CHRYSLER, DODGE MINIVANstarparts.chrysler.com/info/default/K6859745.pdf · 10-18-11 4 of 7 K6859745...
Transcript of CHRYSLER, DODGE MINIVANstarparts.chrysler.com/info/default/K6859745.pdf · 10-18-11 4 of 7 K6859745...
CHRYSLER, DODGE MINIVANTrailer Hitch
10-18-11 1 of K7 6859745
A
J
F
C
L MK
2008 AND FORWARD
B
4xI
4xD 4xE G H 2x2x
2x
H
5
3
10-18-11 2 of K7 6859745
1
2
3
Remove rear fascia.
Remove (4) plastic retainers.
10-18-11 3 of K7 6859745
4 5
6
7
Remove (6) bolts attaching metal bumper to frame rails. Keep M12 bolts, discard M10 bolts.
Remove plastic fascia support. Remove bolt holding muffler hanger
Remove and discard metal bumper assembly.
3
KEEP M12 BOLTS
10-18-11 4 of K7 6859745
8 9
10A 10B
Assemble left and right rail extensions to trailer hitch.
Make sure that thehead of the bolt fallscompletely into thesquare spacing of the hitch bracket
Make sure that you have a minimum of 4threads sticking out after you hand tightenthe nut
10-18-11 5 of K7 6859745
11
12 13
14
Insert handle nuts into rail extensions.Align holes in rail extensions to those inthe frame rails and handle nuts.
rails and push in the hitch assembly.
Raise hitch assembly up to the vehicle. Insert left and right rail extensions into frame
K
Lift up on hitch crossbar to help align holes, install the mounting plate re-using M12 bolts from step 6.
10-18-11 6 of K7 6859745
15 16
19
Tighten bolt
Position plastic fascia support to trailer hitch.Align mounting holes and install the plastic retainers from step 3.
s to 75 ft.-lbs. (101 N·m). Tighten nuts to 75 ft.-lbs. (101 N·m).
H
17 18Re-install bolt holding muffler hangerCut off 170 mm off of each end ofplastic fascia
3
CL 170 mm170 mm
10-18-11 7 of K7 6859745
22 23
24 25Re-install rear fascia (See Step 1).Place receiver cover onto hitch tube whenhitch is not in use.
M
20 21Place fascia on a protected surface.
J
L