›Christopher Leachman, BIM coordinator, HVAC engineer,›COWI AS, Oslo
Design team
Team T3
Nordic Office Of Architecture AS
Ing. Per Rasmussen AS COWI AS Aas-Jakobsen AS
Norconsult AS
Topic for discussion today
• Keys to a successful BIM project• Practical examples of how Team T3 uses BIM
Summary of T3
Keys to a successful BIM project
Technology
StrategyProcess
BIM
Infrastructure:SoftwareHardware
What BIM ambitions does the
owner have?
How will the design team
meet the goals that are set?
Technology
• Shared model via IFC and Navisworks: Works• Design software: Work in progress
Technology
Strategy
Strategy
• AVINOR: ambitions of maximal use of BIM
Process – Organising to meet the BIM goals.
Process
• Responsibilities clearly defined.• BIM manuals.• Plan for use of BIM in QA process.• Use of model in different types of meetings.• Documentation, documentation, documentation…
T3-CAD/BIM Manager
T3-New and exist. Terminals
CAD/BIM Manager
T3-New Terminal Discipline
CAD/BIM Manager
T3-New Terminal Discipline
CAD/BIM Manager
T3-Exist.Terminal Discipline
CAD/BIM Manager
T3-Exist.Terminal Discipline
CAD/BIM Manager
T3-Landside CAD/BIM Manager
T3-Landside DisciplineCAD/BIM Manager
T3-Landside Discipline
CAD/BIM Manager
Responsibilities clearly defined
BIM Manuals define organisation structure
BIM Manuals define organisation structure
BIM Manuals define organisation structure
BIM Manuals define organisation structure
Plan for use of BIM in QA process
Use of model in different types of meetings
›BIM meeting (get on track, and stay there)›Weekly ICM (TFK) meeting (Issue tracking with Solibri)›Design, coordination, planning meetings use model (Navisworks)
Practical examples of how T3 uses BIM
16
›Some examples of how we make use of the BIM model, now that we have one.
Ceiling coordination
›Old school: symbols in the ARCH drawings, objects in ours, coordination, changing, drawing, checking, re-drawing…›New school: ARCH produces drawings with our objects. No symbols, or duplication.›Coordination still required of course but no need for tedious cross-checking.
Sprinkler calculations
18
›Sprinkler calculations via Magicad. Time savings and documentation.
Checking Fire classification
19
›parameters from fire engineer transferred to ARCH to check fire classification of walls›same technique for acoustical classification.
BIM model instead of 2d sections
20
BIM model instead of 2d sections
21
Coordinating with the contractor
NTI tools, Space tool
23
BIM model save us time and in….
24
›Builders work. Utsparinger. Provision for voids.›Magicad system editor. Makes keeping the revit system organized way easier…›standard connections. massive time savings, when it works.