CHATTOGRAM WATER SUPPLY AND SEWERAGE AUTHORITY...

116
CHATTOGRAM WATER SUPPLY AND SEWERAGE AUTHORITY (CWASA). SUB-SOIL INVESTIGATION FOR THE GEOTECHNICAL SURVEY OF ENGINEERING DESIGN AND CONSTRUCTION SUPERVISION OF PROJECT FOR ESTABLISMENT OF SEWERAGE SYSTEM IN CHATTOGRAM METROPOLITAN. SITE: SEWERAGE LINE (BORE HOLE NO-01 TO 30) SUB-SOIL INVESTIGATED & REPORT PREPARED BY: LAND SURVEY TEAM 404/1/A, KHILGAON, (1 ST FLOOR), DHAKA-1219, MOBILE: MOB. 01791727005, 01552-334436. E-mail- [email protected] [email protected] www.landsurveyteam.com CLIENT: REPORT ON JANUARY, FEBRUARY- 2020

Transcript of CHATTOGRAM WATER SUPPLY AND SEWERAGE AUTHORITY...

  • CHATTOGRAM WATER SUPPLY AND SEWERAGE AUTHORITY (CWASA).

    SUB-SOIL INVESTIGATION FOR THE GEOTECHNICAL SURVEY OF

    ENGINEERING DESIGN AND CONSTRUCTION SUPERVISION OF

    PROJECT FOR ESTABLISMENT OF SEWERAGE SYSTEM IN

    CHATTOGRAM METROPOLITAN.

    SITE: SEWERAGE LINE (BORE HOLE NO-01 TO 30)

    SUB-SOIL INVESTIGATED & REPORT PREPARED BY:

    LAND SURVEY TEAM

    404/1/A, KHILGAON, (1ST FLOOR), DHAKA-1219,

    MOBILE: MOB. 01791727005, 01552-334436.

    E-mail- [email protected]

    [email protected]

    www.landsurveyteam.com

    CLIENT:

    REPORT ON

    JANUARY, FEBRUARY- 2020

    mailto:[email protected]

  • REPORT ON SUB-SOIL INVESTIGATION

    SLNO. CONTENTS

    1 INTRODUCTION

    2 METHODOLOGY

    3 CLIENT

    4 LOCATION AND PROJECT

    5 SCOPE OF WORK

    6 FIELD WORK

    7 LABORATORY TESTS

    8 SOIL COMPOSITION

    9 CORRELATION TABLE OF SOILS BASED ON SPT

    10 PHYSICAL PROPERTIES

    11 ENGINEERING PROPERTIES

    12 EVALUATION OF BEARING CAPACITY

    13 FORMULA USED FOR COMPUTATION

    14 CONCLUSIONS

    15 RECOMMENDATIONS

    16 ATTACHMENT:

    A. BORING LOGS

    B. GRAIN SIZE ANALYSIS TEST

    C. UNCONFINED COMPRESSION TEST

    D. CONSOLIDATION TEST

    E. DIRECT SHEAR TEST

    F. SUMMARY SHEET

  • Page 1 of 44

    1.0 INTRODUCTION: A reasonably accurate conception about the subsoil parameters of any project site is an

    essential priority for proper planning and designing the foundation of the concerned structure,

    So that the structure after its construction would remain safe and stable throughout its service

    period.

    According to work order of representative of the client, a detailed sub-soil study comprising

    execution of 30(Thirty) number borings up to 35.0ft or 10.50m to 50.0ft or 15.0m including

    the different field and laboratory tests was carried out and results analysis, preparing report &

    report submission etc had been undertaken and all official correspondence carried out by

    Land Survey Team, during the period of JANUARY, FEBRUARY - 2020.

    2.0 METHODOLOGY:

    Land Survey Team sent one SPT Test team for field test at the site. According to the work

    order, Team Leader of SPT team contracted with representative of client for recognizing the

    selected land and locations for field test. The representative of client visit the field on timely

    and the location of bore holes were selected.

    3.1 CLIENT: CHATTOGRAM WATER SUPPLY AND SEWERAGE AUTHORITY (CWASA).

    4.0 LOCATION & PROJECT: GEOTECHNICAL SURVEY OF ENGINEERING DESIGN AND CONSTRUCTION SUPERVISION

    OF PROJECT FOR ESTABLISMENT OF SEWERAGE SYSTEM IN CHATTOGRAM

    METROPOLITAN.

    SITE: SEWERAGE LINE (BORE HOLE NO-01 TO 30).

    5.0 SCOPE OF WORK:

    The main scopes of this investigation work are:

    a. Execution of exploratory borings, recording of sub-soil stratification and position of ground water table.

    b. Execution of standard penetration test (SPT) at an interval of 1.5m or 5.0ft depth with collection of disturbed & undisturbed soil samples up to final depth exploration of each

    boring.

    c. Preparation of final report with all works including detailed description of soil stratification sub-soil.

    d. From the field tests and laboratory tests, scope of calculation for bearing capacity values for design shallow foundation.

    e. For loose and soft strata, from the field test and laboratory tests, scope of calculation for skin friction and bearing values for design deep foundation.

    6.0 FIELD WORKS:

    All the field works and field tests were conducted as per standard procedure as laid down in

    ASTM specification are as follows:

    6.1 Exploratory Boring drilling:

    Drilling was executed by wash boring method. A hole was started by driving vertically a 4”

    diameter steel casing into the ground to some depth and then the formation ground casing

    was broken up by repeated drops of a chopping bit attached to the lower and of drilling pipe.

    The upper end of the same was forced at high pressure through pressure pipe. Forced slurry

    or water emerges at high velocity through the pores of the chopping bit, and returns to the

  • Page 2 of 44

    surface through the annular space between drilling pipe and the side of the casing or hole,

    carrying with it the broken-up soil. In this way drilling is advanced up to a level of 6” above

    the depth, where SPT has to be executed.

    6.2 Standard Penetration Test (ASTM D 1586):

    Standard penetration Tests have been executed in all the bore holes at 5ft. intervals of depth

    up to the final depth of boring. In this test, a split spoon sampler of 2” out diameter and 1-

    3/8” inner diameter is made to penetrate 18”, into the soil by drops of a hammer weighing

    140lb. failing freely for a height of 30 inches. Number of blows of hammer required for

    penetration of each 6” length of the sampler is recorded. The number of blows for the last 12”

    penetration of the total 18” is know as the standard penetration value (N-values) as specified

    by ASTM and is plotted the SPT value of the particular depth.

    6.3 Extraction of soil samples (ASTM D 1587):

    The Disturbed soil samples were collected at 5ft. intervals and at every change of soil strata

    split spoon sampler. These soil samples were studied visually and the soil classification were

    done to prepare strata chart of soils up to the explored depth. Before collection of samples,

    the hole is washed and cleaned the drill pipe with the help of an adapter and is lowered into

    the hole. The sampler is then pressed down into the ground in one rapid

    continuous movement until the tube, except 4inches from the top is filled with soil sample.

    Undisturbed soil samples were collected at a depth where layer of soil is changed.

    Undisturbed soil samples area collected by means of thin walled sharp ended 3inch

    dia.stationary piston sampler from the cohesive soil formation. The collected tubes were then

    labeled with detailed job designation, date and shifted the laboratory for testing.

    7.0 LABORATORY TESTS:

    All Laboratory Tests conducted on soil samples collected either in the disturbed state. All

    tests were done as per ASTM procedures are as follows:

    7.1 Natural Moisture Content (ASTM D 2937-00):

    The water content of a soil sample is the ratio of the weight of the water in the sample to its

    dry weight. It is usually expressed as a percentage. The soil sample is weight both in natural

    state and in over dry state and the moisture content is calculated by dividing the loose of

    weight of the sample by its dry weight.

    7.2 Complete Grain Size Analysis (ASTM D 422):

    The object of grain size analysis is to determine the size of the soil grains, and the percentage

    by weight of soil particles of different particles size, comprising a soil sample. The process

    consists of either sieve analysis or hydrometer analysis or both. The hydrometer analysis is

    adopted for sample passing sieve No. 200. For hydrometer analysis, a 40 gms of the over dry

    sample, is thoroughly mixed with required quantity of water in a calibrated glass cylinder. In

    order to avoid flocculation, a little dispersing agent is added. The density of the suspension is

    measured at specified time intervals, by means of a hydrometer or special design. At any

    particular time the size of the largest particle remounting in suspension at the level of the

    hydrometer can be computed by means of stocks Law, where as his weight of the particles

    finer than that size, can be computed from the density of the suspension at the same level.

    The mixture is washed through U.S standard sieve No. 200 and the fraction retained is dried.

    The fraction retained on each sieve is weighed for calculation of the percentage of different

  • Page 3 of 44

    fraction. The results are represented by cumulative curves plotted on semi-logarithmic graph

    paper.

    7.3 Atterberg Limits (ASTM D 4318):

    Physical properties of clay are greatly influenced by water content. A given soil behave as a

    fluid or a soil or, as a plastic materials, depending on how much water its contains. The water

    contents that correspond to the boundaries between the states of consistency are called as the

    Atterberg limit. Liquid Limit is the minimum water content at which a clay soil just starts

    behaving like a fluid. It is determined with the help of a standard limit device which consists

    of brass cup and an arrangement to impart blows to cap at an uniform rate. The water content

    at which 25 blows are required is termed as the limit. The plastic limit is the minimum water

    content at which a soil is just plastic and is determined by rolling out a soil sample at a slowly

    decreasing water content until, the desired water content is reached, at which a thread of 3mm

    diameter. Just beginning to crumble. The thread is rolled on glass plate with hand.

    7.4 Specific Gravity Test (ASTM D 854-00):

    The specific gravity of soil particles (GS) is defined as the ratio of the mass of given volume

    of soil particles to the mass of an equal volume of water at TºC. The specific gravity of a

    solid for most natural soils falls in general range of 2.60 to 2.80. To determine the specific

    gravity of soil sample, 25 grams of over dried soil sample is thoroughly pulverized and is

    placed in a calibrated pycnometer. Water is poured inside the pycnometer until its top is

    slightly below the calibrated mark. The mixture is then boiled thoroughly in order to

    eliminate all the air bubbles. More water is then added to the mixture till it over-night, the

    temperature is then recorded and the bottle is weighed.

    The specific gravity Gs is given by:

    GS = Gt . Ws

    Ws –W1+ W2

    Where, Gt = Specific gravity of water at TºC.

    WS = The weight of over dry soil (25gms.)

    W1 = Weight of flask + soil + water.

    W2 = Weight of flask + water.

    7.5 Direct shear Test (ASTM D 3080): Direct shear test can be performed for both cohesion less & cohesive soil to determine shear

    strength, angle of internal friction, cohesion c, volume change etc. The test is done in a direct

    shear machine which consists of a normal loading device, shearing displacement of

    approximately 10mm per minute is often for a sample used for a sample thickness of about

    1.2cm.The results of a direct shear test on a cohesion less & cohesive soil can be presented in

    a summary table & by stress-strain curve. A stress-strain curve normally consists of shear

    stress, various shear displacement for both the undisturbed and the remolded test under a

    specified normal load the normal load usually varies from 1/3kg/cm2 to 1kg/cm2. Another

    curve of normal stress verses shearing stress will give angle of internal and cohesion for

    cohesive soil.

    7.6 UNCONFINED COMPRESSION TEST(ASTM D 2166):

    Unconfined compression test is a simple method for determination of shearing strength of

    cohesive soil which is important to determine the bearing capacity of soil. As the name

    implies, the lateral confining pressure in an unconfined compression test is kept zero,

  • Page 4 of 44

    unsupported specimen and at failure is measured. The specimen is prepared from the

    undisturbed soil sample by carefully trimming it to a cylindrical shape of 7cm height and

    3.5cm dia. The specimen is then placed on the level pedestal of the unconfined compression

    apparatus in a vertical position. The load is applied axially on the top of the specimen an is

    distributed uniformly over surface of the specimen with the help of double providing ring

    assembly fitted with a strain gauge, fitted with the apparatus. The load is applied at such a

    rate that the vertical deformation of the sample is nearly 2% (two percent) per minute in order

    to avoid and drainage during compression. The load is kept increasing until the specimen

    fails along shearing plane. The maximum load at failure knows as the unconfined

    compressive strength of the sample the shearing strength of the sample is half of the

    unconfined compressive strength.

    7.7 CONSOLIDATION TEST(ASTM D 2435):

    The gradual process of compression of soil under the action of static load and with decrease

    of void ratio due to expulsion of water from the soil pores is termed consolidation The

    phenomenon compressibility characteristics of a soil as the period and magnitude of

    settlement of a foundation depends on these characteristics. The test is performed on a

    specimen of circular shape of 6.35cm dia and 2.54cm thickness, the specimen is prepared

    from the undisturbed sample by carefully trimming it to the required dimension with the help

    of a cutting edge and wire saw.

    The specimen is then placed in the consolidation ring and its top and bottom are trimmed off

    level with that of the ring .The specimen along with the ring on the top and the other at the

    bottom of the specimen. The load is then applied on porous stone and on the specimen with

    the help of a level arrangement with the apparatus.

    Decreases in volume of specimen are read from a strain gauge attached to the consolidation

    unit at specified time intervals the consolidation unit is always kept full with water in order to

    avoid evaporation of the specimen. The load increment is allowed after each twenty four

    hours, The observed reading are then plotted on semi-logarithmic graph paper to give the

    pressure-void ratio curve from which compression index, Cc Can be calculated. Cc is

    important factor governing the settlement process of underlying soils.

    8.0 SOIL COMPOSITION:

    8.1 Description of Soil Composition:

    The following terms are used in this report for description of soil composition:

    Trace fine sand : 1 to 10% fine sand.

    Little silt : 11 to 20% silt.

    Some clay : 20 to 35% clay.

    Sandy silt : 35 to 50% sand & 50 to 70% silt.

    Clayey silt : 35 to 50% clay & 50 to 70% silt.

    Silty sand : 35 to 50% silt & 50 to 70 % sand.

    9. 0 CORRELATION TABLE OF SOILS BASED ON SPT-VALUES:

    Two tables for Non – Cohesive and cohesive soils based on N- Values as below:

    9.1 values of Unit Weight and Angle of Internal Friction of Non- Cohesive soil Based on

    N-Values (After K. Terzaghi and R. B. Peck):

    Table No. 1.

    N-Values Consistency Relative Angle of Moist Unit Wt.

  • Page 5 of 44

    Density Internal

    Friction

    in gm/cc.

    0-4 Very loose 0.0-0.2 250-300 1.12-1.60

    4-10 Loose 0.2-0.4 300-350 1.44-1.84

    10-30 Medium 0.4-0.6 350-400 1.76-2.08

    30-50 Dense 0.6-0.85 400-450 1.76-2.24

    Over 50 Very dense 1.00 450 2.08-2.40

    The tabulated values apply for dry/moist cohesion less sand. For silty sands the bearing

    capacity values must be reduced by study of grain size classification and applying judgment.

    Correction for water table close to bottom of foundation the bearing values should be reduced

    to half. The bearing values are, however, not affected by the water table at a depth greater

    than 1.5B below foundation level, B being least dimension of the bottom of foundation.

    Bearings values for intermediate position of water table may be reduced by liner

    interpolation.

    9.2 Values of approximate Unconfined Compressive Strength Based on N-Values for

    Cohesive Soil (After K. Terzaghi and R.B. Peck):

    Table No.- 2.

    N-Values Consistency Unconfined compressive Strength

    in Kg/cm2.

    Below 2 Very soft Below 0.25

    2-4 Soft 0.25-0.50

    4-8 Medium 0.50-1.00

    8-16 Stiff 1.00-2.00

    16-32 Very stiff 2.00-4.00

    Over 32 Hard Over 4.00

    In the above table the shear strength of cohesive soil is equal to 1/2 of unconfined

    compressive strength and the angle of shearing resistance is equal to zero. It should be

    remembered that the correlation for cohesive soil is always much reliable.

    10.0 PHYSICAL PROPERTIES:

    Physical Properties of the subsoil formation of the project area have been evaluated by the

    execution of 30(Thirty) number borings of 35.0ft or 10.50m to 50.0ft or 15.0m deep (firm

    strata). The overall physical properties may be summarized as follows:

    10.1 Stratification of soil:

    The top soil is rubbish to grey/brown soft to medium silty clay, up to the depth of

    investigation; the soil is grey/brown medium dense fine sand, some silt.

    10.2 Consistency/Compactness:

    Up to the depth of EGL to 6.5m, consistency of the top soil usually varies from medium

    consistency of soil, however, gradually increase the consistency. The subsequent deep layers

    medium dense soil state.

    10.3 Ground Water Table:

    The position of Ground Water Table (GWT) is about (-) 0.30m to (-) 3.0m from existing

    ground level.

  • Page 6 of 44

    10.4 Natural Moisture Content, Specific Gravity:

    Table No .3 Name of the Laboratory Test:

    Name of the Soil Test

    Natural Moisture Content

    Specific Gravity

    Grain Size

    Direct shear test

    Unit weight

    Consolidation test

    Unconfined compression test

    Attar berg limit

    11.0 ENGINEERING PROPERTIES:

    The engineering properties of soil, including the cohesion, compressibility and the angle of

    internal granular friction have been determined by performing laboratory tests on the soil

    samples collected during filed investigation. These are as follows:

    11.1 Angle of Internal Friction:

    The angle of internal friction values of the investigated of soil, as reported form the

    performance of direct shear test from laboratory test sheet.

    12. 0 EVALUATION OF BEARING CAPACITY:

    12.1 Bearing Capacities of the Shallow Condition from the SPT:

    The Bearing capacities of the shallow foundation particularly for the top layer of cohesive

    soil may be estimated from the SPT values, as suggested by Terzaghi, according to the

    following table.

    Table No.- 4. Bearing capacities of the shallow foundation (Values in kg/cm2, F. S.

    =2.5):

    SPT range Allowable Bearing Capacity (Tsf)

    Continuous Footing (B=4ft) Isolated Column Footing (B=8ft)

    0-2

    2-4

    4-8

    8-15

    15-30

    >30

    0.00 - 0.225

    0.225 - 0.45

    0.45 - 0.90

    0.90 - 1.80

    1.80-3.60

    > 3.60

    0.00 - 0.30

    0.30 - 0.60

    0.60 - 1.20

    1.20 - 2.40

    2.40-4.80

    > 4.80

    Note:

    a. width = 4ft for strip footing and width = 8ft for isolated footing respectively.

    b. The above values are the net allowable Bearing capacities.

    c. The cohesive soil has been considered in a saturated condition.

    12.2 Bearing capacity of the shallow foundation from the soil parameters:

    The bearing capacities of the shallow foundation may more appropriately be determined from

    the parameters of soil such as the values of cohesion and the angle of internal friction as

    obtained from the performance of laboratory tests. These have been done considering the

  • Page 7 of 44

    general equations of the Bearing capacity of the foundation as suggested by Terzaghi. The

    evaluated values are provided in the following Table no. 5 and 6.

    Table No. 5. Bearing Capacities of the Shallow Foundation from Field and

    Laboratory Test (Values in kg/cm2, F. S. = 2.50):

    Bore

    Hole

    Depth in

    m

    Field

    SPT

    Cohesion

    kg/cm2

    Bearing capacity (kg/cm2)

    For strip

    Foundation

    For circular or

    square footing

    1.5 10 0.46 1.13 1.50

    3.0 14 0.64 1.58 2.10

    4.5 1 0.05 0.11 0.15

    6.0 5 0.23 0.56 0.75

    1.5 9 0.41 1.01 1.35

    3.0 6 0.28 0.68 0.90

    4.5 2 0.09 0.23 0.30

    6.0 3 0.14 0.34 0.45

    1.5 2 0.09 0.23 0.30

    3.0 3 0.14 0.34 0.45

    4.5 6 0.28 0.68 0.90

    6.0 7 0.32 0.79 1.05

    1.5 7 0.32 0.79 1.05

    3.0 8 0.37 0.90 1.20

    4.5 4 0.18 0.45 0.60

    6.0 5 0.23 0.56 0.75

    1.5 8 0.37 0.90 1.20

    3.0 5 0.23 0.56 0.75

    4.5 3 0.14 0.34 0.45

    6.0 6 0.28 0.68 0.90

    1.5 5 0.23 0.56 0.75

    3.0 6 0.28 0.68 0.90

    4.5 8 0.37 0.90 1.20

    6.0 10 0.46 1.13 1.50

    1.5 9 0.41 1.01 1.35

    3.0 5 0.23 0.56 0.75

    4.5 8 0.37 0.90 1.20

    6.0 5 0.23 0.56 0.75

    1.5 6 0.28 0.68 0.90

    3.0 8 0.37 0.90 1.20

    4.5 2 0.09 0.23 0.30

    6.0 6 0.28 0.68 0.90

    1.5 8 0.37 0.90 1.20

    3.0 4 0.18 0.45 0.60

    4.5 4 0.18 0.45 0.60

    6.0 13 0.60 1.46 1.95

  • Page 8 of 44

    BH-10

    1.5 3 0.14 0.34 0.45

    3.0 6 0.28 0.68 0.90

    4.5 7 0.32 0.79 1.05

    6.0 10 0.46 1.13 1.50

    1.5 3 0.14 0.34 0.45

    3.0 4 0.18 0.45 0.60

    4.5 3 0.14 0.34 0.45

    6.0 6 0.28 0.68 0.90

    1.5 7 0.32 0.79 1.05

    3.0 8 0.37 0.90 1.20

    4.5 13 0.60 1.46 1.95

    6.0 8 0.37 0.90 1.20

    1.5 6 0.28 0.68 0.90

    3.0 4 0.18 0.45 0.60

    4.5 3 0.14 0.34 0.45

    6.0 6 0.28 0.68 0.90

    1.5 6 0.28 0.68 0.90

    3.0 9 0.41 1.01 1.35

    4.5 4 0.18 0.45 0.60

    6.0 6 0.28 0.68 0.90

    1.5 4 0.18 0.45 0.60

    3.0 3 0.14 0.34 0.45

    4.5 5 0.23 0.56 0.75

    6.0 8 0.37 0.90 1.20

    1.5 3 0.14 0.34 0.45

    3.0 2 0.09 0.23 0.30

    4.5 5 0.23 0.56 0.75

    6.0 4 0.18 0.45 0.60

    1.5 4 0.18 0.45 0.60

    3.0 6 0.28 0.68 0.90

    4.5 5 0.23 0.56 0.75

    6.0 4 0.18 0.45 0.60

    1.5 6 0.28 0.68 0.90

    3.0 7 0.32 0.79 1.05

    4.5 10 0.46 1.13 1.50

    6.0 5 0.23 0.56 0.75

    1.5 6 0.28 0.68 0.90

    3.0 4 0.18 0.45 0.60

    4.5 5 0.23 0.56 0.75

    6.0 8 0.37 0.90 1.20

    1.5 3 0.14 0.34 0.45

    3.0 6 0.28 0.68 0.90

    4.5 8 0.37 0.90 1.20

    6.0 10 0.46 1.13 1.50

    BH-21

    1.5 0 0.00 0.00 0.00

    3.0 4 0.18 0.45 0.60

    4.5 5 0.23 0.56 0.75

  • Page 9 of 44

    6.0 4 0.18 0.45 0.60

    1.5 3 0.14 0.34 0.45

    3.0 6 0.28 0.68 0.90

    4.5 1 0.05 0.11 0.15

    6.0 8 0.37 0.90 1.20

    1.5 1 0.05 0.11 0.15

    3.0 3 0.14 0.34 0.45

    4.5 1 0.05 0.11 0.15

    6.0 3 0.14 0.34 0.45

    1.5 6 0.28 0.68 0.90

    3.0 5 0.23 0.56 0.75

    4.5 3 0.14 0.34 0.45

    6.0 4 0.18 0.45 0.60

    1.5 4 0.18 0.45 0.60

    3.0 5 0.23 0.56 0.75

    4.5 6 0.28 0.68 0.90

    6.0 4 0.18 0.45 0.60

    1.5 2 0.09 0.23 0.30

    3.0 6 0.28 0.68 0.90

    4.5 1 0.05 0.11 0.15

    6.0 5 0.23 0.56 0.75

    1.5 3 0.14 0.34 0.45

    3.0 2 0.09 0.23 0.30

    4.5 3 0.14 0.34 0.45

    6.0 4 0.18 0.45 0.60

    1.5 3 0.14 0.34 0.45

    3.0 1 0.05 0.11 0.15

    4.5 6 0.28 0.68 0.90

    6.0 3 0.14 0.34 0.45

    1.5 2 0.09 0.23 0.30

    3.0 1 0.05 0.11 0.15

    4.5 10 0.46 1.13 1.50

    6.0 15 0.69 1.69 2.25

    1.5 2 0.09 0.23 0.30

    3.0 2 0.09 0.23 0.30

    4.5 3 0.14 0.34 0.45

    6.0 4 0.18 0.45 0.60

    TABLE NO. 6 THE SKIN FRICTION, END BEARING, ALLOWABLE WORKING LOADS OF PILE:

    BH-01

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 10 10 6.70 167.11 12.63 21.00 33.63 1.37

  • Page 10 of 44

    01 3.0 14 14 9.38 467.91 35.36 58.80 94.16 3.84 4.5 1 1 0.67 50.13 3.79 6.30 10.09 0.41 6.0 5 5 3.35 334.22 25.26 42.00 67.26 2.74 7.5 10 10 6.70 835.56 63.15 105.00 168.15 6.86 9.0 26 20.5 13.74 2055.48 155.34 258.30 413.64 16.87

    10.5 24 19.5 13.07 2281.08 172.39 286.65 459.04 18.72 12.0 20 17.5 11.73 2339.57 176.81 294.00 470.81 19.20 13.5 23 19 12.73 2857.62 215.96 359.10 575.06 23.45 15.0 30 22.5 15.08 3760.03 284.16 472.50 756.66 30.85

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 10 10 6.70 148.54 14.21 23.63 37.83 1.54 3.0 14 14 9.38 415.92 39.78 66.15 105.93 4.32 4.5 1 1 0.67 44.56 4.26 7.09 11.35 0.46 6.0 5 5 3.35 297.09 28.42 47.25 75.67 3.09 7.5 10 10 6.70 742.72 71.04 118.13 189.16 7.71 9.0 26 20.5 13.74 1827.09 174.76 290.59 465.34 18.97

    10.5 24 19.5 13.07 2027.63 193.94 322.48 516.42 21.06 12.0 20 17.5 11.73 2079.62 198.91 330.75 529.66 21.60 13.5 23 19 12.73 2540.11 242.95 403.99 646.94 26.38 15.0 30 22.5 15.08 3342.25 319.68 531.56 851.24 34.71

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 10 10 6.70 133.69 15.79 26.25 42.04 1.71 3.0 14 14 9.38 374.33 44.20 73.50 117.70 4.80 4.5 1 1 0.67 40.11 4.74 7.88 12.61 0.51 6.0 5 5 3.35 267.38 31.57 52.50 84.07 3.43 7.5 10 10 6.70 668.45 78.93 131.25 210.18 8.57 9.0 26 20.5 13.74 1644.39 194.17 322.88 517.05 21.08

    10.5 24 19.5 13.07 1824.87 215.49 358.31 573.80 23.40 12.0 20 17.5 11.73 1871.66 221.01 367.50 588.51 24.00 13.5 23 19 12.73 2286.10 269.95 448.88 718.82 29.31 15.0 30 22.5 15.08 3008.02 355.20 590.63 945.82 38.57

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 10 10 6.70 111.41 18.94 31.50 50.44 2.06 3.0 14 14 9.38 311.94 53.04 88.20 141.24 5.76 4.5 1 1 0.67 33.42 5.68 9.45 15.13 0.62 6.0 5 5 3.35 222.82 37.89 63.00 100.89 4.11 7.5 10 10 6.70 557.04 94.72 157.50 252.22 10.28 9.0 26 20.5 13.74 1370.32 233.01 387.45 620.46 25.30

  • Page 11 of 44

    10.5 24 19.5 13.07 1520.72 258.58 429.98 688.56 28.08 12.0 20 17.5 11.73 1559.71 265.21 441.00 706.21 28.80 13.5 23 19 12.73 1905.08 323.94 538.65 862.59 35.17 15.0 30 22.5 15.08 2506.68 426.24 708.75 1134.99 46.28

    BH-02

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 150.40 11.37 18.90 30.27 1.23 3.0 6 6 4.02 200.53 15.16 25.20 40.36 1.65 4.5 2 2 1.34 100.27 7.58 12.60 20.18 0.82 6.0 3 3 2.01 200.53 15.16 25.20 40.36 1.65 7.5 5 5 3.35 417.78 31.57 52.50 84.07 3.43 9.0 8 8 5.36 802.14 60.62 100.80 161.42 6.58

    10.5 10 10 6.70 1169.79 88.40 147.00 235.40 9.60 12.0 18 16.5 11.06 2205.88 166.71 277.20 443.91 18.10 13.5 16 15.5 10.39 2331.22 176.18 292.95 469.13 19.13 15.0 15 15 10.05 2506.68 189.44 315.00 504.44 20.57

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 133.69 12.79 21.26 34.05 1.39 3.0 6 6 4.02 178.25 17.05 28.35 45.40 1.85 4.5 2 2 1.34 89.13 8.52 14.18 22.70 0.93 6.0 3 3 2.01 178.25 17.05 28.35 45.40 1.85 7.5 5 5 3.35 371.36 35.52 59.06 94.58 3.86 9.0 8 8 5.36 713.01 68.20 113.40 181.60 7.40

    10.5 10 10 6.70 1039.81 99.46 165.38 264.83 10.80 12.0 18 16.5 11.06 1960.78 187.54 311.85 499.39 20.36 13.5 16 15.5 10.39 2072.19 198.20 329.57 527.77 21.52 15.0 15 15 10.05 2228.16 213.12 354.38 567.49 23.14

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 120.32 14.21 23.63 37.83 1.54 3.0 6 6 4.02 160.43 18.94 31.50 50.44 2.06 4.5 2 2 1.34 80.21 9.47 15.75 25.22 1.03 6.0 3 3 2.01 160.43 18.94 31.50 50.44 2.06 7.5 5 5 3.35 334.22 39.47 65.63 105.09 4.29 9.0 8 8 5.36 641.71 75.78 126.00 201.78 8.23

    10.5 10 10 6.70 935.83 110.51 183.75 294.26 12.00 12.0 18 16.5 11.06 1764.71 208.38 346.50 554.88 22.63 13.5 16 15.5 10.39 1864.97 220.22 366.19 586.41 23.91 15.0 15 15 10.05 2005.35 236.80 393.75 630.55 25.71

  • Page 12 of 44

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 100.27 17.05 28.35 45.40 1.85 3.0 6 6 4.02 133.69 22.73 37.80 60.53 2.47 4.5 2 2 1.34 66.84 11.37 18.90 30.27 1.23 6.0 3 3 2.01 133.69 22.73 37.80 60.53 2.47 7.5 5 5 3.35 278.52 47.36 78.75 126.11 5.14 9.0 8 8 5.36 534.76 90.93 151.20 242.13 9.87

    10.5 10 10 6.70 779.86 132.61 220.50 353.11 14.40 12.0 18 16.5 11.06 1470.59 250.06 415.80 665.86 27.15 13.5 16 15.5 10.39 1554.14 264.27 439.43 703.69 28.69 15.0 15 15 10.05 1671.12 284.16 472.50 756.66 30.85

    BH-03

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 2 2 1.34 33.42 2.53 4.20 6.73 0.27 3.0 3 3 2.01 100.27 7.58 12.60 20.18 0.82 4.5 6 6 4.02 300.80 22.73 37.80 60.53 2.47 6.0 7 7 4.69 467.91 35.36 58.80 94.16 3.84 7.5 8 8 5.36 668.45 50.52 84.00 134.52 5.48 9.0 6 6 4.02 601.60 45.47 75.60 121.07 4.94

    10.5 9 9 6.03 1052.81 79.56 132.30 211.86 8.64

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 2 2 1.34 29.71 2.84 4.73 7.57 0.31 3.0 3 3 2.01 89.13 8.52 14.18 22.70 0.93 4.5 6 6 4.02 267.38 25.57 42.53 68.10 2.78 6.0 7 7 4.69 415.92 39.78 66.15 105.93 4.32 7.5 8 8 5.36 594.18 56.83 94.50 151.33 6.17 9.0 6 6 4.02 534.76 51.15 85.05 136.20 5.55

    10.5 9 9 6.03 935.83 89.51 148.84 238.35 9.72

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 2 2 1.34 26.74 3.16 5.25 8.41 0.34 3.0 3 3 2.01 80.21 9.47 15.75 25.22 1.03 4.5 6 6 4.02 240.64 28.42 47.25 75.67 3.09 6.0 7 7 4.69 374.33 44.20 73.50 117.70 4.80

  • Page 13 of 44

    7.5 8 8 5.36 534.76 63.15 105.00 168.15 6.86 9.0 6 6 4.02 481.28 56.83 94.50 151.33 6.17

    10.5 9 9 6.03 842.25 99.46 165.38 264.83 10.80

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 2 2 1.34 22.28 3.79 6.30 10.09 0.41 3.0 3 3 2.01 66.84 11.37 18.90 30.27 1.23 4.5 6 6 4.02 200.53 34.10 56.70 90.80 3.70 6.0 7 7 4.69 311.94 53.04 88.20 141.24 5.76 7.5 8 8 5.36 445.63 75.78 126.00 201.78 8.23 9.0 6 6 4.02 401.07 68.20 113.40 181.60 7.40

    10.5 9 9 6.03 701.87 119.35 198.45 317.80 12.96

    BH-04

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 116.98 8.84 14.70 23.54 0.96 3.0 8 8 5.36 267.38 20.21 33.60 53.81 2.19 4.5 4 4 2.68 200.53 15.16 25.20 40.36 1.65 6.0 5 5 3.35 334.22 25.26 42.00 67.26 2.74 7.5 9 9 6.03 752.01 56.83 94.50 151.33 6.17 9.0 6 6 4.02 601.60 45.47 75.60 121.07 4.94

    10.5 12 12 8.04 1403.74 106.09 176.40 282.49 11.52 12.0 12 12 8.04 1604.28 121.24 201.60 322.84 13.16 13.5 17 16 10.72 2406.42 181.86 302.40 484.26 19.75 15.0 22 18.5 12.40 3091.58 233.64 388.50 622.14 25.37

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 103.98 9.95 16.54 26.48 1.08 3.0 8 8 5.36 237.67 22.73 37.80 60.53 2.47 4.5 4 4 2.68 178.25 17.05 28.35 45.40 1.85 6.0 5 5 3.35 297.09 28.42 47.25 75.67 3.09 7.5 9 9 6.03 668.45 63.94 106.31 170.25 6.94 9.0 6 6 4.02 534.76 51.15 85.05 136.20 5.55

    10.5 12 12 8.04 1247.77 119.35 198.45 317.80 12.96 12.0 12 12 8.04 1426.02 136.40 226.80 363.20 14.81 13.5 17 16 10.72 2139.04 204.59 340.20 544.79 22.21 15.0 22 18.5 12.40 2748.07 262.85 437.06 699.91 28.54

  • Page 14 of 44

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 93.58 11.05 18.38 29.43 1.20 3.0 8 8 5.36 213.90 25.26 42.00 67.26 2.74 4.5 4 4 2.68 160.43 18.94 31.50 50.44 2.06 6.0 5 5 3.35 267.38 31.57 52.50 84.07 3.43 7.5 9 9 6.03 601.60 71.04 118.13 189.16 7.71 9.0 6 6 4.02 481.28 56.83 94.50 151.33 6.17

    10.5 12 12 8.04 1122.99 132.61 220.50 353.11 14.40 12.0 12 12 8.04 1283.42 151.55 252.00 403.55 16.45 13.5 17 16 10.72 1925.13 227.33 378.00 605.33 24.68 15.0 22 18.5 12.40 2473.26 292.05 485.63 777.68 31.71

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 77.99 13.26 22.05 35.31 1.44 3.0 8 8 5.36 178.25 30.31 50.40 80.71 3.29 4.5 4 4 2.68 133.69 22.73 37.80 60.53 2.47 6.0 5 5 3.35 222.82 37.89 63.00 100.89 4.11 7.5 9 9 6.03 501.34 85.25 141.75 227.00 9.26 9.0 6 6 4.02 401.07 68.20 113.40 181.60 7.40

    10.5 12 12 8.04 935.83 159.13 264.60 423.73 17.28 12.0 12 12 8.04 1069.52 181.86 302.40 484.26 19.75 13.5 17 16 10.72 1604.28 272.79 453.60 726.39 29.62 15.0 22 18.5 12.40 2061.05 350.46 582.75 933.21 38.05

    BH-05

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 133.69 10.10 16.80 26.90 1.10 3.0 5 5 3.35 167.11 12.63 21.00 33.63 1.37 4.5 3 3 2.01 150.40 11.37 18.90 30.27 1.23 6.0 6 6 4.02 401.07 30.31 50.40 80.71 3.29 7.5 10 10 6.70 835.56 63.15 105.00 168.15 6.86 9.0 13 13 8.71 1303.48 98.51 163.80 262.31 10.70

    10.5 8 8 5.36 935.83 70.72 117.60 188.32 7.68 12.0 20 17.5 11.73 2339.57 176.81 294.00 470.81 19.20 13.5 24 19.5 13.07 2932.82 221.64 368.55 590.19 24.06 15.0 31 23 15.41 3843.58 290.47 483.00 773.47 31.54

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

  • Page 15 of 44

    BH-

    05

    1.5 8 8

    0.45

    5.36 118.84 11.37 18.90 30.27 1.23

    3.0 5 5 3.35 148.54 14.21 23.63 37.83 1.54 4.5 3 3 2.01 133.69 12.79 21.26 34.05 1.39 6.0 6 6 4.02 356.51 34.10 56.70 90.80 3.70 7.5 10 10 6.70 742.72 71.04 118.13 189.16 7.71 9.0 13 13 8.71 1158.65 110.82 184.28 295.10 12.03

    10.5 8 8 5.36 831.85 79.56 132.30 211.86 8.64 12.0 20 17.5 11.73 2079.62 198.91 330.75 529.66 21.60 13.5 24 19.5 13.07 2606.95 249.35 414.62 663.97 27.07 15.0 31 23 15.41 3416.52 326.78 543.38 870.16 35.48

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 106.95 12.63 21.00 33.63 1.37 3.0 5 5 3.35 133.69 15.79 26.25 42.04 1.71 4.5 3 3 2.01 120.32 14.21 23.63 37.83 1.54 6.0 6 6 4.02 320.86 37.89 63.00 100.89 4.11 7.5 10 10 6.70 668.45 78.93 131.25 210.18 8.57 9.0 13 13 8.71 1042.78 123.14 204.75 327.89 13.37

    10.5 8 8 5.36 748.66 88.40 147.00 235.40 9.60 12.0 20 17.5 11.73 1871.66 221.01 367.50 588.51 24.00 13.5 24 19.5 13.07 2346.26 277.05 460.69 737.74 30.08 15.0 31 23 15.41 3074.87 363.09 603.75 966.84 39.42

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 89.13 15.16 25.20 40.36 1.65 3.0 5 5 3.35 111.41 18.94 31.50 50.44 2.06 4.5 3 3 2.01 100.27 17.05 28.35 45.40 1.85 6.0 6 6 4.02 267.38 45.47 75.60 121.07 4.94 7.5 10 10 6.70 557.04 94.72 157.50 252.22 10.28 9.0 13 13 8.71 868.98 147.76 245.70 393.46 16.04

    10.5 8 8 5.36 623.89 106.09 176.40 282.49 11.52 12.0 20 17.5 11.73 1559.71 265.21 441.00 706.21 28.80 13.5 24 19.5 13.07 1955.21 332.46 552.83 885.29 36.10 15.0 31 23 15.41 2562.39 435.71 724.50 1160.21 47.31

    BH-06

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 5 5 3.35 83.56 6.31 10.50 16.81 0.69 3.0 6 6 4.02 200.53 15.16 25.20 40.36 1.65 4.5 8 8 5.36 401.07 30.31 50.40 80.71 3.29 6.0 10 10 6.70 668.45 50.52 84.00 134.52 5.48

  • Page 16 of 44

    7.5 3 3 2.01 250.67 18.94 31.50 50.44 2.06 9.0 9 9 6.03 902.41 68.20 113.40 181.60 7.40

    10.5 6 6 4.02 701.87 53.04 88.20 141.24 5.76 12.0 10 10 6.70 1336.90 101.03 168.00 269.03 10.97 13.5 14 14 9.38 2105.61 159.13 264.60 423.73 17.28 15.0 19 17 11.39 2840.91 214.70 357.00 571.70 23.31

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 5 5 3.35 74.27 7.10 11.81 18.92 0.77 3.0 6 6 4.02 178.25 17.05 28.35 45.40 1.85 4.5 8 8 5.36 356.51 34.10 56.70 90.80 3.70 6.0 10 10 6.70 594.18 56.83 94.50 151.33 6.17 7.5 3 3 2.01 222.82 21.31 35.44 56.75 2.31 9.0 9 9 6.03 802.14 76.72 127.58 204.30 8.33

    10.5 6 6 4.02 623.89 59.67 99.23 158.90 6.48 12.0 10 10 6.70 1188.35 113.66 189.00 302.66 12.34 13.5 14 14 9.38 1871.66 179.02 297.68 476.69 19.44 15.0 19 17 11.39 2525.25 241.53 401.63 643.16 26.22

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 5 5 3.35 66.84 7.89 13.13 21.02 0.86 3.0 6 6 4.02 160.43 18.94 31.50 50.44 2.06 4.5 8 8 5.36 320.86 37.89 63.00 100.89 4.11 6.0 10 10 6.70 534.76 63.15 105.00 168.15 6.86 7.5 3 3 2.01 200.53 23.68 39.38 63.05 2.57 9.0 9 9 6.03 721.93 85.25 141.75 227.00 9.26

    10.5 6 6 4.02 561.50 66.30 110.25 176.55 7.20 12.0 10 10 6.70 1069.52 126.29 210.00 336.29 13.71 13.5 14 14 9.38 1684.49 198.91 330.75 529.66 21.60 15.0 19 17 11.39 2272.73 268.37 446.25 714.62 29.14

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 5 5 3.35 55.70 9.47 15.75 25.22 1.03 3.0 6 6 4.02 133.69 22.73 37.80 60.53 2.47 4.5 8 8 5.36 267.38 45.47 75.60 121.07 4.94 6.0 10 10 6.70 445.63 75.78 126.00 201.78 8.23 7.5 3 3 2.01 167.11 28.42 47.25 75.67 3.09 9.0 9 9 6.03 601.60 102.30 170.10 272.40 11.11

    10.5 6 6 4.02 467.91 79.56 132.30 211.86 8.64 12.0 10 10 6.70 891.27 151.55 252.00 403.55 16.45

  • Page 17 of 44

    13.5 14 14 9.38 1403.74 238.69 396.90 635.59 25.92 15.0 19 17 11.39 1893.94 322.05 535.50 857.55 34.97

    BH-07

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 150.40 11.37 18.90 30.27 1.23 3.0 5 5 3.35 167.11 12.63 21.00 33.63 1.37 4.5 8 8 5.36 401.07 30.31 50.40 80.71 3.29 6.0 5 5 3.35 334.22 25.26 42.00 67.26 2.74 7.5 8 8 5.36 668.45 50.52 84.00 134.52 5.48 9.0 15 15 10.05 1504.01 113.66 189.00 302.66 12.34

    10.5 17 16 10.72 1871.66 141.45 235.20 376.65 15.36 12.0 19 17 11.39 2272.73 171.76 285.60 457.36 18.65 13.5 13 13 8.71 1955.21 147.76 245.70 393.46 16.04 15.0 16 15.5 10.39 2590.24 195.75 325.50 521.25 21.25

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 133.69 12.79 21.26 34.05 1.39 3.0 5 5 3.35 148.54 14.21 23.63 37.83 1.54 4.5 8 8 5.36 356.51 34.10 56.70 90.80 3.70 6.0 5 5 3.35 297.09 28.42 47.25 75.67 3.09 7.5 8 8 5.36 594.18 56.83 94.50 151.33 6.17 9.0 15 15 10.05 1336.90 127.87 212.63 340.50 13.88

    10.5 17 16 10.72 1663.70 159.13 264.60 423.73 17.28 12.0 19 17 11.39 2020.20 193.23 321.30 514.53 20.98 13.5 13 13 8.71 1737.97 166.23 276.41 442.64 18.05 15.0 16 15.5 10.39 2302.44 220.22 366.19 586.41 23.91

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 120.32 14.21 23.63 37.83 1.54 3.0 5 5 3.35 133.69 15.79 26.25 42.04 1.71 4.5 8 8 5.36 320.86 37.89 63.00 100.89 4.11 6.0 5 5 3.35 267.38 31.57 52.50 84.07 3.43 7.5 8 8 5.36 534.76 63.15 105.00 168.15 6.86 9.0 15 15 10.05 1203.21 142.08 236.25 378.33 15.43

    10.5 17 16 10.72 1497.33 176.81 294.00 470.81 19.20 12.0 19 17 11.39 1818.18 214.70 357.00 571.70 23.31 13.5 13 13 8.71 1564.17 184.70 307.13 491.83 20.05 15.0 16 15.5 10.39 2072.19 244.69 406.88 651.57 26.57

  • Page 18 of 44

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 9 9 6.03 100.27 17.05 28.35 45.40 1.85 3.0 5 5 3.35 111.41 18.94 31.50 50.44 2.06 4.5 8 8 5.36 267.38 45.47 75.60 121.07 4.94 6.0 5 5 3.35 222.82 37.89 63.00 100.89 4.11 7.5 8 8 5.36 445.63 75.78 126.00 201.78 8.23 9.0 15 15 10.05 1002.67 170.49 283.50 453.99 18.51

    10.5 17 16 10.72 1247.77 212.17 352.80 564.97 23.04 12.0 19 17 11.39 1515.15 257.64 428.40 686.04 27.97 13.5 13 13 8.71 1303.48 221.64 368.55 590.19 24.06 15.0 16 15.5 10.39 1726.83 293.63 488.25 781.88 31.88

    BH-08

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 100.27 7.58 12.60 20.18 0.82 3.0 8 8 5.36 267.38 20.21 33.60 53.81 2.19 4.5 2 2 1.34 100.27 7.58 12.60 20.18 0.82 6.0 6 6 4.02 401.07 30.31 50.40 80.71 3.29 7.5 4 4 2.68 334.22 25.26 42.00 67.26 2.74 9.0 3 3 2.01 300.80 22.73 37.80 60.53 2.47

    10.5 10 10 6.70 1169.79 88.40 147.00 235.40 9.60 12.0 8 8 5.36 1069.52 80.83 134.40 215.23 8.78 13.5 14 14 9.38 2105.61 159.13 264.60 423.73 17.28 15.0 20 17.5 11.73 2924.47 221.01 367.50 588.51 24.00

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 89.13 8.52 14.18 22.70 0.93 3.0 8 8 5.36 237.67 22.73 37.80 60.53 2.47 4.5 2 2 1.34 89.13 8.52 14.18 22.70 0.93 6.0 6 6 4.02 356.51 34.10 56.70 90.80 3.70 7.5 4 4 2.68 297.09 28.42 47.25 75.67 3.09 9.0 3 3 2.01 267.38 25.57 42.53 68.10 2.78

    10.5 10 10 6.70 1039.81 99.46 165.38 264.83 10.80 12.0 8 8 5.36 950.68 90.93 151.20 242.13 9.87 13.5 14 14 9.38 1871.66 179.02 297.68 476.69 19.44 15.0 20 17.5 11.73 2599.52 248.64 413.44 662.08 27.00

  • Page 19 of 44

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 80.21 9.47 15.75 25.22 1.03 3.0 8 8 5.36 213.90 25.26 42.00 67.26 2.74 4.5 2 2 1.34 80.21 9.47 15.75 25.22 1.03 6.0 6 6 4.02 320.86 37.89 63.00 100.89 4.11 7.5 4 4 2.68 267.38 31.57 52.50 84.07 3.43 9.0 3 3 2.01 240.64 28.42 47.25 75.67 3.09

    10.5 10 10 6.70 935.83 110.51 183.75 294.26 12.00 12.0 8 8 5.36 855.61 101.03 168.00 269.03 10.97 13.5 14 14 9.38 1684.49 198.91 330.75 529.66 21.60 15.0 20 17.5 11.73 2339.57 276.26 459.38 735.64 30.00

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 66.84 11.37 18.90 30.27 1.23 3.0 8 8 5.36 178.25 30.31 50.40 80.71 3.29 4.5 2 2 1.34 66.84 11.37 18.90 30.27 1.23 6.0 6 6 4.02 267.38 45.47 75.60 121.07 4.94 7.5 4 4 2.68 222.82 37.89 63.00 100.89 4.11 9.0 3 3 2.01 200.53 34.10 56.70 90.80 3.70

    10.5 10 10 6.70 779.86 132.61 220.50 353.11 14.40 12.0 8 8 5.36 713.01 121.24 201.60 322.84 13.16 13.5 14 14 9.38 1403.74 238.69 396.90 635.59 25.92 15.0 20 17.5 11.73 1949.64 331.52 551.25 882.77 35.99

    BH-09

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 133.69 10.10 16.80 26.90 1.10 3.0 4 4 2.68 133.69 10.10 16.80 26.90 1.10 4.5 4 4 2.68 200.53 15.16 25.20 40.36 1.65 6.0 13 13 8.71 868.98 65.67 109.20 174.87 7.13 7.5 18 16.5 11.06 1378.68 104.19 173.25 277.44 11.31 9.0 12 12 8.04 1203.21 90.93 151.20 242.13 9.87

    10.5 16 15.5 10.39 1813.17 137.03 227.85 364.88 14.88

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 118.84 11.37 18.90 30.27 1.23 3.0 4 4 2.68 118.84 11.37 18.90 30.27 1.23 4.5 4 4 2.68 178.25 17.05 28.35 45.40 1.85

  • Page 20 of 44

    6.0 13 13 8.71 772.43 73.88 122.85 196.73 8.02 7.5 18 16.5 11.06 1225.49 117.22 194.91 312.12 12.73 9.0 12 12 8.04 1069.52 102.30 170.10 272.40 11.11

    10.5 16 15.5 10.39 1611.71 154.16 256.33 410.49 16.74

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 106.95 12.63 21.00 33.63 1.37 3.0 4 4 2.68 106.95 12.63 21.00 33.63 1.37 4.5 4 4 2.68 160.43 18.94 31.50 50.44 2.06 6.0 13 13 8.71 695.19 82.09 136.50 218.59 8.91 7.5 18 16.5 11.06 1102.94 130.24 216.56 346.80 14.14 9.0 12 12 8.04 962.57 113.66 189.00 302.66 12.34

    10.5 16 15.5 10.39 1450.53 171.28 284.81 456.10 18.60

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 8 8 5.36 89.13 15.16 25.20 40.36 1.65 3.0 4 4 2.68 89.13 15.16 25.20 40.36 1.65 4.5 4 4 2.68 133.69 22.73 37.80 60.53 2.47 6.0 13 13 8.71 579.32 98.51 163.80 262.31 10.70 7.5 18 16.5 11.06 919.12 156.29 259.88 416.16 16.97 9.0 12 12 8.04 802.14 136.40 226.80 363.20 14.81

    10.5 16 15.5 10.39 1208.78 205.54 341.78 547.32 22.32

    BH-10

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 50.13 3.79 6.30 10.09 0.41 3.0 6 6 4.02 200.53 15.16 25.20 40.36 1.65 4.5 7 7 4.69 350.94 26.52 44.10 70.62 2.88 6.0 10 10 6.70 668.45 50.52 84.00 134.52 5.48 7.5 6 6 4.02 501.34 37.89 63.00 100.89 4.11 9.0 15 15 10.05 1504.01 113.66 189.00 302.66 12.34

    10.5 20 17.5 11.73 2047.13 154.71 257.25 411.96 16.80 12.0 24 19.5 13.07 2606.95 197.02 327.60 524.62 21.39 13.5 14 14 9.38 2105.61 159.13 264.60 423.73 17.28 15.0 36 25.5 17.09 4261.36 322.05 535.50 857.55 34.97

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

  • Page 21 of 44

    BH-

    10

    1.5 3 3

    0.45

    2.01 44.56 4.26 7.09 11.35 0.46

    3.0 6 6 4.02 178.25 17.05 28.35 45.40 1.85 4.5 7 7 4.69 311.94 29.84 49.61 79.45 3.24 6.0 10 10 6.70 594.18 56.83 94.50 151.33 6.17 7.5 6 6 4.02 445.63 42.62 70.88 113.50 4.63 9.0 15 15 10.05 1336.90 127.87 212.63 340.50 13.88

    10.5 20 17.5 11.73 1819.67 174.05 289.41 463.45 18.90 12.0 24 19.5 13.07 2317.29 221.64 368.55 590.19 24.06 13.5 14 14 9.38 1871.66 179.02 297.68 476.69 19.44 15.0 36 25.5 17.09 3787.88 362.30 602.44 964.74 39.34

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 40.11 4.74 7.88 12.61 0.51 3.0 6 6 4.02 160.43 18.94 31.50 50.44 2.06 4.5 7 7 4.69 280.75 33.15 55.13 88.28 3.60 6.0 10 10 6.70 534.76 63.15 105.00 168.15 6.86 7.5 6 6 4.02 401.07 47.36 78.75 126.11 5.14 9.0 15 15 10.05 1203.21 142.08 236.25 378.33 15.43

    10.5 20 17.5 11.73 1637.70 193.39 321.56 514.95 21.00 12.0 24 19.5 13.07 2085.56 246.27 409.50 655.77 26.74 13.5 14 14 9.38 1684.49 198.91 330.75 529.66 21.60 15.0 36 25.5 17.09 3409.09 402.56 669.38 1071.93 43.71

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 33.42 5.68 9.45 15.13 0.62 3.0 6 6 4.02 133.69 22.73 37.80 60.53 2.47 4.5 7 7 4.69 233.96 39.78 66.15 105.93 4.32 6.0 10 10 6.70 445.63 75.78 126.00 201.78 8.23 7.5 6 6 4.02 334.22 56.83 94.50 151.33 6.17 9.0 15 15 10.05 1002.67 170.49 283.50 453.99 18.51

    10.5 20 17.5 11.73 1364.75 232.06 385.88 617.94 25.20 12.0 24 19.5 13.07 1737.97 295.52 491.40 786.92 32.09 13.5 14 14 9.38 1403.74 238.69 396.90 635.59 25.92 15.0 36 25.5 17.09 2840.91 483.07 803.25 1286.32 52.45

    BH-11

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 50.13 3.79 6.30 10.09 0.41 3.0 4 4 2.68 133.69 10.10 16.80 26.90 1.10

  • Page 22 of 44

    4.5 3 3 2.01 150.40 11.37 18.90 30.27 1.23 6.0 6 6 4.02 401.07 30.31 50.40 80.71 3.29 7.5 10 10 6.70 835.56 63.15 105.00 168.15 6.86 9.0 14 14 9.38 1403.74 106.09 176.40 282.49 11.52

    10.5 12 12 8.04 1403.74 106.09 176.40 282.49 11.52

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 44.56 4.26 7.09 11.35 0.46 3.0 4 4 2.68 118.84 11.37 18.90 30.27 1.23 4.5 3 3 2.01 133.69 12.79 21.26 34.05 1.39 6.0 6 6 4.02 356.51 34.10 56.70 90.80 3.70 7.5 10 10 6.70 742.72 71.04 118.13 189.16 7.71 9.0 14 14 9.38 1247.77 119.35 198.45 317.80 12.96

    10.5 12 12 8.04 1247.77 119.35 198.45 317.80 12.96

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 40.11 4.74 7.88 12.61 0.51 3.0 4 4 2.68 106.95 12.63 21.00 33.63 1.37 4.5 3 3 2.01 120.32 14.21 23.63 37.83 1.54 6.0 6 6 4.02 320.86 37.89 63.00 100.89 4.11 7.5 10 10 6.70 668.45 78.93 131.25 210.18 8.57 9.0 14 14 9.38 1122.99 132.61 220.50 353.11 14.40

    10.5 12 12 8.04 1122.99 132.61 220.50 353.11 14.40

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 33.42 5.68 9.45 15.13 0.62 3.0 4 4 2.68 89.13 15.16 25.20 40.36 1.65 4.5 3 3 2.01 100.27 17.05 28.35 45.40 1.85 6.0 6 6 4.02 267.38 45.47 75.60 121.07 4.94 7.5 10 10 6.70 557.04 94.72 157.50 252.22 10.28 9.0 14 14 9.38 935.83 159.13 264.60 423.73 17.28

    10.5 12 12 8.04 935.83 159.13 264.60 423.73 17.28

    BH-12

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 116.98 8.84 14.70 23.54 0.96

  • Page 23 of 44

    12 3.0 8 8 5.36 267.38 20.21 33.60 53.81 2.19 4.5 13 13 8.71 651.74 49.25 81.90 131.15 5.35 6.0 8 8 5.36 534.76 40.41 67.20 107.61 4.39 7.5 10 10 6.70 835.56 63.15 105.00 168.15 6.86 9.0 11 11 7.37 1102.94 83.35 138.60 221.95 9.05

    10.5 13 13 8.71 1520.72 114.93 191.10 306.03 12.48

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 103.98 9.95 16.54 26.48 1.08 3.0 8 8 5.36 237.67 22.73 37.80 60.53 2.47 4.5 13 13 8.71 579.32 55.41 92.14 147.55 6.02 6.0 8 8 5.36 475.34 45.47 75.60 121.07 4.94 7.5 10 10 6.70 742.72 71.04 118.13 189.16 7.71 9.0 11 11 7.37 980.39 93.77 155.93 249.70 10.18

    10.5 13 13 8.71 1351.75 129.29 214.99 344.28 14.04

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 93.58 11.05 18.38 29.43 1.20 3.0 8 8 5.36 213.90 25.26 42.00 67.26 2.74 4.5 13 13 8.71 521.39 61.57 102.38 163.94 6.68 6.0 8 8 5.36 427.81 50.52 84.00 134.52 5.48 7.5 10 10 6.70 668.45 78.93 131.25 210.18 8.57 9.0 11 11 7.37 882.35 104.19 173.25 277.44 11.31

    10.5 13 13 8.71 1216.58 143.66 238.88 382.53 15.60

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 7 7 4.69 77.99 13.26 22.05 35.31 1.44 3.0 8 8 5.36 178.25 30.31 50.40 80.71 3.29 4.5 13 13 8.71 434.49 73.88 122.85 196.73 8.02 6.0 8 8 5.36 356.51 60.62 100.80 161.42 6.58 7.5 10 10 6.70 557.04 94.72 157.50 252.22 10.28 9.0 11 11 7.37 735.29 125.03 207.90 332.93 13.58

    10.5 13 13 8.71 1013.81 172.39 286.65 459.04 18.72

  • Page 24 of 44

    BH-13

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 100.27 7.58 12.60 20.18 0.82 3.0 4 4 2.68 133.69 10.10 16.80 26.90 1.10 4.5 3 3 2.01 150.40 11.37 18.90 30.27 1.23 6.0 6 6 4.02 401.07 30.31 50.40 80.71 3.29 7.5 7 7 4.69 584.89 44.20 73.50 117.70 4.80 9.0 14 14 9.38 1403.74 106.09 176.40 282.49 11.52

    10.5 16 15.5 10.39 1813.17 137.03 227.85 364.88 14.88

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 89.13 8.52 14.18 22.70 0.93 3.0 4 4 2.68 118.84 11.37 18.90 30.27 1.23 4.5 3 3 2.01 133.69 12.79 21.26 34.05 1.39 6.0 6 6 4.02 356.51 34.10 56.70 90.80 3.70 7.5 7 7 4.69 519.90 49.73 82.69 132.42 5.40 9.0 14 14 9.38 1247.77 119.35 198.45 317.80 12.96

    10.5 16 15.5 10.39 1611.71 154.16 256.33 410.49 16.74

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 80.21 9.47 15.75 25.22 1.03 3.0 4 4 2.68 106.95 12.63 21.00 33.63 1.37 4.5 3 3 2.01 120.32 14.21 23.63 37.83 1.54 6.0 6 6 4.02 320.86 37.89 63.00 100.89 4.11 7.5 7 7 4.69 467.91 55.25 91.88 147.13 6.00 9.0 14 14 9.38 1122.99 132.61 220.50 353.11 14.40

    10.5 16 15.5 10.39 1450.53 171.28 284.81 456.10 18.60

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 66.84 11.37 18.90 30.27 1.23 3.0 4 4 2.68 89.13 15.16 25.20 40.36 1.65 4.5 3 3 2.01 100.27 17.05 28.35 45.40 1.85 6.0 6 6 4.02 267.38 45.47 75.60 121.07 4.94 7.5 7 7 4.69 389.93 66.30 110.25 176.55 7.20 9.0 14 14 9.38 935.83 159.13 264.60 423.73 17.28

    10.5 16 15.5 10.39 1208.78 205.54 341.78 547.32 22.32

  • Page 25 of 44

    BH-14

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 100.27 7.58 12.60 20.18 0.82 3.0 9 9 6.03 300.80 22.73 37.80 60.53 2.47 4.5 4 4 2.68 200.53 15.16 25.20 40.36 1.65 6.0 6 6 4.02 401.07 30.31 50.40 80.71 3.29 7.5 8 8 5.36 668.45 50.52 84.00 134.52 5.48 9.0 11 11 7.37 1102.94 83.35 138.60 221.95 9.05

    10.5 15 15 10.05 1754.68 132.61 220.50 353.11 14.40

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 89.13 8.52 14.18 22.70 0.93 3.0 9 9 6.03 267.38 25.57 42.53 68.10 2.78 4.5 4 4 2.68 178.25 17.05 28.35 45.40 1.85 6.0 6 6 4.02 356.51 34.10 56.70 90.80 3.70 7.5 8 8 5.36 594.18 56.83 94.50 151.33 6.17 9.0 11 11 7.37 980.39 93.77 155.93 249.70 10.18

    10.5 15 15 10.05 1559.71 149.18 248.06 397.25 16.20

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 80.21 9.47 15.75 25.22 1.03 3.0 9 9 6.03 240.64 28.42 47.25 75.67 3.09 4.5 4 4 2.68 160.43 18.94 31.50 50.44 2.06 6.0 6 6 4.02 320.86 37.89 63.00 100.89 4.11 7.5 8 8 5.36 534.76 63.15 105.00 168.15 6.86 9.0 11 11 7.37 882.35 104.19 173.25 277.44 11.31

    10.5 15 15 10.05 1403.74 165.76 275.63 441.38 18.00

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 66.84 11.37 18.90 30.27 1.23 3.0 9 9 6.03 200.53 34.10 56.70 90.80 3.70 4.5 4 4 2.68 133.69 22.73 37.80 60.53 2.47 6.0 6 6 4.02 267.38 45.47 75.60 121.07 4.94 7.5 8 8 5.36 445.63 75.78 126.00 201.78 8.23 9.0 11 11 7.37 735.29 125.03 207.90 332.93 13.58

    10.5 15 15 10.05 1169.79 198.91 330.75 529.66 21.60

  • Page 26 of 44

    BH-15

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 66.84 5.05 8.40 13.45 0.55 3.0 3 3 2.01 100.27 7.58 12.60 20.18 0.82 4.5 5 5 3.35 250.67 18.94 31.50 50.44 2.06 6.0 8 8 5.36 534.76 40.41 67.20 107.61 4.39 7.5 8 8 5.36 668.45 50.52 84.00 134.52 5.48 9.0 4 4 2.68 401.07 30.31 50.40 80.71 3.29

    10.5 5 5 3.35 584.89 44.20 73.50 117.70 4.80

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 59.42 5.68 9.45 15.13 0.62 3.0 3 3 2.01 89.13 8.52 14.18 22.70 0.93 4.5 5 5 3.35 222.82 21.31 35.44 56.75 2.31 6.0 8 8 5.36 475.34 45.47 75.60 121.07 4.94 7.5 8 8 5.36 594.18 56.83 94.50 151.33 6.17 9.0 4 4 2.68 356.51 34.10 56.70 90.80 3.70

    10.5 5 5 3.35 519.90 49.73 82.69 132.42 5.40

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 53.48 6.31 10.50 16.81 0.69 3.0 3 3 2.01 80.21 9.47 15.75 25.22 1.03 4.5 5 5 3.35 200.53 23.68 39.38 63.05 2.57 6.0 8 8 5.36 427.81 50.52 84.00 134.52 5.48 7.5 8 8 5.36 534.76 63.15 105.00 168.15 6.86 9.0 4 4 2.68 320.86 37.89 63.00 100.89 4.11

    10.5 5 5 3.35 467.91 55.25 91.88 147.13 6.00

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 44.56 7.58 12.60 20.18 0.82 3.0 3 3 2.01 66.84 11.37 18.90 30.27 1.23 4.5 5 5 3.35 167.11 28.42 47.25 75.67 3.09 6.0 8 8 5.36 356.51 60.62 100.80 161.42 6.58 7.5 8 8 5.36 445.63 75.78 126.00 201.78 8.23 9.0 4 4 2.68 267.38 45.47 75.60 121.07 4.94

    10.5 5 5 3.35 389.93 66.30 110.25 176.55 7.20

  • Page 27 of 44

    BH-16

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 50.13 3.79 6.30 10.09 0.41 3.0 2 2 1.34 66.84 5.05 8.40 13.45 0.55 4.5 5 5 3.35 250.67 18.94 31.50 50.44 2.06 6.0 4 4 2.68 267.38 20.21 33.60 53.81 2.19 7.5 6 6 4.02 501.34 37.89 63.00 100.89 4.11 9.0 9 9 6.03 902.41 68.20 113.40 181.60 7.40

    10.5 8 8 5.36 935.83 70.72 117.60 188.32 7.68

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 44.56 4.26 7.09 11.35 0.46 3.0 2 2 1.34 59.42 5.68 9.45 15.13 0.62 4.5 5 5 3.35 222.82 21.31 35.44 56.75 2.31 6.0 4 4 2.68 237.67 22.73 37.80 60.53 2.47 7.5 6 6 4.02 445.63 42.62 70.88 113.50 4.63 9.0 9 9 6.03 802.14 76.72 127.58 204.30 8.33

    10.5 8 8 5.36 831.85 79.56 132.30 211.86 8.64

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 40.11 4.74 7.88 12.61 0.51 3.0 2 2 1.34 53.48 6.31 10.50 16.81 0.69 4.5 5 5 3.35 200.53 23.68 39.38 63.05 2.57 6.0 4 4 2.68 213.90 25.26 42.00 67.26 2.74 7.5 6 6 4.02 401.07 47.36 78.75 126.11 5.14 9.0 9 9 6.03 721.93 85.25 141.75 227.00 9.26

    10.5 8 8 5.36 748.66 88.40 147.00 235.40 9.60

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 3 3 2.01 33.42 5.68 9.45 15.13 0.62 3.0 2 2 1.34 44.56 7.58 12.60 20.18 0.82 4.5 5 5 3.35 167.11 28.42 47.25 75.67 3.09 6.0 4 4 2.68 178.25 30.31 50.40 80.71 3.29 7.5 6 6 4.02 334.22 56.83 94.50 151.33 6.17 9.0 9 9 6.03 601.60 102.30 170.10 272.40 11.11

    10.5 8 8 5.36 623.89 106.09 176.40 282.49 11.52

  • Page 28 of 44

    BH-17

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 66.84 5.05 8.40 13.45 0.55 3.0 6 6 4.02 200.53 15.16 25.20 40.36 1.65 4.5 5 5 3.35 250.67 18.94 31.50 50.44 2.06 6.0 4 4 2.68 267.38 20.21 33.60 53.81 2.19 7.5 8 8 5.36 668.45 50.52 84.00 134.52 5.48 9.0 11 11 7.37 1102.94 83.35 138.60 221.95 9.05

    10.5 13 13 8.71 1520.72 114.93 191.10 306.03 12.48

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 59.42 5.68 9.45 15.13 0.62 3.0 6 6 4.02 178.25 17.05 28.35 45.40 1.85 4.5 5 5 3.35 222.82 21.31 35.44 56.75 2.31 6.0 4 4 2.68 237.67 22.73 37.80 60.53 2.47 7.5 8 8 5.36 594.18 56.83 94.50 151.33 6.17 9.0 11 11 7.37 980.39 93.77 155.93 249.70 10.18

    10.5 13 13 8.71 1351.75 129.29 214.99 344.28 14.04

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 53.48 6.31 10.50 16.81 0.69 3.0 6 6 4.02 160.43 18.94 31.50 50.44 2.06 4.5 5 5 3.35 200.53 23.68 39.38 63.05 2.57 6.0 4 4 2.68 213.90 25.26 42.00 67.26 2.74 7.5 8 8 5.36 534.76 63.15 105.00 168.15 6.86 9.0 11 11 7.37 882.35 104.19 173.25 277.44 11.31

    10.5 13 13 8.71 1216.58 143.66 238.88 382.53 15.60

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 4 4 2.68 44.56 7.58 12.60 20.18 0.82 3.0 6 6 4.02 133.69 22.73 37.80 60.53 2.47 4.5 5 5 3.35 167.11 28.42 47.25 75.67 3.09 6.0 4 4 2.68 178.25 30.31 50.40 80.71 3.29 7.5 8 8 5.36 445.63 75.78 126.00 201.78 8.23 9.0 11 11 7.37 735.29 125.03 207.90 332.93 13.58

    10.5 13 13 8.71 1013.81 172.39 286.65 459.04 18.72

  • Page 29 of 44

    BH-18

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 100.27 7.58 12.60 20.18 0.82 3.0 7 7 4.69 233.96 17.68 29.40 47.08 1.92 4.5 10 10 6.70 501.34 37.89 63.00 100.89 4.11 6.0 5 5 3.35 334.22 25.26 42.00 67.26 2.74 7.5 6 6 4.02 501.34 37.89 63.00 100.89 4.11 9.0 9 9 6.03 902.41 68.20 113.40 181.60 7.40

    10.5 8 8 5.36 935.83 70.72 117.60 188.32 7.68

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 89.13 8.52 14.18 22.70 0.93 3.0 7 7 4.69 207.96 19.89 33.08 52.97 2.16 4.5 10 10 6.70 445.63 42.62 70.88 113.50 4.63 6.0 5 5 3.35 297.09 28.42 47.25 75.67 3.09 7.5 6 6 4.02 445.63 42.62 70.88 113.50 4.63 9.0 9 9 6.03 802.14 76.72 127.58 204.30 8.33

    10.5 8 8 5.36 831.85 79.56 132.30 211.86 8.64

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 80.21 9.47 15.75 25.22 1.03 3.0 7 7 4.69 187.17 22.10 36.75 58.85 2.40 4.5 10 10 6.70 401.07 47.36 78.75 126.11 5.14 6.0 5 5 3.35 267.38 31.57 52.50 84.07 3.43 7.5 6 6 4.02 401.07 47.36 78.75 126.11 5.14 9.0 9 9 6.03 721.93 85.25 141.75 227.00 9.26

    10.5 8 8 5.36 748.66 88.40 147.00 235.40 9.60

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 66.84 11.37 18.90 30.27 1.23 3.0 7 7 4.69 155.97 26.52 44.10 70.62 2.88 4.5 10 10 6.70 334.22 56.83 94.50 151.33 6.17 6.0 5 5 3.35 222.82 37.89 63.00 100.89 4.11 7.5 6 6 4.02 334.22 56.83 94.50 151.33 6.17 9.0 9 9 6.03 601.60 102.30 170.10 272.40 11.11

    10.5 8 8 5.36 623.89 106.09 176.40 282.49 11.52

  • Page 30 of 44

    BH-19

    Pile dia = 0.40, 0.45m, 0.50m & 0.60m.

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 100.27 7.58 12.60 20.18 0.82 3.0 4 4 2.68 133.69 10.10 16.80 26.90 1.10 4.5 5 5 3.35 250.67 18.94 31.50 50.44 2.06 6.0 8 8 5.36 534.76 40.41 67.20 107.61 4.39 7.5 10 10 6.70 835.56 63.15 105.00 168.15 6.86 9.0 15 15 10.05 1504.01 113.66 189.00 302.66 12.34

    10.5 20 17.5 11.73 2047.13 154.71 257.25 411.96 16.80

    BH

    NO

    Depth(

    m)

    Field

    SPT

    (N)

    Corrected

    SPT(N’)

    Dia

    of

    pile

    (M)

    Skin

    Friction

    (fs)KN/

    M2

    End

    Bearing

    (fb)KN/

    M2

    Pile

    Capacity

    From Fs

    (KN)

    Pile

    Capacity

    From Fb

    (KN)

    Pile

    Capacity

    (KN)

    Pile in

    Ton

    (F.S.=

    2.5)

    1.5 6 6 4.02 89.13 8.52 14.18 22.70 0.93 3.0 4 4 2.68 118.84 11.37 18.90 30.27 1.23 4.5 5 5 3.35 222.82 21.31 35.44 56.