Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan...
Transcript of Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan...
![Page 1: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/1.jpg)
ICLEI 2006 1
Dr In-Keun LEEDirector-General / Office of Waterworks
Formerly Cheong Gye Cheon Project
Seoul Metropolitan Government
Cheong Gye Cheon Restoration Project- a revolution in Seoul -
![Page 2: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/2.jpg)
ICLEI 2006 2
Before After
![Page 3: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/3.jpg)
ICLEI 2006 3
IntroductionSeoul and Cheong Gye Cheon
Cheong Gye Cheon 2002 The Restoration Project
BackgroundOutlineChallengesProgress
Cheong Gye Cheon 2005 Final Remarks
Content
![Page 4: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/4.jpg)
ICLEI 2006 4
Introduction- Seoul and Cheong Gye Cheon
![Page 5: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/5.jpg)
ICLEI 2006 5
Seoul at a glance
City Centre
Han river
Capital city of Korea for over 600 yearsArea : 605.6 km2
Population : 10.3 M
![Page 6: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/6.jpg)
ICLEI 2006 6
Cheong Gye Cheon
Catchment area: 61 km2
Length: 13.7 km Width: 20~85 m
Cheong Cheong GyeGye CheonCheonCBD
![Page 7: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/7.jpg)
ICLEI 2006 7
Old map of Seoul
![Page 8: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/8.jpg)
ICLEI 2006 8
Early 20C
![Page 9: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/9.jpg)
ICLEI 2006 9
Problem: sanitation
![Page 10: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/10.jpg)
ICLEI 2006 10
Solution: covering
![Page 11: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/11.jpg)
ICLEI 2006 11
Covering work (1958~1977)
![Page 12: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/12.jpg)
ICLEI 2006 12
Cheonggye Highway (1967~1971)
![Page 13: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/13.jpg)
ICLEI 2006 13
Highway in 1990s
![Page 14: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/14.jpg)
ICLEI 2006 14
Cheong Gye Cheon 2002
![Page 15: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/15.jpg)
ICLEI 2006 15
Cheong Gye Cheon Area
Building: over 6,000 over 100,000 small shops Nation’s biggest commercial area
![Page 16: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/16.jpg)
ICLEI 2006 16
Cheong Gye Cheon Area
![Page 17: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/17.jpg)
ICLEI 2006 17
Declining old CBD
CBD redevelopment stopped where the Cheonggye Expressway started
Population and employment reduced Population: 40,000 Employment: 80,000 in 10 years
Business headquarters moved to Gangnam(new sub-center)
Industries in CBD lost competitiveness
![Page 18: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/18.jpg)
ICLEI 2006 18
Safety problem
Over all “C”, partially “D” or “E”
![Page 19: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/19.jpg)
ICLEI 2006 19
Safety problem
Only small cars were allowed from 1997 Maintenance cost soared: US$50M (’94~’99)
![Page 20: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/20.jpg)
ICLEI 2006 20
The Restoration Project
- Outline- Challenges
- Progress
- - Background
![Page 21: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/21.jpg)
ICLEI 2006 21
Decision to restore: July 2002
![Page 22: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/22.jpg)
ICLEI 2006 22
Why restore?
Paradigm shift of urban managementDevelopment High quality of life
Environment-friendly city
Fundamental solution to safety problem
Recovery of history and culture
Revitalisation of downtown areaBalanced regional development
![Page 23: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/23.jpg)
ICLEI 2006 23
The Restoration Project- Background
- Challenges- Progress
- Outline
![Page 24: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/24.jpg)
ICLEI 2006 24
Site location
Section 2 (L=2.1km) Section 3 (L=1.7km)Section 1 (L=2.04km)
Total length: 5.84 km
![Page 25: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/25.jpg)
ICLEI 2006 25
Demolition Covered structure and highway: 5.4 km
Waste (concrete+asphalt): 872,400ton (96% recycled)
Step 1 Step 2 Step 3
![Page 26: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/26.jpg)
ICLEI 2006 26
River design Design Criteria• Satisfy with the 2nd grade local river standard• Secure the stream capacity for 200 years frequency rainfall (118mm/hr)
Flood Level: estimated by numerical model and corrected using hydraulic model test
HWL (200yrs)
![Page 27: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/27.jpg)
ICLEI 2006 27
Water supply
Waterway plan• Width: more than 20% of main waterway width• Depth: more than 40 cm• Flow velocity: 0.24 m/sec• Measures to prevent water loss
Water supply plan• Water from the Han river: 120,000 ton/day• Underground water from subway stations: 22,000 ton/day
Water quality: better than the 2nd grade• BOD: 3mg/l or less• SS: 25 mg/l or less• DO: 5 mg/l or less
• Total N: 10 mg/l or less• Total P: 1 mg/l or less
![Page 28: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/28.jpg)
ICLEI 2006 28
Sewer system Design Criteria• Combined sewer system for rainfall and wastewater• Capacity : 3 times of estimated wastewater
Combined Sewer System
![Page 29: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/29.jpg)
ICLEI 2006 29
Bridge design Design Criteria• Minimize flow resistance• Create as cultural places - artistic landmark
Number of bridges: 22 International concept design
competition
![Page 30: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/30.jpg)
ICLEI 2006 30
Landscape design
Concepts• New green belt with waterfront: West to East• Gradual transformation from urban landscape to natural environment• Create ecological biotop and environment• Thematic places: waterfall and fountains
HistoryNature
Culture + Urban
A B CUpstream Downstream
![Page 31: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/31.jpg)
ICLEI 2006 31
Historic relics restoration
Basis Preserve or restore historic relics Consider current situation: flood, traffic, merchants
Involve specialists
Site survey: Feb 2003 to June 2004 Restore 600 year old bridge: Gwangtong gyo 150 m upstream from the original site Restore Supyo gyo and Ogansu gyo: future plan
![Page 32: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/32.jpg)
ICLEI 2006 32
The Restoration Project- Background
- Outline
- Progress- Challenges
![Page 33: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/33.jpg)
ICLEI 2006 33
Challenge 1: Transport
Cheonggye road & hwy Urban backbone corridor170,000 vehicles/day
Traffic disaster warnedMedia, interest groupTraffic simulationProject delay
![Page 34: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/34.jpg)
ICLEI 2006 34
Solutions to transport
Discourage driving cars in the city centre
Improve traffic system Cheong Gye Cheon area
Metropolitan area
Improve public transport system subway system
bus only lane
![Page 35: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/35.jpg)
ICLEI 2006 35
Challenge 2: Neighboring merchants
Traffic congestion : access difficulty Noise & dust due to construction
Business decline
![Page 36: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/36.jpg)
ICLEI 2006 36
Solutions to merchants
Detailed survey on the markets and continuous interviews
consultation offices at the markets regular meeting on the project
Minimize inconvenience for business activity
state-of-the-art technologyprovide parking space nearby
![Page 37: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/37.jpg)
ICLEI 2006 37
Stimulate business activityReduce parking feeImprove parking system for loading & unloadingPromote Cheong Gye Cheon stores
Financial support and subsidies Low-interest loans Grants for the market remodeling
Special arrangement for street vendors Special business centre in a outer area
Solutions to merchants
![Page 38: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/38.jpg)
ICLEI 2006 38
The Restoration Project- Background
- Outline- Challenges- Progress
![Page 39: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/39.jpg)
ICLEI 2006 39
Project delivery
TargetsKeeping the scheduleBest value for money
Details of contract: Design-build contract invitation for bid: Feb 2003 bidding: June 2003 starting work: 1 July 2003
three construction sections
Original project budget (’03): US$357M Final adjusted amount (’05): US$386M (+8%)
Original project period:1 July 03 ~ 30 Sep 05 (27 months)
![Page 40: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/40.jpg)
ICLEI 2006 40
Construction progress
Started on 1 July 2003
![Page 41: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/41.jpg)
ICLEI 2006 41
Construction progress
Stage 1: Scaffolding (July 2003)
![Page 42: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/42.jpg)
ICLEI 2006 42
Construction progressStage 2: Highway demolition (Aug 2003)
![Page 43: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/43.jpg)
ICLEI 2006 43
Construction progress
Stage 3: Covered road demolition (Jan 2004)
![Page 44: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/44.jpg)
ICLEI 2006 44
Construction progressStage 4: Sewer, road & bridge construction (Sep 2004)
![Page 45: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/45.jpg)
ICLEI 2006 45
Construction progressStage 5: Landscaping for the recovered area (May 2005)
![Page 46: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/46.jpg)
ICLEI 2006 46
First water supply
1 June 2005
![Page 47: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/47.jpg)
ICLEI 2006 47
Test running & Final touchJune ~ September 2005
![Page 48: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/48.jpg)
ICLEI 2006 48
Grand opening
1 October 2005
![Page 49: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/49.jpg)
ICLEI 2006 49
Cheong Gye Cheon 2005
![Page 50: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/50.jpg)
ICLEI 2006 50
Monitoring
Monitor the changes due to the project from Jan 2003~Mar 2006 before, during and after the project
Monitoring areasLand useCBD IndustryEnvironmentEcologyTrafficReal estate
Changes
![Page 51: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/51.jpg)
ICLEI 2006 51
Traffic
Speed in CBD
Morning peak: 17~18 km/hr
Evening peak: 12 km/hr
not very much worsened
Car in/out flow1.56M 1.27M (-18.6%)
Subway ridershipCentral area: +13.7%
Changes
![Page 52: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/52.jpg)
ICLEI 2006 52
Environment Changes
Air No2: 69.7 46.0 ppb (-34%) PM10: 74.0 60.0 μg/m3 (-19%)
Water qualityBOD: 100~250 1~2 ppm
Noise level reduced Heat island effect relieved Wind corrider created
![Page 53: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/53.jpg)
ICLEI 2006 53
Cooling effect
Thermal image27 July 2005
Changes
28o 36o
37o 36o
Average 32.7oCCheong Gye Cheon
Average 36.3oCNearby street
-3.6oC
![Page 54: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/54.jpg)
ICLEI 2006 54
Environmental improvement
0% 25% 50% 75% 100%
Wind
Daylight
Odour
Noise
Water
Air
V improvedImprovedUnchanged
Public survey (Nov 2005)
Changes
![Page 55: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/55.jpg)
ICLEI 2006 55
Ecology: Fishes Changes
3 14 species
![Page 56: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/56.jpg)
ICLEI 2006 56
Ecology: Birds Changes
18 species
![Page 57: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/57.jpg)
ICLEI 2006 57
Ecology: Insects Changes
7 41 species
![Page 58: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/58.jpg)
ICLEI 2006 58
Final Remarks
![Page 59: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/59.jpg)
ICLEI 2006 59
Most preferred destination
![Page 60: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/60.jpg)
ICLEI 2006 60
Future of Cheong Gye Cheon
Identity as the 600 yr old Capital
Harmony between preservation & development
Economic vitalityPedestrian oriented street systemInternational standard business district
![Page 61: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/61.jpg)
ICLEI 2006 61
Effects of the Project
Changes in the urban management paradigm
Historic restoration Nature & ecological restoration CBD regeneration Good example of
solving conflicts over a public project successful project management
![Page 62: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/62.jpg)
ICLEI 2006 62
Virtual Tour
![Page 63: Cheong Gye Cheon Restoration Project · 2017. 9. 25. · ICLEI 2006 27 Water supply Waterway plan • Width: more than 20% of main waterway width • Depth: more than 40 cm • Flow](https://reader036.fdocuments.in/reader036/viewer/2022081523/5fde7fffa57b54296a567b3a/html5/thumbnails/63.jpg)
ICLEI 2006 63
Further informationhttp://english.seoul.go.kr/cheonggye/
Thank you for your attention!