Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

28
Chapter 36 Chapter 36 Quality Engineering Quality Engineering Part 2 Part 2 (Review) (Review) EIN 3390 Manufacturing Processes EIN 3390 Manufacturing Processes Summer A, 2012 Summer A, 2012

Transcript of Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Page 1: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Chapter 36Chapter 36Quality EngineeringQuality Engineering

Part 2Part 2(Review) (Review)

EIN 3390 Manufacturing ProcessesEIN 3390 Manufacturing ProcessesSummer A, 2012Summer A, 2012

Page 2: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.3 Inspection to Control Quality36.3 Inspection to Control Quality

Inspection is the function that controls the quality manually, or automatically.

How much should be inspected:

1.Inspect every item being made2.Sample3.None. Assume that everything is

acceptable or the product is inspected by customer, who will exchange it in case it is defective.

Page 3: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.3.1 Statistical Process Control (SPC)36.3.1 Statistical Process Control (SPC)

Sampling requires statistical techniques for decisions about the acceptability of the whole based on sample’s quality. This is known as statistical process control (SPC).

The most widely used basic SPC technique is the control charts.

Page 4: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Control charts for variables are used to monitor the output of a process by 1) sampling, 2) measuring selected quality characteristics,

and3) plotting the sample data on the chart, then

making decisions about the performance of the process.

Page 5: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Figure 36 – 13 shows the basic structure of two charts commonly used for variable types of measurements.

1. X chart tracks the aim (accuracy) of the process.

2. R chart (or chart) tracks the precision or variability of the process.

Usually, only X chart and R chart are used unless the sample size is large (n > 12), and then chart are used in place of R chart.

Page 6: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.3 Inspection to Control Quality36.3 Inspection to Control Quality

Page 7: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Quality CalculationsQuality Calculations

FIGURE 36-13 Quality control chart calculations. On the charts, X plot and R values over time. The constants for calculating UCL and LCL values for the X and R charts are based on 3 standard deviations.

R = Xhigh – X low

= R/d2

A2 = 3/[d2 SQRT(n)]Where, n – sample size

x/n

+

-

Page 8: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Samples are drawn over time. Because some sample statistics tend to be

normally distributed about their own mean, x value are normally distributed about x, and R values are normally distributed about R, and values are normally distributed .

Quality control charts are widely used as aids in maintaining quality and detecting trends in quality variation before defective parts are actually produced.

Page 9: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

When sampling inspection is used, the typical sample sizes are from 3 to about 12.

Fig 16 – 4 shows one example of X and R charts for measuring a dimension of a gap on a part with 25 samples of size 5 over 6 days.

Page 10: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

FIGURE 36-14 Example of X and R charts and the data set of 25 samples [k 25 of size 5 (n = 5)].(Source : Continuing Process Critical and Process Capability Improvement, Statistical Methods Office, Ford Motor Co., 1985.)

0.178

Page 11: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Corrections in textbook

Page 12: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

After control charts have been established, the charts act as a control indicator for the process.

If the process is operating under chance cause conditions, the data will appear random (no trends or pattern).

If X, R or values fall outside the control limits or if nonrandom trends occur, like a.) 7 points on one side of the central line or b.) 6 successive increasing or decreasing points appear, an assignable cause or change may have occurred, and action should be taken to correct the problem.

Page 13: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.4 Process Capability Determination from 36.4 Process Capability Determination from Control Chart Data Control Chart Data

-1

Page 14: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.4 Process Capability Determination 36.4 Process Capability Determination from Control Chart Data from Control Chart Data

After the process is determined to be “under control”, the data can be used to estimate the process capability parameters.

A sample size 5 was used in the example, so n = 5 (Fig 36 – 14). 25 groups of samples were drawn from the process, so K = 25.

For each sample, the sample mean x and sample range R are computed. For large samples, N > 12, the standard deviation of each sample should be computed rather than the range.

Page 15: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.4 Process Capability Determination 36.4 Process Capability Determination from Control Chart Data from Control Chart Data

X, sometimes called grand average is used to estimate the mean of the process, .

For the standard deviation of the process ’, we can use either R, the average of the sample ranges, or the average of the sample standard deviations to estimate ’. ’ = R/d2 or ’c

Page 16: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.5 Determining Causes For 36.5 Determining Causes For Problems in QualityProblems in QualityFishbone diagram developed by Kaorw Ishikowa

in 1943 is used in conjunction with control chart to root out the causes of problems.

Fishbone diagram is also known as Cause-and-effect.

Fishbone lines are drawn from the main line. These lines organize the main factors. Branching from each of these factors are even more detailed factors.

Page 17: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.5 Determining Causes For 36.5 Determining Causes For Problems in QualityProblems in QualityFour “M” are often used in fishbone diagram:

Men, Machines, Materials, and Methods.

CEDAC – Cause-and-Effect Diagram with the Additional of Cards. The effect is often tracked with a control chart. The possible causes of defects or problems are written on cards and inserted in slots in the cards.

Page 18: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Fishbone DiagramFishbone DiagramFIGURE 36-15 Example of a fishbone diagram using a control chart to show effects.

Page 19: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Fishbone DiagramFishbone DiagramFIGURE 36-15 Example of a fishbone diagram using a control chart to show effects.

Page 20: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.5.1 Sampling Errors 36.5.1 Sampling Errors

Two kinds of decision errors: Type I Error ( error): process is running

perfectly, but sample data indicate that something is wrong.

Type II error ( error): process is not running perfectly and was making defective products, but sample data didn’t indicate that anything was wrong.

Page 21: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

ErrorsErrors

FIGURE 36-16 When you lookat some of the output from aprocess and decide about thewhole (i.e., the quality of theprocess), you can make twokinds of errors.

Page 22: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

ErrorsErrors

FIGURE 36-16 When you lookat some of the output from aprocess and decide about thewhole (i.e., the quality of theprocess), you can make twokinds of errors.

Page 23: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.5.3 Design of Experiments (DOE) 36.5.3 Design of Experiments (DOE) and Taguchi Methodsand Taguchi Methods

SPC looks at processes and control, Taguchi methods loosely implies “improvement”.

DOE and Taguchi methods span a much wider scope of functions and include the design aspects of products and processes, areas that were seldom treated from quality standpoint view. Consumer is the focus on quality, and the methods of quality design and controls have been incorporated into all phases of production.

Page 24: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

Taguchi MethodTaguchi Method

FIGURE 36-18 The use ofTaguchi methods can reduce theinherent process variability, asshown in the upper figure.Factors A, B, C, and D versusprocess variable V are shown inthe lower figure.

Page 25: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.5.4 Six Sigma36.5.4 Six Sigma

FIGURE 36-19 To move to six sigma capability from four sigma capability requires that theprocess capability (variability) be greatly improved ( reduced). The curves in these figures representhistograms or curves fitted to histograms.

Page 26: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

36.5.5 Total Quality Control (TQC)36.5.5 Total Quality Control (TQC)

Total Quality Control (TQC) was first used by A. V. Feigenbaum in may 1957.

TQC means that all departments of a company must participate in quality control (Table 36 – 1).

Page 27: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Page 28: Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.

HW for Chapter 36HW for Chapter 36

Review Questions:13, 17, 24, 27, 28 (page 997)Problems: 6 (page 999)