CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

18
CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade

Transcript of CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Page 1: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO

Fargo Bank IT Upgrade

Page 2: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.
Page 3: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Communications

Page 4: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Fargo Bank 1st Floor

Page 5: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Old 2nd Floor Datacenter

Page 6: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Fargo Bank 2nd Floor

Page 7: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Fargo Bank Roof

Page 8: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Alternative Power

Schott 225-250 Watt Solar SW WIND POWER Wind Generator

Page 9: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

How Solar Power Works

Our System Technology

Page 10: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

• Solar Radiance: 5.00 kWh/sq m/day • Avg. Monthly Usage 5,000 kWh/month • System Size: 32.41 kW • Roof Size: 3,240 sq ft • Estimated Cost: $226,855.17• Post Incentive Cost: $134,978.83

Page 11: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Hot & cold Aisle Technology

Page 12: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Hot & cold Aisle Technology With *HACS Technology

* Hot Air Containment System

Page 13: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

FreeCool® Evaporative Free Air Cooling Technology

Fresh air is brought into the system though primary filtration and wetted filter padsWater detection provides additional securityFilters remove airborne particles

Isolation damper is linked to fire systemCool air is fed into void under raised floor

Temperature compliant air is fed into cold aisleWarm air from hot aisle is re-circulated to

heat incoming air when ambient temperatures are below set point temperature to maintain constant inlet temperature.

Hot air is extracted and exhausted to outside of building

Ventilation Mode Fan Assisted Airflow Only Cooling Mode Evaporative Cooling plus Fan Assisted Airflow

Page 14: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Section 2. Project Authority and Milestones

2.1 Funding Authority2.2 Project Oversight Authority2.3 Major Project Milestones

Page 15: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Section 3. Project Organization

3.1 Project Structure

Page 16: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

3.2 Roles and Responsibilities

Page 17: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Section 4. Points of Contact

Primary ContactProject ManagerChaz TekleGreen Data [email protected]

Secondary ContactChief Financial OfficerTim KernGreen Data [email protected]

Page 18: CHAZ TEKLE – TIM KERN – MARK FREIERMUTH – CHA THAO Fargo Bank IT Upgrade.

Section 6. Revision History