500 ton Air-CooledWater Chiller Project

 

Page 2: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 2/13

 

Items to be Accomplished

1. Determine if Thermal Oxidizer needs to be upgraded

2. Demolish Existing Control Room from center of Process 

. !ddress "ater #ammer $ssues 

%. Recei&e Pro'ect !uthorization and (ubmit !)E b* +arch 

Page 3: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 3/13

 

 Actions Involved for Success

Automation

ThermalOxidizer

Relocated

200 tonChiller

Relocated

EngineeringSupport

Demolition ofExisting Piping

,-- ton Chiller Communication

Cooperation

Page 4: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 4/13

 

Progress Diagram

Phase 1 Phase 2 Phase

Engineering

Planning

Site Assessment

Scope

Discipline Support

Design

Pipe Racks PhasesI - III

 hermal !"idi#er$nit

Plat%orms %orChillers

Concrete Work

&e' Chilled WaterPipe Runs

Construction

Pipe Racks

Plat%orms

RelocatingE(uipment

DemolishingE"isting Structuresand Piping

Page 5: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 5/13

 

Costs of Project

New 500 ton Chiller !5"#000

New $hermal %&idi'er "(5#000

Steel StructuresDesign)Construct*50#000

 Automation550#000

Piping Installation(50#000

Concrete +or,

50#000

Page 6: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 6/13

 

+hat is -sed for this Project

)i*erglass+andrails

)i*erglass,rating

)i*erglassadder 'ith

Rolled Cage$. Protected

CorrosionResistant

Page 7: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 7/13 

+hat is -sed for this Project

/1500 ,allon Storage.essel %or the 500 tonChiller

&e' hermal !"idi#er'ith /0 ,P2 Capacit3

Page 8: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 8/13 

Phase I Pipe .ac,

Page 9: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 9/13 

Platform for 500 ton Chiller 

Page 10: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 10/13 

$imeline for Chiller Project

Page 11: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 11/13 

$imeline for Chiller Project

Page 12: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 12/13 

$imeline for Chiller Project

Page 13: Chiller Project

7/21/2019 Chiller Project

http://slidepdf.com/reader/full/chiller-project 13/13 

Items to /a,e the Project a Success

 hermal !"idi#er4 Wh3 do 'e need to upgrade %rom / ,P2 to /0,P2 Runo%% 'ater %rom rain and condensation are the sources the

 ! unit *urns6

Condensation 'ill end 'ith the ne' insulated chilled 'ater pipes6

Water hammering 'ill cease due to ne' steam piping6Communication *et'een the ne' chillers and *et'een thechillers and *oilers6

Automating all 7al7es6 emperature controllers installed6

Sa%et3 o% operators increase6

&e' s3stem linked to emergenc3 connection to cit3 'ater6