CIGRE’s View on the future of the electric power system Klaus Fröhlich President of CIGRE Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Transcript of CIGRE’s View on the future of the electric power system · Examples in recent technological...

Page 1: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

CIGRE’s View on the future of theelectric power system

Klaus FröhlichPresident of CIGRE

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 2: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Energy’s Environmental Footprint has to be reduced

Page 3: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Electricity plays a crucial Role

Sustainable electric energy generation

Prosumers

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 4: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Electricity plays a crucial Role

increase of efficiency by

electrification and/or

advanced technology

high tech lighting

heat pumps

transport

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Combined cycles

Industrial Processes

Page 5: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

The technical challengesfor the network

• Very long distance transport

• Better Interconnection betweencountries/continents

• Reversed load flow from low voltage to transmission level

• Intermittancy of new-renewable sources

• Complex system structures with high intelligence are needed on all voltage levels

• Regulation needs to adapt to technical and soci-economics needs

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 6: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Changes of the power grid are necessary

transmission distribution

Uni-directional load flow Bi-directional load flow

Interactive network

�Smart Grid

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 7: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

The Smart Grid Evolution

Page 8: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Examples in recent technologicaldevelopment in transmission

• Submarine cables; trend for greater depth

• Compact overhead lines

• UHV for 1100 kV AC

• HVDC fast growing (grids?)

• Study by SC B4: Low frequency transmission in consideration by CIGRE (e.g.16 2/3 Hertz)

• IT tools for system analysis, control and automationand modelling

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 9: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Desperate need for storagetechnology

Compressor Turbine

Motor/

Generator

Heat storage Ice storage

Extraction

high quality heat

Input other heat sources Extraction

Kälte

Expected efficiency >70% - like Pumped Hydro Power

Picture: Courtesy ABB

Thermoelectric

energy storage

Batteries

(recently up to 40 MWh)

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 10: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

The Vision of a Global Grid

Swiss Federal Institute of Technology, ETH Zurich

Page 11: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

Many environmental issuesStudy Committee – SC C3 and others

• Land requirement (corridors)

• Esthetics

• Emissions (EM,electric fields,audible emission)

�Pour acceptance of the publicneeds better information and/or mediation

• Prevention and recoveryat catastrophic events

hurrican „Klaus“

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 12: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

CIGRE’s StrategicDirections

Future

power

system

Environment

and

sustainability

Unbiased

information

for all

stakeholders

Best use of

existing

systems

Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015

Page 13: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

The CIGRE vision of the network of the future

Page 14: CIGRE’s View on the future of the electric power system · Examples in recent technological development in transmission • Submarine cables; trend for greater depth • Compact

B2

B1

A1D2

B3C4

B4

C1

C6

B5

C5

C3

C2

A3

A2

D1

Study

Committees

Currently 225 Working Groups Cigre International Workshop, Stresa, Italy, 26 – 28. August, 2015