Provisioning the Power System for Provisioning the Power System for the Porter Farms P.D.the Porter Farms P.D.
By: Marnelli PascualBy: Marnelli Pascual
Christian Brothers UniversityChristian Brothers University650 East Parkway S, Memphis TN 38104650 East Parkway S, Memphis TN 38104
MAESC CONFERENCE - 2005MAESC CONFERENCE - 2005
![Page 2: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/2.jpg)
OverviewOverview
● What is Porter Farms P.D.?What is Porter Farms P.D.?
● Preliminary DesignsPreliminary Designs
● Loop SystemLoop System
● SpecificationsSpecifications
● CalculationsCalculations
● Cost AnalysisCost Analysis
● Project SummaryProject Summary
![Page 3: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/3.jpg)
Porter Farms P.D.Porter Farms P.D.
Consists of 2 AreasConsists of 2 Areas– Area 1, Subdivision with 69 lotsArea 1, Subdivision with 69 lots– Area 2, Apartments with 52 units, plus Area 2, Apartments with 52 units, plus
1 clubhouse1 clubhouseLocated in Collierville, TNLocated in Collierville, TN
![Page 4: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/4.jpg)
Project Location
![Page 5: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/5.jpg)
Project StagesProject Stages
Stage 1Stage 1– Develop Area 2, ApartmentsDevelop Area 2, Apartments
Stage 2Stage 2– Develop Area 1, SubdivisionDevelop Area 1, Subdivision
![Page 6: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/6.jpg)
Existing Power Sources
1Ø
3Ø
3Ø
![Page 7: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/7.jpg)
Design 1 – Two UG Loops
![Page 8: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/8.jpg)
Design 1 – Two UG Loops
SUBDIVISION
APARTMENTS
25
27
32
28 20 18
12
10
17
13
19
11
BORE UNDER BORE UNDER RAILROADRAILROAD
![Page 9: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/9.jpg)
Design 1 (cont’d)
WINCHESTER
SUBDIVISION
APARTMENTS
BORE UNDER BORE UNDER THE STREETTHE STREET
![Page 10: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/10.jpg)
Design 1 (cont’d)Design 1 (cont’d)
AdvantagesAdvantages– Feeds are from the closest sourcesFeeds are from the closest sources– No tree trimming/removal requiredNo tree trimming/removal required
Problems EncounteredProblems Encountered– Railroad approval takes at least 90 Railroad approval takes at least 90
daysdays– Minimum railroad crossing fee of Minimum railroad crossing fee of
$75,000$75,000
![Page 11: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/11.jpg)
Design 2 – Two UG Loops
![Page 12: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/12.jpg)
Design 2 – Two UG Loops
19
17
SUBDIVISION
APARTMENTS
11
13
LAKE NEW 1Ø NEW 1Ø OVERHEAD OVERHEAD LINELINE
![Page 13: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/13.jpg)
Design 2 (cont’d)Design 2 (cont’d)
Problems EncounteredProblems Encountered– Crossing fee and approval from Crossing fee and approval from
Railroad company requiredRailroad company required– City of Collierville and the City of Collierville and the
homeowner’s association objected to homeowner’s association objected to the designthe design
– Involves tree trimming/removalInvolves tree trimming/removal
![Page 14: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/14.jpg)
Design 3One UG Loop
![Page 15: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/15.jpg)
Design 3One UG Loop
TEMPORARY TEMPORARY OVERHEAD OVERHEAD LINELINE
UNDERGROUNUNDERGROUND PRIMARYD PRIMARY
![Page 16: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/16.jpg)
Design 3 (cont’d)
WINCHESTER
SUBDIVISION
APARTMENTS
BORE UNDER BORE UNDER THE STREETTHE STREET
![Page 17: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/17.jpg)
Design 3 (cont’d)Design 3 (cont’d)
AdvantagesAdvantages– No railroad fee or approval requiredNo railroad fee or approval required– No tree trimming/removalNo tree trimming/removal
Problem EncounteredProblem Encountered– Cost of $10,000 for the temporary Cost of $10,000 for the temporary
electricelectric
![Page 18: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/18.jpg)
UG Single LoopUG Single Loop
Calculated LoadsCalculated Loads– Apartments = 525kVAApartments = 525kVA– Subdivision = 775kVASubdivision = 775kVA– Total = 1300kVATotal = 1300kVA
MLGW RequirementMLGW Requirement– Maximum load = 1320kVAMaximum load = 1320kVA
![Page 19: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/19.jpg)
UG Electrical Loop
![Page 20: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/20.jpg)
Transformer Isolation
DISCONNECTDISCONNECT
![Page 21: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/21.jpg)
SpecificationsSpecifications Fuse: (2) Fuse: (2) 100 A100 A Transformers Used (Area 1 & 2)Transformers Used (Area 1 & 2)
– (3) 50 kVA(3) 50 kVA– (14) 75 kVA(14) 75 kVA– (1) 100 kVA(1) 100 kVA
Cables & ConduitsCables & Conduits– Primary: #2 insulated copper inside 2” pvc conduitPrimary: #2 insulated copper inside 2” pvc conduit– Secondary: 350 kCM triplex inside 3” pvc conduitSecondary: 350 kCM triplex inside 3” pvc conduit
Meter Sockets (Apartments)Meter Sockets (Apartments)– (12) 6-Gang Meter (12) 6-Gang Meter – (2) 2-Gang Meter(2) 2-Gang Meter– (1) Single Meter(1) Single Meter
![Page 22: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/22.jpg)
Specifications (cont’d)Specifications (cont’d)
6-Gang Meter Socket6-Gang Meter Socket
RISER ENTRY
![Page 23: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/23.jpg)
Specifications (cont’d)Specifications (cont’d)
Location of FacilitiesLocation of Facilities– Riser LocationRiser Location
![Page 24: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/24.jpg)
Specifications (cont’d)Specifications (cont’d)
Location of FacilitiesLocation of Facilities– Transformer Location (Apartments)Transformer Location (Apartments)
![Page 25: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/25.jpg)
Specifications (cont’d)Specifications (cont’d)
Location of FacilitiesLocation of Facilities– Transformer Location (Subdivision)Transformer Location (Subdivision)
![Page 26: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/26.jpg)
CalculationsCalculations
Cost: Cost: Software-calculated Software-calculated
Fuse: Fuse: No calculation neededNo calculation needed
Cables & ConduitsCables & Conduits– Size: Software-calculated based on Size: Software-calculated based on
cable length and loadcable length and load– Length: Measured from mapLength: Measured from map
![Page 27: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/27.jpg)
Calculations (cont’d)Calculations (cont’d)
Cable Tension, Cable Tension, ≤ 850 lbs.≤ 850 lbs.– Maximum Tension = 831 lbs.Maximum Tension = 831 lbs.– Software-calculatedSoftware-calculated
![Page 28: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/28.jpg)
Calculations (cont’d)Calculations (cont’d)
Transformer Size (Apartments)Transformer Size (Apartments)
Load from Electrician, kW Demand Factor Projected Load, kW
Lighting 4.00 0.5 2.00
Receptacle 4.00 0.4 1.60
Range 7.00 0.6 4.20
Dryer 6.00 0.6 3.60
Air Conditioning 3.50 0.8 3.92
Total Load per Unit 15.32
Total Load per Unit = (Load from Electrician)(Demand Factor)Equation 1
![Page 29: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/29.jpg)
Calculations (cont’d)Calculations (cont’d)
Transformer Size (Apartments)Transformer Size (Apartments)
Transformer Load = (Total Load per Unit)(No. of Unit)(Demand Factor)Equation 2
No. of Buildings No. of Units
Demand Factor
Transformer Load
Transformer Size to Use
2 8 0.7 85.792 100 kVA
1 4 0.8 49.024 50 kVA
Calculated Total Load per Unit = 15.32 kVA
![Page 30: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/30.jpg)
Calculations (cont’d)Calculations (cont’d)
Transformer Size (Subdivision)Transformer Size (Subdivision)
Number of Lots Load Based on Sq. Ft., kVA Transformer Size
4 36.7250 kVA
5 44.56
6 52.36
75 kVA
7 61.58
8 65.69
9 68.62
10 70.38
House Square Footage: 2500 sq. ft.
![Page 31: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/31.jpg)
Project CostProject Cost
Subdivision Apartments
Total Cost $109,881.08 $65,701.85
Cost per Lot/Unit
$1,592.48 $1,239.66$1,239.66
2003 Average Cost per Lot/Unit
$1,594.00 $679.00
![Page 32: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/32.jpg)
Apartments CostApartments Cost
Transformer Secondary CablePrimary Cable
Quantity Cost, $ Length, ft. Cost, $
Project 1 1 2586 200 1710 C
Project 2 2 5170 80 844 C
![Page 33: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/33.jpg)
Apartments Cost (cont’d)Apartments Cost (cont’d)
Transformer Secondary CablePrimary Cable
Quantity Cost, $ Length, ft. Cost, $
Project 1 1 2586 200 1710 C
Project 2 2 5170 80 844 C
![Page 34: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/34.jpg)
Project SummaryProject Summary
– All requirements were metAll requirements were met– MLGW and the customer approved the MLGW and the customer approved the
final designfinal design– Project is currently under constructionProject is currently under construction
![Page 35: Christian Brothers University 650 East Parkway S, Memphis TN 38104](https://reader030.fdocuments.in/reader030/viewer/2022020111/56813b75550346895da4846f/html5/thumbnails/35.jpg)
QuestionsQuestions