CHANNEL ISLAND HIGH SCHOOL · 19 Replace Locker Room Windows 20 Field Restrooms and Snack Bar...
-
Upload
truongtuyen -
Category
Documents
-
view
212 -
download
0
Transcript of CHANNEL ISLAND HIGH SCHOOL · 19 Replace Locker Room Windows 20 Field Restrooms and Snack Bar...
1CAMARILLO SENIOR HIGH SCHOOL
N
ADOLFO CAMARILLO HIGH SCHOOL
25
15
1620
18
19
17
14
14
2324 26
1CAMARILLO SENIOR HIGH SCHOOL
N
ADOLFO CAMARILLO HIGH SCHOOL
1
1
1
3
4
5
5
5
6
7
8
9
8
8
10
10
10
10
11
12
22
22
2 22
2222
22 22
2222
222222
15
21
2122
22
NOT TO SCALE
27
ADOLFO CAMARILLO HIGH SCHOOL
1313
13
13
13 13
1313
131313
13
1313
1 Replace Portable Classrooms-AG, T3, and T4 wings only
2 Security Improvements
3 Little Theater Renovation
4 Gym Modernization
5 Site Drainage Improvements
6 Cafeteria Storage Addition
7 Lighting in Quad
8 Roofing Replacement
9 PA System/Intercom Outside Speakers
10 Renovate Fields / Artificial Turf at Stadium
11 Plumbing - Replace Field Septic System
12 Parking Lot Pick-up, Drop-off, Flow & Safety
13 HVAC - New Throughout (including AC)
14 Electrical Infrastructure
15 Music Building Acoustics
16 New Window Coverings
17 Stadium Light Replacement
18 Replace Finishes at Library
19 Renovate Administration Building Entry
20 Relocate IT office
21 Replace Portable Classrooms-T1 and T2 wings (eligible for state matching funds 2026)
22 Modernization Throughout Campus (Scope TBD, B&C Priority)(eligible for state matching funds 2026)
23 I Wing - Renovate Activity Room
24 Ag. Building Addition (potential CTE grant for welding program)
25 Snack Shack - New Building26 I Wing - Renovate Woodshop into Maker
Space (potential CTE grant for up-to-date facility)
27 Little Theater (or Small Performing Arts Center)
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
Throughout
1CHANNEL ISLANDS HIGH SCHOOL - SITE PLAN
N
CHANNEL ISLANDS HIGH SCHOOL 1CHANNEL ISLANDS HIGH SCHOOL - SITE PLAN
N
CHANNEL ISLANDS HIGH SCHOOLNOT TO SCALECHANNEL ISLAND HIGH SCHOOL
1 Replace Portable Classrooms-M wing only
2 Security Improvements
3 Upgrade Fire Alarm System
4 Elevator Tower Repair
5 Gym Modernization
6 Site Drainage Improvements
7 Computer Lab Exiting Renovations
8 Roofing Repair at Classrooms
9 Conex Boxes Relocation
10 Repairs at 2-story Classrooms - Railings, Building Joints
11 Cafeteria and Lunch Shelter Renovation
12 Classroom Door Lock-Blok Retrofit
13 Administration Building Entry Renovation
14 Maintenance Building Security
15 Renovate Fields / Artificial Turf at Stadium
16 Electrical Infrastructure Upgrades
17 Lighting In Quad
18 New Window Coverings
19 Replace Locker Room Windows
20 Field Restrooms and Snack Bar Renovation
21 Tennis Court Replacement
22 Field Entrance and Ticket Booth Improvements
23 Replace Asphalt Paving in Parking Lots
24 Misc. repairs in N and T wings
25 Replace Portable Classrooms-D, E, I, L, and Y wings(eligible for state matching funds 2026)
26 Phase 2 Modernization-Select areas TBD (eligible for state matching funds 2026)
27 New Pool and Aquatics Center
28 Renovate Woodshop into Maker Space
29 New HVAC (including air conditioning)30 Small Performing Arts Center
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
26
19
27
5
6
7
8
9
10
12 1617
13
14
15
11
25
28
1 1
32
4
6
6
6
68 10
11
15
22
15
1826
1826 1826
1826 1826
1826
1826
182624
26
2426
1816
26
19
1826
23 23 23
2326
21
20
25
2530
292929
2929
2929
29 2929
2921
Throughout
1FRONTIER HIGH SCHOOL - SITE PLAN
N
FRONTIER HIGH SCHOOL
1FRONTIER HIGH SCHOOL - SITE PLAN
N
FRONTIER HIGH SCHOOL
1
2
3
45
6
7
11
8
9
11
10
1
1
1
4
4
10
NOT TO SCALEFRONTIER HIGH SCHOOL
1 Replace Roofing & Gutters
2 Lunch Room Code Compliance Renovation
3 Weight Room Floor Retrofit
4 Parking Lot Path of Travel
5 Miscellaneous Site Improvements
6 New Restroom Building
7 New lunch shelter
8 New Library Building
9 Administration Building Modernization
10 Modernization-Classrooms #12-#20
11 Security Improvements
12 New Multi-Purpose Building
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
Throughout
8HUENEME SENIOR HIGH SCHOOLN
HUENEME HIGH SCHOOL
8HUENEME SENIOR HIGH SCHOOLN
HUENEME HIGH SCHOOLNOT TO SCALEHUENEME HIGH SCHOOL
1 Replace Portable Classrooms-O, Q, and U5 wings
2 Security Improvements
3 Gym Modernization
4 Electrical - Replace Equipment at D wing
5 Cafeteria Kitchen Renovation
6 Site Fencing Replacement
7 Renovate Fields / Artificial Turf at Stadium
8 Tennis Court Replacement
9 Locker Rooms Ventilation and Misc. Repairs
10 Conex Boxes Relocation
11 H wing Renovation
12 Administration Building Entry Renovation
13 Classroom Door Lock-Blok Retrofit
14 Maintenance Building Security
15 Electrical Infrastructure
16 New Window Coverings
17 Field Entrance and Ticket Booth Improvements
18 Replace Asphalt and Paving in Parking Lots
19 Replace Finishes in Music Building
20 Misc. Repairs in Q and R Wings
21 Replace Port. Classrooms-Q, U1, U2, U3, and U4 wings (eligible state matching funds 2026)
22 Phase 2 Modernization-Select areas TBD (eligible for state matching funds 2026)
23 New HVAC (including Air Conditioning)
24 Renovate Old Shops Into Maker Space H Wing
25 Renovate Old Home Ec. Classrooms into Renovate Old Home Ec. Classrooms into
26 Small Performing Arts Center
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
1
21
18
18
18
3
4
5
6
7
8
9
10
1213
14
11
11
7
10
7
9
13
13
13
13
13
13
10
22
22
22
22
22
22
22
16 15
22
2
19 22
13
22
22 22
13
13
2222
2221
21
17
24
25
22
23
20
23
20
23
23
23
23
23
23
23
23 23
23
23
23
26
Throughout
2OXNARD ADULT EDUCATION
N
OXNARD ADULT SCHOOL
2OXNARD ADULT EDUCATION
N
OXNARD ADULT SCHOOL
1
2
3
4
7
6
89
3
33
3
1
1
1
1 1 11 1
5
5
5
5
5 5 55 5
5 5 5
5
5
5
5 5 5
5
5
2 2
4
4
9
NOT TO SCALEOXNARD ADULT SCHOOL
1 Fire Alarm Upgrades
2 Electrical Repairs
3 Site Bollard Additions
4 ADA Site Improvements
5 Roofing Replacement
6 Security Improvements
7 New Restroom Building
8 Existing Restroom Renovation
9 Original Permanent Building Modernization
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
Throughout
4OXNARD SENIOR HIGH SCHOOL
N
OXNARD HIGH SCHOOL
4OXNARD SENIOR HIGH SCHOOL
N
OXNARD HIGH SCHOOLNOT TO SCALEOXNARD HIGH SCHOOL
1 Replace Portable Classrooms
2 Modernization Throughout Campus (scope TBD)(eligible for state funds 2018)Including but not limited to: New window coverings, Site improvements for service vehicle access, Upgraded finishes, Tennis court replacement, and HVAC repairs and/or upgrades
3 Security Improvements
4 Parking Lot Pick-up, Drop-off, Flow & Safety
5 Pool Deck Replacement & Upgrades
6 Renovate Fields / Artificial Turf at Stadium
7 New HVAC (including air conditioning)
8 Lunch Shelter(s)
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
5
1
4
1
1
1
2
22 2
2
2
2
22
2
22
2
2
2
4
4
5
6
8
7
7
7
7
7
77
7
7
7
7
3
1
Throughout
(N) POOL
1PACIFICA HIGH SCHOOL - SITE PLAN
N
PACIFICA HIGH SCHOOL
1 Security Improvements and Campus Security Addition
2 Gym Repair
3 Gym Roof Access
4 Lighting in Quad
5 Parking Lot Pick-up, Drop-off, Flow & Safety
6 Conex Boxes Relocation
7 Performing Arts Center Repairs
8 Administration Building Repairs
9 Roofing and Skylights Repair
10 Maintenance Building Security
11 Renovate Fields / Artificial Turf at Stadium
12 Repair Windows and Replace Coverings
13 Carpeting - Replace Throughout with VCT
14 Wall Coverings - Replace Throughout Classroom Buildings
15 Landscape Replacement
16 Multi-Purpose Room Minor Modifications
17 Faculty Dining Renovation
18 Replace (3) Portable Classrooms-M wing (eligible for state matching funds 2023)
19 New Pool and Aquatic Center
20 New HVAC (including air conditioning)
(N) POOL
1PACIFICA HIGH SCHOOL - SITE PLAN
N
PACIFICA HIGH SCHOOLNOT TO SCALEPACIFICA HIGH SCHOOL
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
3
16
13
17
2
1
4
5
6
7
8
9
11
18
12
14
10
15
19
11
11
44
5
9
14
12
13 1312 141516 16
20
20
20
20
20
20
20
2020 14
12
13
12
14
13
7RANCHO CAMPANA HIGH SCHOOL
N
RANCHO CAMPANA HIGH SCHOOL
7RANCHO CAMPANA HIGH SCHOOL
N
RANCHO CAMPANA HIGH SCHOOL
1 3
4
5
6
1 3
1
2
3
1
1
3
NOT TO SCALERANCHO CAMPANA HIGH SCHOOL
1 HVAC - New Throughout (AC only)
2 Security Improvements
3 Skylight Shades in Classrooms
4 Maintenance Building Office and Restroom Improvements
5 Storage Building
6 Locker Room Addition
COLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
Throughout
10RIO MESA SENIOR HIGH SCHOOL
N
RIO MESA HIGH SCHOOL
10RIO MESA SENIOR HIGH SCHOOL
N
RIO MESA HIGH SCHOOLNOT TO SCALERIO MESA HIGH SCHOOL
1 Replace Relocatable Classrooms (except R wing offices)
2 Phase 1 Modernization-Gym
3 Security Improvements
4 New Restrooms
5 Renovate Field Restrooms and Snack Bar
6 Cafeteria Kitchen Miscellaneous Renovations
7 Parking Lot Pick-up, Drop-off, Flow & Safety
8 Landscape Renovation at Front of School
9 Renovate Fields / Artificial Turf at Stadium
10 Modernization-D, L, M, N, R, and U wings
11 Electrical Infrastructure Upgrade
12 New Window Coverings
13 Stadium Modernization
14 Special Ed Classroom Renovations
15 Site Drainage Improvements
16 Misc. Repairs in A and K Wings
17 MERIT Program H wing Renovation (potential CTE grant)
18 Auto Shop Addition and Renovation (potential CTE grant)
19 Small Performing Arts Center
20 New HVAC (including air conditioning)
COLOR LEGENDCOLOR LEGEND
Measure A- Health & Safety Projects
Measure A- Other Priority Projects (eligible for future state funds only as noted)
Replace Portables and/or Modernization (eligible for state funds 2018)
Replace Portables and/or Modernization(eligible for state funds 2023-26)
Stakeholder Generated Projects
Throughout
1
2
4
5
6
7
8
9
17
18
8
1
1
1
1
1
10
10
14
16
15 15
13
16
12
3 1115
12
19
20 20 20
20 20
20
20
10 20
20 20
20
15
10
20
10
20
10
20