Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4....

27
Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010 1 Chapter 4: INTRODUCTION TO COST ACCOUNTING Test your knowledge 1. A direct cost is able to be traced to a product or service with a high degree of accuracy. Directly traceable means that the cost can be physically and easily (i.e. economically and conveniently) traced to the finished product. Direct materials and direct labour are the two most common direct costs for a business. Examples are: Raw materials used in making gold ring Wages of a mechanic in a car repair business Parts and supplies used in a panel beating business Cost of bottles used in making wine Cost of paint used in making a motor cycle Indirect costs are not so easily traced to a product or service. These are items that are not actually incorporated in the product or are too insignificant to make it worth tracing the cost to the finished product. Examples are: Salary of the factory manager Local government rates and taxes Paint used in making a Dolls House Glue used in making furniture Oil and lubricants used in maintaining factory machinery Insurance of the business premises 2. Some costs may be direct in the making of one cost object and be indirect in the making of another cost object. Therefore the distinction between direct and indirect costs is important as it allows the determination of a cost object to be more accurate. 3. The factor that affects the classification of an item as a direct or indirect cost is whether it is traceable to the finished product. To be traceable means that the cost can be physically and easily (i.e. economically and conveniently) traced to the finished product. 4. Cost behaviour is how a cost changes in relation to the level of production activity. This is important as the distinction between fixed, variable and mixed costs is important to the accurate determination of the cost of a product or service. With a fixed cost the unit activity cost will change as the level of units produced increases or decreases, while with a variable cost the unit cost does not change. Fixed costs in total are constant as the level of activity increases whereas with a variable cost the total cost does increase as the level of activity increases. This cost behaviour affects the unit cost of a product or service. 5. Fixed costs are those that do not change in total when the level of activity changes. For example, the rent of a factory building will be the same in total no matter how many units are produced. Examples are: Depreciation of factory machinery Office supervisor’s salary Rent of a shop Delivery vehicle insurance

Transcript of Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4....

Page 1: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   1  

Chapter 4: INTRODUCTION TO COST ACCOUNTING 

Test your knowledge 1. A direct cost is able to be traced to a product or service with a high degree of accuracy. Directly traceable means that the cost can be physically and easily (i.e. economically and conveniently) traced to the finished product. Direct materials and direct labour are the two most common direct costs for a business. Examples are: 

• Raw materials used in making gold ring 

• Wages of a mechanic in a car repair business 

• Parts and supplies used in a panel beating business 

• Cost of bottles used in making wine 

• Cost of paint used in making a motor cycle 

Indirect costs are not so easily traced to a product or service. These are items that are not actually incorporated in the product or are too insignificant to make it worth tracing the cost to the finished product. Examples are: 

• Salary of the factory manager 

• Local government rates and taxes 

• Paint used in making a Dolls House 

• Glue used in making furniture 

• Oil and lubricants used in maintaining factory machinery 

• Insurance of the business premises 

2. Some costs may be direct in the making of one cost object and be indirect in the making of another cost object. Therefore the distinction between direct and indirect costs is important as it allows the determination of a cost object to be more accurate. 

3. The factor that affects the classification of an item as a direct or indirect cost is whether it is traceable to the finished product. To be traceable means that the cost can be physically and easily (i.e. economically and conveniently) traced to the finished product. 

4. Cost behaviour is how a cost changes in relation to the level of production activity. This is important as the distinction between fixed, variable and mixed costs is important to the accurate determination of the cost of a product or service. With a fixed cost the unit activity cost will change as the level of units produced increases or decreases, while with a variable cost the unit cost does not change. Fixed costs in total are constant as the level of activity increases whereas with a variable cost the total cost does increase as the level of activity increases. This cost behaviour affects the unit cost of a product or service.  

5. Fixed costs are those that do not change in total when the level of activity changes. For example, the rent of a factory building will be the same in total no matter how many units are produced. Examples are: 

• Depreciation of factory machinery • Office supervisor’s salary • Rent of a shop • Delivery vehicle insurance 

Page 2: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   2  

A variable cost is one that changes in total as the level of activity changes. For example, the cost of raw materials in total will increase as the level of units produced increases. Examples are: 

• Wages for casual staff to make glassware 

• Raw materials used in the manufacture of a computer 

• Cost of goods sold 

• Commission paid to salespeople 

Mixed or semi‐variable costs are those costs which contain both fixed and variable elements. For example, a telephone bill will contain the line rental cost, which is a fixed cost, and the cost of phone calls made, which is a variable cost. Examples are: 

• Telephone bill 

• Maintenance costs 

• Electricity 

• Water rates 

6. Direct materials are those raw materials that are directly traceable to the product being made. 

Raw materials are what go into the making of a product. For example, in the making of a men’s suit the raw materials would be such items as the fabric, the lining, buttons and thread. Other examples are in making a bottle of wine the bottle would be a direct material, in making a lounge chair the wood in the chair structure would be a direct material, for a T‐shirt product the cotton material would be a direct material and for shoes the direct material would be leather. 

The direct labour cost is the amount paid such as wages, salaries, long‐service leave, sick leave, and payroll tax paid to the employees that is traceable to the finished product. Examples are machine operators in a factory making security screens, panel beaters fixing vehicles and bakers making bread products 

Manufacturing overhead represents costs that are not direct materials or direct labour, but which are still part of the manufacturing process. Examples are: 

• Indirect materials 

• Indirect labour 

• Electricity, water and gas used in the production of a product 

• Depreciation 

• Insurance 

• Maintenance of the factory buildings 

• Repairs to equipment used in the manufacturing process 

7. Costs of operating a business that are not incurred in the manufacturing process are called non‐manufacturing costs. These can be categorised as selling or marketing costs, distribution or transport costs, administration costs and financial costs. Examples are: 

• Direct materials used in the making of a surfboard 

• Direct labour used in making a diamond ring 

• Overheads assigned to the manufacture of a ball gown 

8. A product cost includes all those costs that are attributable to a product and are those costs to do with merchandise acquired or manufactured or a service provided. It is recorded as an expense in the period in which the product is sold and this will be recorded as the cost of goods. The product is an asset because it has future economic benefit to the business. 

Page 3: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   3  

Costs that are not product costs are period costs. Period costs are an expense and therefore shown in the business income statement in the period in which they are incurred. A period cost is a cost that relates to the current accounting period and which does not have a future economic benefit to the business. Period costs are not carried forward with the product until the time of sale. Examples are: 

• Advertising • Wages paid to sales personnel 

• Office rent • Office contents insurance 

9. Cost accounting is the measuring, analysing, recording and reporting on the cost of a product or service. Cost accounting is useful to both financial and managerial accounting for such purposes as: 

• determining profitability – management can determine if it is worth producing or selling the product or service. 

• the setting of selling prices – often set with reference to the cost of the product or service • control of costs – comparing actual product costs with planned costs and, if necessary, taking corrective action so that the predetermined targets are met in the future 

• planning – using past product costs to estimate future product costs 

• inventory valuation – calculating the value of products that are complete (finished goods) and products that are partially complete (work in progress) at the end of each accounting period for inclusion in the financial statements 

10. Absorption costing is the method whereby all fixed manufacturing costs and variable manufacturing costs are included in the product cost. 

11. Job order costing is the process of recording all the costs of a distinct product or service. A job order costing system is used when a business creates a single unit or multiple units of a distinct product, makes a product to a customer order or provides a service to meet specific customer requirements. Each job has its own special characteristics and may be, for example, a single product, a batch of the same product or a service provided to an individual client. 

12. A predetermined overhead rate allocates the indirect costs of production to the actual quantity of the product or service produced.  

The predetermined overhead rate is calculated as =  budgeted manufacturing overhead cost budgeted allocation base

13. A normal costing system determines the cost of a product or service with job order costing using actual direct materials, actual direct labour and a predetermined overhead rate. These figures are applied to the actual quantity related to a job. The predetermined overhead rate allocates the indirect costs of production to the actual quantity of the product or service produced. 

14. Standard costing is a system of product costing where the cost of a product is based on standard costs for direct materials, direct labour and manufacturing overheads. A standard cost is a predetermined cost and based on some preconceived benchmark of what is considered appropriate to the making of a product. Therefore, the direct materials, direct labour and manufacturing overhead are not actual costs but rather estimates based on a standard cost. 

15. Variance analysis is the comparison of the actual results compared to the standard amount or value called the flexible budget. The flexible budget is the standard quantity or hours allowed for output multiplied by the standard price or rate 

16. The markup is the amount (either in dollars or percentage) added to the unit cost price of a product or service to determine its selling price. Therefore the selling price = cost + (markup percentage × cost) 

17. As there are too many possible answers to this question, students should check their answers with their teacher. 

Page 4: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   4  

Test your understanding  4.1  

Item  Manufacturing or Non‐manufacturing cost 

Direct or Indirect cost 

Fixed or Variable costor Mixed cost 

Product or Period cost 

Clothing factory equipment maintenance  Manufacturing cost  Indirect cost  Mixed cost (fixed and variable costs)  Product cost 

Wages of vehicle factory assembly workers  Manufacturing cost  Direct cost  Variable cost  Product cost 

Salaries of marketing staff  Non‐manufacturing cost N/A Fixed cost  Period costDepreciation of office equipment in a law practice  Non‐manufacturing cost  N/A  Fixed cost  Period cost 

Surfboard factory supervisor’s salary  Manufacturing cost Indirect cost Fixed cost  Product costGlue used in the production of chairs  Manufacturing cost Indirect cost Variable cost  Product costLinen cloth used in the upholstery of a chair  Manufacturing cost Direct cost Variable cost  Product costStationery used in the administration office of an architect  Non‐manufacturing cost  N/A  Fixed cost  Period cost 

Salary of the business accountant for a chain of jewellery stores  Non‐manufacturing cost  N/A  Fixed cost  Period cost 

Wages of factory store personnel Manufacturing cost Indirect cost Fixed cost  Product costDepreciation of factory machinery Manufacturing cost Indirect cost Fixed cost  Product costElectricity used in a factory brewing beer  Manufacturing cost Indirect cost Variable cost  Product costInsurance of business delivery vehicles  Non‐manufacturing cost N/A Fixed cost  Period costVarnish paint used in making furniture  Manufacturing cost Indirect cost Variable cost  Product costDye used in making t‐shirts  Manufacturing cost Indirect cost Variable cost  Product cost

4.2  Item  Manufacturing or Non‐

manufacturing cost Direct or 

Indirect cost Fixed or Variable cost

Or Mixed cost Product or Period cost 

Paper used in the making of a textbook  Manufacturing cost Direct cost Variable cost  Product costDepreciation of factory machinery Manufacturing cost Indirect cost Fixed cost  Product costSales commission paid to sales staff  Non‐manufacturing cost N/A Variable cost  Period costWages paid to factory assembly workers  Manufacturing cost Direct cost Variable cost  Product costWages paid to workers making pizzas in a fast food shop  Manufacturing cost  Direct cost  Variable cost  Product cost 

Leather used in making shoes  Manufacturing cost Direct cost Variable cost  Product costSalary paid to business director of chain of music stores  Non‐manufacturing cost  N/A  Fixed cost  Period cost 

Wages paid to delivery drivers in a transport company  Non‐manufacturing cost  N/A  Variable cost  Period cost 

Wages paid to pizza delivery drivers in a fast food business  Non‐manufacturing cost  N/A  Variable cost  Period cost 

Plumbing materials used in a plumbing business  Non‐manufacturing cost  N/A  Variable cost  Period cost 

Electricity used in repairing a vehicle in a panel beating workshop  Non‐manufacturing cost  N/A  Variable cost  Period cost 

Oil used by a mechanic in servicing and repairing vehicles  Non‐manufacturing cost  N/A  Variable cost  Period cost 

Steel used to make pergolas  Manufacturing cost Direct cost Variable cost  Product cost

 

Page 5: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   5  

4.3  a) Predetermined overhead rate = $90 000/4 350 direct labour hours 

Therefore = $20.69 per direct labour hour 

b) Job Number 56 

Direct Materials           $11 000 

Direct Labour ($50 per hour X 600 hours)    $30 000 

Manufacturing Overhead (600 hours X $20.69)  $12 414 

Total cost Job 56          $53 414 

4.4 a) Predetermined overhead rate 

Budgeted Factory Overhead 

Indirect Materials           $  78 000 

Indirect Labour          $  64 000 

Other overheads               $110 000 

                  $ 252 000 

Therefore = $252 000/11 350 direct labour hrs 

Therefore = $22.20 per direct labour hour 

b) Job Number 658 

Direct Materials           $250 000 

Direct Labour           $  70 000 

Manufacturing Overhead (250 hours X $22.20)  $    5 550  

Total cost Job 658          $  53 414 

4.5 a) Predetermined overhead rate 

Budgeted Factory Overhead 

Indirect Materials           $  83 000 

Indirect Labour          $  67 000 

Other overheads               $130 000 

                  $ 280 000 

Therefore = $280 000/2 150 machine hrs 

Therefore = $116.28 per direct labour hour 

Page 6: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   6  

b) Job Number 130 

Direct Materials           $20 000 

Direct Labour           $  3 600 

Manufacturing Overhead (24 hours X $116.28)  $  2 791  

Total cost Job 130          $26 391 

c) $26 392/10 000 = $2.64 per bottle for choc milk 

4.6 a) Predetermined overhead rate = $154 000/2 300 machine hrs 

Therefore = $66.96 per machine hour 

b) Batch Number 15 Hand Lotion 

Direct Materials           $15 000 

Direct Labour ($55 per hour X 50 hours)    $  2 750 

Manufacturing Overhead (80 hours X $66.96)    $  5 357 

Total cost Job 15          $23 107 

Batch Number 16 After Shave Lotion 

Direct Materials           $32 000 

Direct Labour ($55 per hour X 70 hours)    $  3 850 

Manufacturing Overhead (120 hours X $66.96)  $  8 035 

Total cost Job 16          $43 885 

c) Batch number 15 $23 107/1 000 = $23.11 per bottle of hand lotion 

Batch number 16 $43 885/1 500 = $29.26 per bottle of after shave lotion 

4.7  a) Predetermined overhead rate = $74 000/4 000 direct labour hrs 

Therefore = $18.50 per direct labour hour 

b) Job Number 134  

Direct Materials           $   650 

Direct Labour ($63 per hour X 70 hours)    $4 410 

Manufacturing Overhead (70 hours X $18.50)    $1 295 

Total cost Job 134          $6 355 

Page 7: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   7  

Job Number 135  

Direct Materials           $   540 

Direct Labour ($63 per hour X 60 hours)    $3 780 

Manufacturing Overhead (60 hours X $18.50)    $1 110 

Total cost Job 135          $5 430 

Job Number 136  

Direct Materials           $   720 

Direct Labour ($63 per hour X 80 hours)    $5 040 

Manufacturing Overhead (80 hours X $18.50)    $1 480 

Total cost Job 136          $7 240 

4.8  a) Predetermined overhead rates 

Mixing Department = $35 000/600 machine hrs 

Therefore = $58.33 per machine hour 

Cooking Department = $56 000/1 000 machine hrs 

Therefore = $56.00 per machine hour 

Packaging Department = $25 000/6 300 direct labour hrs 

Therefore = $3.97 per direct labour hour 

b) Direct Materials  

  Mixing Department     Sugar       $2 500 

          Citric Acid    $     50 

          Gelatine     $     80 

          Essence      $     60 

          Food Colouring    $     45 

  Packaging Department    Plastic      $   300 

          Paper boxes    $   200 

Total Direct Materials cost           $3 775 

Direct labour 

Mixing Department 12 hours @ $45 per hour      $    540 

Cooking Department 25 hours @ $55 per hour    $ 1 375 

Packaging Department 42 hours @ $40 per hour    $ 1 680 

Total Direct labour cost          $ 3 595 

Page 8: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   8  

Manufacturing overheads  

Mixing Department 10 machine hours @ $58.33 per hour   $   583 

Cooking Department 23 machine hours @ $56 per hour  $1 288 

Packaging Department 42 direct labour hours @ $3.97 per hour $   167 

Total Manufacturing overhead        $2 038 

Total cost of a batch of Jelly Beans        $9 408 

c) Cost of a packet of Jelly Beans $9 408/1 000 = $9.41 

4.9  a) Predetermined overhead rates 

Set‐up Department = $43 000/5 500 direct labour hrs 

Therefore = $7.82 per direct labour hour 

Print Department = $67 000/2 900 machine hrs 

Therefore = $23.10 per machine hour 

b) Costs for Job 271 from before July 2011: 

Total of incomplete jobs           $ 5 700 

Job 269 ($2 800 – 1 000)          ($1 800) 

Job 270               ($2 700) 

Job 271 therefore             $ 1 200 

Current Months Manufacturing costs for Job Number 271 

Direct Materials  

Set‐up Department           $     90     

Print Department            $1 900 

Total Direct Materials cost           $1 990 

Direct labour 

Set‐up Department 18 hours @ $45 per hour       $   810 

Print Department 3 hours @ $25 per hour      $     75 

Total Direct labour cost          $   885 

Manufacturing overheads  

Mixing Department 2 machine hours @ $7.82 per hour   $     16 

Cooking Department 12 machine hours @ $23.10 per hour  $   277 

Total manufacturing overhead        $   293 

Total cost of Job number 271        $3 168 

Page 9: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   9  

4.10  Total Overheads 

Electricity costs incurred          $    4 500 

  Water costs incurred        $    1 800 

  Cleaning costs incurred        $  15 000 

  Repairs and maintenance of equipment     $    2 900 

  Deprecation of equipment       $  12 600 

  Indirect materials used        $  35 600 

  Rent cost incurred        $  27 800 

  Insurance cost incurred        $    5 100 

  Hairdresser manager        $  67 000 

  Miscellaneous costs incurred      $  16 450 

              $188 750 

Predetermined overhead rate  

Direct labour hours 7.5 X 5 X 9 X 52 = 17 550 

Therefore     188 750/17 550 = 10.75 

Cost of the ladies style cut 

Direct materials           $  3.50 

Direct labour ($26 per hour X 30 minutes)    $13.00 

Overheads ($10.75 X 30 minutes)       $  5.38 

            $21.88 

4.11  a) Total cost of labour: 

Partners  $250 000 X 4 =   $1 000 000 

Seniors   $140 000 X 5 =    $   700 000 

Juniors  $  80 000 X 5 =     $   400 000 

        $2 100 000 

Apportion of overheads: 

Partners  1 000 000/2 100 000 = 48% 

Seniors  700 000/2 100 000 = 33% 

Juniors  400 000/2 100 000 = 19% 

Partners  48% X 490 000 =  $235 200 

Seniors  33% X 490 000 =  $161 700 

Juniors  19% X 490 000 =  $  93 100 

 

Page 10: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   10  

Overheads to be covered by each category of lawyer 

Partners  235 200/4 =   58 800 Seniors  161 700/5 =   32 340 

Juniors  93 100/5 =   18 620 

Overheads to be covered each hour: 

Partners  58 800/1 700 = 34.59 per hour Seniors  32 340/1 700 = 19.01 per hour 

Juniors  18 620/1 700 = 10.95 per hour 

Direct labour cost per category of lawyer  

Partners  250 000/1 700 = 147.06 per hour Seniors  140 000/1 700 = 82.35 per hour 

Juniors  80 000/1 700 = 47.06 per hour 

Charge our rate for each category of lawyer: 

Partners  34.59 + 147.06 = 181.65 Seniors  19.01 + 82.35 = 101.36 

Juniors  10.95 + 47.06 = 58.01 

b) Amount to charge Brian Epstein Pty Ltd 

Partner 30 hours X 181.65 =  $5 449.50 Senior 25 X 101.36 =   $2 534 

Juniors 30 X 58.01 =   $1 740.30 

Total =       $9 724 

4.12  a) Predetermined overhead rate: 

Total of budgeted overheads 

Electricity costs incurred        $    8 700 

Water costs incurred        $    2 800 

Cleaning costs incurred        $  34 000 

Repairs and maintenance of equipment     $    7 400 

Repairs and maintenance of warehouse     $    9 600 

Deprecation of equipment         $  11 000 

Deprecation of warehouse         $  15 000 

Insurance costs incurred        $    7 600 

Warehouse manager        $  88 000 

Security guards and dogs        $  55 000 

Miscellaneous costs incurred      $165 000 

              $404 100 

Predetermined overhead rate:  404 100/17 000 = $23.77 

Page 11: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   11  

b) Rate to charge of fuel per kilometre   

Cost of fuel: $1.50 per litre of fuel X 150 kilometres = $225  

Therefore $225/900 kilometres = 25 cents (0.25) to charge per kilometre  

c) Job – Amber Pty Ltd 

Direct Materials Fuel – 4 000 kilometres X 0.25    $1 000  

Direct Labour 5 days X 12 hours X $70 per hour   $4 200 

Accommodation – 4 nights X $90 per night      $   360 

Food allowance –   4 breakfasts X $15      $     60 

       4 lunches X $15        $     60 

      4 dinners X$25        $   100 

Overheads – 60 hours X $23.77 per hour     $1 426 

Total cost            $7 206 

Job – Lucky Pty Ltd  

Direct Materials Fuel – 3 500 kilometres X 0.25   $   875  

Direct Labour 4.5 days X 12 hours X $70 per hour   $3 780 

Accommodation – 4 nights X $90 per night      $   360 

Food allowance –   4 breakfasts X $15     $     60 

       4 lunches X $15       $     60 

      4 dinners X$25        $   100 

Overheads – 54 hours X $23.77 per hour    $1 284 

Total cost            $6 519 

4.13  Standard Cost Men’s Shirt 

Direct Materials  

  Cotton – 2 metres per shirt X $7.00 per metre      $14.00 per shirt 

  Buttons – 3 buttons X 0.50 per button         $1.50 per shirt 

Direct labour  

  0.5 hours per shirt X $30.00 per hour         $15.00 per shirt 

Overheads  

  $160 000/18 000 direct labour hours = $8.80 per direct labour hour 

  Therefore – 0.5 hours per shirt X $8.80 per direct labour hour    $4.40 per shirt 

Total standard cost of making a shirt           $34.90 per shirt 

Cost of making a batch of 5 000 shirts is: 

  5 000 X $34.90 per shirt = $174 500 

Page 12: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   12  

4.14  Predetermined overhead rate 

  $79 000/11 520 direct labour hours = $6.86 per direct labour hour 

Standard cost of a batch of incense burners  

Direct materials 

Clay – 500 kilos X $8.00 per kilo       $  4 000 

Glaze – 300 litres X $2.00 per litre      $     600 

Paint – 80 litres X $5.00 per litre       $     400 

Sealant – 200 litres X $3.50 per litre       $     700 

Total direct materials cost        $  5 700 

Direct labour 

200 hours X $30.00 per hour         $  6 000 

Overheads  

200 direct labour hours X $6.86 per direct labour hour  $  1 372 

Standard cost of a batch        $13 072 

Cost of making one incense burner: 

  $13 072/2 000 = $6.54 

4.15  Predetermined overhead rate 

Leather goods factory: 

$200 000/5 400 direct labour hours = $37.04 per direct labour hour 

Farming 

$200 000/5 000 = $40 per Crocodile 

Slaughter, drying and cutting 

$90 000/5 000 = 18 per Crocodile 

Standard cost of farming each crocodile  

Direct materials             $100 per crocodile 

Direct labour             $  80 per crocodile 

Overheads               $  40 per crocodile 

Total cost of farming one crocodile        $220  

 

Page 13: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   13  

Standard cost of slaughtering, drying and cutting each crocodile  

Direct materials             $  50 per crocodile 

Direct labour             $  60 per crocodile 

Overheads               $  40 per crocodile 

Total cost of slaughtering, drying and cutting one crocodile  $150 

Standard cost of direct materials relating to one crocodile: 

Farming              $220 

Slaughtering, drying and cutting        $150 

Total cost              $370 

Standard cost of making a batch of handbags 

Small Handbags 

Direct materials  

Crocodile skin – $370/16           $23.13 

Lining – half a metre at $5.00 per metre        $  2.50  

Studs – 6 @ 30 cents per stud         $  1.80 

Zip – one @ $3.00 pre zip           $  3.00 

Rings – four @ 30 cents per ring          $  1.20 

Latch – one @ 80 cents per latch          $  0.80 

                $32.43 

Direct labour 

Time to make one small bag –  300 hours/400 items = ¾ hour @ $26.00 per hour     $19.50  

Overheads 

  ¾ hour @ $37.04 per direct labour hour        $27.78 

Total cost of making one small handbag        $79.71 

Large Handbags 

Direct materials  

Crocodile skin – $370/8           $  46.25 

Lining – one a metre at $5.00 per metre        $    5.00  

Studs – 12 @ 30 cents per stud          $    3.60 

Zip – one @ $3.00 pre zip            $    3.00 

Rings –four @ 30 cents per ring          $    1.20 

Latch – one @ $1.00 cents per latch         $    1.00 

                $  60.00 

Page 14: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   14  

Direct labour Time to make one small bag  

– 400 hours/400 items =One hour @ $26.00 per hour $  26.00 

Overheads 

1 hour @ $37.04 per direct labour hour      $  37.04 

Total cost of making one small handbag        $123.04 

4.16 a) Predetermined overhead rates 

Overhead costs 

Factory building depreciation           $  18 000 

Electricity incurred  (15 000 X 0.75)          $  11 250 

Factory office costs             $  35 000 

Cleaning costs incurred (26 000 X 0.75)        $  19 500 

Repairs and maintenance of factory machinery and equipment     $  12 000 

Repairs and maintenance of factory           $    9 500 

Insurance costs incurred (13 500 X 0.75)        $  10 125 

Factory manager              $110 000 

Security guards and dogs            $  54 000 

Miscellaneous factory costs incurred          $  77 000 

Finance costs (19 400 X 0.75)          $  14 550 

Total overhead costs            $370 925 

Therefore $370 925/3 500 = 105.98 per machine hour 25 cents 424   

Allocation to departments  

Stage 1 Department   105.98 X 30% = $31.79 per machine hour 

Stage 2 Department   105.98 X 50% = $52.99 per machine hour 

Stage 3 Department  105.98 X 20% = $21.20 per machine hour 

b) Direct materials cost 

Stage 1 Department   $2 010 000 X 35% = $703 500/10 500 000 = 67 cents per litre @2 litres = $1.34 DM per tub 

Stage 2 Department   $900 000 X 35% = $315 000/1 000 000 = 31.5 cents per gram @ 2 grams = 63 cents DM per tub 

Stage 3 Department   $360 000 X 35% = $126 000/256 000 = $1.02 DM per tub 

Direct materials cost total = $2.99 DM per tub 

 

 

Page 15: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   15  

c) Direct labour 

Stage 1 Department   $450 000 X 30% = $135 000/5 400 hours = $25/278 tubs = 9 cents DLH per tub 135 000/25/ 

Stage 2 Department   $360 000 X 30% = $108 000/4 909 hours = 22/314 tubs = 7 cents DLH per tub 

Stage 3 Department   $300 000 X 30% = $90 000/4 500 hours     20/100 = 20 cents DLH per tub 

Total Direct Labour cost = 36 cents DLH per tub 

d) Overhead cost per tub 

Stage 1 Department   $31.79 per machine hour/425 = 7 cents per tub 

Stage 2 Department    $52.99 per machine hour/500 = 11 cents per tub 

Stage 3 Department  $21.20 per machine hour/350 = 6 cents per tub 

Total overhead cost per tub = 24 cents per tub 

(e) Total cost of making a tub of supreme ice cream 

Direct materials     $2.99 per tub 

Direct Labour     $0.36 per tub 

Overhead      $0.24 per tub 

Total cost per tub     $3.59 per tub 

4.17  Direct materials price and quantity variances 

Actual results  Flexible budget Actual quantity of inputs X actual price  950 square metres X $11.00 per sq metre = $10 450 

Actual quantity of inputs X standard price  950 square metres X $10.00 = $9 500 

Standard quantity allowed for output X standard price  1 000 square metres (1 000 outdoor deck chairs x 1 sq metre per chair) X $10.00 = $10 000 

Price variance is $950 U  Quantity variance is $500 F 

Direct labour rate and efficiency variances  Actual results  Flexible budget 

Actual hours of inputs X actual rate 550 hours X $18.30 per hour wage rate = $10 065 

Actual hours of inputs X standard rate 550 hours X $18.00 per hour = $9 900 

Standard hours allowed for output X standard rate  500 (1 000 outdoor deck chairs x ½ hour per chair) hours X $18.00 per hour = $9 000 

Rate variance is $165 U  Efficiency variance is $900 U 

 

Page 16: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   16  

4.18  a) and b) Direct materials price and quantity variances 

Distilled Water Actual results  Flexible budget 

Actual quantity of inputs X actual price   650 litres X $30.00 per litre = $19 500 

Actual quantity of inputs X standard price   650 litres X $29.00 = $18 850 

Standard quantity allowed for output X standard price   600 litres ((120 mLs X 5 000 items)/1 000) X $29.00 per litre = $17 400 

Price variance is $650 U  Quantity variance is $1 450 U 

Alcohol Actual results  Flexible budget 

Actual quantity of inputs X actual price   380 litres X $40.00 per litre = $15 200 

Actual quantity of inputs X standard price   380 litres X $41.00 = $15 580 

Standard quantity allowed for output X standard price   400 litres ((80 mLs X 5 000)/1 000 litres X $41.00 = $16 400 

Price variance is $380 F  Quantity variance is $820 F 

Lavender fragrance  Actual results  Flexible budget 

Actual quantity of inputs X actual price   260 litres X $60.00 per litre = $15 600 

Actual quantity of inputs X standard price   260 litres X $61.00 = $15 860 

Standard quantity allowed for output X standard price   250 litres ((50 mLs X 5 000)/1 000 litres X $61.00 = $15 250 

Price variance is $260 F  Quantity variance is $610 U 

c) and d) Direct labour rate and efficiency variances  Actual results  Flexible budget 

Actual hours of inputs X actual rate 300 hours X $23.00 per hour wage rate = $6 900  

Actual hours of inputs X standard rate  300 hours X $23.00 per hour = $6 900 

Standard hours allowed for output X standard rate  312.5 hours (5 000/16) X $23.00 per hour = $7 187.50 

Rate variance is $0  Efficiency variance is $287.50 F 

4.19  a) and b) Fixed overhead spending and production volume variances  

Actual results  Budgeted  Flexible budget Allocated fixed overhead applied   $70 000 

Budgeted amount regardless of output  $60 000 

Budgeted amount regardless of output  $60 000 

Standard hours allowed for output X standard rate625 direct labour hours (5 000 deserts X 7 ½ minutes per desert) X $87.27 per direct labour hour = $54 543.75  

Spending variance is $10 000 U Production volume variance is $9 000 U 

 

Page 17: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   17  

Overhead application rate  

Budgeted Direct labour hours  

5 500 X 7 ½ minutes per desert = 687.5 hours 

Budgeted Fixed Overhead costs $60 000/687.50 = $87.27 per direct labour hour 

c) and d) Variable overhead spending and efficiency variances  Actual results  Flexible budget 

Actual hours of inputs X actual rate $80 000 (600 labour hours X $133.33 per hour*) 

Actual hours of inputs X standard rate $81 000 (600 labour hours X $135.00 per hour) 

Standard hours allowed for output X standard rate  $84 375 (625 direct labour hours X $135.00 per hour) 

Spending variance is $1 000 F  Efficiency variance is $3 375 F 

* $80 000/600 = $133.33 

4.20 a) and b) Fixed overhead spending and production volume variances  

Actual results  Budgeted  Flexible budget Allocated fixed overhead applied   $50 000 

Budgeted amount regardless of output  $40 000 

Budgeted amount regardless of output  $40 000 

Standard hours allowed for output X standard rate3 360 machine hours (420 units X 8 machine hours per unit) X $12.20 per machine hour = $40 992  

Spending variance is $10 000 U Production volume variance is $992 F 

Overhead application rate  

Budgeted Fixed Overhead costs $40 000/3 280 = $12.20 per machine hour 

c) and d) Variable overhead spending and efficiency variances  Actual results  Flexible budget 

Actual hours of inputs X actual rate $165 000 (3 465 machine hours X $47.62 per hour*) 

Actual hours of inputs X standard rate  $173 250 (3 465 machine hours X $50.00 per hour) 

Standard hours allowed for output X standard rate  $168 000 (3 360 machine hours X $50.00 per machine hour) 

Spending variance is $8 250 F  Efficiency variance is $5 250 U 

* $165 000/3 465 = $47.62 

4.21  a) and b) Direct materials price and quantity variances 

Actual results  Flexible budget Actual quantity of inputs X actual price   99 200 square metres (31 sq metres X 3 200) X $0.33 per sq metre = $32 736 

Actual quantity of inputs X standard price   99200 square metres (31 sq metres X 3 200) X $0.30 = $29 760 

Standard quantity allowed for output X standard price   96 000 square metres (30 sq metres X 3 200) X $0.30 = $28 800 

Price variance is $2 976 U  Quantity variance is $960 U 

Page 18: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   18  

c) and d) Direct labour rate and efficiency variances  Actual results  Flexible budget 

Actual hours of inputs X actual rate 800 hours (3 200 frames X 15 minutes per frame) X $24.00 per hour wage rate = $19 200  

Actual hours of inputs X standard rate  800 hours (3 200 frames X 15 minutes per frame) X $22.00 per hour = $17 600 

Standard hours allowed for output X standard rate  853.33 hours (3 200 frames X 16 minutes per frame) X $22.00 per hour = $18 773.26 

Rate variance is $165 U  Efficiency variance is $1 173.26 F 

g) and h) Fixed overhead spending and production volume variances  Actual results  Budgeted   Flexible budget Allocated fixed overhead applied 

Actual hours of inputs X actual rate  $14 080 (1 600 machine hours X $8.80 per machine hour) 

Budgeted amount regardless of output  $13 496 (1 400 machine hours X $9.64 per machine hour) 

Budgeted amount regardless of output  $13 496 (1 600 machine hours X $8.44 per machine hour) 

Standard hours allowed for output X standard rate $14 395.70  (1 493.33 machine hours (3 200 frames X 28 minutes per frame) machine hours X $9.64 per machine hour) 

Spending variance is $584 U  Production volume variance is $899.70 F 

e) and f) Variable overhead spending and efficiency variances  Actual results    Flexible budget 

Actual hours of inputs X actual rate  $13 280 (1 600 machine hours (3 200 X 30 minutes)  $8.30 per machine hour) 

Actual hours of inputs X standard rate  $13 712 (1 600 machine hours (3 200 X 30 minutes) X $8.57 per machine hour 

Standard hours allowed for output X standard rate  $12 797.84 (1 493.33 hours (3 200 frames X 28 minutes) machine hours X $8.57 per machine hour) 

Spending variance is $432 F  Efficiency variance is $914.16 U 

4.22 Direct materials price and quantity variances 

Actual results    Flexible budget Actual quantity of inputs X actual price   7 200 square metres X $210 per sq metre = $1 512 000 

Actual quantity of inputs X standard price   7 200 square metres X $200 per sq metre = $1 440 000 

Standard quantity allowed for output X standard price   6 900 square metres (3 sq metres X 2 300 rugs) X $200 per sq metre = $1 380 000 

Price variance is $72 000 U  Quantity variance is $60 000 U 

Direct labour rate and efficiency variances  Actual results    Flexible budget 

Actual hours of inputs X actual rate  4 400 hours X $22.00 per hour wage rate = $96 800  

Actual hours of inputs X standard rate  4 400 hours X $21.00 per hour = $92 400 

Standard hours allowed for output X standard rate  4 600 hours (2 300 rugs x 2 hour per rug) X $21.00 per hour = $96 600 

Rate variance is $4 400 U  Efficiency variance is $4 200 F 

 

Page 19: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   19  

Fixed overhead spending and production volume variances  Actual results  Budgeted   Flexible budget Allocated fixed overhead applied 

Actual hours of inputs X actual rate  $60 000 (50 000 machine hours X $1.20 per machine hour ($60 000/50 000 machine hours) 

Budgeted amount regardless of output  $63 750 (51 000 machine hours X $1.25 per machine hour) 

Budgeted amount regardless of output  $63 750 (50 000 machine hours X $1.275 per machine hour) 

Standard hours allowed for output X standard rate $67 500 (54 000 machine hours (27 000 rugs X 2 hours per rug) X $1.25 per machine hour) 

Spending variance is $3 750 F  Production volume variance is $3 750 F 

Overhead application rate  

Budgeted Fixed Overhead costs $63 750/51 000 machine hours = $1.25 per machine hour 

Variable overhead spending and efficiency variances  Actual results    Flexible budget 

Actual hours of inputs X actual rate  $38 000 (50 000 machine hours x $0.76 per hour*) 

Actual hours of inputs X standard rate  $45 500 (50 000 machine hours x $0.91 per hour) 

Standard hours allowed for output X standard rate  $49 140 (54 000 machine hours (27 000 rugs X 2 hours per rug) x $0.91 per machine hour) 

Spending variance is $7 500 F  Efficiency variance is $3 640 F 

* $38 000/50 000 machine hours = $0.76 per machine hour 

$46 000/51 000 machine hours = $0.91 per machine hour 

4.23  a) Predetermined overhead per machine hour 

  $430 000/4 570 = $94.09 per machine hour  

b) Cost of new outback tent 

Direct materials ($463 000/500)         $   926 per tent 

Direct labour ($23 560/500)         $     47 per tent 

Overheads ($94.09 X 160 hours = $15 054.40/500)    $     30 per tent 

Total cost of one tent          $1 003 

c) Price to be charged of one new tent  

  $1 003 + ($1 003 X 35%) 

  $1 003 + 351 

= $1 354 

Therefore the price to charge of one new camping tent is $1 354 

d) The factors that would be considered would be: o The selling price that the customer is willing to pay 

o The selling price that is competitive in the marketplace  

o The desired rate of return on investment, that is, what profit margin does the business wish to make. o The business’s costs, as all costs must be covered. 

Page 20: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   20  

4.24 a) Predetermined overhead rates 

Cutting and Assembly Department 

$460 000/7 200 machine hours = $63.89 per machine hour 

Finishing Department  

$250 000/3 500 direct labour hours = $71.43 per direct labour hour 

b) Production targets 

Model Basic – 1 500 X 70% = 1 050 products 

Model Luxury – 1 500 X 30% = 450 products 

Cost of making Model Basic 

Direct Materials: Cutting and Assembly – 890 000 X 60% = 534 000/1 050   $   508.57 

Direct Materials: Finishing – 370 000 X 60% = 222 000/1 050       $   211.43 

Direct labour 

Cutting and Assembly – 1 400 hours X 50% = 

700 hours X $30 per hour =  21 000/1 050            $    20.00 

Finishing – 3 500 hours X 50% =  

1 750 hours X $35 per hour = 61 250/1 050               $     58.33 

Overheads 

Cutting and Assembly – 7 200 X 70% =  

5 040 hours X $63.89 per hour = $322 005.60/1 050          $   306.67 

Finishing – 3 500 X 50% =  

1 750 hours X $71.43 per hour = $125 002.50/1 050         $   119.05 

Total cost of making the Model Basic           $1 224.05 

Cost of making Model Luxury 

Direct Materials 

Cutting and Assembly – 890 000 X 40% = 356 000/450          $   791.11 

Finishing – 370 000 X 40% = 148 000/450           $   328.89 

Direct labour 

Cutting and Assembly – 1 400 hours X 50% =  

700 hours X $30 per hour = 21 000/450            $     46.67 

Finishing – 3 500 hours X 50% =  

1 750 hours X $35 per hour = 61 250/450           $   136.11 

Page 21: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   21  

Overheads 

Cutting and Assembly – 7 200 X 30% =  

2 160 hours X $63.89 per hour = $138 002.40/450         $   306.67 

Finishing – 3 500 X 50% =  

1 750 hours X $71.43 per hour = $125 002.50/450         $   277.78 

Total cost of making the Model Basic           $1 887.23 

c) Price Model Basic 

  $1 224.05 + ($1 224.05 X 25%) 

  $1 224.05 + 306.01 

= $1 530 

Therefore the price to charge for Model Basic is $1 530 

Price Model Luxury 

  $1 887.23 + ($1 887.23 X 30%) 

  $1 887.23 + 566.17 

= $2 453 

Therefore the price to charge for Model Basic is $2 453 

4.25  a) Charge our rate for a partner and an associate 

Cost of overheads 

Salaries of secretarial staff        $  90 000 

Electricity            $    5 700 

Insurance            $    3 700 

Rent of office space        $  40 000 

Office supplies          $  18 500 

Depreciation of office equipment       $  19 500 

Repairs to equipment         $    2 700 

Professional requirements costs      $  10 000 

Miscellaneous costs        $  15 500 

Total overhead           $205 600 

Total hours 1 800 X 7 staff = 12 600 hours  

Predetermined Overhead Rate  

$205 600/12 600 hours = $16.32 per hour 

 

Page 22: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   22  

Partners charge our rate 

Salary costs ($270 000/1 800)      $150.00 per hour 

Overhead costs          $  16.32 per hour 

Total cost            $166.32 per hour 

Associates charge out rate 

Salary costs ($120 000/1 800)       $  66.67 per hour 

Overhead costs          $  16.32 per hour 

Total cost            $  82.99 per hour 

b) Cost of preparing the three types of personal tax returns 

Basic personal tax returns 

Partners time 2 ½ hours X 20% = ½ hour X $166.32 per hour  $    83.16 

Associates time 2 ½ hours X 80% = 2 hours X $82.99 per hour  $   165.98 

Total cost              $   249.14 

Standard personal tax returns 

Partners time 5 hours X 40% = 2 hours X $166.32 per hour   $   332.64 

Associates time 5 hours X 60% = 3 hours X $82.99 per hour   $   248.97 

Total cost              $   581.61 

Difficult personal tax returns 

Partners time 10 hours X 60% = 6 hour s X $166.32 per hour  $   997.92 

Associates time 10 hours X 40% = 4 hours X $82.99 per hour  $   331.96 

Total cost              $1 329.88 

c) Standard hourly rate for each type of personal tax return 

Basic personal tax returns 

$249.14 + ($249.14 X 20%)   = $298.97 

$298.97/2.5 hours    = $120 per hour 

Standard personal tax returns 

$581.61 + ($581.61 X 20%)   = $697.93 

$697.93/5 hours     = $140 per hour 

Difficult personal tax returns 

$1 329.88 + ($1 329.88 X 20%) = $1 595.86 

$1 595.86/10 hours       = $160 per hour 

 

Page 23: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   23  

Standard price for each type of personal tax return 

Basic personal tax return – 2 ½ hours X $120 per hour = $300 

Standard personal tax return – 5 hours X $140 per hour = $700 

Difficult personal tax return – 10 hours X $160 per hour = $1 600 

4.26  Costs 

Predetermined overhead rate $75 per direct labour hour X 15 hours (3 workers X 5 hours each)   $1 125 

Direct materials               $1 700 

Direct labour $62 per hour X 15 hours (3 workers X 5 hours)      $   930 

Total cost                $3 755 

Mark up 

Cost $3 755 + ($3 755 X 25%) 

= $4 694 

Quote for repairing the vehicle is $4 694 

4.27  Costs  

Prefabrication Department  

Direct materials            $6 000 

Direct labour – 4 hours X $45 per hour        $   180 

Overheads – $23 per machine hour X 10 hours     $   230 

Total cost              $6 410 

Cutting Department 

Direct materials            $   300 

Direct labour – 8 hours X $55 per hour       $   440 

Overheads – $18 per machine hour X 8 hours      $   144 

Total cost              $   884 

Construction Department  

Direct materials            $   500 

Direct labour – 30 hours X $61 per hour        $1 830 

Overheads – $3 per machine hour X 30 hours      $     90 

Total cost              $2 420 

Total overall cost            $9 714 

Page 24: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   24  

Mark up 

$9 714 + ($9 714 X 28%) = $12 434 

Quote for making and erecting the patio is $12 434 

4.28  a) Predetermined overhead rate 

Manufacturing Department Air‐conditioners –  

$530 000/5 000 machine hours        $106 per machine hour 

Manufacturing Department Other Parts –  

$257 000/3 000 machine hours      $  86 per machine hour 

Installation Department –  $210 000/30 000 direct labour hours     $    7 per direct labour hour 

Model A67 costs 

Direct materials  

Manufacturing Department Air‐conditioners –     $1 958 000 

Manufacturing Department Other Parts –       $1 120 000 

Total Direct materials cost          $3 078 000 

Direct labour 

Manufacturing Department Air‐conditioners –  

9 750 X 30% = 2 925 hours X $30 per hour        $     87 750 

Manufacturing Department Other Parts –  

2 470 X 30% = 741 hours X $35 per hour        $     25 935 

Total Direct labour cost          $   113 685 

Overheads  

Manufacturing Department Air‐conditioners –  

5 000 X 35% = 1 750 hours X $106 per hour        $   185 500 

Manufacturing Department Other Parts –    

3 000 X 35% = 1050 hours X $86 per hour        $     90 300 

Total Overhead cost          $   275 800 

Total cost to make Model A67        $3 467 485 

Cost of making one Model A67: 

Production 2 500 X 40% = 1 000 air conditioners  

Therefore $3 467 485/1 000 = $3 467 each 

Page 25: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   25  

b) Direct materials  

Installation Department –           $190 000 

Direct labour 

Installation Department –  

30 000 X 30% = 9 000 hours X $35 per hour       $315 000 

Overheads  

Installation Department –  

30 000 X 30% = 9 000 hours X $7 per hour       $  63 000 

Total cost of one             $568 000 

Cost of one Basic Installation Package: 

Production 2 500 X 40% = 1 000 air conditioners 

Therefore $568 000/1 000 = $568 each 

c) Quote for Holly Spears 

One A67 Basic Air Conditioner           $3 467 

One Basic Installation Package           $   568 

Other parts for installation             $   250 

Extra direct labour time 2 hours $35 per hour =       $     70 

Total cost                $4 355 

Plus mark up $4 355 X 25%            $1 089 

Total cost to make and install           $5 444 

Essay The following is a skeleton outline only showing some key points. 

Cost accounting is important to the accurate measuring, analysing, recording and reporting on the cost of a product or service so as to determine the selling price of an item and its profitability. Cost accounting information is therefore used to make informed decisions and to maximise profits. The business can see how profit is linked closely with costs and the level of business activity. 

Costing can be used to improve the efficiency and effectiveness of business operations through identifying value‐added and non‐value‐added costs. The latter can then be eliminated to make the business more profitable. 

Specifically cost accounting is important and useful as follows: 

• control of costs – comparing actual product costs with planned costs and, if necessary, taking corrective action so that the predetermined targets are met in the future 

• planning – using past product costs to estimate future product costs 

• inventory valuation – calculating the value of products that are complete (finished goods) and products that are partially complete (work in progress) at the end of each accounting period for inclusion in the financial statements 

• the setting of selling prices – often set with reference to the cost of the product or service • determining profitability – management can determine if it is worth producing or selling the product or service. 

Page 26: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   26  

In explaining how it is useful students should give examples for each of the above relating to manufacturing, service and retail businesses.  

Job order costing is the process of recording all the costs of a distinct product or service. A job order costing system is used when a business creates a single unit or multiple units of a distinct product, makes a product to a customer order or provides a service to meet specific customer requirements. 

Each job has its own special characteristics and may be, for example, a single product, a batch of the same product or a service provided to an individual client. In each case the job uses its own specific resources. A batch may be a variety of wine, a type of shirt made for a particular market or a small quantity of invitations printed for an expo. The business may manufacture a number of different unique products in small or large quantities or provide a number of different services to meet client requests. The product being manufactured or service provided is unique and different to the other products being made by the business. 

Job order costing is used in both manufacturing and service industries but is rarely used in merchandising firms as the cost of the product is already known.  

Many firms are not purely manufacturing, merchandising or service firms, but a bit of each, as they may make and/or sell a product and also provide a service to the customer. For example, a firm may manufacture, sell and install swimming pools or a café may make sandwiches, sell pre‐purchased cakes and provide customers with an agreeable venue to eat them in. Job order costing is used in such service industries as accounting firms, legal firms and repair shops. 

Job order costing records all the costs for each finished job whereby all costs are traced and allocated to the job and the quantity noted. It is possible then to calculate the average cost per unit of the item being made or service provided. 

A job order costing system is used when a business creates a single unit or multiple units of a distinct product, makes a product to a customer order or provides a service to meet specific customer requirements. 

Each job has its own special characteristics and may be, for example, a single product, a batch of the same product or a service provided to an individual client. In each case the job uses its own specific resources. A batch may be a variety of wine, a type of shirt made for a particular market or a small quantity of invitations printed for an expo. The business may manufacture a number of different unique products in small or large quantities or provide a number of different services to meet client requests. The product being manufactured or service provided is unique and different to the other products being made by the business. 

Job order costing is used in both manufacturing and service industries but is rarely used in merchandising firms as the cost of the product is already known. Job order costing is used in such service industries as accounting firms, legal firms and repair shops. 

Job order costing records all the costs for each finished job whereby all costs are traced and allocated to the job and the quantity noted. It is possible then to calculate the average cost per unit of the item being made or service provided. 

Actual costing calculates the cost of a product or service using the actual direct materials, actual direct labour and actual overheads costs. All costs are applied to the actual quantity. In the case of the actual overhead costs, an actual overhead rate is applied at the end of each accounting period to the product or service to determine the total unit cost. 

Normal costing determines the cost of a product or service with job order costing using actual direct materials, actual direct labour and a predetermined overhead rate. These figures are applied to the actual quantity related to a job. The predetermined overhead rate allocates the indirect costs of production to the actual quantity of the product or service produced. 

Absorption costing is the method whereby all fixed manufacturing costs and variable manufacturing costs are included in the product cost. 

Standard costing is a system of product costing where the cost of a product is based on standard costs for direct materials, direct labour and manufacturing overheads. A standard cost is a predetermined cost and based on some preconceived benchmark of what is considered appropriate to the making of a product. 

Page 27: Chapter 4: INTRODUCTION TO COST ACCOUNTING · Chapter 4: INTRODUCTION TO COST ACCOUNTING ... 4. Cost behaviour is how a cost changes in relation to the level of production activity.

 

Nelson Accounting and Finance for WA 3A3B 9780170182058 © Cengage Learning Australia 2010   27  

A direct cost is able to be traced to a product or service with a high degree of accuracy. Directly traceable means that the cost can be physically and easily (i.e. economically and conveniently) traced to the finished product. Direct materials and direct labour are the two most common direct costs for a business. Indirect costs are not so easily traced to a product or service. These are items that are not actually incorporated in the product or are too insignificant to make it worth tracing the cost to the finished product 

Fixed costs are those that do not change in total when the level of activity changes. For example, the rent of a factory building will be the same in total no matter how many units are produced. A variable cost is one that changes in total as the level of activity changes. For example, the cost of raw materials in total will increase as the level of units produced increases 

A product cost includes all those costs that are attributable to a product and are those costs to do with merchandise acquired or manufactured or a service provided. It is recorded as an expense in the period in which the product is sold and this will be recorded as the cost of goods. The product is an asset because it has future economic benefit to the business. Costs that are not product costs are period costs. Period costs are an expense and therefore shown in the business income statement in the period in which they are incurred. A period cost is a cost that relates to the current accounting period and which does not have a future economic benefit to the business. Period costs are not carried forward with the product until the time of sale.  

Ethics case study The General Manager may have chosen direct labour hours for the allocation of overheads instead of the machine hours recommended by the Financial Controller so as to ensure that more or less cost is charged to the contract. The selection of the inappropriate cost allocation base could see more or less cost charged to the contract than would otherwise be the case if machine hours had been chosen. 

The first ethical issue relates to the over‐charging or under‐charging of cost to the Sarich contract. The question here is why? Is it to make extra profit out of the Sarich contract or is under‐charge them so as to ensure further business in the future. The other question related to this is ethical issue is: what is the relationship of the General Manager to the Sarich contract? Is there a conflict of interest?  

A further ethical issue relates to the perceived technical competence of the financial controller. This decision of the General Manager could reflect poorly, although not correctly so, on the Financial Controller. If a problem was to occur in the future with the Sarich business and this contract, and the Board of Directors was to investigate all aspects of the contract, it could perhaps incorrectly attribute some of the problem to financial controller for not selecting the appropriate allocation base. This business may have under‐charged or over‐charge Sarich and may blame this on the Financial Controller. 

The Financial Controller has a number of possible options. He/she could contact the Board of Directors of Digital Electronics Ltd and explain his/her concerns to them. He/she could write a memo to the General Manager outlining his/her concerns and in this way place it on the records. He/she could contact the Sarich business, although this may be seen by Digital as breaking confidentiality. A further possible course of action is for the Financial Controller to resign.