500 ton Air-CooledWater Chiller Project
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 2/13
Items to be Accomplished
1. Determine if Thermal Oxidizer needs to be upgraded
2. Demolish Existing Control Room from center of Process
. !ddress "ater #ammer $ssues
%. Recei&e Pro'ect !uthorization and (ubmit !)E b* +arch
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 3/13
Actions Involved for Success
Automation
ThermalOxidizer
Relocated
200 tonChiller
Relocated
EngineeringSupport
Demolition ofExisting Piping
,-- ton Chiller Communication
Cooperation
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 4/13
Progress Diagram
Phase 1 Phase 2 Phase
Engineering
Planning
Site Assessment
Scope
Discipline Support
Design
Pipe Racks PhasesI - III
hermal !"idi#er$nit
Plat%orms %orChillers
Concrete Work
&e' Chilled WaterPipe Runs
Construction
Pipe Racks
Plat%orms
RelocatingE(uipment
DemolishingE"isting Structuresand Piping
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 5/13
Costs of Project
New 500 ton Chiller !5"#000
New $hermal %&idi'er "(5#000
Steel StructuresDesign)Construct*50#000
Automation550#000
Piping Installation(50#000
Concrete +or,
50#000
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 6/13
+hat is -sed for this Project
)i*erglass+andrails
)i*erglass,rating
)i*erglassadder 'ith
Rolled Cage$. Protected
CorrosionResistant
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 7/13
+hat is -sed for this Project
/1500 ,allon Storage.essel %or the 500 tonChiller
&e' hermal !"idi#er'ith /0 ,P2 Capacit3
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 8/13
Phase I Pipe .ac,
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 9/13
Platform for 500 ton Chiller
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 10/13
$imeline for Chiller Project
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 11/13
$imeline for Chiller Project
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 12/13
$imeline for Chiller Project
7/21/2019 Chiller Project
http://slidepdf.com/reader/full/chiller-project 13/13
Items to /a,e the Project a Success
hermal !"idi#er4 Wh3 do 'e need to upgrade %rom / ,P2 to /0,P2 Runo%% 'ater %rom rain and condensation are the sources the
! unit *urns6
Condensation 'ill end 'ith the ne' insulated chilled 'ater pipes6
Water hammering 'ill cease due to ne' steam piping6Communication *et'een the ne' chillers and *et'een thechillers and *oilers6
Automating all 7al7es6 emperature controllers installed6
Sa%et3 o% operators increase6
&e' s3stem linked to emergenc3 connection to cit3 'ater6