Chris Frey Landscape Architecture Portfolio
-
Upload
chris-frey -
Category
Documents
-
view
223 -
download
3
description
Transcript of Chris Frey Landscape Architecture Portfolio
Contents
Philadelphia Navy Yard
Quick Shots
Mang’ula, Tanzania
Harbor Point, MD Master Plan 3
7
11
15
Web Map http://arcg.is/1MLKQF3
Harbor Point, MarylandHarbor Point in Baltimore, Maryland, is a brownfield site that used to host a chromium plant. Redevelopment of this prime waterfront location provides an opportunity to improve the community’s relationship with the water, and each other. It will also act as a magnet to draw in investment and people from outside the area.
3
Fells Point
Harbor Point
Harbor East
Inner Harbor
Harbor Point is located near the historicaly popular Inner Harbor that houses the Baltimore Aquarium, and the increasingly desireable area of Fells Point, home to many young professionals. The design includes market-rate and low income housing, office, ground floor retail, and ample public space. The site is connected back to the existing community through bridges and a continuous path around the development.
An intriguing aspect to this site is its interface with the water. The bay was already busy with boats and waterborn activities, so the design included transportation nodes with access to water taxis. These taxis ran often and gave convenient access between Harbor Point and the Inner Harbor.
Major Circulation Points Surrounding NeighborhoodsBuildings and Parks
5
Project Proforma (Phase 1)
Rentable/Saleable Square FeetLand Area (Acres)Land Area (SQFT)
Total
Hard CostsSITEWORK/LANDSCAPE: 41,164,200BUILDING: (SHELL & INTERIOR) 622,745,100PUBLIC GRANT (25,000,000)
Subtotal 638,909,300
Soft CostsDESIGN: 63,890,930LEGAL: 31,945,465 TRANSACTION/MARKETING: 31,945,465Subtotal 127,781,860
ACQUISITION LAND: 9,999,990
CONSTRUCTION FINANCING @ 3.5% 27,184,190 LEASE UP Reserve: 30% NOI 15,101,569
TOTAL PROJECT COSTS 818,976,909
Unlevered ReturnsVACANCY RATE NET RENT per SF 50,338,562SALES PRICE (Income/Cap Rate) 629,232,028
UNLEVERED RETURN ON INVESTMENT (RENT)* 6.15%UNLEVERED RETURN ON INVESTMENT (SALES)* -23.17%*pre-tax
Levered ReturnsPublic Debt Interest Rate 3.00%
Private Debt Interest Rate 5.50%Term (years) 30.00
Equity 20%Public Debt 50%
Private Debt 30%
TermPUBLIC DEBT SERVICE (RENT) 20,891,798PRIVATE DEBT SERVICE (RENT) 16,905,008DEBT RETIREMENT & EQUITY REVERSION (SALES) 818,976,909
PROFIT AFTER DEBT SERVICE (RENT) 12,541,757PROFIT AFTER DEBT PRINCIPAL PAYOFF & EQUITY REVERSION (SALES) (189,744,881)
LEVERED RETURN ON EQUITY (RENT)* 7.66%LEVERED RETURN ON EQUITY (SALES)* -115.84%*pre-tax
Assuming existing interest rates and similar building costs, a Pro-forma shows the project meets desireable returns on investment for phase 1 of the project.
Phase 1
Phase 2
Mang’ula, TanzaniaA small village sandwiched between a protected national park, and a privately owned sugar cane farm, Mang’ula is facing change from both population growth and climate change. Very few of the residents have formal education, and do not have the resources to solve some of these growing issues. Their need for solutions to major issues catalyzed a research project in the field, that culimnated in a report looking at changes the village residents could make to improve their situation, all without additional monetary inputs.
7
Due to a high illiteracy rate, images and diagrams with minimal wording was necessary. These images can be made into signs or posters for farmers to read and understand what they need to do to accomplish a task.
Crops and trees were measure and researched in order to provide farmers with designs that would involve multiple crops grow together, while also improving soil quality. Legumes, for instance, planted next to maiz provide nitrogen to increase crop yeild.
Design A
Design C
9
Philadelphia Naval YardA small village sandwiched between a protected national park, and a privately owned sugar cane farm, Mang’ula is facing change from both population growth and climate change. Very few of the residents have formal education, and do not have the resources to solve some of these growing issues. Their need for solutions to major issues catalyzed a research project in the field, that culimnated in a report looking at changes the village residents could make to improve their situation, all without additional monetary inputs.
11
Marina Esplanade Concentrated RetailMixed-Use Residential CanalMixed-Use Residential Concentrated RetailCanal
Pushing stormwater towards the main pedestrian areas feeds shallow pools that support interactivity with creative infrastructure solutions.
13
Marina Esplanade Concentrated RetailMixed-Use Residential CanalMixed-Use Residential Concentrated RetailCanal
Ensuring an adequate number of residences to support local retail without relying on tourism is important. Larger companies are given the opportunity to create small office campuses for their workers. This affords them the opportunity to live close to work or, if they live elsewhere, to still enjoy a vibrant social atmosphere during the work day.
Graphic: Team Memeber
Median FamilyIncome
$63,7052x
National JobGrowth
3%Year Over Year
Employment Growth
4thBest Place
For Business -Forbes
833,000Millenials
Vacancy Rates
Office 10.8%
3.4%
5.8%
Industrial
Retail
7.9%Residential
PurchasedResidential
$279.00 sqft
P h d
$279.00 s ft Commercial
Lease$22.38 sqft
RentedResidential $1.34 sqft
1858Gold Discovered at
Confluence Park
1873Coors Brewery
founded by Adolph Coors
1890Denver 26th Largest City in the Country
1893First state to give women
the right to voteby popular referendum
1915Woodrow Wilson
signs Rocky Mountain National Park act
2014First legal 4:20 celebrated on
April 20th
1993State Amendment 2, banning
gay rights, struck down as unconstitutional
1803Eastern Colorado
acquired in Liouisiana Purchase
C o l o r a d o a d or o l o r a oo d lC oCC o oao oCARROS FREY&
SnapshotsThe next couple pages are either small projects I have worked on in and out of school. They showcase my varied interest and experience in work related to landscape architecture.
15
Meters
Median FamilyIncome
$63,7052x
National JobGrowth
3%Year Over Year
Employment Growth
4thBest Place
For Business -Forbes
833,000Millenials
Vacancy Rates
Office 10.8%
3.4%
5.8%
Industrial
Retail
7.9%Residential
PurchasedResidential
$279.00 sqft
P h d
$279.00 s ft Commercial
Lease$22.38 sqft
RentedResidential $1.34 sqft
1858Gold Discovered at
Confluence Park
1873Coors Brewery
founded by Adolph Coors
1890Denver 26th Largest City in the Country
1893First state to give women
the right to voteby popular referendum
1915Woodrow Wilson
signs Rocky Mountain National Park act
2014First legal 4:20 celebrated on
April 20th
1993State Amendment 2, banning
gay rights, struck down as unconstitutional
1803Eastern Colorado
acquired in Liouisiana Purchase
C o l o r a d o a d or o l o r a oo d lC oCC o oao oCARROS FREY&
0 500 1,000250
¯
Left: Marketing Graphics. A poster convinc-ing developers to consider building in Denver, Colorado by showing off the character and history of the area and contrasting with raw data. This was a short and fun research project focused on understanding the culture and feel of a city.
This PedShed shows the accessability of a new shuttle system, which is part of a bigger transportation redesign I am working on. The map shows distances people will have to travel by road in order to reach a shuttle stop.
! Shuttle Stops
200 meters
400 meters
600 meters
I was contacted to assist in creating realistic 3D terrain models of the United States. My workflow started from contour data in ArcGIS, to ArcScene, and finally to Rhino. Slight adjust-ments in the data allowed me to create a wooden MDF model that was cut on a C&C router.
US Terrain Model
17
GradingThis grading plan was done for a new environmental center on a greenfield area of Pennsylvania State University.
SHEET1 of 1
Chr
is F
rey
Edu
catio
n C
ente
rP
enn
Sta
te C
ente
r for
Sus
tain
abili
ty
Cre
ated
By:
Dat
e:
N0 20
1":20'
Frey
C_F
inal
Gra
ding
Existing 1' ContourExisting 5' ContourProposed 1' ContourProposed 1' ContourExisting ContourProposed ContourSwale Center LineDrainage PipeDrain Inlet #Raised Pipe Inlet #Drain OutletTop of CurbBottom of CurbTop of WallBottom of WallSpot ElevationHigh Point SwaleLow Point SwaleTop Finished FloorElevationBottom FinishedFloor ElevationSlope Direction
(####)####
OutTCBCTWBW
HPSLPSTFFE
BFFE
LEGEND
CurbFlow-through Curb
TF FFE 1105BF FFE 1095
1100
1105
1110
1105
TW1096BW1095
TW1096BW1095
1104
.25
(110
0)
1109
1108
1107
1101
1102
1103
1104
1106
(109
9)
(119
8)
(119
7)
(119
6)
(119
5)
(110
1)
1102
1103
1104
1103.50
1106
1108
1109
1107
1111
1105
1110
11111112
LPS
1105
.5H
PS 1
106.
5
LPS 1105.00
1109
1108
1107
1106 11
04
1110
TW1101BW1100
LPS
1101
.50
1102
.25
TW1102BW11015.1011
1103.50
59015901
1112
1109
1104
.25
1100.50
05.4011 SPH
HPS 1104.50
1105
1104
02.5011
1104.00
1106.50
1106.00
1112
.00
1106
02.3011
1113
1104
05.2011 SPL
1194
1193
(119
4)
(119
3)
1106
1103
1113
RIM
110
5.55
D.I.
1.1
08.5011 IPR2.1 IPR
RPI 1
105.
75
RPI 1
.5
RPI 1
101.
80
RPI 1
.6
Out 1
097.
00
RPI 1107.50
RPI 2.1
RPI 1106.00
RPI 2.3
RPI 1104.80
RPI 2.4
xx.5011 IPR2.3 IPR
D.I. 1104.15
D.I. 4.1
D.I. 1104.45
D.I. 3.1D.I.
110
5.29
D.I.
2.2
D.I. 1105.95
D.I. 1.4
00.5011
1108
1107
1106 RPI 1106.503.1 IPR
Out 1
102.
00
Out
110
4.27
Inv 1101.45
1105.50
TC 1111.45
Out 1100.00
00.2111 SPH
52.8011 SPH
LPS
110
1.00TC 1108.45BC 1108.45
TC 1109.40BC 1108.90
TC 1109.59BC 1109.09
TC 1109.66BC 1109.16TC 1109.37BC 1108.87
TC 1109.28BC 1108.78
TC 1109.50BC 1109.00
TC 1110.38BC 1109.88
TC 1111.20BC 1110.70
TC 1110.07BC 1109.57
BC 1110.95
TC 1111.95BC 1111.45
TC 1107.20BC 1106.70TC 1106.72BC 1106.22
TC 1106.28BC 1105.78TC 1105.58BC 1105.08
TC 1106.82BC 1106.32
TC 1106.72BC 1106.22
TC 1105.95BC 1105.45
TC 1108.88BC 1108.38
TC 1108.65BC 1108.15
TC 1106.40BC 1105.90
TC 1105.63BC 1105.13
TC 1104.95BC 1104.45
TC 1109.02BC 1108.52
TC 1108.38BC 1107.88
TC 1108.00BC 1107.50
TC 1105.50BC 1105.00
TC 1104.75BC 1104.25
TC 1107.25BC 1106.75TC 1107.15BC 1106.65
TC 1107.90BC 1107.40
5.00%3.30%
2.50%
1.66%
2.5%
2.5%
7.14%
2.56%
1.36
%
5.00%
2.17
%
4.34%
(1108)
(1109)
(1110)
(1111)
(1112)
(1113)
(1114)
(1115)
(1107)
(1106)
(1105)
(1108)
(1107)
(1106)
(1105)
(1104)
(1103)
Parking
Parking
Parking
Parking
Pedestrian path
PlantingArea
PlantingArea
Drop-Off
00.3011 SPL
Building