Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation feasibility and review of housing plan for Ekuphumleni 820 Ekuphumleni 820

Transcript of Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not...

Page 1: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Chris Hani District MunicipalityINTSIKA YETHU LOCAL MUNICIPALITY

April 2014

PRELIMINARY DRAFTnot for circulation

feasibility and review of housing plan for Ekuphumleni 820Ekuphumleni 820

Page 2: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Page 3: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Feasibility and Review of Housing Plan

Ekuphumleni 820Ekuphumleni 820

April 2014

by

prepared for

CNdV africa (Pty) Ltdenvironmental planning, urban design, landscape architecture

17 New Church Street Cape Town 8000Tel; 021 424-5022 Fax: 021 424-6837

Kantey & TemplerPO Box 15087Beacon Bay, 5205Tel: 041 373-0738

IQ Vision110 Sarel Cillier Street Strand 7140Tel; 021 853-3902

EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS 31-33 Phillip Frame Road ChiselhurstTel: +27 (0) 43 711 9735

INTSIKA YETHU LOCAL MUNICIPALITYPrivate Bag X1251, Cofimvaba, 5380

Tel: (047) 874-8700

Fax: (047) 874-010

Page 4: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Page 5: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 5

CONTENTS

2.1 INTRODUCTION

2.1.2 Purpose of the Report

2.1.2 Background of this Report

2.1.3 Terms of Reference

2.1.4 Background to Settlement

2.2 Status of Housing Project and Waiting List

2.3 Land Identification and Ownership

2.4 Engineering

2.5 Environment

2.6 Geo-tech

2.7 Distribution of Social Facilities

2.8 Current Spatial Development Framework

2.9 Future plans of other Sector Departments

2.10 Approval by Council

2.11 Summary and Recommendations

LIST OF FIGURES

Figure 2.1 .1 Locality Plan

Figure 2.1.2 Aerial Photograph

Figure 2.1.3 Visual Survey

Figure 2.2.1 Statistical Background

Figure 2.3.1 Cadastral Layout

Figure 2.4.1 Engineering

Figure 2.5 .1 Environment

Figure 2.6.1 Geo-tech

Figure 2.7.1 Distribution of Social Facilities

Figure 2.8.1 Current Spatial Development Framework

LIST OF ANNEXURESAnnexure 1 OwnershipAnnexure 2 Title DeedAnnexure 3 S.G. Diagram

Page 6: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 6

CONTENTS

GLOSSARY

Informal Site: A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief.

Formal Site: A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered.

In-Situ upgrade project: Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit.

Greenfields project: New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development.

Infill Project: New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement.

Rectification projects: Repair or rebuilding of defective existing houses built through one or other government housing program.

Erven: The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan.

Plots: The plural of ‘plot’ meaning unregistered pieces of land informally laid out.

Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered.

ACRONYMS

BLMC Biodiversity Land Management ClassCBA Critical Biodiversity AreaCRU Community Residential UnitECBCP Eastern Cape Biodiversity Conservation PlanECDHS Eastern Cape Department of Human SettlementEIA Environmental Impact AssessmentGP General PlanHSP Human Settlement PlanLM Local Municipality MHSP Municipal Human Settlement PlanSA South AfricaSANBI South African National Biodiversity InstituteSDF Spatial Development Framework

Page 7: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Page 8: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 8

INTRODUCTION 2.1

2.1.4 BACKGROUND TO SETTLEMENT

• Registered Owner: Intsika Yethu Municipality (see Annexure1)

• Property Description: RE/1, Cofimvaba

• Title Deed Number: T380/1998

• Servitudes: N/A

• Site Size: 34.6 Ha

• The Ekuphumleni 820 project is an urban project located near Cofimvaba within Intsika Yethu Municipality.

• Ekuphumleni was a vacant site which has been invaded.

• The site is located along a gravel road off of the R61, next to the Nyanisweni Site.

• No subdivision is in place for this area since the land has never been surveyed.

2.1.1 PURPOSE OF THE REPORT

The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Ekuphumleni 820 as a Human Settlement Project and to recommend whether it should be approved or not.

2.1.2 BACKGROUND TO THIS REPORT

This report is one of six Human Settlement Project feasibility reports for Intsika Yethu Municipality. It is designed so that it can be part of a single document that includes the other five projects.

2.1.3 TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240)

The project terms of reference for the feasibility report are summarised as follows:

Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to:

1.Determination of housing demand and potential beneficiary status

2.Land identification and ownership3.Availability of bulk services and confirmation of capacity4.Environmental conditions;5.Geo-technical conditions6.Alignment with Municipal Spatial Planning7.Visual survey (area visits)8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS

Page 9: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 9

Locality Plan Figure 2.1.1

Page 10: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 10

Aerial Photograph Figure 2.1.2

Page 11: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 11

VISUAL SURVEY Figure 2.1.3

a. Gravel access road to Ekuphumleni, currently undergoing maintenance b. Privately owned prpoerty across the gravel road c. Ekupohumleni on far left from R61

d. Formal privately owned housing opposite Ekuphumleni utilising solar panels for energy.

e. Ekuphumleni extends to the mountian hills f. Local community school opposite the settlement

g. Small scale industry in the Ekuphumleni area h. Road abutting Ekuphumleni leading to rural villages of Cofimvaba i. Typical brick and mud structures on site

Page 12: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 12

STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2

Ekuphumleni 820

Population (Intsika Yethu Draft SDF 2013) Not specified

Population (2011 Census) Not specified

Ex. Units (Intsika Yethu Draft SDF 2013) Not specified

No. Households (2011 Census) Not specified

Proposed Units (EC DHS) 820

Waiting List (Intsika Yethu LM) Awaited

Figure 2.2.1 Statistical Background

• A total of 820 subsidies have been proposed for this project onto an invaded site.

• The proposed project’s delivery strategy and housing instrument is project linked housing subsidies.

• No waiting list is available for this project.

Page 13: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 13

LAND IDENTIFICATION AND OWNERSHIP 2.3

• The land on which Ekuphumleni 820 is located on RE/1, Cofimvaba (G.P No. 1913/1935), see figure 2.3.1.

• The General Plan was approved on 7 May 1935.

• The site has not been subdivided and the registered owner of the property is Intsika yethu Municipality (Title Deed T380/1998). (Await Title Deed from King William’s Town)

Page 14: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 14

Cadastral Layout Figure 2.3.1

Page 15: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 15

ENGINEERING (Kantey and Templer) 2.4

BULK SERVICES Existing Services

....

INTERNAL SERVICES Existing Services

....

GEOTECHNICAL CONDITIONS....

EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING

Await K&T

TOP STRUCTURE....

TRAFFIC IMPACT ASSESSMENT...

ROADS AND ACCESSIBILITY...

THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

Page 16: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 16

Engineering (Kantey and Templer) Figure 2.4.1

Await K&T

Page 17: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 17

ENVIRONMENT 2.5

• South facing slopes occur on the site which are not ideal for residential for development.

• Subsistence farming can be found on most of the site and should be taken into consideration when planning development.

• The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensurebiodiversity persistence.

• The site falls within CBA 3: Other Natural Areas as per SANBI data (2007) and therefore is subject to BLMC 3 guidelines according to the ECBCP. This must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project.

• BLMC 3 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are permitted with conditions of approval upon environmental authorisation.

• However, it can be seen on Fig. 2.5.1 that CBA 3 is shown as extending over most of the urban areas of Cofimvaba. This is clearly incorrect and the mapping of CBA 3 in this vicinity has not been ground-truthed and amended.

• Housing development needs to ensure that it remains 32m from the river or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). Should the development require a buffer less than 32m, a basic assessment will be required for:

The expansion of:

(i) jetties by more than 50 square metres;

(ii) slipways by more than 50 square metres; or

(iii) buildings by more than 50 square metres

(iv) infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line.

Page 18: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 18

Environment Figure 2.5.1

Page 19: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 19

GEO-TECH (Kantey and Templer) 2.6

• Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

• Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs.

• The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements.

• On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems.

• In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites.

• Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

Page 20: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 20

Geo-tech (Kantey and Templer) Figure 2.6.1

The Site

Page 21: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 21

DISTRIBUTION OF SOCIAL FACILITIES 2.7

• No facilities are located on site. However, all facilities are within a 1-2 km buffer distance from the site, which is a comfortable walking distance , see Figure 2.7.1.

• A combined school is located within walking distance of the site, see Figure 2.7.1.

• The Cofimvaba hospital is located within the 2km buffer from the site, see Figure 2.7.1.

• The police station servicing the area is situated in Cofimvaba, approximately 1.5 km away.

• This proposed Human Settlement Project will not require the provision of additional facilities.

Page 22: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 22

Distribution of Social Facilities Figure 2.7.1

Page 23: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 23

CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8

• In 2013, a Local Spatial Development Framework was developed for Cofimvaba.

• Ekuphumleni falls within the Cofimvaba commonage.

• The existing houses are within the 50m buffer flood line proposed by the Cofimvaba Local SDF.

• The road layout in Ekuphumleni is currently informal, however the secondary corridor of Cofimvaba is proposed to pass along the area.

• The site is within the proposed urban edge.

• The Human Settlement Project is in line with the SDF, however development is restricted to land beyond the 50m buffer line from the Cofimvaba River and its tributaries.

Page 24: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 24

Current Spatial Development Framework Figure 2.8.1

The Site

Page 25: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 25

FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9

• The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP 2013-2014.

• The IDP indicates the intention of a Municipal Infrastructure Grant (MIG) Project for the upgrading of the entire Cofimvaba sewer bulk line and treatment works with a total budget of R12 million over three years.

• A total of R3 million is to be spent on upgrading of roads in Cofimvaba.

Page 26: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 26

APPROVAL BY COUNCIL 2.10

• Await Council Resolution

Page 27: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 27

SUMMARY AND RECOMMENDATIONS 2.11

2.11.1 SUMMARY

• The ownership of the land on which Ekuphumleni 820 is located, is registered to Intsika Yethu Municipality.

• There are adequate engineering services. (K&T to confirm)

• In Terms of ECBCP BLMCs that apply to CBA 3 that covers the site, settlements are permitted with conditions. It is recommended that the site be assessed by a botanist to verify and ground-truth the extent CBA 3 on the site prior to the Human Settlement Project implementation.

• The location of any buildings that may be constructed on plots near the watercourse will need to ensure that they keep 32m from the banks of the watercourse of they are to avoid triggering an EIA.

• A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing.

• No waiting lists are available from the municipality.

• No new facilities is required to support the proposed human settlements project.

• The project is in line with the SDF.

• Awaiting Council Resolution from the municipality.

2.11.2 RECOMMENDATIONS

• The project is feasible, pending a technical assessment by a botanist to ground truth the extent of CBA 3 on the site.

Page 28: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 28

Page 29: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 29

ANNEXURE 1: OWNERSHIP PRINTOUT

Page 30: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 30

Page 31: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 31

ANNEXURE 2: TITLE DEED

Page 32: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 32

Page 33: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

Ekuphumleni 820 FEASIBILITY STUDYCNdV africa (Pty) Ltd 18 April 2023

page 33

ANNEXURE 3: SURVEYOR GENERAL DIAGRAM

Page 34: Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.

The Site