What is a project?
A project is a complex, non-routine, one-time effort limited by time, budget, resources, and performance specifications designed to meet customer needs.
JEE 632
3
Project CharacteristicsMajor characteristics of a project:
1. Established objectives.2. A defined life span with a beginning and an end.3. Involvement of several departments and professionals.4. Something that has never been done before.5. Specific time, cost, and performance requirements.
JEE 632
4
Project Characteristics
A project is a specific, finite task to be accomplished, with some attributes as :-
• purpose one-time activity, well defined objectives
• life cycle slow beginning, size build up, peak, decline, terminate
• interdependencies interact with other projects, or ongoing operations, or other departments of an organization
JEE 632
5
Project Characteristics
• uniquenessno two projects are alike• conflicts clients, parent organization,
project team, and the public
JEE 632
6
Project Characteristics Program
Projects
Tasks
Work packages
Work Units
JEE 632
7
Project CharacteristicsProgram Life Cycle : S-Curve
% C
ompl
etio
n
Time
slow start
slow finish
quick momentum
JEE 632
8
Project CharacteristicsProgram Duration vs Project Cost
Cost
Time
JEE 632
9
Major Project Phases
• Business Planning ..... Initial Project• Screening .... Select Facilities• Definitive Planning ..... Establish Design Bases• Design ..... Define Selected Facilities• Execution ..... Engineering, Proc., Const.• Start-Up .... Commissioning
BusinessPlanning Screening Definitive
Planning Design Execution Start-Up
JEE 632
10
Major Project Phases
Business Planning and Screening
• Reason for Capital Investment• Scope of Facilities Required (Roughed Out)• Philosophy and Project Execution Plan• Class V Cost Estimate• Justification
JEE 632
11
Major Project Phases
Definitive Planning
• Design Bases• Preliminary Milestone Schedule• Site Data• Further Development of Project Execution Plan• Class III Cost Estimate
JEE 632
12
Major Project Phases
Basic Design
• Development of Specification– Owner Basic Practices– Process Design Specifications
• Review of Constructability, Operability, Maintainability• Finalize Initial Issue of Project Execution Plan &
Schedule• Class II Cost Estimate
JEE 632
13
Major Project Phases
Detailed Engineering and Procurement
• Translate Design Specifications, Basic Practices, etc., into :– Construction Drawings– Specifications– Purchase Orders
• Major Effort by :– Contractor– In-House Engineering Group
JEE 632
14
Major Project Phases
Construction
• Translate Detailed Engineering into A Plant• Major Effort by Contractor
JEE 632
15
Major Project Phases
Start-Up and Operation
• Completion and Turn-Over Activities• Start-Up Procedures Preparation and Execution• Contractor’s Specialists Involvement• High Level of Interfaces between Project Team, Owner,
and Contractor
JEE 632
16
Major Project PhasesOpportunity for Optimization
BusinessScoping
ProjectScreening
Definitive Planning
BasicDesign Project Execution Start-Up
OpportunityTo Influence(Changes)
Resource
Expenditures
Influ
ence
Opp
ortu
nity
Project Time Line
Expe
nditu
res
Max. Max.
Min. Min.
JEE 632
17
Major Project Phases
Project Phases for Small Projects
• All These “Front End” Activities may not be necessary for small projects, because– may not be practical– may be done mentally or verbally (not written down)
JEE 632
18
Major Project PhasesExample – A Small ProjectAn inspection finds a boiler safety valve plugged and failed to lift
• Scoping - “Fix it before it blew up the boiler and kill someone....not to mention losing a
lot of money”• Philosophy - Do as soon as possible ... in 1 month
(by Operations)• Screening - Using Rupture Disk ... Don’t study further
(by Technical Dept.)
JEE 632
19
Major Project PhasesExample – Continued
• Planning - Use Same Manufacturer as already on site (by Technical/Maint Dept.)
• Basic Design - Process Design Spec.(by Technical Dept.)
• Execution Plan - Simplified (by Project Engineer)
JEE 632
20
Major Project PhasesSummary
• Typical Phases and Progression of Activities exist for all projects (Simple or Complex)
• Project Personnel must:– Be aware of various stages– understand activities for each stage– initiate action to ensure activity taking place
JEE 632
21
“Quality Management”
• Get It Right The First Time• Customer Satisfaction (know what customer wants)• Continuous Improvement (mechanism to measure and
improve performance)• Zero Defects
JEE 632
22
QUALITY MANAGEMENT
Four Prime Elements :
• Know what is required (Project Objectives)• Develop plan to meet requirements (Project Execution
Plan)• Implement the plan (Execute the plan)• Monitor & Take corrective action (Track/Plan/Action)