Chapter 1
Introduction
![Page 2: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/2.jpg)
1.1 Purpose City/Municipality’s Vision**
Key issues facing the community **
**must have *nice to have
![Page 3: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/3.jpg)
Goals for the plan, and how the plan will help to alleviate the
issues facing the community**
Intent of RA 9003 and its effect on solid waste management*
**must have *nice to have
Example:
![Page 4: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/4.jpg)
1.2 Approach Approach**
Data sources*
**must have *nice to have
Example:
![Page 5: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/5.jpg)
1.3 Acknowledgement*
**must have *nice to have
Example:
![Page 6: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/6.jpg)
Chapter 2
City/Municipal Profile
![Page 7: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/7.jpg)
**must have *nice to have
2.1 Location Location of the city/municipality including map indicating
locations of barangays, as well as residential, commercial,
and industrial centers, and agricultural areas**
Land area**
2.2 History*
![Page 8: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/8.jpg)
Example:
![Page 9: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/9.jpg)
**must have *nice to have
2.3 Population Current population for each barangay, indicating rural and
urban areas**
10-yr projection**
Example:
![Page 10: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/10.jpg)
![Page 11: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/11.jpg)
**must have *nice to have
2.4 Economic Profile/Land Use List of industries within the city/municipality**
Example:
![Page 12: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/12.jpg)
Example:
• Land use map, in particular showing the urban and rural
land use classification**
![Page 13: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/13.jpg)
Example:
![Page 14: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/14.jpg)
Example:
• Major transportation routes and traffic conditions**
![Page 15: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/15.jpg)
**must have *nice to have
2.5 Physical
Characteristics Geography,
geology,
hydrology, soil
and climate of
the area or
region**
Example:
![Page 16: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/16.jpg)
Example:
![Page 17: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/17.jpg)
Chapter 3. Current Solid
Waste Management
Conditions
![Page 18: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/18.jpg)
3.1 Institutional Arrangements**
• List of existing agencies of the city
administration that handle SWM its services, and
the roles and responsibilities of the agencies.
Should include all aspects of SWM such as:
collection, recycling, disposal, IEC, accounting,
implementation and enforcement of regulations.
**
![Page 19: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/19.jpg)
![Page 20: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/20.jpg)
Source: Municipality of Alabel, 10 year SWM Plan.
![Page 21: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/21.jpg)
3.2 Inventory of Equipment and
Staff List of existing equipment**
its capacity and
present conditions,
make,
model,
location for repairs, and others.
Number of personnel (with classification- working in
SWM by department or type of service)**
Type of staff training available
![Page 22: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/22.jpg)
![Page 23: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/23.jpg)
3.3 Source Reduction**
• Discussion of existing waste reduction
practices.
![Page 24: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/24.jpg)
![Page 25: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/25.jpg)
3.4 Collection**
Description of existing system for each service area,including those serviced by private haulers
Type of collection (segregated vs. non-segregated)
Frequency of collection to same area for each type ofcollection
Description of areas not currently receiving collectionservice
If collection service is by a private hauler, provide a listof the haulers, service areas, types of waste collected,location where waste is deposited.
![Page 26: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/26.jpg)
![Page 27: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/27.jpg)
![Page 28: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/28.jpg)
3.5 Transfer
Description of facilities used to transfer solid
waste.
List of facilities including location, capacity, types
of materials accepted, and source of materials.
![Page 29: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/29.jpg)
![Page 30: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/30.jpg)
3.6 Processing Facilities**
Description of facilities used for processing waste, such
as:
material recovery facilities (MRFs)
composting facilities.
List of facilities including
location,
capacity,
types of materials accepted,
source of materials, and
brief description of operations.
![Page 31: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/31.jpg)
![Page 32: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/32.jpg)
3.7 Final Disposal**
Description of facilities used for the final disposal
of solid waste or residues from processing.
List of facilities including location, ownership,
capacity, types of materials accepted, source of
materials, brief description of operations, and
number of scavengers.
Evaluation of the situation of scavengers
working at existing dumpsite.
![Page 33: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/33.jpg)
![Page 34: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/34.jpg)
Special Wastes
• Report of available information on the quantities
of these wastes disposed. **
• Health Care Wastes ** Existing treatment and disposal practices of infectious and other
health care wastes.*
Report of available information on the quantities of these wastes
disposed.*
![Page 35: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/35.jpg)
![Page 36: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/36.jpg)
Markets for Recyclables
List of junk shops in the city/municipality.
Include types and quantities of materials
accepted if possible.**
List of industries in the city/municipality
that use or could use recycled materials.**
![Page 37: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/37.jpg)
![Page 38: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/38.jpg)
Information, Education and
Communication
Description of IEC program.**
List of IEC activities. Include message, targeted
audience, and effectiveness.**
![Page 39: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/39.jpg)
![Page 40: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/40.jpg)
![Page 41: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/41.jpg)
Costs and Revenues
Annual budget for SWM.**
Expenditures for previous year. Include
capital investment, operation and
maintenance, and contracted services.*
Revenues for previous year. Include
revenues from allocations, from fees
charged for the service, and from fines.*
![Page 42: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/42.jpg)
![Page 43: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/43.jpg)
Key Issues
• Brief description of key solid waste
management issues facing the
community.**
![Page 44: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/44.jpg)
![Page 45: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/45.jpg)
LOCAL SWM PLAN
COMPONENT A: WACS
(What is suppose to be seen in
Chapter 4)
![Page 46: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/46.jpg)
How important is a WACS?
1. Waste Generation Projection,10-year
planning period
2. Basis for Chapter 6, target setting;
3. Chapter 7- for the intervention based in
Chapter 6 targets;
4. Projection of Types of Waste for
Diversion in Chapter 8
![Page 47: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/47.jpg)
4.0 waste characteristics
Uses results of WACS and recycling information to determine
quantity and composition of waste generated **
The LGU must give brief introduction of this
component and may describe how important a WACS
is, how it was conducted including sample
determination and identification.
![Page 48: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/48.jpg)
Sample Brief Introduction• WACS is the process of gathering information on the quantity (e.g., tons per day, cubic
meters per day, kilograms per household) and composition (e.g., biodegradable and non-biodegradable) and weight of solid wastes generated from various major sources.
• In order to formulate an achievable waste management plan, planners must have knowledge on the type of waste, weight & volume, and composition of wastes generated within the Municipality. Because the data will guide planners in formulating appropriate waste management strategies, designing facilities, institutional arrangements, and provide baseline information for LGUs to monitor and evaluate its SWM performance in reducing waste generation
• WACS requires preparation and training before the conduct of actual WACS. Identification of the major sources of waste both residential and non-residential sources and sample size determination for both major sources is necessary prior to WACS.
• Sample size for residential sources was determined using Slovin’s Formula at 5% margin of error while 10% of the total number of non-households by category was also taken as sample size.
![Page 49: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/49.jpg)
4.1 Disposed Waste (from WACS)
4.1.1 Quantity of Waste Disposed by Sector
(Residential,Commercial,Institutional,Industrial)
in kgs/day & tons/year)
Table ___. Summary on the Quantity & Waste , Municipality/City
of ______, 2014-2023.
![Page 51: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/51.jpg)
4.1 Disposed Waste (from WACS)
4.1.1 Quantity of Waste Disposed by Sector
(Residential,Commercial,Institutional,Industrial)
in kgs/day & tons/year)
Based on the summary of WACS results shown in
Table 17, a total quantity of 63,510 kgs per day or
23,181 tons per year of waste disposed by sector or
from major sources of waste such as residential,
commercial, institutional, and industrial sources.
However, the daily volume of waste actually
disposed by the LGU in its current collection areas is
only ________ cubic meter/day or equivalent to
______kgs./day or _____ tons per year..
![Page 52: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/52.jpg)
Present in a pie chart the Waste
generations from the four major sources;
![Page 53: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/53.jpg)
PIE CHART SHOWING WASTE GENERATION, ALL MAJOR
SOURCES
TOTAL WASTE GENERATION,
0.00%
RESIDENTIAL, 80.43%
COMMERCIAL , 16.67%
INSTITUTIONS, 1.62% INDUSTRIAL, 1.28%
RESIDENTIAL COMMERCIAL INSTITUTIONS INDUSTRIAL
![Page 54: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/54.jpg)
RESIDENTIAL
RESIDENTIAL, 0.00%
URBAN, 24.88%
RURAL, 49.84%
SUBDIVISION,
5.71%
URBAN
RURAL
SUBDIVISION
Food Establishment
s, 8.28%General Stores, 2.92%
Malls, 0.30%
Public Market, 3.29%
Service Centers, 1.89%
Food Establishments
General Stores
Malls
Public Market
Service Centers
School, 1.03%
Offices, 0.30%
Hospital, 0.05%
Clinics, 0.03%
Church, 0.01%
Bus Station, 0.04%
Financing, 0.15%
School
Offices
Hospital
Clinics
Church
Bus Station
Financing
Food Processing,
0.00%
Manufacturing, 0.65%
Mills, 0.04%
Food Processing
Manufacturing
Mills
COMMERCIAL
INSTITUTIONAL
INDUSTRIAL
OPTIONAL
![Page 55: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/55.jpg)
From the same Table, residential source is being rated asthe biggest waste generator, followed by the Commercial,Institutional & Industrial sources with the following percent sharesof 80.43%, 16.67%, 1.62% and 1.28%, respectively. On thesame Table, it also shows that biodegradable waste has thehighest percent waste composition of about 58.62% over therecyclables, residuals & special waste with respective percentshares of 19.57%; 20.59 & 1.22%.
Table 17, also shows that the LGU has a maximum potentialfor diversion (MPD) of 91.80% broken down as follows:
Biodegradable - 58.62%;
Recyclable - 19.57%; and
Residual with - 13.61
Maximum Potential for Diversion = 91.80%
Total Potential Materials for Recycling & Resource Recovery = 33.18%
![Page 56: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/56.jpg)
Biodegradable, 58.62%
Recyclable, 19.57%
Residuals, 20.59%
Special, 1.22%
Biodegradable
Recyclable
Residuals
Special
Percent waste composition, LGU
LEVEL
![Page 57: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/57.jpg)
Optional pie chart:
Types of waste under biodegradable waste
composition (Residential & Non-Residential
level);
![Page 58: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/58.jpg)
Percent share of waste types under
biodegradable at residential level
Yard waste, 38.59%
Veg & Fruit residues, 11.94%
Fish cleanings, 4.01%
Food /kitchen wastes, 4.66%
Animal carcassess, 0.77%
Agricultural wastes, 2.00%
Yard waste
Veg & Fruit residues
Fish cleanings
Food /kitchen wastes
Animal carcassess
Agricultural wastes
![Page 59: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/59.jpg)
4.2 Diverted Waste
4.2.1 Quantity of waste currently recycled and composted based on 3.4 & 3.6** (3.3 & 3.6);
a. Source reduction (3.3) such as backyard composting (pit method), windrows composting and any other methods
b List of MRFs (Composting & Recycling) including location, capacity, Types of materials accepted, source of materials
c List of Junkshops (get estimated quantity of recyclables bought per day within the LGU) ;
d Add altogether the above (a+b+c) =Total waste diverted of the LGU
![Page 60: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/60.jpg)
4.3 Generated Waste
4.3.1 Quantity of Waste Generated (disposed + diverted)**
Make a brief discussion with reference to Table 17 again , emphasizing waste disposed in Chapter 4.1 based on WACS + diverted ( 4.2.1) = the LGU Generated Waste.
4.3.2 Projection of quantity of waste generated based on population (residential Level) PLUS Projection quantity non-residential level EQUALS LGU projected waste generation within the 10-year planning period.
How to make Projection at the Non-HH level
![Page 61: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/61.jpg)
TABLE _____ Waste Projection from Residential & Non-Residential Sources, CY 2014-2023.
MAJOR SOURCES
Waste 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Generation 1 2 3 4 5 6 7 8 9
per day (kgs) Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Residential 51,078 18,643.47Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Proj Popn X
pcg
Non-residential 12,432 13,919.21 15,584.34 17,448.66 19,536.00 21,873.05 24,489.67 27,419.32 30,699.43 34,371.93 38,483.77
TOTAL 63,510 32,562.68
![Page 62: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/62.jpg)
Summary on the Quantity & Waste Composition
for the LGU, Residential Level, 2014-2023.
Summary on the Quantity & Waste Composition from
Sample Sources, Residential Level, 2014-2023.
Summary on the Quantity & Waste Composition from
Sample Sources, Non-Residential Level, 2014-2023
OTHER TABLES (Part of the Plan or Part of the
Annexes)
![Page 63: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/63.jpg)
TABLE 15. Summary Showing the Quantity and Composition of Waste Disposed from the City of San Jose, Residential Level, CY 2014.
Outright
Sando
bagsThin films
Composit
ePP Others Sub Total
For
Disposal
Urban Brgys
Abar 1st 17,007 0.36 6,153.92 12.05% 3,361.97 1,216.42 25.4 127.17 115.23 332.17 327.16 927.12 549.84 1,476.97 98.57
FE Marcos 1,576 0.61 954.7 1.87% 521.56 188.71 3.94 19.73 17.88 51.53 50.75 143.83 85.3 229.13 15.29
R. Rueda 2,240 0.28 636.35 1.25% 347.64 125.78 2.63 13.15 11.92 34.35 33.83 95.87 56.86 152.73 10.19
C. Sanchez 1,479 0.41 607.45 1.19% 331.86 120.07 2.51 12.55 11.37 32.79 32.29 91.52 54.27 145.79 9.73
Calaocan 3,752 0.24 906.36 1.77% 495.16 179.16 3.74 18.73 16.97 48.92 48.18 136.55 80.98 217.53 14.52
Sibut 5,554 0.3 1,678.77 3.29% 917.14 331.84 6.93 34.69 31.43 90.61 89.25 252.92 150 402.91 26.89
Malasin 5,906 0.18 1,054.57 2.06% 576.12 208.45 4.35 21.79 19.75 56.92 56.06 158.88 94.22 253.1 16.89
Canuto Ramos 2,477 0.25 621.83 1.22% 339.71 122.91 2.57 12.85 11.64 33.56 33.06 93.68 55.56 149.24 9.96
R. Eugenio 1,783 0.25 447.6 0.88% 244.53 88.48 1.85 9.25 8.38 24.16 23.8 67.43 39.99 107.43 7.17
Sto. Niño 1st 5,882 0.47 2,738.80 5.36% 1,496.24 541.37 11.31 56.6 51.28 147.83 145.6 412.62 244.71 657.32 43.87
Sub-Total 47,656 15,800 30.93% 8,631.94 3,123.19 65.22 326.51 295.85 852.85 839.98 2,380.41 1,411.74 3,792.15 253.07
% Share Urban 54.63% 19.77% 0.41% 2.07% 1.87% 5.40% 5.32% 15.07% 8.93% 24.00% 1.60%
Total
Residual
Waste
Special
Major SourcesPopulatio
n (2014)
PCG*
kgs/pers
on/ day
Total Waste
Generation
(kgs/day)
Waste Composition (kgs/day)
Kgs./dayPercenta
ge
Biodegra
dable
Recyclabl
e
Residual with potential for diversion
![Page 64: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/64.jpg)
Outright
Sando
bagsThin films
Composit
ePP Others Sub Total
For
Disposal
Rural Brgys
A. Pascual 1,575 0.24 371 0.73% 247.54 44.58 1.27 6.22 4.37 20 22.13 53.99 23.02 77.01 2.35
Abar 2nd 2,768 0.39 1,082 2.12% 721.01 129.84 3.69 18.13 12.72 58.26 64.47 157.26 67.05 224.31 6.86
Bagong Sikat 2,172 0.49 1,058 2.07% 704.91 126.94 3.61 17.72 12.43 56.96 63.03 153.75 65.55 219.3 6.7
Caanawan 4,354 0.19 807 1.58% 537.94 96.88 2.76 13.53 9.49 43.47 48.1 117.33 50.02 167.36 5.11
Camanacsacan 1,720 0.48 827 1.62% 551.03 99.23 2.82 13.85 9.72 44.52 49.27 120.19 51.24 171.43 5.24
Culaylay 1,892 0.28 523 1.02% 348.57 62.77 1.79 8.76 6.15 28.16 31.17 76.03 32.41 108.44 3.31
Dizol 974 0.34 335 0.66% 223.19 40.19 1.14 5.61 3.94 18.03 19.96 48.68 20.75 69.43 2.12
Kaliwanagan 2,755 0.59 1,614 3.16% 1,075.45 193.67 5.51 27.04 18.97 86.9 96.16 234.57 100.01 334.58 10.23
Kita Kita 5,444 0.55 3,020 5.91% 2,012.44 362.41 10.31 50.6 35.49 162.61 179.94 438.95 187.14 626.08 19.13
Manicla 2,041 0.43 877 1.72% 584.3 105.22 2.99 14.69 10.3 47.21 52.24 127.45 54.34 181.78 5.56
Palestina 4,683 0.31 1,447 2.83% 964.28 173.65 4.94 24.24 17.01 77.92 86.22 210.32 89.67 299.99 9.17
Parang Mangga 964 0.85 819 1.60% 545.82 98.29 2.8 13.72 9.63 44.1 48.8 119.05 50.76 169.81 5.19
Pinili 2,939 0.32 941 1.84% 627.3 112.97 3.21 15.77 11.06 50.69 56.09 136.82 58.33 195.16 5.96
Porais 3,369 0.43 1,463 2.86% 974.87 175.56 4.99 24.51 17.19 78.77 87.17 212.63 90.65 303.29 9.27
San Agustin 3,197 0.46 1,457 2.85% 970.9 174.85 4.97 24.41 17.12 78.45 86.81 211.77 90.29 302.05 9.23
San Juan 1,878 0.68 1,281 2.51% 853.77 153.75 4.37 21.47 15.06 68.99 76.34 186.22 79.39 265.61 8.12
San Mauricio 1,159 0.73 847 1.66% 564.44 101.65 2.89 14.19 9.95 45.61 50.47 123.11 52.49 175.6 5.37
Sinipit Bubon 1,429 0.51 724 1.42% 482.72 86.93 2.47 12.14 8.51 39 43.16 105.29 44.89 150.18 4.59
Sto. Niño 2nd 3,324 0.31 1,030 2.02% 686.52 123.63 3.52 17.26 12.11 55.47 61.38 149.74 63.84 213.58 6.53
Sto. Niño 3rd 5,314 0.63 3,322 6.50% 2,213.43 398.61 11.34 55.65 39.04 178.85 197.91 482.78 205.83 688.61 21.05
sto. Tomas 5,089 0.43 2,209 4.33% 1,472.26 265.13 7.54 37.02 25.96 118.96 131.64 321.12 136.91 458.03 14
Tabulac 1,237 0.19 231 0.45% 153.68 27.68 0.79 3.86 2.71 12.42 13.74 33.52 14.29 47.81 1.46
Tayabo 4,660 0.31 1,423 2.79% 948.31 170.78 4.86 23.84 16.72 76.62 84.79 206.84 88.18 295.03 9.02
Tondod 3,401 0.28 964 1.89% 642.15 115.64 3.29 16.15 11.32 51.89 57.42 140.06 59.71 199.78 6.11
Tulat 1,532 0.31 477 0.93% 318 57.27 1.63 8 5.61 25.69 28.43 69.36 29.57 98.93 3.02
Villa Floresta 737 0.4 296 0.58% 197.34 35.54 1.01 4.96 3.48 15.95 17.64 43.04 18.35 61.39 1.88
Villa Joson 1,763 0.96 1,698 3.32% 1,131.51 203.77 5.8 28.45 19.96 91.43 101.17 246.8 105.22 352.02 10.76
Villa Marina 1,712 0.3 509 1.00% 338.85 61.02 1.74 8.52 5.98 27.38 30.3 73.91 31.51 105.42 3.22
Sub-Total 74,082 31,654 61.97% 21,092.52 3,798.45 108.05 530.32 371.98 1,704.30 1,885.95 4,600.61 1,961.42 6,562.03 200.55
% Share Rural 66.64% 12.00% 0.34% 1.68% 1.18% 5.38% 5.96% 14.53% 6.20% 20.73% 0.63%
Total
Residual
Waste
Special
Major SourcesPopulatio
n (2014)
PCG*
kgs/pers
on/ day
Total Waste
Generation
(kgs/day)
Waste Composition (kgs/day)
Kgs./dayPercenta
ge
Biodegra
dable
Recyclabl
e
Residual with potential for diversion
![Page 65: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/65.jpg)
Outright
Sando
bagsThin films
Composit
ePP Others Sub Total
For
Disposal
Subdivision
Christianville 777 0.14 106 0.21% 56.73 21.01 0.02 2.67 1.82 9.33 2.9 16.74 10.58 27.32 0.57
Curamen 612 0.08 51 0.10% 27.3 10.11 0.01 1.28 0.87 4.49 1.39 8.05 5.09 13.15 0.27
Encarnacion 500 0.9 452 0.89% 242.78 89.94 0.11 11.42 7.78 39.93 12.4 71.64 45.28 116.92 2.44
Habitat 1,250 0.27 339 0.66% 181.83 67.36 0.08 8.56 5.82 29.91 9.28 53.65 33.91 87.56 1.83
Josephine 1,765 0.18 319 0.62% 171.14 63.4 0.08 8.05 5.48 28.15 8.74 50.5 31.92 82.42 1.72
Melcar 1,025 0.17 177 0.35% 94.92 35.16 0.04 4.47 3.04 15.61 4.85 28.01 17.7 45.71 0.95
NH Housing 60 0.39 23 0.05% 12.47 4.62 0.01 0.59 0.4 2.05 0.64 3.68 2.33 6.01 0.13
Ramar 1,900 0.16 300 0.59% 161.26 59.74 0.07 7.59 5.16 26.52 8.23 47.58 30.08 77.66 1.62
Roseville 500 0.19 96 0.19% 51.63 19.12 0.02 2.43 1.65 8.49 2.64 15.23 9.63 24.86 0.52
Rufina II 280 0.16 44 0.09% 23.58 8.74 0.01 1.11 0.76 3.88 1.2 6.96 4.4 11.36 0.24
Rufina III 315 0.77 243 0.48% 130.33 48.28 0.06 6.13 4.17 21.44 6.65 38.45 24.31 62.76 1.31
Rufina IV 2,212 0.5 1,107 2.17% 594.74 220.32 0.26 27.99 19.05 97.82 30.37 175.48 110.93 286.41 5.98
St. Cecilia 575 0.13 77 0.15% 41.17 15.25 0.02 1.94 1.32 6.77 2.1 12.15 7.68 19.83 0.41
Villa Ramos 1,852 0.16 291 0.57% 156.46 57.96 0.07 7.36 5.01 25.73 7.99 46.16 29.18 75.35 1.57
SUB-TOTAL 13,623 3,624 7.10% 1,946.33 721.02 0.86 91.58 62.34 320.12 99.38 574.28 363.02 937.3 19.57
% SHARE 53.70% 19.89% 0.02% 2.53% 1.72% 8.83% 2.74% 15.85% 10.02% 25.86% 0.54%
TOTAL 135,361 51,078 100.00% 31,670.79 7,642.67 174.13 948.42 730.17 2,877.27 2,825.31 7,555.30 3,736.17 11,291.47 473.19
% of Total 62.00% 14.96% 0.34% 1.86% 1.43% 5.63% 5.53% 14.79% 7.31% 22.11% 0.93%
Total
Residual
Waste
Special
Major SourcesPopulatio
n (2014)
PCG*
kgs/pers
on/ day
Total Waste
Generation
(kgs/day)
Waste Composition (kgs/day)
Kgs./dayPercenta
ge
Biodegra
dable
Recyclabl
e
Residual with potential for diversion
![Page 66: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/66.jpg)
CHAPTER 5. LEGAL/
INSTITUTIONAL FRAMEWORK
![Page 67: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/67.jpg)
5.1 Local Laws and Regulations
• Related laws and regulations and their relevant provisions. (Authority and description)**
• Permitting procedures for solid waste facilities as well as inspection and compliance procedures.*
Note: *nice to have
**must have
![Page 68: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/68.jpg)
LAWS AND
REGULATION/ORDINAN
CES
TITLE RELEVANT
PROVISIONS
Municipal Ordinance No. 02,
Series of 2009
An Ordinance Creating
a System of Ecological
Waste Management
Declaring Certain …
Defined the moral duties
and obligations of every
one in solid waste
management system.
Table 5.1. Local and Related Laws and Regulations and their Relevant
Provisions
Source: Legal Office, 2015
Source: City of Zamboanga
Plan
![Page 69: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/69.jpg)
![Page 70: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/70.jpg)
5.2 Roles
Roles of the City SWM Board, the city, barangay, private entities and institutions as generators, citizens, NGOs and recycling companies.**
Note: *nice to have
**must have
![Page 71: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/71.jpg)
5.3 City/Municipal Solid Waste
Management Board
• Sangguniang Bayan Ordinance No. for creating the CSWM Board.**
• List of members of the CSWM Board.**
• Description of activities to date and planned activities.**
Note: *nice to have
**must have
![Page 72: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/72.jpg)
Source: City of Zamboanga
Plan
Source: Maria Aurora Plan
![Page 73: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/73.jpg)
Source: Maria Aurora Plan
![Page 74: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/74.jpg)
5.4 Barangay Solid Waste
Management Committees
• List of BSWM Committees formed to date and schedule for Boards in other barangays**
Note: *nice to have
**must have
![Page 75: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/75.jpg)
Source: Maria Aurora Plan
![Page 76: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/76.jpg)
5.5 Stakeholders Participation
• Activities conducted and future plans to involve stakeholders in development and implementation of plan.*
Note: *nice to have
**must have
Source: Maria Aurora Plan
![Page 77: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/77.jpg)
CHAPTER 6. PLAN STRATEGY
![Page 78: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/78.jpg)
6.1 Vision
• Discussion of vision and goals*
Note: *nice to have
**must have
Source: Maria Aurora
Plan
![Page 79: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/79.jpg)
Source: City of Zamboanga
Plan
![Page 80: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/80.jpg)
6.2 Targets
• Diversion targets for each year, 10-year
planning period (more than 25%).**
• Disposal targets for each year, 10-year
planning period.**
Note: *nice to have
**must have
![Page 81: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/81.jpg)
Source: Maria Aurora
Plan
![Page 82: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/82.jpg)
6.3 Strategies
• Brief description of strategies to reach diversion targets (detail will be provided in Section 7).**
• General description of coordination with barangays to implement segregated collection, MRFs, and composting facilities.**
Note: *nice to have
**must have
![Page 83: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/83.jpg)
![Page 84: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/84.jpg)
6.3 Strategies
• General description of collection.*
• Overview of plans for disposal.**
• Discussion of other key elements of
strategy.*
Note: *nice to have
**must have
![Page 85: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/85.jpg)
Source: Maria Aurora Plan
![Page 86: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/86.jpg)
Source: Maria Aurora Plan
![Page 87: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/87.jpg)
Chapter 7
SWM System
![Page 88: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/88.jpg)
7. SWM System
- Detailed description of each program that will be implemented to reach the
objectives and targets defined in Section 6 -
7.1 Source Reduction
7.2 Collection
7.2.1 Overview
7.2.2 Collection equipment and routes
7.2.3 Private collection service
7.2.4 Storage and setout
7.2.5 Segregated recyclables
7.2.6 Segregated compostables
7.2.7 Mixed solid waste/residuals
7.3 Segregation, Recycling, and Composting
7.3.1 Segregation
7.3.2 Recycling
7.3.3 Composting/ Management of Biodegradable Waste
7.3.4 Marketing and Market Development
7.4 Transfer (if applicable)
7.5 Alternative Technologies for Residual Wastes
7.6 Disposal
7.6.1 SW Disposal Capacity
7.6.2 Existing Facilities
7.6.3 New Facilities
7.6.4 Categorized Disposal Facilities (Sanitary
Landfill) Design
7.7 Special Wastes
7.7.1 Health Care Wastes
7.8 Information, Education and Communication (IEC)
7.8.1 Introduction
7.8.2 Core Messages
![Page 89: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/89.jpg)
7.1 Source Reduction
• Source reduction programs to be implemented and implementation
schedule.**
• Sectors to target**
• Materials to be addressed and methods to determine the categories of solid
waste to be diverted.**
• Capability and economic viability of the city/municipality in implementing the
program for this component.*
• Technical requirements for the ordinances and other formal actions to be
taken by the city/municipality. *
• Social impacts on stakeholders involved or affected.*
• Estimated diversion resulting from source reduction.**
![Page 90: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/90.jpg)
Municipality of Maragusan 10-year SWM plan
![Page 91: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/91.jpg)
7.2 Collection- Collection of segregated recyclable and compostable materials is the
responsibility of the barangay. Collection of mixed solid waste and residuals is
the responsibility of the city/municipality. The SWM plan should describe how
the city/municipality will coordinate collection activities with the barangay.* -
7.2.1 Overview
• Description of the strategy for collection, based on the projected
quantities of segregated bio-degradables and recyclables, and of
residual waste.**
• Description of collection process for each type of waste.*
• Types of collection vehicles, collection frequency, collection points,
and types of containers.*
• Entity responsible for providing collection for each type of waste,
and for each sector. *
![Page 92: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/92.jpg)
![Page 93: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/93.jpg)
7.2.2 Collection equipment
and routes
• Description of each generator type and
service area, and the particular
requirements for collection equipment.*
• Table listing current number of vehicles
(compaction vehicles and/or dump trucks)
and projection of additional vehicles or
equipment to be purchased by year. *
• Rationale for selection of the equipment.*
![Page 94: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/94.jpg)
![Page 95: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/95.jpg)
![Page 96: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/96.jpg)
7.2.3 Private collection service
• If collection service will be conducted by
private haulers, provide a rationale for
contracting out the service.*
• Listing of service areas, types of waste to
be collected, location where waste will be
taken. *
• Discussion of basic terms of contract.*
![Page 97: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/97.jpg)
7.2.4 Storage and setout
• Types of containers to be used for each
generator type and service area, and rationale
for selection of types of containers.*
• Setout requirements (i.e., placement, time of
day, etc.).*
![Page 98: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/98.jpg)
![Page 99: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/99.jpg)
WASTE CLASSIFICATION CHARACTERIZATION Bag or Bin Labels/Tags
1. Biodegradable/ Compostable Waste
Waste which can be broken down to harmless or non-poisonous substances by the action of micro-organisms are called biodegradable waste such as plants, fruits and vegetables, leaves, twigs, soiled or wet paper and wood.
Biodegradable*
Green Color Code (recommended)
2. Recyclable Waste Any waste material retrieved from the waste stream and free from contamination that can still be converted into suitable beneficial use or for other purposes, including, but not limited to plastics, paper, iron and steel, aluminum, tins, glass, bottles and cans.
Recyclable*
Blue Color Code (recommended)
3. Residual Waste Non-biodegradable waste materials that have no beneficial use.
Residual*
Black Color Code (recommended)
4. Special Waste**
4.a Toxic and Hazardous Waste (THW)
Harmful to human health and the environment or is difficult to handle such as containers of paint, thinner, pesticides and similar chemicals, busted or broken fluorescent lamps and bulbs, household/dry cell batteries, consumer electronics such as cell phones and batteries, mercury-containing thermometers, etc. or any other items to be identified under RA 6969
THW
Red Color Code (recommended)
4.b Household Health Care Waste (HHCW)
Syringes, cotton swabs, wipes, bandages, condoms, used diapers, sanitary napkins and other infectious waste
Yellow container or HHCW tag or label (required)
4.c. Bulky Waste Waste materials which cannot be appropriately placed in separate containers because of either its bulky size, shape or other physical attributes. These include large worn-out or broken household, commercial and industrial items such as furniture, lamps, bookcases, filing cabinets and other similar items.
5. Construction and demolition waste
Debris, wood, iron, spoils and others.
![Page 100: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/100.jpg)
7.2.5 Segregated recyclables
• Strategy for implementing segregated collection
of recyclables in each of the barangays.*
• Types of materials to include types of vehicles,
collection frequency, types of containers.*
• Assistance the city/municipality will provide to
the barangay.*
![Page 101: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/101.jpg)
![Page 102: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/102.jpg)
![Page 103: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/103.jpg)
7.2.6 Segregated compostables
• Strategy for implementing segregated collection
of compostables in each of the barangays.**
• Types of materials to include types of vehicles,
collection frequency, types of containers.*
• Assistance the city/municipality will provide to
the barangay.*
![Page 104: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/104.jpg)
![Page 105: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/105.jpg)
7.2.7 Mixed solid
waste/residuals
• Plan for collecting residuals.**
• Table listing type of collection vehicle, capacity, and collection
frequency by year for 5 years. In preparing table, consideration
should be given to the quantities of waste requiring collection and
disposal as diversion programs are implemented.*
• Types of containers that may be used for setout.*
• Plan for increasing coverage area to provide collection service to all
parts of the city/municipality (if applicable).*
![Page 106: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/106.jpg)
![Page 107: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/107.jpg)
7.3 Segregation, Recycling, and Composting
- Segregation and recycling and composting of segregated materials are the
responsibility of the barangay. The SWM plan should describe how the
city/municipality will work with the barangay to implement the programs.*-
7.3.1 Segregation
• Strategy for promoting segregation in each of the barangays.**
• Strategies for start-up, implementation, monitoring, and enforcement.**
• Assistance the city/municipality will provide to the barangay.*
7.3.2 Recycling
• Strategy for implementing MRFs in each of the barangays or in clusters of
barangays.**
• Strategies for start-up, implementation, monitoring, and enforcement.**
• Materials to be recycled, methods of determining categories of recyclable waste for
diversion *
• Existing capacity, future demand, and how the capacity will be met (e.g., new
facilities and expansion of existing facilities)*
• Assistance the city/municipality will provide to the barangay.*
• Implementation schedule.**
• Acceptable technologies and lay-out of facilities.*
![Page 108: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/108.jpg)
![Page 109: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/109.jpg)
![Page 110: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/110.jpg)
7.3 Segregation, Recycling, and Composting
7.3.3 Composting/ Management of Biodegradable Waste
– Overall strategy for managing biodegradable waste.**
– Quantity of waste, by barangay, to be composted. *
– Existing capacity, future demand, and how the capacity will be met (e.g., new
facilities and expansion of existing facilities).*
– Strategies for start-up, implementation, monitoring, and enforcement.**
– Materials to be composted, methods of determining categories of biodegradable
waste for diversion *
– Acceptable technologies and layouts of composting facilities.*
– Assistance city/municipality will provide to the barangay.*
– Implementation schedule.**
![Page 111: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/111.jpg)
Materials Recovery Facility
1. Eco-Center at San Carlos City, Negros Occidental
![Page 112: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/112.jpg)
Final Segregation of “non-biodegradable wastes” at the MRF
1. Eco-Center at San Carlos City, Negros Occidental
![Page 113: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/113.jpg)
1. Eco-Center at San Carlos City, Negros Occidental
Processing of “biodegradable wastes”
![Page 114: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/114.jpg)
ADOPT A MateriaL Recovery Facility
![Page 115: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/115.jpg)
![Page 116: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/116.jpg)
7.3 Segregation, Recycling, and Composting
7.3.4 Marketing and Market Development
• Estimated prices for recovered materials and average selling price/average
price.*
• Evaluation of feasibility of procurement preferences for compost, recyclable and
recycled materials by city/municipality. *
• Strategies for developing and expanding markets for composts, recyclables,
recycled and other processed materials.**
• Evaluation of the feasibility of procurement preferences to encourage the
purchase of products made from recycled material and compost.*
![Page 117: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/117.jpg)
7.4 Transfer (if applicable)
– Strategy for use of transfer facilities.*
– Existing capacity, future demand, and how the capacity will be
met (e.g., new facilities and expansion of existing facilities).*
– Locations for new facilities, types and quantities of waste that will
be accepted, source of waste, and destination of waste.*
– Description of transfer station design and operations.*
– Strategies for start-up, implementation, monitoring, and
enforcement.*
– Implementation schedule.*
![Page 118: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/118.jpg)
7.5 Alternative Technologies
for Residual Wastes
• Description of technology, capacity etc.**
• Options for the Cities/Municipalities to utilize
alternative technologies for the residual wastes.*
• Proof of Environmental Technology Verification
from DOST (if any).*
![Page 119: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/119.jpg)
7.6 Disposal - Disposal plan for 10-years including identification of prospective sites
for future use. Include plans for upgrading or closing existing facilities to
meet requirement for sanitary landfills. -
7.6.1 SW Disposal Capacity
• Projection of the amount of disposal capacity needed to accommodate
residual wastes, by year for a 10-year period.**
• Comparison of existing disposal capacity with capacity requirements.*
• Description of overall plan for disposal, by year.*
7.6.2 Existing Facilities
• For open and controlled dumps provide closure and rehabilitation plan
based on DAO 9 Series of 2006 or Authority to Close (ATC) issued by EMB
regional office.**
• For SLF, strategies to extend life span and capacity of the existing disposal
site.**
![Page 120: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/120.jpg)
7.6 Disposal
7.6.3 New Facilities
• Description of the Categorized Disposal
Facility (if applicable).
• Explanation of how the design will meet
the requirements of RA 9003.
7.6.4 Categorized Disposal Facilities
(Sanitary Landfill) Design
• Demonstration that the capacity will be
adequate for a minimum of 5 years based
![Page 121: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/121.jpg)
![Page 122: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/122.jpg)
![Page 123: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/123.jpg)
7.7 Special Wastes
• Plan for storage, collection, treatment, disposal and other
appropriate technologies for any special wastes as referred to 3.8**
• Estimated quantities of special wastes to be generated in the
future.**
7.7.1 Health Care Wastes
• Plan for treatment and disposal as referred to 3.8.1**
• Estimated quantities of special wastes to be generated in the
future.**
![Page 124: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/124.jpg)
RA 9003
RA6969
RA 9003 vis-à-vis RA 6969
Toxic
Substances and
Hazardous and
Nuclear Waste
Control Act of
1990
![Page 125: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/125.jpg)
![Page 126: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/126.jpg)
7.8 Information, Education and Communication (IEC)
- Purpose and content of information dissemination, education and
communication program -
7.8.1 Introduction
• Discussion of strategy including need for public education and involvement.**
• Problems/issues that will be addressed.**
• Purpose of IEC activities (i.e., information dissemination, education, motivation, advocacy).**
• Audiences that will be targeted e.g. Brgy. Officials, Schools, etc.**
7.8.2 Core Messages
• Discussion of core message(s) for each target audience. *
• Explanation of how message will be coordinated with other agencies.**
• Description of how IEC activities will support solid waste management program activities, e.g.,
source reduction, litter prevention, segregation, recycling, and composting.**
![Page 127: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/127.jpg)
7.8 Information, Education and Communication (IEC)
7.8.3 Approach
• Discussion of approach (es) for each target audience. **
• Matrix of planned activities. Include: purpose, target audience,
subject of message, method, responsible party, and monitoring
plan.**
• Implementation schedule. IEC activities should be integrated with
infrastructure and should be on-going.**
• Cost of activities (to be incorporated into financial plan (see Section
11).**
End of presentation
![Page 128: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/128.jpg)
![Page 129: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/129.jpg)
![Page 130: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/130.jpg)
CHAPTER 8.
IMPLEMENTATION STRATEGY
![Page 131: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/131.jpg)
8.1 Framework
• Overview of each program to be implemented, generator segment, by year. Include source reduction, recycling, management of biodegradables, disposal and alternative technologies.**
Note: *nice to have
**must have
![Page 132: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/132.jpg)
Source: Maria Aurora
Plan
![Page 133: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/133.jpg)
8. 2 Diversion Projections
• Table of types and percentages of materials to be diverted to meet the mandated diversion requirement.**
Note: *nice to have
**must have
![Page 134: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/134.jpg)
Year Waste
Gen/Capit
a/day with
of
2%/annu
m based
on WACS
(kg/day)
Project
Pop.
Daily
Waste
Gen.
based on
Populatio
n (kg/day)
Waste
Div.
Target
(%)
Weight
to be
Diverted
(kg/day)
Target
Residual
Target
Disp.
(kg/day)
WACS
Bio
(56.31%)
kg/day
Recyclabl
e(16.15%)
(kg/day)
Selected
Residual
(15.30%)
(kg/day)
‘15 0.240 40,652 9,756.48 87.76 8,562.3 12.24 1,194.2 5,493.9 1,575.7 1,492.7
‘16 0.245 41,179 10,080.6 87.76 8,846.8 12.24 1,233.9 5,676.4 1,628.0 1,542.3
‘17 0.250 41,704 10,413.3 87.76 9,138.7 12.24 1,274.6 5,863.7 1,681.8 1,593.2
‘18 0.255 41,704 10,759.6 87.76 9,442.7 12.24 1,317 6,058.8 1,737.9 1,646.2
‘19 0.260 42,246 11,116.4 90.26 10,034 9.74 1,082.3 6,259.7 1,795.3 1,700.8
Source: Maria Aurora Plan
![Page 135: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/135.jpg)
8.3 Monitoring Program
• Description of monitoring program to provide accurate information and to show whether or not policies are succeeding and to monitor the performance of the SWM plan.**
Note: *nice to have
**must have
![Page 136: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/136.jpg)
Source: Maria Aurora Plan
![Page 137: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/137.jpg)
Source: Maria Aurora Plan
![Page 138: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/138.jpg)
8.4 Incentive Programs
• Description of program providing for incentives (rewards, grants, fiscal incentives and non-fiscal Incentives) that will be provided to concerned sectors in order to encourage wide participation in the implementation of the plan.*
Note: *nice to have
**must have
![Page 139: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/139.jpg)
Source: Maria Aurora Plan
![Page 140: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/140.jpg)
CHAPTER 9. INSTITUTIONAL
ASPECTS
![Page 141: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/141.jpg)
Annotated Outline
Chapter 9: Institutional AspectsPlanned structure for the implementation of plan
9.1 Roles
• Future roles of the city SWM Board, the city, barangay, private entities and
institutions as generators, citizens, NGOs and recycling companies.*
• Strategy for cooperation with the city/municipal SWM Board.*
• Coordination with other entities (e.g., barangays, NGOs, business leaders).*
9.2 Legal
• Recommended changes to city structure.*
• Zoning and building code changes.*
• Plans to impose penal provisions *
• Other legal requirements.*
** Must have *Nice to have
![Page 142: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/142.jpg)
![Page 143: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/143.jpg)
![Page 144: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/144.jpg)
![Page 145: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/145.jpg)
![Page 146: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/146.jpg)
CHAPTER 10. SOCIAL AND
ENVIRONMENTAL ASPECTS
![Page 147: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/147.jpg)
Annotated Outline
Chapter 10: Social and Environmental AspectsDiscussion of social and environmental issues related development of
full-scale infrastructure (if there’s any).
10.1 Social Aspects
• Significant social impacts (both positive and negative) from community-based SWM.*
• Social acceptability of proposed solid waste system (including collection system and
processing and disposal sites.*
• Discussion of requirements of stakeholders.*
• Discussion of conditions concerning waste pickers at the disposal site and what the
city/municipality can do to improve their conditions.*
10.2 Environmental Aspects
• Discussion of environmental aspects of the proposed solid waste system.*
• Environmental review requirements.*
** Must have *Nice to have
![Page 148: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/148.jpg)
![Page 149: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/149.jpg)
CHAPTER 11. COST
ESTIMATED/FINANCIAL
ASPECTS
![Page 150: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/150.jpg)
11.1 Investment cost
• Breakdown of estimated investment cost by year for 5 years, by
private and public sectors. Investment costs should address each
component of the solid waste system, i.e., collection, transfer
stations, MRFs, composting facilities, and disposal facilities.**
• Facility costs to include engineering and infrastructure.*
• Equipment costs to include stationary equipment (e.g., shredder)
and rolling equipment (e.g., collection vehicles)*
• Estimated cost to be amortized based on life expectancy of
facility/equipment.*
** Must have *Nice to have
![Page 151: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/151.jpg)
Detailed Cost EstimatesCapital Outlay: Vehicles and Equipment, 2008-2017
Item and Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Total
Segregation and Source Reduction
Drop Off Containers for Recyclables -
Sub-Total - - - - - - - - - - -
Collection and Transport -
Truck -Leyland -
Waste Dumptruck 500,000 500,000
Dumptruck 500,000 500,000
Sound system (public market) 30,000 30,000 60,000
Sub-total - 30,000 530,000 - 500,000 - - - - - 1,060,000
Materials Recovery -
Weighing Scales 30,000 30,000
Sifter 1,000 1,000 1,000 1,000 4,000
Sub-total - - 31,000 - 1,000 - 1,000 - 1,000 - 34,000
Disposal Management -
Backhoe -
Bulldozer -
Mower (Landscaping) 20,000 30,000 50,000
Shredding Machine 300,000 300,000
Sub-total - 20,000 - - 30,000 - - - - - 50,000
Program Management -
Computer System - laptop 70,000 70,000 140,000
Printer 11,500 11,500
Sub-total 81,500 - - - - - - 70,000 - - 151,500
TOTAL 81,500 50,000 561,000 - 531,000 - 1,000 70,000 1,000 - 1,595,500
![Page 152: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/152.jpg)
11.2 Annual Costs
• Breakdown of annual costs by year for 5 years, by private and public
sector.**
• Labor cost, including fringes, by labor category.*
• Administrative costs including insurance, office expense, etc.*
• Operating and maintenance costs including fuel, repair, supplies,
etc.*
• Amortized investment cost (if any)*
• Loan repayment schedule (if any)*
** Must have *Nice to have
![Page 153: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/153.jpg)
Personal Expenses, 2008-2017
Itemized Personnel Positions 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Total
Segregation at Source
Laborer - - - - - - - - -
Sub-total - - - - - - - - - - -
Collection and Transport - - - - - - - - - -
1-SWM coordinator () 72,336 72,336 72,336 168,000 168,000 168,000 168,000 168,000 168,000 1,225,008
Driver 72,336 144,672 144,672 144,672 144,672 280,000 280,000 280,000 280,000 1,771,024
Laborers 121,968 121,968 243,936 243,936 243,936 243,936 243,936 243,936 243,936 243,936 2,195,424
Sub-total 121,968 266,640 460,944 460,944 556,608 556,608 691,936 691,936 691,936 691,936 5,191,456
Materials Recovery
Sorters/Composters 121,968 121,968 182,952 182,952 182,952 182,952 182,952 182,952 182,952 1,524,600
Sub-total - 121,968 121,968 182,952 182,952 182,952 182,952 182,952 182,952 182,952 1,524,600
Disposal Management
Disposal Facility In-Charge - 1 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 723,360
Sub-total 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 723,360
Program Management
General Management
1-Office staff 72,336 72,336 110,000 110,000 110,000 120,000 120,000 120,000 120,000 120,000 1,074,672
Public Services Enforcer-1 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 72,336 651,024
Sub-total 72,336 144,672 182,336 182,336 182,336 192,336 192,336 192,336 192,336 192,336 1,725,696
Total 266,640 605,616 837,584 898,568 994,232 1,004,232 1,139,560 1,139,560 1,139,560 1,139,560 9,165,112
![Page 154: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/154.jpg)
Maintenance and Other Operating Expenses, 2008-2017
Expense Item 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Total
Collection
Fuel 85,000 150,000 250,000 300,000 300,000 350,000 350,000 350,000 350,000 350,000 2,835,000
Vehicle maintenance/spare parts 35,000 50,000 50,000 80,000 60,000 80,000 100,000 100,000 150,000 150,000 855,000
Insurance, registration 17,000 17,000 17,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 331,000
Bukag 4,320 4,320 4,320 4,320 4,320 4,320 4,320 4,320 4,320 4,320 43,200
Protective gear & supplies 1,620 1,620 1,620 1,620 1,620 1,620 1,620 1,620 1,620 14,580
Sub-total 141,320 222,940 322,940 425,940 405,940 475,940 495,940 495,940 545,940 545,940 4,078,780
Materials Recovery
MRF Supplies & Materials 10,000 15,000 15,000 15,000 20,000 20,000 20,000 25,000 25,000 165,000
Building and grounds maintenance - - - - -
Utilities (electricity, water) 12,000 12,000 12,000 18,000 18,000 18,000 25,000 25,000 25,000 165,000
Sub-total - 22,000 27,000 27,000 33,000 38,000 38,000 45,000 50,000 50,000 330,000
Disposal Management
Fuel and lubricants & maintenance 30,000 30,000 30,000 50,000 50,000 50,000 80,000 80,000 80,000 480,000
Sampling and analysis of ground
water8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 72,000
Services (pre-development activities) -
- topo & detailed engineering 25,000 25,000 50,000
Sub-total 25,000 63,000 38,000 38,000 58,000 58,000 58,000 88,000 88,000 88,000 602,000
Program Management
Equipment maintenance (computers) 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 40,000
Office supplies and materials 20,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 260,000
IEC materials 25,000 25,000 25,000 10,000 10,000 10,000 10,000 10,000 10,000 135,000
Meetings (e.g., ESWM Board) 12,000 18,000 18,000 18,000 24,000 24,000 24,000 24,000 24,000 24,000 210,000
Staff training 10,000 15,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 165,000
Sub-total 12,000 78,000 93,000 98,000 89,000 89,000 89,000 84,000 89,000 89,000 810,000
Total 178,320 385,940 480,940 588,940 585,940 660,940 680,940 712,940 772,940 772,940 5,820,780
![Page 155: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/155.jpg)
11.3 Funding Options
• Discussion of options to finance the capital investments, e.g., loans
from financial institutions, central government grants, and municipal
funds. (if any)**
– IRA
– PSP (Private Sector Participation)
– National Government Grants
– Loans
• Bilateral
• Multilateral
• DBP
• LBP
• MDFO
• Discussion of options to finance recurring cost **
– local taxes
– intergovernmental transfers
– user charges.
** Must have *Nice to have
![Page 156: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/156.jpg)
11.3 Funding Options
• Presentation of existing and projected sources of revenues. Include
consideration of
– revenues from collection of fees;
– outside sources of funds,
– collection and use of fines, and
– sources for the local SWM fund and their uses.**
• Specific projects, activities, equipment and technological
requirement for which outside sourcing of funds or materials as may
be necessary.*
• Breakdown of revenues by year for 5 years, and by source.*
** Must have *Nice to have
![Page 157: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/157.jpg)
ESWM Revenues by revenue category
ESWM
RevenuesTotal 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
SWM Fees
from
Households
16,470,900 52,110 237,060 431,730 1,063,800 1,423,800 1,801,8002,207,25
0
2,632,95
0
3,077,5
50
3,542,8
50
SWM Fees
from
Establishments
2,573,736 215,400 217,554 219,730 266,312 268,975 271,665 274,382 277,126 279,897 282,696
Total 19,044,636 267,510 454,614 651,460 1,330,112 1,692,775 2,073,4652,481,63
2
2,910,07
6
3,357,4
47
3,825,5
46
Table __. ESWM Revenues, by Revenue Category, 2008-2017
![Page 158: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/158.jpg)
11.4 Cost Evaluation and Comparison
– Cost for waste management per service capita.*
– Cost for waste management by unit weight for each type of
service, e.g., collection, processing, and disposal.*
– Comparison of costs for each component of the solid waste
management system.*
– Discussion of ways to optimize costs.*
** Must have *Nice to have
![Page 159: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/159.jpg)
11.5 Summary
• Tabular summary of investment costs, annual costs, and annual
revenues by year.**
** Must have *Nice to have
![Page 160: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/160.jpg)
ESWM Plan Ten-Year Financing Requirements, 2008-2017
Cost Items TOTAL 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Investment
Costs7,358,500 429,500 1,625,000 1,481,000 160,000 1,131,000 1,060,000 651,000 320,000 651,000 150,000
Personal
Expenses9,165,112 266,640 605,616 837,584 898,568 994,232 1,004,232 1,139,560 1,139,560 1,139,560 1,139,560
MOOEs 5,820,780 178,320 385,940 480,940 588,940 585,940 660,940 680,940 712,940 772,940 772,940
TOTAL 22,644,392 874,460 2,616,556 2,799,524 1,647,508 2,711,172 2,725,172 2,471,500 2,172,500 2,563,500 2,062,500
![Page 161: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/161.jpg)
![Page 162: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/162.jpg)
CHAPTER 12. PLAN
IMPLEMENTATION
![Page 163: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/163.jpg)
12.1 Phases and Responsibilities
– Discussion of phases from the development of a plan to guide the
operation and the implementing agency or persons/groups
responsible.**
12.2 Milestones
– Milestones in implementation of the institutional/legal aspects of
the plan including: public hearings, final approval of plan, and
establishment of the SW Division.**
** Must have *Nice to have
![Page 164: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/164.jpg)
– Milestones in implementation of the solid waste system described in
the plan including: source reduction activities, segregated collection
in each barangay, establishment of MRFs and composting facilities,
upgrade/closure of dumpsites, establishment of sanitary landfills,
IEC activities, enforcement activities, etc.**
• 12.3 Implementation Schedule
– Tables or diagrams showing the schedule of implementation.**
– Schedule should include all of the programs discussed in Section
7.**
– Table summarizing diversion goals and quantities.**
** Must have *Nice to have
![Page 165: Chapter 1. Introductionrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/final... · Introduction. 1.1 Purpose City/Municipality’sVision** Key issues facing the ... Current](https://reader031.fdocuments.in/reader031/viewer/2022013100/609144263d6672049a46e118/html5/thumbnails/165.jpg)
The National Solid Waste Management Commission
Office of the Secretariat, EMB-DENR
Telefax : +632 920 2252/2279
Website : www.emb.gov.ph/nswmc