C.H.Scott Goodwin (2)

10
C.H. Scott Goodwin 26 Halswell Street, Wanganui NZ Home: +64 6 34 37723 Mobile: +64 21 038 9090 [email protected] Training and Certificates Offshore Installation Manager Course Advanced Rigging - Advanced Fire Fighting Crane Operations Sea Survival Training – BOSIET McDermott In-house Safety Training Confined Space Entry Wire Rope inspection Australian Import and export Cert. Employment History Barge Superintendent June 2013 – Present Duties: Operations of the DB27.DB 32 for McDermott’s Middle East. PROJECTS Aramco: Kingdom Saudi Arabia Pipelines and Jacket installations. Topside and Cable lay. Water depth 10m-50m Barge Superintendent - - - - - - - -

Transcript of C.H.Scott Goodwin (2)

Page 1: C.H.Scott Goodwin (2)

C.H. ScottGoodwin

26 Halswell Street,Wanganui NZ Home: +64 6 34 37723Mobile: +64 21 038 9090 [email protected]

Training and Certificates

Offshore Installation Manager CourseAdvanced Rigging - Advanced Fire Fighting Crane OperationsSea Survival Training – BOSIETMcDermott In-house Safety TrainingConfined Space EntryWire Rope inspectionAustralian Import and export Cert.

Employment History

Barge Superintendent June 2013 – PresentDuties: Operations of the DB27.DB 32 for McDermott’sMiddle East. PROJECTSAramco: Kingdom Saudi Arabia Pipelines and Jacket installations. Topside and Cable lay.Water depth 10m-50m

Barge Superintendent

--

------

Page 2: C.H.Scott Goodwin (2)

Barge Superintendent January – March 2013 Duties: Oversee the Norse Endeavor’s arrival from Singapore toDampier. Overall review and writing of project procedures.Advise on training, and Australian Standards to the overseasMarine Crew. PROJECTChevron Gorgon LNG, Barrow Island, West Australia.2.5 km LNG Load out Jetty.

Barge Superintendent

Supura Clough Australia Ply Ltd November 2012 – January 2013 Duties: Supervision of the Kulinder 8 point mooring system, shallowwater barge for the Jetting of the Domgas Pipeline.Overseeing accommodation vessels, shallow water tugs andsupply vessels.

Barge Foreman DB-30 McDermott Australia, Ply Ltd.

January 2011 – October, 2012

Duties:

Include: Supervision of all Boats / Anchor movements anddeck operations pertaining to a Derrick Barge in Pipe laymode; Jacket Installation and FPSO installations.

Rigging/Scaffolding/Diving/Sub-contractors Supervision PROJECT

BHP BILLITON, Exmouth, West Australia. June 2012.

Macedon Gas Project20” 84km pipe layI.L.S installationOver the side - Sub Sea Manifold Installation.

••••

Page 3: C.H.Scott Goodwin (2)

I.L.S installationOver the side - Sub Sea Manifold Installation.

PROJECT

ESSO: Kipper Tuna Turrum (KTT), BASSSTRAIT, Victoria, Australia.

Pipelines

18”, 14” 70km and 24km’s

Jacket Installation Jacket launch, Marlin-B (MLB)Riser Access Tower (RAT Jacket) Lift and upend

MLB, 8 skirt piles, P1Driven and Drilled. Inserts pilesgrouted.RAT ... P1 driven, drilled and grouted.

MLB Module Installation

MSF - 950MTMLB Bridge – 440 MTM2B – 1296 MTM2A – 1759 MTM1 – 1658 MTM3 – 2095 MTFlare – 403 MT RAT Topside Installation

640 MTBridge – 240 MT

Barge Superintendent

QP 2000 Quippo Prakash Ltd, Singapore, March 2010 – Nov2011 Duties:

Finish off commissioning works in Nan Tong, China.Make vessel ready for sea trails Singapore.Oversea operation on the following projects.

PROJECT

Pertronas Carigalli, West MalaysiaSUB CONTRACTED to TLO

(June- August 2010)TBDR-A, Jacket Launch (2916mt)installation.TBFP-A, Tripod installation.

Shell, Sarawak SSB, MALAYSIA (August-September 2010)

CPDR-A, Jacket launch (3430mt) installation- Skirtpiles.

••

o

o

oo

o

o

o

ooooooo

o

oo

ooo

•••

o

o••

o

Page 4: C.H.Scott Goodwin (2)

Shell, Sarawak SSB, MALAYSIA (August-September 2010)

CPDR-A, Jacket launch (3430mt) installation- Skirtpiles.Topside (1645mt) in tire back mode.

Talisman Energy, Talisman field PM 3, WestMalaysia

(October -2010)TML Mercury Removal Unit installation.2x MRU Gas absorbers Vessels2x MRU Condensate absorbers Vessels380 Gas SkidCondensate skid

Barge Foreman

DB-30 McDermott, Australia.

Duties Include: Supervision of all Boats / Anchormovements and deck operations pertaining to a DerrickBarge in Pipe lay mode; Jacket and FPSO installations

Rigging/Scaffolding/Diving/Sub-contractorsPROJECT:

Wood side Burrup Pty Ltd- Pluto LNG Project-NWAustralia

(November 09-January 2010)Pluto Jacket Launch (10,000mt) Upend &Drill for Skirt Piles, Grout.Topside Lifts, lower (2190mt) upper (2160mt)flare (585mt)TLQ (700mt)

PROJECT: Malaysia

Sarawak Shell Berhad- B-11- ATopsides Installation- (September2009)

Module- A1- Module-1 B & 1C and BridgePROJECT: Vietnam

Cuulong Joint Operation Company. Su TuDevelopmentSu Tu Den North East- July, 2009- Vietnam(August 2009)Wellhead Platform, Submarine Cable and PipelineW.H.P.-B Jacket- 4 Pile and Conducters

PROJECT: Malaysia

Sarawak Shell Berhad – B-11 PLATFORM (April,2009 – May 2009 )Miri, SarawakEight Leg Jacket InstallationRemoved B-11 LQRemoved F-6 LQ and Installed New LQRemoved M-1 Old Generator Set and Installed NewGenerator SetInstalled B-11 New LQ

Sarawak Shell Berhad – F23 PLATFORM (Nov 82008 – Nov 18, 2008 )

o

o••••

ooooo

o

o

o

••

o

••

o

oo

••

ooooo

o

••

Page 5: C.H.Scott Goodwin (2)

Installed B-11 New LQ

Sarawak Shell Berhad – F23 PLATFORM (Nov 82008 – Nov 18, 2008 )Miri, SarawakInstalled F-23 Module

Barge Superintendent

March 08 – Nov 08 Aussie One - Trident Australasia PtyLtd, Perth Australia Duties Include: Overall review and writing of projectprocedures.Supervision for the commissioning and project teams inSingapore for mobilization of the AUSSIE ONE for TridentAustralasia - Kim Heng Marine. PROJECT (Land based)

Nexus Energy – Bass Strait , Australia20km 12” concrete coated gas line13km Electro / hydraulic umbilical.DP2 vessel – umbilical and ROV operations.

Barge Foreman

October 2005 – March 08 DB-30 McDermott, Singapore /Australia.

Duties Include: Supervision of all Boats / Anchormovements and deck operations pertaining to aDerrick Barge in Pipe lay mode; Jacket and FPSOinstallations

Rigging/Scaffolding/Diving/Sub-contractors Supervision

PROJECT HISTORY

Woodside Petroleum Ltd, Perth, Australia – AngelProject

Oct 07 - March 08Angel Jacket Launch Upend & Drill for Skirt Piles,Grout

3x CRA 14inch Pipelines1x 30 inch CS Angel-NRA 49KM

ONGC/Larsen & Toubro 4WPP-1 Project (Dec 06-April-07)

Mumbai High. DB-30N2A Tripod InstallationNEA Tripod InstallationNHA Tripod, Deck & NHA-NH BridgeInstallationN2A Deck, N2 Boat Landing & N2A-N2 BridgeInstallationNE-NEA Bridge InstallationBF Jacket & Deck InstallationNE-NH 6” Pipeline Installation6” Riser Stalk-On @ NH+ NE PlatformJBBS 16” NH-NE Pipeline Installation16” Riser Stalk-On Installation @ BF+BFPlatform

o

••

oo

oooo

o•

••

ooo

o

oooooo

Page 6: C.H.Scott Goodwin (2)

JBBS 16” NH-NE Pipeline Installation16” Riser Stalk-On Installation @ BF+BFPlatform

CUEL / Chevron - Phase 29 (June 06– Oct 06) DB-30

Plamuk, Kaphong, Satun, Funan, & Pailin Fields,Thailand

PMWJ Jacket installation, Tie-ins @ PF endKPWE 16” pipeline / jacket installationSAPLN 10” pipelineFUPLN 10”pipeline / jacket installation8” water injection pipelineBAWE jacket install, Tie-in @ PF endSAWN 30/1 JACKET & TOPSIDEFUNA-30/2 JACKET & TOPSIDEERMRP-JACKET 620 TONERMRP – TOPSIDE -1800 TONERMRP – BRIDGE – 500 TONKPWE – 29/7 JACKET & TOPSIDE.

Talisman Malaysia(May 06 – June 06) DB-30Bunga Tulip Field, Terengganu, Malaysia6” dia. Pipeline (BT- A to BR-C)14” & 4½“ PiggybackBR-C Riser Installation 14” / 6” / 4½” & Spool Tie-insBT – A Substructure installation

EMEPMI (April 06 – May 06) DB-30 Seligi – A Field,Terengganu, Malaysia

18” SEA – TAP Pipe lay & Pipeline crossingRiser Installation, Pigging, Hydro testing & De-oiling

TL Offshore Charter (Oct 05 – April 06) DB-30,TLO/PCSB – Baram Oilfield, Miri, East Malaysia,Petronas Carigali/Shell Malaysia DB30

BAJT – H/ BAK - BP Baram installation projectMCOT 2005 Development projectInstalled 16” diameter BAP – AA / MCOTpipelineInstalled 6 pile jackets, in field pipe andassociated risers in Baram Field, OffshoreMiri, East Malaysia as per JRM / TL offshorecharterInvolving pipe lay various pipelinesRiser installation / Sub sea spoolsHeavy lifts Jackets / Topsides /BridgesOver the side pipeline tie in by means of Davitlifts

Petronas Carigali (Oct 05) DB-30

Ruby Field development stage 1- phase 2 Installed RBDP – B topside installation.Installed 10” riser & repair at RBDP - A

Anchor Foreman / Relief Foreman

oo

••

oooooooooooo

oooo

••

oo

••

ooo

o

oooo

••

oo

Page 7: C.H.Scott Goodwin (2)

Anchor Foreman / Relief Foreman

January 2003 – Oct 2005 McDermott SingaporeDuties Include: Supervision of all Anchor movements anddeck operations pertaining to a Derrick Barge in Pipe laymode; Jacket and FPSO installations

Exon Nestegas Limited (June - Sept 05) Sakhalinexport terminal, SPM and SSLL installation – Dekastri

Installed 12” WWOL InstallationInstalled 12” WWOL / 48” SSLL(onshore)Installed 48” SSLL pipeline installationand two submarine cables installation.Installed SPM Substructure (2550 tons)& Rotation head (1050 tons)Loaded test on Templates (680 tons) &(585 tons)

Talisman Malaysia / PTSC (May 05)

Launched and Installed 8 legged jacket (400tons)

Installed bridge (250 tons) from BRE to BRDplatforms

Installed BRE Tripod Bridge (360 tons)Installed BRE Bridge (400 tons) to flare

PTTP Bongkot Field Development PRJT Phase 3C(Mar 05)

Installed SSP jacket and adjoining deck (Northdeck - 2550 tons and South deck - 2700 tons)Installed RP bridge (135 tons)Installed SSP bridge (290 tons)Installed Bridge support frame (112 tons), andNorth Module Flare. CUEL, Thailand (March, 2005)Installed 4 legged jacket (380 tons) andadjoining deck (450 tons) - PAWJInstalled 4 legged jacket (402 tons) andadjoining deck (450 tons) - ERWXInstalled 4 legged jacket (450 tons) andadjoining deck (450 tons) - TRWCInstalled 4 legged jacket (415 tons) andadjoining deck (590 tons) – Pearl (WHPA)Installed PLOCP2 Production Deck (2450 tons)and Utility deck (1400 tons)Installed PLOCP2 Bridge (180 tons) Installed subset tie-ins for all above

Oil & Natural Gas Corporation Ltd. (Dec 04 - Jan2005) Hyundai Heavy Industries Co. Ltd.

Installation of 8 pie MSP jacket and flare tripodInstallation of MSP decks comprising of 7 modulesand bridge installation

L & T – QP (November 2004) DB30, Maydan MahzamField, Qatar

Installed 4 legged jacket (PS3Q)Installed tripod (PS2J)

••

oo

o

o

o

••o

o

oo

••

o

ooo

oo

o

o

o

o

oo

••

oo

••

oo

Page 8: C.H.Scott Goodwin (2)

L & T – QP (November 2004) DB30, Maydan MahzamField, Qatar

Installed 4 legged jacket (PS3Q)Installed tripod (PS2J)Removed PS-2 old LQ moduleInstalled power module PS-2 LQInstalled 4 legged PS-2Q jacketRemoved PS-3 old LQ moduleInstalled new PS-2 LQ moduleInstalled PS-2 helideck and bridgeInstalled sub sea tie-ins 6", 10" and 16"

Qatar Petroleum – Qatar (September – November2004) Larsen & Toubro Limited.

PS2/PS3 Living Quarters and power upgrade projectInstallations of 4 pile jacket(s) and tripod(s)Installation of topsides (power package/regenerationskid, living quarters and associated bridges.

Belanak FPSO Batam Yard Installation (2004)

Installation of 5 x deck sections / Crane towers / FlareTowerUsed Asian Hercules as lift craneAverage lift 1500 to 2300 tones

ALOC PLBG (April 2004 – June 2004) Baku,Azerbaijan.

Trenching (pipeline burial)

Mcdermott DB30 (February-April 2004)Dry and wet docking of McDermott DB30 andassociated heavy cargo material barges at KeppelShipyard in Singapore.

Control Tower Operator/ Leader man 2001-2003Mcdermott Singapore DB30

Duties Include: Anchor hoist operations, Supervisor for deckoperations ie: Crane operations, rigging, and scaffolding.DB30, Rang Dong Field, Vietnam (2003) /JapanVietnam Petroleum Corp. (JVPC)

Installed 16" 7km pipeline and associated hydro test.Installed 2 jackets, NCW1 and LQ.

DB30, Belanak Field Development (2003),Natuna Field Indonesia.

CONOCO Phillips Indonesia Inc.Heavy lift of WHPA deck 2917 ST

Peciko (2003)Ibis-West KalimantanTotal ElfJetting

EMEPMI (October 2002) DB30, Terengganu, WestMalaysia. Exxon Mobil

Jackets and adjoining decks Tapis-F, Bintang-A andBintang-B

PM3 (September 2002) DB30, Terengganu, WestMalaysia. Clough

••

ooooooooo

••

ooo

••o

oo

••

o

••o

••

oo

••

o••

ooo

••

o

••

Page 9: C.H.Scott Goodwin (2)

Bintang-B PM3 (September 2002) DB30, Terengganu, WestMalaysia. Clough

2 jacketsBayu Undan Gas Recycle Project (2002) DB30, TimorSea, Timor Leste.Phillip 66

Launched and installed 2ea 8-legged jacketsUnderwater drilling, piling and groutingInstalled flare bridgeInstalled 1ea 4 legged jacket with adjoining deckInstalled 2 ea 12" dia pipelines FSO SBM installation and flexible riser installation

Batam Marine Base (Dec 2001 - Feb 2002) Batam,Indonesia

Upgrading of KP1, DB26 and DB30 in preparation forupcoming projectsCable change outs, load test and E-mag of cranecables

MODEC Bongkot (November 2001) DB30,Thailand. MODECLaunched and installed an 8-legged jacket andadjoining topside

EPMI Larut-A (August 2001) DB30, Terengganu,Malaysia. Esso Production Malaysia IncMSF Heavy Lift of 2500 STHeavy Lift and installation of 4 Modules

AngsiProject(2001)DB30,Terengganu,Malaysia.Carigali -TLO

Crane OperatorOctober 1999 – March 2001 Three Foot Six Ltd. “Lord of theRings” Construction Company, Wellington, New Zealand.

Duties Include: Operation of 40-ton mobile crane andassociated rigging requirements.

Machinery OperatorMay 1996 – October 1999 Henry Walker Ltd (MiningContractors) Western Australia

Duties Include: Operation of Dozers and dump trucksfor the recovery of gold in an open pit mine.

Control Tower Operator/ Leader Man

DB27, DB14 and DBL8011991 – 1996 McDermott ETPM Dubai United ArabEmirates

••

o••

oooooo

••

o

o

••

o

••

oo

••

Page 10: C.H.Scott Goodwin (2)

DB27, DB14 and DBL8011991 – 1996 McDermott ETPM Dubai United ArabEmiratesDuties Include: Anchor hoist operation; all aspects ofrigging, scaffolding and working with cranes on thesebarges. Foreman: pigging, hydro testing and grouting.Free span work with divers on four point mooringvessels. Crane Operation on these vessels involved 10to 40 ton hydraulic units. Referees1.) John Nicholson Sapura General Superintendant KL , Malaysia Telephone: 60 19 620 6074 2.) Stuart WrightDB30 SuperintendantSingaporeEmail: [email protected] 3.) Wayne BinghamSuperintendantTelephone: 61 3 9862 5590