Checklist about scheduling
description
Transcript of Checklist about scheduling
![Page 1: Checklist about scheduling](https://reader036.fdocuments.in/reader036/viewer/2022082817/55cf92b1550346f57b98cbdd/html5/thumbnails/1.jpg)
MACHINE / PLANT CHECKLIST TECHNOLOGY STUDIES School Name Blank (Highlight this cell)
Machine METAL LATHE Barcode No Blank (Highlight this cell & insert barcode)
Location Blank (Highlight & insert Room) Person Responsible Blank (Highlight this cell & insert name) Year Blank
Term 1WEEK
1WEEK
2WEEK
3WEEK
4WEEK
5WEEK
6WEEK
7WEEK
8WEEK
9WEEK
10WEEK
11End of week date
DAILY In addition to programmed regular maintenance teachers are expected to conduct Routine Surveillance of each machine before student useVisual check of mains Electrical Switches, Wiring and/or Conduit (Cracks, broken controls etc.) Arrange for immediate repair of any faults
Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes
Verify all Guards are secure and function correctly (Check latches, locks, fasteners and/or interlocks)
Ensure workspaces and walk-ways are clear and unobstructed and that no slip-hazards are present
Confirm availability and condition of Personal Protective Equipment
Lubricate lightly according to manufacturer’s specification
WEEKLY CHECKS Tick each cell as WEEKLY CHECKS are made N Use a letter “N” to indicate if the MACHINE is NOT USED during that week
Conduct close inspection for damage to Switch Gear Test operation of Switch Gear (Proper function of switch controls)
Lubricate lightly according to manufacturer’s specification
Lubricate ways and slides according to manufacturer’s specification
WEEKLY TASKS sign off
/tt/file_convert/55cf92b1550346f57b98cbdd/document.doc
![Page 2: Checklist about scheduling](https://reader036.fdocuments.in/reader036/viewer/2022082817/55cf92b1550346f57b98cbdd/html5/thumbnails/2.jpg)
MACHINE / PLANT CHECKLIST TECHNOLOGY STUDIES School Name Blank (Highlight this cell)
Machine METAL LATHE Barcode No Blank (Highlight this cell & insert barcode)
Location Blank (Highlight & insert Room) Person Responsible Blank (Highlight this cell & insert name) Year Blank
Term 2WEEK
1WEEK
2WEEK
3WEEK
4WEEK
5WEEK
6WEEK
7WEEK
8WEEK
9WEEK
10WEEK
11End of week date
DAILY In addition to programmed regular maintenance teachers are expected to conduct Routine Surveillance of each machine before student useVisual check of mains Electrical Switches, Wiring and/or Conduit (Cracks, broken controls etc.) Arrange for immediate repair of any faults
Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes
Verify all Guards are secure and function correctly (Check latches, locks, fasteners and/or interlocks)
Ensure workspaces and walk-ways are clear and unobstructed and that no slip-hazards are present
Confirm availability and condition of Personal Protective Equipment
Lubricate lightly according to manufacturer’s specification
WEEKLY CHECKS Tick each cell as WEEKLY CHECKS are made N Use a letter “N” to indicate if the MACHINE is NOT USED during that week
Conduct close inspection for damage to Switch Gear Test operation of Switch Gear (Proper function of switch controls)
Lubricate lightly according to manufacturer’s specification
Lubricate ways and slides according to manufacturer’s specification
WEEKLY TASKS sign off
/tt/file_convert/55cf92b1550346f57b98cbdd/document.doc
![Page 3: Checklist about scheduling](https://reader036.fdocuments.in/reader036/viewer/2022082817/55cf92b1550346f57b98cbdd/html5/thumbnails/3.jpg)
MACHINE / PLANT CHECKLIST TECHNOLOGY STUDIES School Name Blank (Highlight this cell)
Machine METAL LATHE Barcode No Blank (Highlight this cell & insert barcode)
Location Blank (Highlight & insert Room) Person Responsible Blank (Highlight this cell & insert name) Year Blank
Term 3WEEK
1WEEK
2WEEK
3WEEK
4WEEK
5WEEK
6WEEK
7WEEK
8WEEK
9WEEK
10WEEK
11End of week date
DAILY In addition to programmed regular maintenance teachers are expected to conduct Routine Surveillance of each machine before student useVisual check of mains Electrical Switches, Wiring and/or Conduit (Cracks, broken controls etc.) Arrange for immediate repair of any faults
Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes
Verify all Guards are secure and function correctly (Check latches, locks, fasteners and/or interlocks)
Ensure workspaces and walk-ways are clear and unobstructed and that no slip-hazards are present
Confirm availability and condition of Personal Protective Equipment
Lubricate lightly according to manufacturer’s specification
WEEKLY CHECKS Tick each cell as WEEKLY CHECKS are made N Use a letter “N” to indicate if the MACHINE is NOT USED during that week
Conduct close inspection for damage to Switch Gear Test operation of Switch Gear (Proper function of switch controls)
Lubricate lightly according to manufacturer’s specification
Lubricate ways and slides according to manufacturer’s specification
WEEKLY TASKS sign off
/tt/file_convert/55cf92b1550346f57b98cbdd/document.doc
![Page 4: Checklist about scheduling](https://reader036.fdocuments.in/reader036/viewer/2022082817/55cf92b1550346f57b98cbdd/html5/thumbnails/4.jpg)
MACHINE / PLANT CHECKLIST TECHNOLOGY STUDIES School Name Blank (Highlight this cell)
Machine METAL LATHE Barcode No Blank (Highlight this cell & insert barcode)
Location Blank (Highlight & insert Room) Person Responsible Blank (Highlight this cell & insert name) Year Blank
Term 4WEEK
1WEEK
2WEEK
3WEEK
4WEEK
5WEEK
6WEEK
7WEEK
8WEEK
9WEEK
10WEEK
11End of week date
DAILY In addition to programmed regular maintenance teachers are expected to conduct Routine Surveillance of each machine before student useVisual check of mains Electrical Switches, Wiring and/or Conduit (Cracks, broken controls etc.) Arrange for immediate repair of any faults
Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes Notes
Verify all Guards are secure and function correctly (Check latches, locks, fasteners and/or interlocks)
Ensure workspaces and walk-ways are clear and unobstructed and that no slip-hazards are present
Confirm availability and condition of Personal Protective Equipment
Lubricate lightly according to manufacturer’s specification
WEEKLY CHECKS Tick each cell as WEEKLY CHECKS are made N Use a letter “N” to indicate if the MACHINE is NOT USED during that week
Conduct close inspection for damage to Switch Gear Test operation of Switch Gear (Proper function of switch controls)
Lubricate lightly according to manufacturer’s specification
Lubricate ways and slides according to manufacturer’s specification
WEEKLY TASKS sign off
/tt/file_convert/55cf92b1550346f57b98cbdd/document.doc
![Page 5: Checklist about scheduling](https://reader036.fdocuments.in/reader036/viewer/2022082817/55cf92b1550346f57b98cbdd/html5/thumbnails/5.jpg)
MACHINE / PLANT CHECKLIST TECHNOLOGY STUDIES School Name Blank (Highlight this cell)
Machine METAL LATHE Barcode No Blank (Highlight this cell & insert barcode)
Location Blank (Highlight & insert Room) Person Responsible Blank (Highlight this cell & insert name) Year Blank
END OF TERM CHECKS Date / / / / END OF SEMESTER CHECKS Date / /Sign Off at end of T1 T2 T3 T4 Sign Off at end of Sem 1 Sem 2
Check the availability of spare parts i.e. belts cutting tools etcClear away accumulated swarf and waste from inside and around housings, cabinets etc
Lubricate all points in accordance with the manufacturer's specification
Examine drive belts for Flaws & Correct Tension - Adjust if necessary
Adjust Gib strips on all slides according to manufacturers specification
Check pulleys for Correct Alignment - Adjust if necessary
Check floor space for oil contamination Check security of all Fixed Guards
Replace suds (if used)Check gear train (Stud gear, change gear etc.) for correct mesh and alignment - Adjust if necessary
Protect all bare metal surfaces before Term Shutdown (CRC, WD40, RP7 of similar)
Examine bolts used for mounting the motor to the machine. Re-tighten if necessary
Check the security of Machine Mountings to the floor or base block
Inspect internal Morse tapers for burrs/scratches. Remove any raised metal with appropriate reamer
ANNUAL CHECKSCheck condition of 50mm line markings defining Operator Zones and Access Walkways
Review Safety Operating Procedure and update if necessary
/tt/file_convert/55cf92b1550346f57b98cbdd/document.doc
![Page 6: Checklist about scheduling](https://reader036.fdocuments.in/reader036/viewer/2022082817/55cf92b1550346f57b98cbdd/html5/thumbnails/6.jpg)
MACHINE / PLANT CHECKLIST TECHNOLOGY STUDIES School Name Blank (Highlight this cell)
Machine METAL LATHE Barcode No Blank (Highlight this cell & insert barcode)
Location Blank (Highlight & insert Room) Person Responsible Blank (Highlight this cell & insert name) Year Blank
MAINTENANCE RECORD – MACHINE / EQUIPMENTDate Regular servicing as per Maintenance Checklist / Major or Minor repairs Maintenance performed by
Company / Business / Individual
Time Taken
Cost Tag-out (If Required)
Tag Removed & Checked by
OHS&W Regulations 1995 Record keeping 3.2.44 Section (b) and (c):(b) keep those records for at least five years or, if an approved code of practice specifies a different period, for that period; and (c) except where the plant is being sold for scrap or spare parts for other plant - ensure that those records are transferred to any person who purchases or otherwise acquires the plant (other than on hire or lease) from the owner.
/tt/file_convert/55cf92b1550346f57b98cbdd/document.doc