Choice of battery energy storage for a hybrid renewable...

11
Turk J Elec Eng & Comp Sci (2018) 26: 666 – 676 c T ¨ UB ˙ ITAK doi:10.3906/elk-1707-350 Turkish Journal of Electrical Engineering & Computer Sciences http://journals.tubitak.gov.tr/elektrik/ Research Article Choice of battery energy storage for a hybrid renewable energy system Kusum Lata THARANI 1, * , Ratna DAHIYA 1,2 1 Department of Electrical and Electronics Engineering, Bharati Vidyapeeth College of Engineering, New Delhi, India 2 Department of Electrical Engineering, National Institute of Technology, Kurukshetra, India Received: 27.07.2017 Accepted/Published Online: 18.12.2017 Final Version: 30.03.2018 Abstract: There are certain unelectrified villages across the Indian subcontinent where providing supply through the grid is difficult due to forest cover or mountainous terrain. The most feasible option is to provide off-grid electrification through renewable energy resources such as solar or wind energy. These intermittent sources do not promise a 24 × 7 supply system. Thus, along with solar or wind energy systems, it becomes important to use a renewable resource, such as biomass, which is available in abundance in rural areas. The need for battery energy storage becomes mandatory in order to store the surplus energy produced by renewable resources and supply it at a time of insufficiency. Currently, many battery technologies are evolving with better characteristics than conventional battery systems in terms of efficiency, response time, deep cycle discharge, lifecycle, etc. The aim of this study is, firstly, to design and model a hybrid renewable energy system (HRES), using photovoltaic (PV)-Biogas (BG) system with HOMER software. Secondly, we aim to test this model using three different battery types: advanced lead acid (LA) batteries, lithium ion (LI) batteries, and zinc-bromine (Zn-Br) flow batteries (FB), used individually. Using these three battery technologies, the HRESs are then compared in terms of system sizing, economy, technical performance, and environmental stability. A case study for the unelectrified village of Madhya Pradesh (MP) is discussed to suggest the practical aspect of the comparative analysis. The results demonstrate that the HRES using LI batteries is the most favorable choice. Using this configuration, the economic parameters, including total net present cost (NPC) and levelized cost of energy (LCOE), are found to be lowest. The technical parameters, including battery state of charge (SOC), capacity shortage, and environmental parameters (CO 2 emissions) are found to be optimum. Key words: Flow battery, lead acid battery, lithium ion battery, optimization 1. Introduction Switching to renewable resources from fossil fuels [1] calls for an extensive survey of the available potential of different natural resources in the area to be electrified. According to the Ministry of New and Renewable Energy’s 2016–17 report, the state of Madhya Pradesh (MP), considered for the present study, has a solar potential of 61,660 MW, wind potential of 2931 MW, and biomass potential of 1364 MW. It is clear from the above data that the state has 4.5 times more solar potential than wind potential. Therefore, solar energy is taken as one of the resources for generating electricity. However, due to the intermittent nature of solar energy and its variability with cloud cover, the use of a standalone PV system for serving the base load may not be a reliable solution. As there is an abundance of biomass potential in rural areas, the PV system can be used along with a biogas generator [2–9] to serve the domestic and agricultural loads in rural off-grid village areas. The * Correspondence: kusum.tharani@rediffmail.com 666

Transcript of Choice of battery energy storage for a hybrid renewable...

Page 1: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

Turk J Elec Eng & Comp Sci

(2018) 26: 666 – 676

c⃝ TUBITAK

doi:10.3906/elk-1707-350

Turkish Journal of Electrical Engineering & Computer Sciences

http :// journa l s . tub i tak .gov . t r/e lektr ik/

Research Article

Choice of battery energy storage for a hybrid renewable energy system

Kusum Lata THARANI1,∗, Ratna DAHIYA1,2

1Department of Electrical and Electronics Engineering, Bharati Vidyapeeth College of Engineering, New Delhi, India2Department of Electrical Engineering, National Institute of Technology, Kurukshetra, India

Received: 27.07.2017 • Accepted/Published Online: 18.12.2017 • Final Version: 30.03.2018

Abstract: There are certain unelectrified villages across the Indian subcontinent where providing supply through the

grid is difficult due to forest cover or mountainous terrain. The most feasible option is to provide off-grid electrification

through renewable energy resources such as solar or wind energy. These intermittent sources do not promise a 24 × 7

supply system. Thus, along with solar or wind energy systems, it becomes important to use a renewable resource, such as

biomass, which is available in abundance in rural areas. The need for battery energy storage becomes mandatory in order

to store the surplus energy produced by renewable resources and supply it at a time of insufficiency. Currently, many

battery technologies are evolving with better characteristics than conventional battery systems in terms of efficiency,

response time, deep cycle discharge, lifecycle, etc. The aim of this study is, firstly, to design and model a hybrid

renewable energy system (HRES), using photovoltaic (PV)-Biogas (BG) system with HOMER software. Secondly, we

aim to test this model using three different battery types: advanced lead acid (LA) batteries, lithium ion (LI) batteries,

and zinc-bromine (Zn-Br) flow batteries (FB), used individually. Using these three battery technologies, the HRESs are

then compared in terms of system sizing, economy, technical performance, and environmental stability. A case study for

the unelectrified village of Madhya Pradesh (MP) is discussed to suggest the practical aspect of the comparative analysis.

The results demonstrate that the HRES using LI batteries is the most favorable choice. Using this configuration, the

economic parameters, including total net present cost (NPC) and levelized cost of energy (LCOE), are found to be lowest.

The technical parameters, including battery state of charge (SOC), capacity shortage, and environmental parameters

(CO2 emissions) are found to be optimum.

Key words: Flow battery, lead acid battery, lithium ion battery, optimization

1. Introduction

Switching to renewable resources from fossil fuels [1] calls for an extensive survey of the available potential

of different natural resources in the area to be electrified. According to the Ministry of New and Renewable

Energy’s 2016–17 report, the state of Madhya Pradesh (MP), considered for the present study, has a solar

potential of 61,660 MW, wind potential of 2931 MW, and biomass potential of 1364 MW. It is clear from the

above data that the state has 4.5 times more solar potential than wind potential. Therefore, solar energy is

taken as one of the resources for generating electricity. However, due to the intermittent nature of solar energy

and its variability with cloud cover, the use of a standalone PV system for serving the base load may not be a

reliable solution. As there is an abundance of biomass potential in rural areas, the PV system can be used along

with a biogas generator [2–9] to serve the domestic and agricultural loads in rural off-grid village areas. The

∗Correspondence: [email protected]

666

Page 2: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

research on rural electrification in [2] considers two different models. Model 1 consists of a solar-biogas system

and Model 2 only uses a biogas system. From an economic and environmental point of view, the results show

that Model I is more suitable, with a lower total net present cost (NPC), lower levelized cost of energy (LCOE),

and less impact on the environment than Model II. Research in [3] considers a PV-biomass and wind-biomass

system for the electrification of a rural area. It is quite evident from the results that the PV-biomass system gave

a more reliable, economical, and environmentally friendly solution in comparison to the wind-biomass system.

The above literature shows that there has been extensive research on the hybrid PV-BG system with battery

back-up, and the results show that hybrid systems have a lower total NPC, lower LCOE, and less impact on

the environment in comparison to stand-alone PV or BG systems. Therefore, the first objective is to design

and model a hybrid PV-BG system with battery back-up as a source for electrifying the village area.

As a matter of fact, very limited research has focused on the type of battery to be used with hybrid

PV-BG system for yielding better economics and system performance. In the last decade, not much attention

was paid to the type of battery energy storage (BES) to be used when designing a grid-connected or off-grid

system. Batteries can be compared on the basis of their cost, cycling, replacement, and, most importantly,

their safe disposal. Five different battery types ((lead acid (LA), lithium ion (LI), sodium-based, nickel-based,

and flow battery (FB)) are normally used in renewable energy systems. Among these batteries, the sodium-

based and nickel-based ones are not considered in this study, because sodium-based batteries use nontoxic

materials [10] and have high energy densities; as a result, they need an extra system to ensure a high operating

temperature, thereby increasing their high annual operating cost [11]. Similarly, nickel-based batteries present

certain drawbacks such as nickel as a toxic material, whose decomposition may lead to environmental hazards

[12]. Moreover, the battery suffers from the memory effect: maximum capacity can rapidly decrease if it is

repeatedly recharged. Table 1 and Figure 1 show a technical comparison, taken from various literature sources,

for the remaining three battery types: LA, LI, and FB. After analyzing the scientific details of all the battery

types, the second objective is to use the three different batteries, advanced LA, LI, and Zn-Br FB, one at a

time with the designed HRES, and compare the system on the basis of economics, technical performance, and

environmental effects.

Table 1. Technical comparison of different battery types.

Parameters Lead acid [13–17] Lithium ion [18–20] Flow battery [21–24]

Unit cell voltage (V) 2 3.7 1.8

Power density (W/L) 10–400 1500–10,000 < 25

Energy density (W h/L) 50 200 35

Cycle life (cycles) 500–2000 1000–5000 > 10, 000

Calendar life (years) 5–15 5–20 10–15

DoD (%) 70–80 80–90 100

Round trip efficiency (%) 85 92 75

2. Materials and methods

2.1. HOMER software

HOMER simulation software is used to test the technical and economic feasibility of the HRES model by using

three different batteries individually, namely advanced LA, LI, and Zn-Br FB. HOMER is a simulation and

667

Page 3: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

104

103

102

10101

1010 1 102 103 1041

1

Po

we

r D

en

sit

y (

W/L

)

Energy Density (Wh/L)

Lithium lon

Zn-Br Flow Battery

Advanced Lead Acid

Figure 1. Comparison of power density and energy density for different battery types.

optimization software used for designing distributed generation systems in two different modes: on-grid and off-

grid. HOMER uses two optimization algorithms. The first algorithm, “original grid search”, checks the system

configurations defined by the user in the search space and simulates all the feasible system configurations. The

second, “proprietary derivative-free” algorithm, is used to search for the lowest cost. Finally, a list of all possible

configurations sorted by net present cost is displayed, which can be used to compare system design options.

HOMER considers three different costs as inputs for each component added to the system design: capital cost

per kW, replacement cost per kW, and operation and maintenance (O&M) cost per kW [25].

2.2. System design

The HRES model, shown in Figure 2, highlights the different components of a PV-BG system with battery

back-up. It consists of a biogas generator (Bio), an electric load (Electric load #1) that shows a domestic load

of 243.81 kWh/day with a peak load of 56.71 kW, and an agricultural load (deferrable load), constituted by

three submersible pumps with a total capacity of 17.91 kWh/day with a peak load of 10 kW, all connected to

an AC bus. The photovoltaic (PV) system and zinc bromine (ZBM) FB are both connected to the DC bus.

The converter is connected between both AC and DC buses.

2.3. Case study

The HRES system model designed in the present study is proposed for the Nishana village in the Betul district

of MP. According to the 2011 Census, this unelectrified village is under dense forest cover with 505.8 ha of land

and contains 81 households. Each household has a maximum of 2 cattle, generating dung of around 20 kg/day.

The total biomass available in the village accounts to approximately 2000 kg/day. The domestic load in each

household consists of 4 LED tube lights (18 W each), 2 fans (75 W each), a point for mobile phone charging (5

W), and a color TV (100 W). The energy consumed per day in a single household during the summer season

(April–October) is around 2.64 kWh/day, and during the winter season (November–March) is 1.22 kWh/day.

The load estimation for the entire village is performed assuming around 100 households after future extension.

Three submersible pumps, with a capacity of 0.746 kW each, drawing 40,000 L of water, is installed to irrigate

around 2.42 ha of land. The annual energy requirement accounts to approximately 95479 kWh, considering

both domestic and agricultural load.

668

Page 4: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

AC DC

Electric Load # 1

Deferrable Load

243.81 kWh/d

56.71 kW Peak

Bio PV

17.91 kWh/d

10.00 kW Peak

Converter

ZBM

D

Figure 2. Schematic of system model.

2.4. System components

Generic flat plate polycrystalline PV panels, with 13% efficiency, a life span of 25 years, and a derating factor of

80%, are used. It is estimated that the total PV system capacity required to meet the present load is around 66

kW, if a standalone PV system is used. Thus, different PV sizes (in kW) under consideration for the HRES are

in a range of 10 to 70.The converter rating is expected to be 20%–30% more than the total wattage of appliances

per day. This accounts for 30–45 kW, whereas different converter sizes (in kW) used in the simulation are in a

range of 30 to 45. The generic biogas generator has a lifetime of 20,000 h with a minimum load ratio of 50%.

It is estimated that 20–25 kg of cow dung produces around 1.2 kWh of energy. Therefore, in order to produce

95,479 kWh of energy per annum, a biogas generator of approximately 20–30 kW will be required. Different

BG sizes (in kW) considered for the study are in a range of 5–30. Three different batteries, used individually,

are considered during the simulation in the HRES. Battery capacity (Ah) can be calculated using Eq. (1):

Battery capacity =TotalWatts − hours per day used by appliances× days of autonomy

(DOD × nominal battery voltage)(1)

Depth of discharge (DoD) is different for different battery types. For advanced LA batteries, DoD is 70%–80%,

for LI batteries it is 80%–90%, and for FB, it is 100%, as shown in Table 1.

3. System metrics

During the simulation, different sizes of PV, BG, converter, and batteries are used in each HRES, using LA,

LI, or FB batteries. On the basis of the 4 economic metrics and 3 performance metrics discussed in the next

section, the most suitable configuration is chosen and proposed to be installed in the village area. A nominal

discount rate of 8% with an inflation rate of 2% and project lifetime of 25 years is considered in this study.

669

Page 5: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

3.1. Economic metrics

3.1.1. Total net present cost

The net present cost (NPC), also known as life cycle cost, is calculated for each component installed in the

system. It is defined as the present value of capital cost, replacement cost, operation cost, and maintenance

cost of a component over the project lifetime, subtracting the present values of revenues earned over the project

lifetime. HOMER uses the total NPC, given by Eq. (2), to rank all system configurations in the economic

optimization results.

Total NPC =∑T

tCcap,t + Co&M,t + Creplace,t + Cfuel,t + Psalvage,t (2)

where T is the lifetime of the project, Ccap,t is the present capital cost for year t, Co&M,t is the present operation

and maintenance cost for year t, Cfuel,t is the present fuel cost for year t , Creplace,t is the present replacement

cost for year t, and Psalvage,t is the present salvage price for year t. The unit cost data for all the components

are shown in Table 2.

Table 2. Unit cost data for different components.

Component Capital cost Replacement cost O&M cost

PV 60,000 INR/kW 60,000 INR/kW 60 INR/kW

BG 70,000 INR/kW 20,000 INR/kW 0.5 INR/hour

Converter 16,000 INR/kW 16,000 INR/kW 0

LA battery 19,500 INR/kW 19,500 INR/kW 100 INR/year

L I battery 39,000 INR/kW 39,000 INR/kW 100 INR/year

Flow battery 54,000 INR/kW 54,000 INR/kW 0

3.1.2. Initial capital cost

The initial capital cost is a fixed one-time investment on the purchase and installation of a component at the

beginning of the project. This is an important factor for consideration when off-grid systems are designed.

3.1.3. Replacement cost

Replacement cost is the cost incurred to replace a particular component at the end of its lifetime. Not all

components require replacement during the project lifetime. It is always possible to negotiate the initial capital

cost with funding agencies and private vendors, but at the time of replacement the real cost of the component

to be replaced will have to be shouldered by the buyer. This includes the extra transportation cost at the time

of replacement. The off-grid system may require battery and converter replacement twice or three times during

the project lifetime.

3.1.4. Cost of energy

The average cost per kWh of useful energy produced by the system is the LCOE in INR/kWh. This is the

actual cost metric used to compare grid-connected to off-grid systems. The COE given in Eq. (3) is found to

be greater for off-grid systems than grid-connected systems.

670

Page 6: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

COE =ACtot

Tpri + Tdef(3)

ACtot is the total annualized cost, and Tpri and Tdef are the total amounts of primary and deferrable loads,

respectively, that the system serves per year.

3.2. Performance metrics

3.2.1. Battery state of charge

The state of charge (SOC) is an important deciding factor to know the actual remaining capacity of a battery.

DoD is an alternate way to indicate the battery’s SOC. It is important to monitor the SOC of a battery to

prevent it from overcharging, undercharging, or deep-discharging.

3.2.2. Capacity shortage

The maximum value of the capacity shortage fraction allowed by HOMER is an important feasibility criterion.

The capacity shortage fraction is given by Eq. (4):

FCS=Ecs

Edemand, (4)

where Ecs is the total capacity shortage (kWh/year) and Edemand is the total electrical demand (primary and

deferrable load) in kWh/year. Renewable energy system designers usually do not set the maximum annual

capacity shortage to zero. If it is set to zero, that means that the power system will tend to meet 100% of the

load demand, considering that the system sizes selected to meet the peak load are quite large and the total

NPC of the system will be high. If the load needs to be supplied at all times, only then the maximum annual

capacity shortage should be set to zero. Otherwise, if some unmet load is acceptable so as to design a less

expensive power system, one may set the maximum annual capacity shortage between 1% and 5%.

3.2.3. Battery autonomy

Battery autonomy is the number of hours the battery can support the critical load without charging. It is a

function of SOC, battery capacity, and load size. It is preferable to have at least 2–3 days of battery autonomy,

especially during the rainy season when the PV system is part of the HRES.

4. Simulation results

The optimization of the HRES was performed using three different battery types: advanced LA, LI, and

Zn-Br FB. The aim was to study the effect of different battery chemistries on system sizing, cost, technical

performance of the HRES, and the environment. In an ideal supply–demand situation, the total generation

should be sufficient to meet the desired load. This infers that the desired capacity shortage of the HRES should

be 0%. However, for the practical implementation of the above condition, a high cost will have to be incurred

on the renewable energy sources. Therefore, we choose the right battery type by considering minimum cost,

capacity shortage, and environmental hazard.

4.1. System sizing

When designing a HRES, it becomes imperative to decide the share of each renewable energy resource and the

capacity of battery storage. It was found that by changing the battery type, the sizes of PV and BG, required to

671

Page 7: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

meet the load with minimum capacity shortage, change. From Figure 3, it is evident that the BG system serves

the base load during both summer and winter months. The BG system generates 65%–70% more electricity in

comparison to a PV system. From the optimization results shown in Table 3, it was found that the HRES using

LI batteries offered the most compact configuration with 26 kW of PV arrays, 28 kW of BG system, 29 kW of

converter, and 199 kWh of battery backup. In the HRES using Zn-Br FB, the capacity of the converter and

battery required is the lowest, yet the capacity of BG required is the highest (30 kW) in comparison to HRESs

using LA or LI batteries. In the HRES using LA batteries, the battery capacity required is the highest (369

kWh) in comparison to the other two configurations.

18

16

14

12

10

8

6

4

2

0

Month

PV BG

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Po

wer

(k

W)

Figure 3. Monthly average electricity production from optimized HRES.

Table 3. Optimal size and cost summary for different configurations.

ModelPV BG Battery Converter Total NPC LCOE

(kW) (kW) (kWh) (kW) (INR in millions) (INR/kWh)

PV-BG-LA 26 28 369 29 21.4 17.342

PV-BG-LI 26 28 199 29 15.9 12.888

PV-BG-FB 26 30 136 27 17.76 14.393

4.2. Economic analysis

The cash flow summary of HRESs using three different battery types considers capital, replacement, and salvage

costs. The O&M costs for the HRESs have been taken as zero, since the PV-BG system is maintained by the

local people, and the batteries considered are maintenance-free and are simply replaced after their life span.

Figures 4–6 clearly indicate that the cost of battery storage constitutes a major fraction of the total NPC for

all three battery types. Therefore, the choice of battery type is of utmost importance. The HRES using LI

batteries has the lowest total NPC of 15.9 million INR and the least LCOE of 12.888 INR/kWh, as shown in

Table 3. Although the initial capital cost of LA and flow batteries is low in comparison to LI batteries, total

NPC and LCOE of the HRES using these batteries are higher. The LA batteries are oversized when designing

a practical system, as their efficiency is low and their cycle life is short. This incurs a huge cost on the end

user as the battery needs frequent replacement. Therefore, the use of LA batteries is the least preferred for the

HRES.

672

Page 8: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

12m

10m

8m

6m

4m

2m

0

-2mCapital Fuel Operating Replacement Salvage

Category

PVLA Battery

ConverterBG

Net

Pre

sen

t C

ost

(IN

R i

n M

illi

on

s)

Capital Fuel Operating Replacement Salvage

Category

01m2m3m4m5m6m7m8m9m

10m11m12m

-1m

Net

Pre

sen

t C

ost

(IN

R i

n M

illi

on

s)

PVConverter LI Battery

BG

Figure 4. Cash flow summary for PV-BG-LA battery

set-up.

Figure 5. Cash flow summary for PV-BG-LI battery set-up.

4.3. Technical analysis

The performance of a HRES using different battery systems depends on 3 metrics: battery SOC, capacity

shortage, and battery autonomy. HRESs, which use advanced LA batteries despite having the highest autonomy

of 27 h, are utilized only up to 70% of their full capacity, as shown in Figure 7. HRESs using LI batteries are

utilized up to 80% of their full capacity, as shown in Figure 8, with a capacity shortage of 86 kWh/year and

autonomy of 13 h. This difference in battery autonomies accounts for the difference in sizing; LA batteries,

being oversized, provide maximum autonomy. HRESs using FB offer the least battery autonomy of only 12

hours, with a capacity shortage of 88 kWh/year, and are utilized to their fullest capacity only during several

summer months (April, June, August, and September), as shown in Figure 9.

Capital Fuel Operating Replacement Salvage

Category

Net

Pre

sen

t C

ost

(IN

R i

n M

illi

on

s)

01m2m3m4m5m6m7m8m9m

10m11m12m

-1m

PVConverter Flow Battery

BG

100

02

04

06

08

0Ja

n1Ja

n13

Jan2

5Fe

b6Fe

b18

Mar

2M

ar14

Mar

27Ap

r8Ap

r20

May

2M

ay14

May

26Ju

n8Ju

n20

Jul2

Jul1

4Ju

l26

Aug7

Aug2

0Se

p1Se

p13

Sep2

5O

ct7

Oct

19No

v1No

v13

Nov2

5De

c7De

c19

Dec

31

State of charge (%)

Figure 6. Cash flow summary for PV-BG-Flow battery

set-up.

Figure 7. State of charge for LA batteries.

4.4. Environmental effects

The major factors causing environmental hazards in the present HRES are emissions from the biogas generator

and, to some extent, the disposal of batteries. Biogas made out of cow dung is a mixture of gasses composed of

673

Page 9: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci 10

00

20

40

60

80

Jan1

Jan1

3Ja

n25

Feb6

Feb1

8M

ar2

Mar

14M

ar27

Apr8

Apr2

0M

ay2

May

14M

ay26

Jun8

Jun2

0Ju

l2Ju

l14

Jul2

6Au

g7Au

g20

Sep1

Sep1

3Se

p25

Oct

7O

ct19

Nov1

Nov1

3No

v25

Dec7

Dec1

9D

ec31

State of charge (%)

100

020

4060

80Ja

n1Ja

n13

Jan2

5Fe

b6Fe

b18

Mar

2M

ar14

Mar

27Ap

r8Ap

r20

May

2M

ay14

May

26Ju

n8Ju

n20

Jul2

Jul1

4Ju

l26

Aug7

Aug2

0Se

p1Se

p13

Sep2

5O

ct7

Oct

19No

v1No

v13

Nov2

5De

c7De

c19

Dec

31

State of charge (%)

Figure 8. State of charge for LI batteries. Figure 9. State of charge for Flow batteries.

methane (CH4), carbon dioxide (CO2), hydrogen (H2), and hydrogen sulfide (H2S). CO2 gas constitutes the

dominant part of the discharge. As shown in Table 4, HRES with FB, requiring the highest capacity of the BG

system, produces the maximum CO2 emissions of around 57 kg/year. HRES using LA and LI batteries release

almost the same amount of CO2 , that is, 41 and 40 kg/year, respectively.

Table 4. Battery performance metrics and emission comparison.

Model Usable battery Capacity shortage Battery autonomy CO2 emissions

capacity (kWh) (kWh/year) (hours) (kg/year)

PV-BG-LA 222 88 27 41

PV-BG-LI 159 86 13 40

PV-BG-FB 136 88 12 57

5. Recommendations and conclusion

The aim of this paper was to find a solution to two major objectives of the study regarding remote rural

electrification in MP. Firstly, a HRES using PV-BG system with battery backup was modeled and simulated

using HOMER software. Secondly, the most feasible battery energy storage system was chosen among advanced

LA, LI, and Zn-Br FB for the HRES model after comparing them in terms of technical, economic, and

environmental concerns. Amongst the three different battery types (advanced LA, LI, and Zn-Br FB) used

in the study, the HRES using LI batteries has been recommended for the unelectrified village area. This

configuration is found to offer the most compact arrangement, requiring a nominal PV system capacity of 26

kW, a nominal BG rating of 28 kW, and a battery bank rating of 266 kWh. Furthermore, the HRES using LI

batteries is the most economical configuration, with the lowest NPC of 15.9 million INR and the least COE

of 12.888 INR/kWh. The system proves to be highly efficient with a lowest capacity shortage of 86 kWh/year

and the least CO2 emissions of 40 kg/year. The efficiency of the proposed HRES can be further improved by

using different tracking mechanisms with the PV modules. Finally, other renewable sources can be integrated

into the existing HRES, and the model can be tested under varying load conditions.

674

Page 10: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

References

[1] Zhang C, Zhou K, Yang S, Shao Z. On electricity consumption and economic growth in China. Renew Sust Energ

Rev 2017; 76: 353-368.

[2] Sharma R, Goel S. Stand-alone hybrid energy system for sustainable development in rural India. Environment,

Development and Sustainability 2016; 18: 1601-1614.

[3] Mishra S, Panigrahi CK, Kothari DP. Design and simulation of a solar–wind–biogas hybrid system architecture

using HOMER in India. International Journal of Ambient Energy 2016; 37: 184-191.

[4] Lai CS, Jia Y, Xu Z, Lai LL, Li X, Cao J, McCulloch MD. Levelized cost of electricity for photovoltaic/biogas power

plant hybrid system with electrical energy storage degradation costs. Energ Convers Manage 2017; 153: 34-47.

[5] Bhatt A, Sharma MP, Saini RP. Feasibility and sensitivity analysis of an off-grid micro hydro–photovoltaic–biomass

and biogas–diesel–battery hybrid energy system for a remote area in Uttarakhand state, India. Renew Sust Energ

Rev 2016; 61: 53-69.

[6] Singh S, Singh M, Kaushik SC. Feasibility study of an islanded microgrid in rural area consisting of PV, wind,

biomass and battery energy storage system. Energ Convers Manage 2016; 128:178-190.

[7] Aziz A. Techno-economic analysis using different types of hybrid energy generation for desert safari camp in UAE.

Turk J Elec Eng & Comp Sci 2017; 25: 2122-2135.

[8] Dalton GJ, Lockington DA, Baldock TE. Feasibility analysis of renewable energy supply options for a grid-connected

large hotel. Renew Energ 2009; 34: 955-964.

[9] Goel S, Sharma R. Feasibility study of hybrid energy system for off-grid rural water supply and sanitation.

International Journal of Ambient Energy 2016; 37: 314-320.

[10] Dıaz-Gonzalez F, Sumper A, Gomis-Bellmunt O, Villafafila-Robles R. A review of energy storage technologies for

wind power applications. Renew Sust Energy Rev 2012; 16: 2154-2171.

[11] Kawakami N, Iijima Y, Fukuhara M, Bando M, Sakanaka Y, Ogawa K. Development and field experiences of

stabilization system using 34 MW NAS batteries for a 51 MW wind farm. In: IEEE 2010 International Symposium

on Industrial Electronics; 4–7 July 2010; Bari, Italy. New York, NY, USA: IEEE. pp. 2371-2376.

[12] Lacerda VG, Mageste AB, Santos IJB, da Silva LHM, Da Silva MdoCH. Separation of Cd and Ni from Ni–Cd

batteries by an environmentally safe methodology employing aqueous two-phase systems. J Power Sources 2009;

193: 908-913.

[13] Achaibou N, Haddadi, Malek A. Lead acid batteries simulation including experimental validation. J Power Sources

2008; 185: 1484-1491.

[14] Bogno B, Sawicki JP, Salame T, Aillerie M, Saint-Eve F, Hamandjoda O, Tibi B. Improvement of safety, longevity

and performance of lead acid battery in off-grid PV systems. Int J Hydrogen Energ 2017; 42: 3466-3478.

[15] Lujano-Rojas JM, Dufo-Lopez R, Atencio-Guerra JL, Rodrigues EMG, Bernal-Agustın JL, Catalao JPS. Operating

conditions of lead-acid batteries in the optimization of hybrid energy systems and microgrids. Appl Energ 2016;

179: 590-600.

[16] Hadjipaschalis I, Poullikkas A, Efthimiou V. Overview of current and future energy storage technologies for electric

power applications. Renew Sust Energy Rev 2009; 13: 1513-1522.

[17] Mariaud A, Acha S, Ekins-Daukes N, Shah N, Markides CN. Integrated optimisation of photovoltaic and battery

storage systems for UK commercial buildings. Appl Energ 2017; 199: 466-478.

[18] Anuphappharadorn S, Sukchai S, Sirisamphanwong C, Ketjoy N. Comparison the economic analysis of the battery

between Lithium-ion and Lead-acid in PV stand-alone application. Energy Proced 2014; 56: 352-358.

[19] Jaiswal A. Lithium-ion battery based renewable energy solution for off-grid electricity: a techno-economic analysis.

Renew Sust Energ Rev 2017; 72: 922-934.

[20] Diouf B, Pode R. Potential of lithium-ion batteries in renewable energy. Renew Energ 2015; 76: 375-380.

675

Page 11: Choice of battery energy storage for a hybrid renewable ...journals.tubitak.gov.tr/elektrik/issues/elk-18-26-2/elk-26-2-4-1707... · supply system. Thus, along with solar or wind

THARANI and DAHIYA/Turk J Elec Eng & Comp Sci

[21] Barton JP, Infield DG. Energy storage and its use with intermittent renewable energy. IEEE T Energy Conver 2004;

19: 441-448.

[22] Wu MC, Zhao TS, Jiang HR, Zeng YK, Ren YX. High-performance zinc bromine flow battery via improved design

of electrolyte and electrode. J Power Sources 2017; 355: 62-68.

[23] Nakatsuji-Mather M, Saha TK. Zinc-bromine flow batteries in residential electricity supply: two case studies. IEEE

2012 Power and Energy Society General Meeting; 22–26 July 2012; San Diego, CA, USA. New York, NY, USA:

IEEE. pp. 1-8.

[24] Ouedraogo BI, Kouame S, Azoumah Y, Yamegueu D. Incentives for rural off grid electrification in Burkina Faso

using LCOE. Renew Energ 2015; 78: 573-582.

[25] Shahzad MK, Zahid A, Rashid T, Rehan MA, Ali M, Ahmad M. Techno-economic feasibility analysis of a solar-

biomass off grid system for the electrification of remote rural areas in Pakistan using HOMER software. Renew

Energ 2017; 106: 264-273.

676