Systems Commissioning Lessons

Nicholas A. ChazapisNicholas A. ChazapisMechanical Engineer, ASHRAE, C l d BMS C S i liControls and BMS Cx Specialist 

Page 2: Chazapis Systems Commissioning Lessons.

AP goals would include:AP goals would include:  design considerations,  square foot needs, q , adjacencies,  circulation, personal forecasts,  user characteristics,  organizational structure

(AP)ARCHITECTURAL 

organizational structure,  budget & costs and  project schedule

PROGRAMp j

Design Construction Occupancyg p y

Page 3: Chazapis Systems Commissioning Lessons.

SYSTEMS COMMISSIONING: What is it?“A quality focused process forA quality focused process for enhancing the delivery of a project. 

The process focuses on verifying and documenting that the facility and all f it t d bliof its systems and assemblies are 

planned, designed, installed, tested, operated and maintained to meet theoperated and maintained to meet the owner’s project requirements.” 

Design Construction Occupancyg p y

Page 4: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 5: Chazapis Systems Commissioning Lessons.

COMMISSIONING SCOPE

Th O d iThe Owner determines the systems and assemblies to be includedassemblies to be included in the project team’s scope.  

Design Construction Occupancyg p y

Page 6: Chazapis Systems Commissioning Lessons.

(OPR)OWNER’S PROJECT REQUIRMENTS

The OPR goals would include: minimizing environmental impactminimizing environmental impact,  define energy savings requirements,  defined efficiency for HVAC & water usage,  defined Indoor Air Quality (IAQ) requirements, defined Indoor Air Quality (IAQ) requirements,maintenance & operations requirements and  sustainable operation. 

Design Construction Occupancyg p y

Page 7: Chazapis Systems Commissioning Lessons.

(Cx PLAN)COMMISSIONING PLAN

The Cx Plan includes:  the systems to be commissioned with the the systems to be commissioned with the type   of tests for the equipment & systems   the measurable & acceptable performances,  the Functional Performance Testing (FTP) the Functional Performance Testing (FTP) documentation,  O&M training requirements and  Cx construction schedule Cx construction schedule.

Design Construction Occupancyg p y

Page 8: Chazapis Systems Commissioning Lessons.

CHECKLISTS

The Owner shall require, by agreement, the Cx Team to develop utilize and complete Cx process and written b ti d t ti h k li t iobservation and testing check lists in 

accordance with the Cx Plan. 

Design Construction Occupancyg p y

Page 9: Chazapis Systems Commissioning Lessons.

(BOD)BASIS OF DESIGN

The BOD goals would include:  how the building systems meet the OPR how the building systems meet the OPR,  why the systems were selected,  the concepts,  the calculations, the calculations, all product selections provide information to the team during each phase of a project. p p j

Design Construction Occupancyg p y

Page 10: Chazapis Systems Commissioning Lessons.

COMMISSIONING SPECIFICATIONS

The Owner shall require byThe Owner shall require, by agreement, the design / construction team to include Cxspecifications in the project contractspecifications in the project contract documents. Sh ll include the meeting of all requirements defines in the OPRrequirements defines in the OPR applicable to the contracted parties and follow the Cx Process contained in the project’s Cx Plan. p j

Design Construction Occupancyg p y

Page 11: Chazapis Systems Commissioning Lessons.

SYSTEMS TO BE COMMISSIONED

HVAC Systems HVAC Systems Controls and BMS Systems Generators Switchboards SwitchboardsWater supply / sanitation PumpsMotors Fire Detection and protection  Security Lifting and escalators Acoustic and vibration appraisals Building Enclosure other

Design Construction Occupancyg p y

Page 12: Chazapis Systems Commissioning Lessons.

(DR)DESIGN REVIEW

The design review, should also include:  operability & maintainability (O&M) operability & maintainability (O&M),  functionality,  training,  energy efficiency energy efficiency,  control systems,  sequence of operations,  commissioning specifications and commissioning specifications and the ability to functionally test the systems.

Design Construction Occupancyg p y

Page 13: Chazapis Systems Commissioning Lessons.

SUBMITTAL REVIEW

shop drawingsmaterial data samples samples product data

Design Construction Occupancyg p y

Page 14: Chazapis Systems Commissioning Lessons.

CONSTRUCTION OBSERVATION AND TESTING.

Check lists and test procedures. Cx kick off and scoping meeting. Executing Test Procedures. Uniform and effective process for documentation of testing, to provide Cxtesting and interaction between commissioned equipment, systems and assemblies.  

Design Construction Occupancyg p y

Page 15: Chazapis Systems Commissioning Lessons.

Cx SPECIALISTS

HVAC HVAC,  Controls and BMS,  Electrical & Lighting Controls, Plumbing Plumbing,   Fire alarm, Vibration, Building enclosure Building enclosure,  etc.

Design Construction Occupancyg p y

Page 16: Chazapis Systems Commissioning Lessons.

ISSUES AND RESOLUTIONS DOCUMENTATION

Issues identified during Cx Process shall be documented and any open or continuing it h ll li t d i “I ditems shall listed in an “Issue and resolution log and Cx Progress Reports”

Design Construction Occupancyg p y

Page 17: Chazapis Systems Commissioning Lessons.

(O&M)OPERATION & MAINTENANCETRAINING

It is conducted, in accordance with: the project documents the project documents,  approved submittals of the training content,  training materials,  instructor qualifications instructor qualifications,  the requirements of the Cx Plan. 

Design Construction Occupancyg p y

Page 18: Chazapis Systems Commissioning Lessons.

SYSTEMS MANUAL

Th S t M l i l d i 6 tiThe Systems Manual includes in 6 sections: the OPR,  the BOD,  contract documents contract documents,  Record Documents, testing information with updates & corrections, building & equipment specifications & submittals building & equipment specifications & submittals, manufacturer’s operation & maintenance data, warranties and  Supplier & subcontractor listing with contact Supplier & subcontractor listing with contact   information. Copy of Warranties.

Design Construction Occupancyg p y

Page 19: Chazapis Systems Commissioning Lessons.

(PFT)PRE‐FUNCTIONAL TESTING 

Visual inspection of whether a particular system Visual inspection of whether a particular system or assembly is installed as specified.Whether the correct components were selected and installed without damage.and installed without damage.Whether the installation meets the criteria set forth in the OPR in terms of maintainability, access and the like.

Design Construction Occupancyg p y

Page 20: Chazapis Systems Commissioning Lessons.

(FPT)FUNCTIONAL PERFORMANCE TESTSACCEPTANCE INTEGRATED TESTS

Functional testing and documentationFunctional testing and documentation provide: valuable performance benchmarks,  acceptance criteria and acceptance criteria and  a baseline for the future operation.

Design Construction Occupancyg p y

Page 21: Chazapis Systems Commissioning Lessons.

POST OCCUPANCY OPERATION

Includes delayed and seasonal testing and warranty issues. P.O activities begin with at substantial 

l ticompletion. Additional training and operations accordance with the training and the Cx Plans.

Design Construction Occupancyg p y

Page 22: Chazapis Systems Commissioning Lessons.

18 (24) MONTH FINAL COMMISSIONING REPORT

A final Cx report shall be provided to summarize the Cx Process and thesummarize the Cx Process and the building operation for delivery to the building Owner and other required recipientsrecipients.  Includes an executive summary describing the Cx process and identifying the systems commissionedthe systems commissioned. 

Design Construction Occupancyg p y

Page 23: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 24: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 25: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 26: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 27: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 28: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 29: Chazapis Systems Commissioning Lessons.

Design Construction Occupancyg p y

Page 30: Chazapis Systems Commissioning Lessons.

This material was presented by:This material was presented by:

Thank you for watching this presentation.More, on round table discussions on: www.commissioning.gr