CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.
-
Upload
poppy-brown -
Category
Documents
-
view
264 -
download
4
Transcript of CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.
![Page 1: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/1.jpg)
CHAPTER 10CHAPTER 10CHAPTER 10CHAPTER 10
Budgetary Planning and Control
Budgetary Planning and Control
![Page 2: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/2.jpg)
Budgeting BasicsBudgeting Basics
Components of the Master
Budget.
![Page 3: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/3.jpg)
Expected sales volume: 3,000 units in the first quarter with 500-unit increments for each following quarter.
Sales price: $60 per unit.
Illustration – Hayes Company manufactures and sells a single product, Kitchen-Mate. The budgets are prepared by quarters for the year ending December 31, 2011. Hayes company begins its annual budgeting process on September 1, 2010, and it completes the budget for 2011 by December 1, 2010.
Preparing the Operating Budget
![Page 4: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/4.jpg)
Shows units that must be produced to meet anticipated sales.
Derived from sales budget plus the desired change in ending finished goods.
Required production in units formula:
Essential to have a realistic estimate of ending inventory.
Production Budget
Preparing the Operating BudgetsPreparing the Operating Budgets
![Page 5: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/5.jpg)
Hayes Co. believes it can meet future sales needs with an ending inventory of 20% of next quarter’s sales.
Illustration – Hayes Company
Preparing the Operating BudgetsPreparing the Operating Budgets
![Page 6: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/6.jpg)
Shows both the quantity and cost of direct materials to be purchased.
Formula for direct materials quantities.
Direct Materials Budget
Budgeted cost of direct materials to be purchased = required units of direct materials x anticipated cost per unit.
Preparing Operating BudgetsPreparing Operating Budgets
![Page 7: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/7.jpg)
Inadequate inventories could result in temporary shutdowns of production. Because of its close proximity to suppliers,
Hayes Company maintains an ending inventory of raw materials equal to 10% of the next quarter’s production requirements.
The manufacture of each Kitchen-Mate requires 2 pounds of raw materials, and the expected cost per pound is $4.
Assume that the desired ending direct materials amount is 1,020 pounds for the fourth quarter of 2011.
Prepare a Direct Materials Budget.
Illustration – Hayes Company
Preparing Operating BudgetsPreparing Operating Budgets
![Page 8: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/8.jpg)
Illustration – Hayes Company
Preparing Operating BudgetsPreparing Operating Budgets
![Page 9: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/9.jpg)
Shows both the quantity of hours and cost of direct labor necessary to meet production requirements.
Critical in maintaining a labor force that can meet expected production.
Total direct labor cost formula:
Direct Labor Budget
Preparing Operating BudgetPreparing Operating Budget
![Page 10: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/10.jpg)
Illustration: Direct labor hours are determined from the production budget. At Hayes Company, two hours of direct labor are required to produce each unit of finishedgoods. The anticipated hourly wage rate is $10.
Preparing Operating BudgetPreparing Operating Budget
![Page 11: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/11.jpg)
Projection of anticipated operating expenses.
Distinguishes between fixed and variable costs.
Selling and Administrative Expense Budget
Illustration: Variable expense rates per unit of sales are sales commissions $3 and freight-out $1. Variable expenses per quarter are based on the unit sales from the sales budget (Illustration 9-3). Hayes expects sales in the first quarter to be 3,000 units. Fixed expenses are based on assumed data.
Prepare a selling and administrative expense budget.
Preparing Operating BudgetsPreparing Operating Budgets
![Page 12: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/12.jpg)
Selling and Administrative Expense Budget
Preparing Operating BudgetsPreparing Operating Budgets
![Page 13: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/13.jpg)
Important end-product of the operating budgets.
Indicates expected profitability of operations.
Provides a basis for evaluating company performance.
Prepared from the operating budgets:
Budgeted Income Statement
Manufacturing Overhead
Selling and Administrative Expense
Sales
Direct Materials
Direct Labor
Preparing Operating BudgetsPreparing Operating Budgets
![Page 14: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/14.jpg)
Illustration: To find the cost of goods sold, it is first necessary to determine the total unit cost of producing one Kitchen-Mate, as follows.
Second, determine Cost of Goods Sold by multiplying units sold times unit cost: 15,000 units X $44 = $660,000
Budgeted Income Statement
Preparing Operating BudgetsPreparing Operating Budgets
![Page 15: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/15.jpg)
Illustration: All data for the income statement come from the individual operating budgets except the following: (1) interest expense is expected to be $100, and (2) income taxes are estimated to be $12,000.
Preparing Operating BudgetsPreparing Operating Budgets
![Page 16: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/16.jpg)
Shows anticipated cash flows.
Often considered to be the most important output in preparing financial budgets.
Contains three sections:
Cash Receipts
Cash Disbursements
Financing
Shows beginning and ending cash balances.
Cash Budget
Preparing Financial BudgetsPreparing Financial Budgets
![Page 17: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/17.jpg)
Cash Budget - Basic Format
Preparing Financial BudgetsPreparing Financial Budgets
![Page 18: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/18.jpg)
Cash Receipts Section Includes expected receipts from the principal sources of
revenue.
Shows expected interest and dividends receipts as well as proceeds from planned sales of investments, plant assets, and capital stock.
Cash Disbursements Section Includes expected cash payments for direct materials
and labor, taxes, dividends, plant assets, etc.
Financing Section Shows expected borrowings and repayments of
borrowed funds plus interest.
Preparing Financial BudgetsPreparing Financial Budgets
![Page 19: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/19.jpg)
Must prepare in sequence.
Ending cash balance of one period is the
beginning cash balance for the next.
Data obtained from other budgets and from
management.
Often prepared for the year on a monthly
basis.
Cash Budget
Preparing Financial BudgetsPreparing Financial Budgets
![Page 20: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/20.jpg)
Illustration – Hayes Company Assumptions
1. The January 1, 2011, cash balance is expected to be $38,000. Hayes wishes to maintain a balance of at least $15,000.
2. Sales: 60% are collected in the quarter sold and 40% are collected in the following quarter. Accounts receivable of $60,000 at December 31, 2010, are expected to be collected in full in the first quarter of 2011.
3. Short-term investments are expected to be sold for $2,000 cash in the first quarter.
Continued
Preparing Financial BudgetsPreparing Financial Budgets
![Page 21: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/21.jpg)
Illustration – Hayes Company Assumptions
4. Direct materials: 50% are paid in the quarter purchased and 50% are paid in the following quarter. Accounts payable of $10,600 at December 31, 2010, are expected to be paid in full in the first quarter of 2011.
5. Direct labor: 100% is paid in the quarter incurred.
6. Manufacturing overhead and selling and administrative expenses: All items except depreciation are paid in the quarter incurred.
7. Management plans to purchase a truck in the second quarter for $10,000 cash.
Preparing Financial BudgetsPreparing Financial Budgets
![Page 22: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/22.jpg)
Illustration – Hayes Company Assumptions
8. Hayes makes equal quarterly payments of its estimated annual income taxes.
9. Loans are repaid in the earliest quarter in which there is sufficient cash (that is, when the cash on hand exceeds the $15,000 minimum required balance).
Prepare a schedule of collections from customers.
Preparing Financial BudgetsPreparing Financial Budgets
![Page 23: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/23.jpg)
Illustration – Prepare a schedule of collections from customers.
Preparing Financial BudgetsPreparing Financial Budgets
![Page 24: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/24.jpg)
Illustration – Prepare a schedule of cash payments for direct materials.
Preparing Financial BudgetsPreparing Financial Budgets
![Page 25: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/25.jpg)
Illustration – Cash Budget based on the assumptions and preceding schedules.
Preparing the Financial BudgetsPreparing the Financial Budgets
![Page 26: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/26.jpg)
CHAPTER 11CHAPTER 11CHAPTER 11CHAPTER 11
Standard Costs and Variance Analysis
Standard Costs and Variance Analysis
![Page 27: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/27.jpg)
Both standards and budgets are predetermined costs, and both contribute to management planning and control.
There is a difference:
A standard is a unit amount.
A budget is a total amount
Distinguishing between Standards and Budgets
The Need for StandardsThe Need for Standards
![Page 28: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/28.jpg)
Setting Standard Costs—a Difficult TaskSetting Standard Costs—a Difficult Task
Ideal versus Normal Standards Companies set standards at one of two levels:
Ideal standards represent optimum levels of performance under perfect operating conditions.
Normal standards represent efficient levels of performance that are attainable under expected operating conditions.
Properly set, normal standards should be rigorous but attainable.
![Page 29: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/29.jpg)
Setting Standard Costs—a Difficult TaskSetting Standard Costs—a Difficult Task
A Case Study
To establish the standard cost of producing a product, it is necessary to establish standards for each manufacturing cost element—
direct materials,
direct labor, and
manufacturing overhead.
The standard for each element is derived from the standard price to be paid and the standard quantity to be used.
![Page 30: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/30.jpg)
Setting Standard Costs—a Difficult TaskSetting Standard Costs—a Difficult Task
Direct Materials
The direct materials price standard is the cost per unit of direct materials that should be incurred.
![Page 31: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/31.jpg)
Setting Standard Costs—a Difficult TaskSetting Standard Costs—a Difficult Task
Direct Materials
The direct materials quantity standard is the quantity of direct materials that should be used per unit of finished goods.
The standard direct materials cost is $12.00 ($3.00 x 4.0 pounds).
![Page 32: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/32.jpg)
One of the major management uses of standard costs is to identify variances from standards.
Variances are the differences between total actual costs and total standard costs.
Analyzing and Reporting Variances From StandardsAnalyzing and Reporting Variances From Standards
![Page 33: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/33.jpg)
Illustration: Assume that in producing 1,000 gallons of Weed-O in the month of June, Xonic, Inc. incurred the following costs.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
The total standard cost of Weed-O is $42,000 (1,000 gallons x $42). Thus, total variance is $2,500.
![Page 34: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/34.jpg)
When actual costs exceed standard costs, the variance is unfavorable.
When actual costs are less than standard costs, the variance is favorable.
To interpret properly the significance of a variance, you must analyze it to determine the underlying factors. Analyzing variances begins by determining the cost elements that comprise the variance.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
![Page 35: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/35.jpg)
Direct Materials Variances
In completing the order for 1,000 gallons of Weed-O, Xonic used 4,200 pounds of direct materials. These were purchased at a cost of $3.10 per unit. Standard price is $3.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
Total Materials Variance (TMV)
Actual Quantity x Actual Price (AQ) x
(AP)
Standard Quantity x Standard Price (SQ) x
(SP)- =
$1,020 U$13,020
(4,200 x $3.10)$12,000
(4,000 x $3.00)- =
![Page 36: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/36.jpg)
Direct Materials VariancesNext, the company analyzes the total variance to determine the amount attributable to price (costs) and to quantity (use). The materials price variance is computed from the following formula.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
Materials Price Variance (MPV)
Actual Quantity x Actual Price (AQ) x
(AP)
Actual Quantity x Standard Price (AQ) x
(SP)- =
$420 U$13,020 (4,200 x $3.10)
$12,600 (4,200 X $3.00)
- =
![Page 37: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/37.jpg)
Direct Materials VariancesThe materials quantity variance is determined from the following formula.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
Materials Quantity Variance (MQV)Actual Quantity x
Standard Price (AQ) x (SP)
Standard Quantity x Standard Price (SQ) x
(SP)- =
$600 U$12,600
(4,200 X $3.00)$12,000
(4,000 x $3.00)- =
![Page 38: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/38.jpg)
Price Variance
$13,020 – $12,600 = $420 U
Quantity Variance
$12,600 – $12,000 = $600 U
Total Variance
$13,020 – $12,000 = $1,020 U
Matrix for Direct Materials VariancesMatrix for Direct Materials Variances
1 2 3
1 2- 2 3-
1 3-
Actual Quantity× Actual Price(AQ) × (AP)
4,200 x $3.10 = $13,020
Standard Quantity× Standard Price(SQ) × (SP)
4,000 x $3.00 = $12,000
Actual Quantity× Standard Price(AQ) × (SP)
4,200 x $3.00 = $12,600
![Page 39: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/39.jpg)
The standard cost of Product XX includes two units of direct materials at $8.00 per unit. During July, the company buys 22,000 units of direct
materials at $7.50 and uses those materials to produce 10,000 units. Compute the total, price, and quantity variances for materials.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
![Page 40: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/40.jpg)
Direct Labor VariancesIn completing the Weed-O order, Xonic, Inc. incurred 2,100 direct labor hours at an average hourly rate of $9.80. The standard hours allowed for the units produced were 2,000 hours (1,000 gallons x 2 hours). The standard labor rate was $10 per hour. The total labor variance is computed as follows.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
(2,100 x $9.80) - (2,000 x $10.00) = $580 U
![Page 41: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/41.jpg)
Direct Labor Variances
Next, the company analyzes the total variance to determine the amount attributable to price (costs) and to quantity (use). The labor price variance is computed from the following formula.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
(2,100 x $9.80) - (2,100 x $10.00) = $420 F
![Page 42: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/42.jpg)
Direct Labor Variances
The labor quantity variance is determined from the following formula.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
(2,100 x $10.00) - (2,000 x $10.00) = $1,000 U
![Page 43: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/43.jpg)
Manufacturing Overhead Variances
Manufacturing overhead variances involves total overhead variance, overhead controllable variance, and overhead volume variance.
Manufacturing overhead costs are applied to work in process on the basis of the standard hours allowed for the work done.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
![Page 44: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/44.jpg)
Total Overhead VarianceThe total overhead variance is the difference between actual overhead costs and overhead costs applied to work done. The computation of the actual overhead is comprised of a variable and a fixed component.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
The predetermined rate for Weed-O is $5, comprised of a variable overhead rate of $3 and a fixed rate of $2.
![Page 45: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/45.jpg)
Total Overhead VarianceThe formula for the total overhead variance and the calculation for Xonic, Inc. for the month of June.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
![Page 46: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/46.jpg)
The overhead variance is generally analyzed through a price variance and a quantity variance.
Overhead controllable variance (price variance) shows whether overhead costs are effectively controlled.
Overhead volume variance (quantity variance) relates to whether fixed costs were under- or over-applied during the year.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
Total Overhead Variance
![Page 47: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/47.jpg)
The standard cost of Product YY includes 3 hours of direct labor at $12.00 per hour. The
predetermined overhead rate is $20.00 per direct labor hour. During July, the company incurred 3,500 hours of direct labor at an average rate of $12.40 per hour and $71,300 of manufacturing overhead costs. It produced 1,200 units. (a) Compute the total, price, and quantity variances for labor. (b) Compute the total overhead variance.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
![Page 48: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/48.jpg)
Reporting Variances
All variances should be reported to appropriate levels of management as soon as possible.
The form, content, and frequency of variance reports vary considerably among companies.
Facilitate the principle of “management by exception.”
Top management normally looks for significant variances.
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
![Page 49: CHAPTER 10 Budgetary Planning and Control. Budgeting Basics Components of the Master Budget.](https://reader036.fdocuments.in/reader036/viewer/2022081421/56649eef5503460f94bfeca3/html5/thumbnails/49.jpg)
Reporting Variances
Analyzing and Reporting VariancesAnalyzing and Reporting Variances
Materials price variance report for Xonic, Inc., with the materials for the Weed-O order listed first.