmission readings and short-term losses MVStar – receives interval meter readings (reused) Envision – scheduling data from KWH system BPA – sends interval meter readings SAP – gets accounts receivable information CSS – sends consumption data (reused) IVRCSS – sends phoned-in meter reading corrections MVPBS – receives consumption data, meter readings, sends out
invoices and accounts receivable (reused) K2 – Trading, price curves, plant operations
– Reused analysis from EDW (metering), Retail Access (customers), and SCHOOL project (interval readings)
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
8
Transmission Billing interface to SAP
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 2
9
Single Person Scheduling
– A single person scheduling (SPS) system facilitates improved management of short duration, high volume single person work assignments.
– CIM attribute names used for data attributes in repository data base
– CIM attribute names used for data elements in simplified XML schema
– Full CIM XML structure rejected by project Used CIM attribute names, but not relationships Processing time lessened Complexity reduced No reusability
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 3
0
Enterprise Data Warehouse
– CIM is the foundation for warehouse data structures– Areas implemented that made particular use of the CIM include
the following: Customer information from CSS Distribution work management from RCMS Customer metering Project financials
– Generic CIM names for entities and attributes should make integration with multiple source systems and replacement systems easier
– Project issues around dates, other attributes– Director of Warehouse project said “we would never have
achieved as much as we did in so short a time without the CIM”
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 3
1
Retail Access
– Oregon’s electric restructuring bill (SB 1149) for investor-owned utilities, implemented March 1, 2002
– PacifiCorp used CIM messaging for interfaces between PacifiCorp's Customer Information System and Itron interval meter reading system
– Extended CIM structure to include details of customer billing and energy service supplier
– XML schema developed used explicit structure names rather than repeating groups with type codes
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 3
2
Other Areas
– Trading and Risk Management Extensions were created for trading applications using both
CIM and Financial Products Markup Language (FPML) All new trading application interfaces are designed with CIM
and extensions• Forecasting (River, Plant Generation, etc...)• Risk Management (Mark to Market)• Gas Management extensions will be next
– SOX ChangeAuditReport XSD created to publish changes to operating
system and database.
© 2
00
7 P
AC
IFIC
OR
P |
PA
GE 3
3
Lessons Learned
– CIM integration works well, especially for Power Delivery– Project work is reduced when the CIM data entities and
relationships are mapped before detailed attribute modeling begins
– Messages in XSD format are accessible and reusable– Project management: additional data modeling cost of CIM
needs to be understood at PM level– Actual savings come from reuse, data clarity, and quality– CIM expertise currently resides in our EAI group– Projects need modelers through unit testing– CIM compromises come back to haunt you– Abstract thinking in projects remains a challenge