RNG Upgrades Page 1 Addendum 1 MWMC Project No. P80095
ADDENDUM NUMBER: 1 RNG UPGRADES
PROJECT NO. P80095
Date of Issue: February 20, 2020 Addendum Number 1 for the above-mentioned project is a part of the Contract Documents, and as such, supersedes anything within the Contract Documents with which it may conflict. Acknowledge receipt of this Addendum in the proposal. Failure to do so may subject the Proposer to disqualification. CHANGES TO SPECIFICATIONS Item AD1-1 Table of Contents (page 5) Add the following specification section under Division 16: 16290 Harmonic Filters
Item AD1-2 Section 00111 – Invitation to Bid (page 2) Scope of Work, replace the sentence:
“6. Trenching and backfilling of roughly 1,300 linear feet of NW Natural-provided RNG pipeline located between the RNG facility and Corliss Ln.”
With: “6. Trenching and backfilling of roughly 2,000 linear feet of
NW Natural-provided RNG pipeline located between the RNG facility and River Ave.”
RNG Upgrades Page 2 Addendum 1 MWMC Project No. P80095
Item AD1-3 Section 00111 – Invitation to Bid (page 4) Move the following paragraph from just below the bulleted line starting
”Form 00270 – Warranty” to just below the bulleted line starting “Form 00170 – Noncollusion Affidavit”:
“Failure to submit the forms listed above may result in the rejection of your Bid. Substitution of other versions of the forms listed above will also likely result in the rejection of your Bid.”
Item AD1-4 Section 00111 – Invitation to Bid (page 4)
Add the following paragraph just above the bulleted line starting ”Form 00250 – Contract”:
“The following forms are to be executed and submitted by the successful bidder within 10 calendar days after the contract is awarded:”
Item AD1-5 Section 00151 – Bid Form
Replace Section 00151 with attachment A.
Item AD1-6 Section 01010 – Summary of Work (page 1)
Paragraph 1.02, replace the sentence:
“6. Trenching and backfilling of roughly 1,300 linear feet of NW Natural-provided RNG pipeline located between the RNG facility and Corliss Ln.”
With:
“6. Trenching and backfilling of roughly 2,000 linear feet of NW Natural-provided RNG pipeline located between the RNG facility and River Ave.”
Item AD1-7 Section 13110 – Analytical Instruments (page 6)
Add the following paragraph 2.05:
“2.05 SMOKE DETECTORS
A. Unit shall contain solid state electronic circuitry including a pulsed light emitting diode and a light sensing photodiode. Unit shall also contain a 135°F fusible back-up heat detecting element. Solid state electronics shall be RF and transient protected. Detector shall alarm on 2% smoke obscurity but shall ignore invisible products of combustion. Unit shall operate on 24 Vdc. A supervisory red indicating LED shall provide indication of both normal and alarm conditions. Detector shall be ADT Catalog 3521 200, equivalent Pyrotronics, or equal.”
RNG Upgrades Page 3 Addendum 1 MWMC Project No. P80095
Item AD1-8 Section 16122 – Medium Voltage Cable (page 6) Delete paragraph 2.03 in its entirety.
Item AD1-9 Section 16290 – Harmonic Filters
Add Section 16290 included as attachment B to the Contract Specifications.
Item AD1-10 Section 16462 - Padmount Transformers (page 3)
Delete paragraph 2.01.D, Item 1 in its entirety.
Item AD1-11 Section 16611 – Uninterruptible Power Supply (UPS) (page 2) Paragraphs 2.03.A and 2.03.B, change the voltage from “120/240” to “120/208.”
CHANGES TO DRAWINGS Item AD1-12 Drawing G-001: REGIONAL MAP, VICINITY MAP AND LOCATION
MAP Drawing Coordinates A4 - Location Map
Extend project location boundary on the west side up to River Avenue to encompass work shown on Sheet C-110.
Item AD1-13 Drawing G-002: SHEET INDEX
Change the title of Sheet C-109 to “CIVIL RNG PIPELINE PLAN AND PROFILE – 1”
Item AD1-14 Drawing G-002: SHEET INDEX Add the following drawings to the SHEET INDEX:
C-110 CIVIL RNG PIPELINE PLAN AND PROFILE - 2
E-013 ELECTRICAL CONDUIT AND WIRE SCHEDULE - 3
Item AD1-15 Drawing C-101: CIVIL OVERALL SITE PLAN
Drawing Coordinates A1 though A4
Add the boundary of Sheet C-110 to the west side of the Plant between Sheet C-109 and River Avenue and add the note “SEE SHEET C-110” with a leader line pointing to the boundary.
Item AD1-16 Drawing C-109: CIVIL RNG PIPELINE PLAN AND PROFILE
Replace Drawing C-109 with attachment C.
Item AD1-17 Drawing C-110: CIVIL RNG PIPELINE PLAN AND PROFILE - 2
Add Drawing C-110 included as attachment D to the Contract Drawings.
RNG Upgrades Page 4 Addendum 1 MWMC Project No. P80095
Item AD1-18 Drawing E-001: ELECTRICAL ABBREVIATIONS AND SYMBOLS Replace Drawing E-001 with attachment E.
Item AD1-19 Drawing E-002: ELECTRICAL SINGLE LINE DIAGRAM Replace Drawing E-002 with attachment F.
Item AD1-20 Drawing E-003: ELECTRICAL CONDUIT SCHEMATIC Replace Drawing E-003 with attachment G.
Item AD1-21 Drawing E-004: ELECTRICAL DETAILS Replace Drawing E-004 with attachment H.
Item AD1-22 Drawing E-010: ELECTRICAL PANEL AND LUMINAIRE SCHEDULES
Replace Drawing E-010 with attachment I.
Item AD1-23 Drawing E-011: ELECTRICAL CONDUIT AND WIRE SCHEDULE - 1 Replace Drawing E-011with attachment J.
Item AD1-24 Drawing E-012: ELECTRICAL CONDUIT AND WIRE SCHEDULE - 2 Replace Drawing E-012 with attachment K.
Item AD1-25 Drawing E-013: ELECTRICAL CONDUIT AND WIRE SCHEDULE - 3 Add Drawing E-013 included as attachment L to the Contract Drawings.
Item AD1-26 Drawing E-100: ELECTRICAL OVERALL SITE PLAN Replace Drawing E-100 with attachment M.
Item AD1-27 Drawing E-101: ELECTRICAL ENLARGED SITE PLAN Replace Drawing E-100 with attachment N.
Item AD1-28 Drawing E-102: ELECTRICAL RNG BUILDING POWER AND SIGNAL PLAN
Replace Drawing E-102 with attachment O.
Item AD1-29 Drawing E-103: ELECTRICAL RNG BUILDING ROOF - POWER, SIGNAL AND HVAC PLAN
Replace Drawing E-103 with attachment P.
Item AD1-30 Drawing E-104: ELECTRICAL RNG BUILDING LIGHTING AND HVAC PLAN
Replace Drawing E-104 with attachment Q.
RNG Upgrades Page 6 Addendum 1 MWMC Project No. P80095
THIS PAGE INTENTIONALLY BLANK
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT A
THIS PAGE INTENTIONALLY BLANK
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-1 BID FORM
SECTION 00151
METROPOLITAN WASTEWATER MANAGEMENT COMMISSION BID FORM
CONTRACT NUMBER P80095
1.0 BID RECIPIENT
1.1 This Bid is submitted to:
Troy McAllister Construction Program Manager 225 Fifth Street Springfield, Oregon 97477
1.2 The undersigned, having full knowledge of the quality of the material and labor to be performed, hereby proposes to perform all labor and furnish all materials necessary for the RNG UPGRADES PROJECT, Contract P80095, for the prices as stated herein.
1.3 The undersigned as Bidder, declares that Bidder has received and examined the Contract Documents entitled RNG UPGRADES PROJECT (Contract P80095), and will contract with the Metropolitan Wastewater Management Commission (“MWMC” or “Owner”) to do everything required for the fulfillment of the Contract for the construction at the prices and on the terms and conditions herein contained.
Bidder:
Date:
Person representing the bidder:
Name:
Address:
Telephone:
E-mail: ______________________________________________________________________
Oregon Construction Contractor’s Board Registration Number: _______________________
Bidder’s Federal Employer’s Identification Number (EIN):___________________________
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-2 BID FORM
2.0 BIDDER’S ACKNOWLEDGEMENTS
Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
3.0 BIDDER’S DECLARATION AND REPRESENTATIONS
In submitting this Bid, Bidder represents that:
3.1 The undersigned Bidder declares that the only persons or parties interested in the Bid are those named herein, that this Bid is, in all respects, fair and without fraud, that it is made without collusion with any official of the Owner, and that the Bid is made without any connection or collusion with any person submitting another Bid on the Contract.
3.2 The Bidder further declares that they have carefully examined the Contract Documents entitled “Contract Documents for the construction of RNG UPGRADES PROJECT, Contract P80095,” and that this Bid is made according to the provisions and under the terms of the Contract Documents, which documents are hereby made a part of this Bid.
3.3 Bidder has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, and performance of the Work.
3.4 Bidder has carefully studied all: i) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) that have been identified in Section 00140.
3.5 Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, and performance of the Work.
3.6 Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) Bid and within the times and in accordance with the other terms and conditions of the Bid Documents.
3.7 Bidder has given Project Manager written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bid Documents, and the written resolution thereof by Project Manager is acceptable to Bidder.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-3 BID FORM
3.8 The Bid Documents are sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
4.0 FURTHER REPRESENTATIONS
Bidder further represents that:
4.1 This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
4.2 Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
4.3 Bidder has not solicited or induced any individual or entity to refrain from bidding; and
4.4 Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
4.5 All required sales and use taxes are included in the stated Bid prices for the Work unless provision is made herein for the Bidder to separately itemize the estimated amount of sales tax.
4.6 Bidder agrees to be bound by and will comply with the provisions of ORS 279C.838; ORS 279C.840; or 40 U.S.C. 3141 to 3148 as applicable.
5.0 ADDENDA
Bidder has examined and carefully studied the Bid Documents, the other related data identified in the Bid Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
(Bidder shall insert number of each Addendum received.)
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-4 BID FORM
6.0 CONTRACT TIMES
The Bidder agrees that the Work, and any stages and/or milestones specified in Section 01040, Coordination, will be Substantially Complete and will be completed and ready for final payment in accordance with the General Conditions on or before the dates or within the number of calendar days indicated in the Contract.
7.0 LIQUIDATED DAMAGES
Bidder accepts the provisions in the Contract as to Liquidated Damages.
8.0 CONTRACT EXECUTION AND BONDS
The Bidder agrees that if this Bid is accepted, it will, within 10 calendar days after Notice of Final Award of Contract is provided to Bidder, sign the Contract in the form included herein, and will at that time deliver to the Owner the required bonds and certificates of insurance, and will, to the extent of this Bid, furnish all labor, machinery, tools, apparatus, and other means to do the Work and furnish all the materials necessary to complete the Work as specified in the Contract Documents.
9.0 ATTACHMANTS TO THIS BID
The following documents are attached to and made a condition of this Bid:
9.1 Required Bid Security
10.0 LUMP SUM AND/OR UNIT PRICE WORK
10.1 The Bidder agrees to accept as full payment for the Work proposed herein the amounts computed under the provisions of the Contract Documents and based on the following lump sum or unit price amounts including installation of Owner-furnished equipment, it being expressly understood that the unit prices are independent of the exact quantities involved. The Bidder agrees that the lump sum prices and the unit prices represent a true measure of the labor and materials required to perform the Work, including all allowances for overhead and profit for each type and unit of Work specified in these Contract Documents. The Bidder shall provide prices for Work listed in numerical figures and words in the Schedule of Contract Prices.
SCHEDULE OF CONTRACT PRICES
10.2 The Work consists of all labor, materials, equipment and all other Work necessary for the completion of the following portions of the Work described in the Bid Documents.
Installation of biogas upgrading equipment. (equipment costs for Greenlane scope of biogas upgrading equipment is covered under allowances below)
RNG Building constructed of masonry on a reinforced concrete slab.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-5 BID FORM
Installation of regenerative thermal oxidizer.
Reinforced concrete equipment pads.
Installation of buried and exposed biogas, RNG, plant water, potable water, compressed air, and natural gas piping and associated pipe supports.
Trenching and backfilling of roughly 2,000 linear feet of NW Natural-provided RNG pipeline.
Earthwork, grading, paving, and associated civil work as shown on the Contract Drawings.
Testing, startup, commissioning, and training associated with the project elements.
10.2.1 LUMP SUM WORK: Bidder agrees to accept as full payment for the Lump Sum Work proposed within the Bid Documents, based upon the undersigned's own estimate of quantities and costs and including sales, consumer, use, and other taxes, except as provided below, and overhead and profit, the following lump sum of:
Dollars (words) and Cents $ (numerals)
10.2.2 NOT USED
10.2.3 NOT USED
10.2.4 CASH ALLOWANCES: Bidder agrees that the following products (materials and equipment), as further described in Sections 01025, Measurement and Payment, will be furnished and paid for on a cash allowance basis. The allowance for “Unknown Utilities and Underground Obstructions,” “DCS Yokogawa Hardware/Programming,” “Hazard Operations Study,” and “RNG Equipment Procurement (Greenlane),” is not a ceiling and is used only to provide a figure in the Contract Price. It does not limit payment to the Contractor to this as a maximum amount or entitle the Contractor to this as a lump sum amount for the event of such occurrence. This allowance is intended to cover the costs of:
o Removing, relocating or maintaining underground obstructions and utilities pursuant to Part 3.C.4 of the General Conditions.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-6 BID FORM
o The Distributed Control System (DCS) Programming and additional hardware that may become necessary though construction as described in specification section 13401.
o Conducting a Hazard Operations Study as described as an attachment to specification section 01630.
o The remaining costs associated with the assignment of the Owner Pre-Contracted Products contract (“Assigned Contract”) as included in specification section 01630 with Greenlane Industries to the Contractor.
Item Description Cash
Allowance
1. Allowance for “Unknown Utilities & Underground Obstructions”
$60,000.00
2. Allowance for “DCS Yokogawa hardware/programming”
$100,000.00
3. Allowance for “Hazard Operations Study” $100,000.00
4. Allowance for “RNG Pre-Purchased Equipment (Greenlane)” Remaining value to be paid on contract assignment
$1,151,175.00
TOTAL AMOUNT FOR CASH ALLOWANCE ITEMS $1,411,175.00
10.2.4.1 Bidder acknowledges that the amount shown for cash allowance items is an estimated amount to be included in the Lump Sum Bid, and that final payment will be based on actual costs as determined in conformance with the Bid Documents and as authorized by Change Order.
10.2.4.2 Bidder further acknowledges that the Lump Sum Bid amount, and not the cash allowance, includes all additional costs associated with the cash allowance and that it has been computed in accordance with Part 7, Section C.6 of the General Conditions.
10.2.5 TOTAL BASE BID SUMMARY: The undersigned Bidder agrees to provide the Work as denoted in the summary table below for the lump sum price of:
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-7 BID FORM
Lump Sum Amount for supply of all Work, with the exception of items listed below in this Bid Summary (from 10.2.1):
$
Total of Cash Allowance Items (from 10.2.4): $1,411,175.00
TOTAL BASE BID (BASIS OF AWARD) $
TOTAL BASE BID (BASIS OF AWARD), handwritten below:
Dollars (words) and Cents $ (numerals)
10.2.6 BASIS OF AWARD: The award of this Contract shall be made to the responsible bidder with the lowest Total Base Bid.
11.0 SUBCONTRACTORS
Bidder agrees to submit as part of its Bid, or within two (2) working hours after the effective Bid submittal time, the names of subcontractors as required in the Instructions to Bidders and by State law, whom Bidder, if awarded Contract, will name for performance of the categories of Work.
12.0 NOT USED
13.0 BIDDER
13.1 If the Bid is accepted, Bidder hereby agrees to contract with the Owner in the form of a Contract prepared by the Owner’s Attorney and to furnish the performance and payment bonds and the required evidence of the insurance within 15 calendar days after receiving written Notice of the Final Award of the Contract.
13.2 The Bidder further agrees, if its Bid is accepted and a Contract for performance of the Work is entered into with the Owner, to construct said project at the at the amount Bid and to so plan Work and to prosecute it with such diligence that all of the Work shall be completed within the time stipulated in the Bid.
14.0 RESIDENT/NON-RESIDENT BIDDER
Check one: The Bidder submitting this Bid is a:
( ) Resident Bidder. Bidder’s Oregon business address: _______________________________________________
_______________________________________________
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-8 BID FORM
_______________________________________________
_______________________________________________
( ) Non-Resident Bidder. Bidder’s state of residency: ____________________
Pursuant to ORS 279A.120, “Resident Bidder” means a Bidder that has paid unemployment taxes or income taxes in this state during the 12 calendar months immediately preceding submission of the Bid, has a business address in this state, and has stated in the Bid whether the Bidder is a “Resident Bidder.”
15.0 TAX CERTIFICATION Bidder attests or affirms under penalty of perjury and in accordance with ORS 305.385: “That I am authorized to act on behalf of the Bidder in this matter that I have authority and knowledge regarding the payment of taxes, and that the Contract is, to the best of my knowledge, not in violation of any Oregon tax laws. For purposes of this certification, “Oregon tax laws” are those tax laws listed in ORS 305.380 (4), namely ORS Chapters 118, 314, 316, 318, 320, 321, and 323 sections 10 to 20, Chapter 533, Oregon Laws 1981, as amended by Chapter 16, Oregon Laws 1982 (first special session); the elderly rental assistance program under ORS 310.630 to 310.706; and any local tax laws administered by the Oregon Department of Revenue under ORS 305.620.”
16.0 BID SUBMISSION
This Bid is submitted by:
A Corporation:
Corporation Name:
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
By: (Signature – attach evidence of authority to sign)
Name (typed or printed):
Title: (CORPORATE SEAL)
Attest: (Signature of Corporate Secretary)
Business Address:
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 00151-9 BID FORM
Phone No.: Facsimile:
E-mail Address:
A Limited Liability Company (LLC)
LLC Name:
State in Which Organized:
By: (Signature – attach evidence of authority to sign)
Name (typed or printed):
Title:
Business Address:
Phone No.: Facsimile:
E-mail Address:
If Sole Proprietor or Partnership or Joint Venture
Names of partners (if co-partnership) or names of joint venturers (if a joint venture):
IN WITNESS hereto the undersigned has set (its) hand this _________ day of _______________________________, 20___.
Signature of Bidder
Name (typed)
Title
END OF SECTION
THIS PAGE INTENTIONALLY BLANK
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT B
THIS PAGE INTENTIONALLY BLANK
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 016290-1 HARMONIC FILTERS
SECTION 16290 HARMONIC FILTERS
PART 1 - GENERAL
1.01 SUMMARY
A. SCOPE: This section specifies active harmonic filter power correction systems to reduce current harmonics and correct power factor on 480-volt power distribution systems. All filters will be installed in the Motor Control Center lineup.
1.02 QUALITY ASSURANCE
A. REFERENCE STANDARDS: 1. This Section incorporates by reference the latest revisions of the following
documents. They are part of this Section insofar as specified and modified herein. In the event of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.
2. Unless otherwise specified, references to documents shall mean the documents in effect on the effective date of the Agreement. If referenced documents have been discontinued by the issuing organization, references to those documents shall mean the replacement documents issued or otherwise identified by that organization or, if there are no replacement documents, the last version of the document before it was discontinued.
Reference Title
ANSI/IEEE C62.41 Surge Withstand Capacity
ANSI/IEEE 519 Guide for Harmonic Control and Reactive Compensation of Static Power C t
UL 508 Standard for Industrial Control Equipment
IEC 60529, IP20 Degrees of Protection Provided by Enclosures (IP Code)
ICC IBC International Building Code
B. FACTORY TESTS: The manufacturer shall test the system performance at rated current and voltage while functioning as a harmonic correction device prior to shipment. A certified report shall be submitted at the successful completion of factory performance tests.
1.03 SUBMITTALS
A. A copy of the contract document single line diagrams and plan drawings, with addendum updates that apply to the equipment in this section, marked to show specific changes necessary for the equipment proposed in the submittal. If no changes are required, the drawing or drawings shall be marked "no changes
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 016290-2 HARMONIC FILTERS
required". Failure to include copies of the relevant drawings with the submittal shall be cause for rejection of the entire submittal with no further review.
C. Electrical single line, schematic diagrams, and conductor connection diagram. D. Layout drawings indicating arrangement, dimensions, cable entries, and weights. E. Manufacturer’s product and catalog data indicating equipment specifications and
features. F. Provide size and weights of shipping units to be handled by installer. Detailed
layouts of customer power and control connections. Detailed installation drawings including all terminal locations.
G. Operation and maintenance information as specified in Section 01300, including:
1. As-built drawings. 2. Final, complete reviewed submittal information
H. Factory test report specified in paragraph 16290-1.02 B. I. Field test reports specified in paragraphs 16290-3.02 and 3.04
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. The Owner believes the following candidate manufacturers are capable of producing equipment and/or products that will satisfy the requirements of this Section. This statement, however, shall not be construed as an endorsement of a particular manufacturer’s products, nor shall it be construed that named manufacturers’ standard equipment or products will comply with the requirements of this Section. Candidate manufacturers for include: 1. TCI, HGA 5% (NEMA 1/12) 2. Eaton HCU2 (NEMA 1/12) 3. Or equal
2.02 DESIGN FEATURES
A. SYSTEM DESCRIPTION: System Voltage: 480 volts, 3-Phase, 3-Wire plus ground conductor.
B. OUTPUT LOAD CAPACITY: Rated capacity shall be the required current capacity at the voltage indicated meet the requirements of this Section, with all MCC loads operating.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 016290-3 HARMONIC FILTERS
C. CURRENT TRANSDUCERS: 1. Two 400-Hertz split core type current transducers shall be installed on phases
A & B at locations shown. 2. Transducer current ratings shall be 1000:5. 3. Current transducer output shall be 5 amperes full scale.
D. MODES OF OPERATION: 1. The power correction system shall inject harmonic current to cancel load
produced harmonic current so the upstream power harmonic current and voltage are reduced to below 5% TDD and 5% THD(V), respectfully. The system shall correct all types of nonlinear loads.
2. The applied circuit may be a single nonlinear load, a distribution-bus with multiple loads, or the facility load at the point-of-common coupling (PCC) with the power source.
3. The displacement power factor correction of the reactive current shall be activated or deactivated via a door-mounted human machine interface (HMI) with touch screen control.
E. PERFORMANCE REQUIREMENTS: 1. Input Power:
a. Voltage: Automatically adapted to 480V, 3 phase and ground conductor. b. Voltage Tolerance: +/- 10% of nominal. c. Frequency: automatically adapted to 50 or 60 Hertz, +/- 3 Hertz. d. Surge Withstand Capability: ANSI/IEEE C62.41-1991 without damage. e. Input Fuses: Class T rated at 200,000 AIC (amperes interrupting
capacity). 2. Output Performance: Performance of the power correction system shall be
independent of the impedance of the power source. 3. Harmonic Correction:
a. Limit the 3rd through 49th order harmonic current to <5% TDD at the main bus. Harmonic levels for individual harmonic orders shall comply with respective levels established in ANSI/IEEE std 519-1992, Table 10.3.
b. Limit the THD(V) added to the electrical system immediately upstream of the power correction system location(s) to less than or equal to 5%.
c. The power correction system shall not correct for power utility supplied voltage distortion levels.
4. Reactive Current Compensation: Maintain a set point of .99 lagging displacement power factor under all load conditions. Power factor shall not go “leading” at any point.
5. Both filters shall operate tandem (tie closed) or independently with all wiring required to achieve this requirement.
F. SYSTEM FEATURES: 1. Each unit provided with a current limiting function to protect the
semiconductors.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 016290-4 HARMONIC FILTERS
2. Non-critical level faults shall provide automatic restart and return to normal operation upon automatic fault clearance: a. Faults such as AC line over voltage b. AC line under-voltage c. AC line power loss d. AC line phase imbalance shall be automatically restarted.
3. Critical level faults shall stop the function of the unit and await Operator action to restart the power correction system: a. The display shall indicate the fault condition and “stop.” b. The run LED and relay shall be disabled and the fault relay enabled. c. Operator shall initiate a power reset by turning the power off and on.
4. The ratio of the two CTs shall be entered into the logic via the digital keypad/display to calibrate the operation of the power correction system.
G. OPERATOR INTERFACE SYSTEM: 1. Filters shall have a door-mounted human machine interface (HMI) with touch
screen control rated NEMA 4-12 (IP65), dust-tight and liquid-resistant. 2. HMI shall provide run/stop control from every screen. 3. HMI shall provide an oscilloscope feature to display specific parameters.
a. HMI shall display the mains voltage and CT current curves. b. Performance trend curves shall be displayed for load total RMS current,
load RMA harmonic current per phase, AHF harmonic current output per phase, AC mains voltage per phase, THDi, TDD, load RMS reactive current, and AHF RMS reactive current output.
c. Bar graphs shall be provided for display of the mains and load harmonic current amplitudes per harmonic order.
d. Selected internal curves shall be provided for diagnostic and performance checks.
e. Parameter adjustment shall be made via HMI and shall be password protected.
f. HMI shall record and display an event log with time and date stamp. Event log shall be cleared via the stop function or power-off. A minimum of 100 events shall be stored.
4. HMI shall provide external communications via a RJ45 connector. a. Ethernet TCP/IP shall provide remote run/stop and display of operating
parameters, set-up parameters and diagnostic functions. 5. HMI shall have a safety feature that shall lock out all other forms of control
during service and commissioning. a. After 15 minutes of non-use the lockout shall clear and control functions
shall revert to full functionality and remote control capability. 6. HMI shall display a flashing warning screen in the event of a fault. 7. HMI shall download pertinent parameters to a USB memory device to permit
remote diagnostic evaluations and to save unit set up parameters. 8. HMI shall include, but shall not be limited to, an on-board commissioning
guide with automatic detection features.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 016290-5 HARMONIC FILTERS
a. AHF shall automatically check for proper AC line phase rotation. Clockwise is required.
b. AHF shall automatically test for CT phase rotation and polarity. If installation is incorrect, a fault warning and lockout of operation shall occur.
c. AHF shall automatically calibrate the CT for optimum harmonic cancellation performance.
d. AHF shall perform at full capacity for a period of 15 minutes to validate components meet temperature performance requirements.
9. In the event any of the above cannot be reconciled, HMI shall lock out AHF function until commissioning agent corrects, verifies, and clears each test.
H. ENCLOSURE: 1. Each unit shall be provided in a wall mounted NEMA 1 gasketed enclosure.. 2. Disconnects:
a. The switchgear circuit breaker shall be utilized as the local disconnecting means.
3. Features: a. 42,000 AIC rated fuses with Class T actuation. b. Grounding lug.
I. NAMEPLATES: In addition to the manufacturer's identification, an external nameplate conforming to the requirements of Section 16010 shall be provided with equipment number and name as shown
2.03 WARRANTY
A. Provide a Warranty for the harmonic filters. Manufacturer shall warrant against defects in materials and workmanship for two (2) years.
PART 3 - EXECUTION
3.01 FIELD INSTALLATION
A. Take all necessary precautions to exclude moisture and foreign material from the equipment at all times during storage and installation. Care shall be taken to prevent corrosion of silver-plated contact surfaces and damage to relays and control devices.
3.02 FIELD QUALITY CONTROL
A. The following inspections and test procedures shall be performed during startup: 1. VISUAL INSPECTION:
a. Inspect equipment for signs of damage. b. Verify installation per drawings c. Verify ground conductors are properly sized and configured. d. Verify current transducer orientation and wiring to power correction
system.
MWMC PROJECT NO.: P80095 – RNG UPGRADES
ADDENDUM 1 FEBRUARY 2020 1876001*00 016290-6 HARMONIC FILTERS
e. Verify logic setup corresponds to performance specifications defined herein.
2. MECHANICAL INSPECTION: a. Check control wiring connections for tightness. b. Check power wiring connections for tightness. c. Check terminal screws, nuts, and/or spade lugs for tightness.
3. ELECTRICAL INSPECTION: a. Check fuses for continuity. b. Confirm input voltage and verify unit match. c. Check current transducers for proper phase location and orientation.
3.03 STARTUP AND SITE TESTING
A. The manufacturer shall provide field test personnel to initialize all equipment: 1. Submit test reports for each point of test. 2. Field test reports, conducted after the facility is operating under normal load
conditions, shall be required. Test reports shall be documented, signed, and dated.
END OF SECTION
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT C
3
9
7
.
5
3
9
7
.5
3
9
7
.5
398
3
9
8
3
9
8
3
9
9
400
401
4
0
1
398
3
9
8
3
9
8
3
9
9
400
401
4
0
1
MATCHLINE
SEE SHEET C-107
397.5
3
9
7
.5
4
0
5
.0
402.5
4
0
0
.0
395.0
395.0
397.5
395.0
3
9
7
.5
392.5
3
9
5
.0
3
9
5
.
0
395.0
3
9
5
.0
397.5
(E
)6
"S
8" S
3/4"AHP
3/4
"A
HP
54SLP99-01
(E
)3
" W
2
R
R
36" IPS2 FM
(E)96" PTE-DIV
96" P
TE
-D
IV
10
8" P
TE
-D
IV
6" V
72" PTE
36
" O
A
36" OA
30" OA
24" OA
6" O
A
18
" O
A
6" O
A
6" O
A
CO
CO
(E
)1
1
/2
"N
G
A
S
(E
)W
1 IR
R
S AS
3
9
7
3
9
6
3
9
6
3
9
6
3
9
7
397
3
9
6
3
9
6
397
4
0
0
397
3
9
6
3
9
6
S AS
3
9
7
3
9
6
3
9
6
3
9
6
3
9
7
397
3
9
6
3
9
6
397
4
0
0
397
3
9
6
3
9
6
0+
00
1+
00
2+003+004+00
5
+
0
0
6+
00
7+008+00
9
+
0
0
1
0
+
0
0
1
1
+
0
0
12
+0
0
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
WMH
CEC
JF
ADDENDUM 1 - REVISED ENTIRE SHEET 02/12/20 WMH
CIVIL
RNG PIPELINE PLAN AND PROFILE - 1
C-109
1876001-C-109.dwg
pw
:\\kjce-pw
.bentley.com
:kjce-pw
\D
ocum
ents\C
lients\M
etropolitan W
astew
ater M
anagem
ent C
om
mission\P
rojects\R
NG
U
PG
RA
DE
S_1876001.00\10-D
esign\10.06-D
raw
ings\C
ivil\1876001-C
-109
200
1"=40'
40 60
H2S REMOVAL
SYSTEM
RNG BUILDING
TRANSFORMER
RECEIPT
POINT
FACILITY
REGENERATIVE
THERMAL
OXIDIZER
(F) GRAVITY
BELT
THICKENER
PSA
PLAN
4" RNG
PROFILE
1. REFER TO GENERAL NOTES ON SHEET C-106.
LOCATE 4" RNG CENTERLINE A MINIMUM OF 2 FEET SOUTH OF (E) CHAIN LINK FENCE.
CONCRETE ENCASE 4" RNG BETWEEN RECEIPT POINT
FACILITY AND (E) FENCE PER DETAIL .
REPLACE ANY DAMAGED BIKE PATH WITH NEW BIKE PATH PER DETAIL .
NOTES:
RADIATOR
CHILLER
10+00
370
390
400
410
420
380
430
9+00 8+00 7+00 6+00 5+00 4+00 3+00 2+00 1+00 0+00
370
390
400
410
420
380
430
VE
RT
. 1
"=
4'
02
4
HORIZ. 1"=40'
0 20 40 60
EXISTING GRADE ALONG
CENTERLINE OF RNG
2'-6" MINIMUM COVER,
TYPICAL
INVERT 4" RNG
(E) 8" SW
(E) 72" S
(E) W1" IRR
(E) 6" W2
(E) W1" IRR
(E) 6" W2
(E) 36" FM
(E) 54" FM(E) 48" FM
(E) 1 1/2" W1
(E) ELECTRICAL
(E) SIGNAL
(E
) 4
8" T
ER
RY
S
TR
EE
T F
M
(E) 48" TERRY STREET FM
(E) 30" WEST IRWIN FM
(E) 54" WILLAKENZIE PS OWASSO BRIDGE FM
(E) 54" WILLAKENZIE PS UNDER RIVER FM
(E) 8" S
(E) SIGNAL
(E) ELECTRICAL
(E) 1 1/2" W1
(E) 24" WEST
IRWIN FM
(E) 36" WEST
IRWIN FM
(E) 48" TERRY
STREET FM
(E) 48" TERRY
STREET FM
(E
) 8
" S
(E
) 6
" W
2
(E
) W
1 IR
R
(E) 6" W1
(E) W1 IRR
(E) BIKE PATH
(E) FENCE
(E
) 7
2" S
(E) FENCE
(E) FENCE
(E) PAVEMENT
(E) SIGNAL
(E) BERM
(E) ELECTRICAL
(E) BIKE PATH
(E) 72" S
(E) BERM OVER 96" PTE-DIV PIPE
(E) LANDSCAPE
FEATURE
(E) ELECTRICAL
(E) SIGNAL(E) PAVEMENT
2
2
2
(E) 4" PERF
PIPE, TYP.
(E) 8" SW
4" RNG
3
C-001
3
3
(E) FENCE
5
C-002
4
1
2
3
4
5
6
7
8
HORIZONTAL BEND
HORIZONTAL BEND
HORIZONTAL BEND
HORIZONTAL BEND
HORIZONTAL BEND
HORIZONTAL BEND
HORIZONTAL BEND
HORIZONTAL BEND
LOCATIONPOINT
NORTHING
COORDINATE
EASTING
COORDINATE
N 1082.13 E 2054.25
N 1064.34 E 2036.10
N 1064.34 E 1692.77
N 1055.25 E 1670.82
N 1066.73 E 1576.51
N 1066.73 E 1298.51
N 1087.54 E 1193.85
N 1190.88 E 1124.80
1
23
4
5
6
7
LOCATION COORDINATES:
1
1
9 HORIZONTAL BEND N 1682.57 E 1124.80
MA
TC
HLIN
E - S
TA
. 10+
00
S
E
E
S
H
E
E
T
C
-
1
1
0
M
A
T
C
H
L
I
N
E
-
S
T
A
.
1
0
+
0
0
SE
E S
HE
ET
C
-110
4
10 HORIZONTAL BEND N 1741.70 E 1122.15
11 STA. 19+17 N 1987.30 E 1118.72
1
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT D
4
0
5
.0
3
9
7
.5
3
9
5
.
0
3
9
5
.0
392.5
3
9
2
.5
395.0
402.5
3
9
5
.0
392.5
4
0
0
.0
400.0
3
9
7
.5
397.5
397.5
3
9
5
.
0
392.5
392.5
3
9
2
.5
3
9
2
.
5
HB
60" P.I.
60" P.I.
60" P.I.
60" P.I.
6
0
"
P
T
E
6
0
"
P
T
E
54S
LP
99-01
J
JJ
J
J J
3" P
D
3" P
D
6"P
D
6"P
D
4" PD
4" PD
4" PD
2" W
2
42" OA
48" OA
36" OA
36
" O
A
42" O
A
48
" O
A
CO
CO
CO
CO
4" perf pipe
CO
FH
W
W
W
T
9
+
0
0
1
0
+
0
0
1
1
+
0
0
12+0013+0014+0015+0016+00
17+00
18+0019+00
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
WMH
CEC
JF
ADDENDUM 1 - NEW SHEET 02/12/20 WMH
CIVIL
RNG PIPELINE PLAN AND PROFILE - 2
C-110
1876001-C-110.dwg
pw
:\\kjce-pw
.bentley.com
:kjce-pw
\D
ocum
ents\C
lients\M
etropolitan W
astew
ater M
anagem
ent C
om
mission\P
rojects\R
NG
U
PG
RA
DE
S_1876001.00\10-D
esign\10.06-D
raw
ings\C
ivil\1876001-C
-110
200
1"=40'
40 60
PLAN
4" RNG
1. REFER TO GENERAL NOTES ON SHEET C-106.
2. REFER TO LOCATION COORDINATES TABLE
ON SHEET C-109.
NOTES:
PROFILE
20+00
350
360
370
390
400
410
420
380
430
19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00
350
360
370
390
400
410
420
380
430
VE
RT
. 1
"=
4'
02
4
HORIZ. 1"=40'
0 20 40 60
EXISTING GRADE ALONG
CENTERLINE OF RNG
2'-6" MINIMUM COVER,
TYPICAL
INVERT 4" RNG
(E) 6" W1
AND W1 IRR
(E) 6" W1
AND W1 IRR
(E) 8" S
(E) 12" SW
(E) BIKE PATH
(E) 8" S
(E) 48" TERRY STREET FM
(E
) 6
" W
1
(E
) 8
" S
(E) 48" TERRY STREET FM
(E
) 3
0
" W
E
S
T
IR
W
IN
F
M
(E) W
1 IR
R
(E) 30" WEST IRWIN FM
(E
) 1
2" S
W
(E
) 12" S
W
ST
A. 1
9+
17
CO
NN
EC
T P
OIN
T T
O N
OR
TH
WE
ST
NA
TU
RA
L P
IP
EL
IN
E
(E) FENCE
STA. 19+17
CONNECT POINT TO NORTHWEST
NATURAL PIPELINE
(
E
)
6
"
W
1
(
E
)
W
1
I
R
R
S
E
E
S
H
E
E
T
C
-
1
0
9
M
A
T
C
H
L
I
N
E
-
S
T
A
.
1
0
+
0
0
SE
E S
HE
ET
C
-109
(E) 4" PERF PIPE
(E) 4" PERF PIPE
(E) 4" PERF PIPE
MA
TC
HLIN
E - S
TA
. 10+
00
(E) 4" PERF PIPE, TYP.
(E) 4" PERF PIPE, TYP.
8
9
10
11
1
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT E
DISTR
MANUFACTURER
MOTOR CONTROL CENTER
MANHOLE
MOTOR OPERATED VALVE
MISCELLANEOUS
NORMALLY CLOSED
MOTOR STARTER
MOUNTING
MOUNTED
MANUFACTURER'S ASSOC.
NOT IN CONTRACT
NOT TO SCALE
NATIONAL ELECTRICAL
P2.
MOTOR CIRCUIT PROTECTOR
NORMALLY OPEN, NUMBER
MANUAL TRANSFER SWITCH
NATIONAL ELECTRICAL CODE
THIS IS A GENERALIZED LEGEND SHEET.
THIS CONTRACT MAY NOT USE ALL
INFORMATION SHOWN.
NOTIFY THE ENGINEER IMMEDIATELY IF
CONFLICTS IN EQUIPMENT LOCATIONS
ARE DISCOVERED OR IF PROBLEMS ARISE
DUE TO FIELD CONDITIONS, LACK OF
INFORMATION OR ANY OTHER REASON. NO
PAYMENT WILL BE MADE FOR CHANGES
WHICH HAVE NOT BEEN FAVORABLY
REVIEWED BY THE ENGINEER.
THESE DRAWINGS ARE DIAGRAMMATIC ONLY;
EXACT LOCATIONS OF ELECTRICAL
EQUIPMENT SHALL BE DETERMINED IN THE
FIELD BY THE ENGINEER. THE INSTALLATION
OF ALL EQUIPMENT SHOWN ON THESE
DRAWINGS OR DESCRIBED IN THE
SPECIFICATIONS SHALL CONFORM TO THE
REQUIREMENTS SET FORTH IN THE LATEST
EDITIONS OF ALL APPLICABLE CODES AND
UTILITY COMPANY STANDARDS. CONTACT
THE UTILITY COMPANY REPRESENTATIVES
AND VERIFY THEIR REQUIREMENTS.
CONDUIT SIZE AND FILL SHALL BE AS
INDICATED. WHERE NO SIZE IS SHOWN, THE
CONDUIT SHALL BE SIZED IN ACCORDANCE
WITH THE EDITION OF THE NATIONAL
ELECTRICAL CODE ADOPTED BY THE
AUTHORITY HAVING CODE ENFORCEMENT
JURISDICTION. WHERE NO FILL IS
INDICATED, THE FILL SHALL BE 2#12.
PROVIDE 3/16 INCH NYLON PULL ROPE IN
EACH EMPTY CONDUIT.
PLAN NOTES:
P1.
ELAPSED TIME METERETM
FIRE ALARM CONTROL PANEL
GENERAL NOTES:
G1.
FACP
FDR FEEDER
G3.
G2.
NTS
NIC
NO
DISTRIBUTION PANEL
ELECTRICAL HANDHOLE
ELECTRIC, ELECTRICAL
EHH
EQ
EQPT
EFFL
ENCL
EMERG
ELEM
ELEC
EL, ELEV
EFFLUENT
ENCLOSURE
EQUIPMENT
EQUAL
ELEVATION
ELEMENTARY
EMERGENCY
EA
EF
DWG
(E)
DP
DN
DRAWING
EXISTING
EXHAUST FAN
EACH
DISTRIBUTION
DOWN
NC
NEMA
NEUT
NEC
NEUTRAL
MTS
(N)
MTD
MTG
NEW
MH
MOV
MS
MIN
MISC
MINIMUM
MFR
MCP
MAX
MCC
MAXIMUM
LOWER CASE LETTERS ADJACENT TO A
SWITCH OR LIGHT FIXTURE INDICATE A
SWITCHED CIRCUIT. FOR FOUR LAMP
FIXTURES WIRED IN PAIRS WITHIN EACH
FIXTURE, THE "a" SWITCH CONTROLS THE
OUTER LAMPS AND THE "b" SWITCH
CONTROLS THE INNER LAMPS; WIRE 3
LAMP FIXTURES SIMILARLY.
P3.
WATERTIGHT
TRANSFORMER
WATER TREATMENT PLANT
INFORMATION SHOWN MAY NOT BE ALL
INCLUSIVE. SEE ALSO ANSI C37.2, Y1.1,
Y32.2, AND Y32.9.
VERIFY ALL COLOR REQUIREMENTS
BEFORE ORDERING MATERIALS.
REFER TO THE MECHANICAL DRAWINGS FOR
CERTAIN CONTROL DIAGRAMS AND EXACT
LOCATIONS OF MECHANICAL EQUIPMENT
AND FOR CERTAIN CONNECTIONS TO BE
MADE TO ELECTRICAL CIRCUITS.
G6.
G5.
G4.
XFMR
WT
WTP
TEMPERATURE
TELEPHONE
UNDERGROUND
UNIT HEATER
ULTRA VIOLET
TYPICAL
VOLT-AMPERES
VAR-HOUR
WIRE, WATTS
VERTICAL
VOLTS
TWISTED SHIELDED PAIR
WATTHOUR METER
VOLT AMPERES REACTIVE
VOLTMETER SWITCH
VARIABLE FREQUENCY DRIVE (AC)
WEATHER RESISTANT
WATTHOUR DEMAND METER
VS
WHDM
WR
W
WHM
VERT
VH
VAR
VFD
UG
UV
VA
V
UH
TEMP
TSP
TYP
TEL
FA
T
FLUORESCENT
FEET, FOOT
FREQUENCY
GALVANIZED
FORWARD
GENERATOR
HYDROGEN PEROXIDE
HAND-OFF-REMOTE
HORSEPOWER
HORIZONTAL
HANDHOLE
HAND-OFF-AUTOMATIC
HIGH VOLTAGE
INPUT/OUTPUT
INDICATING LIGHT
HIGH PRESSURE SODIUM
KILOVOLTS
KILOAMPERES
KILOVOLT AMPERES
LIGHTING PANEL
KILOWATT HOURS
LOW PRESSURE SODIUM
KILOWATTS
JUNCTION BOX
GALVANIZED RIGID STEEL
ABBREVIATIONS
KILOVOLT AMPERES REACTIVE
THOUSANDS OF CIRCULAR MILS
INSTRUMENT, INSTRUMENTATION
HERTZ (CYCLES PER SECOND)
FULL VOLTAGE, NON REVERSING
HUMAN MACHINE INTERFACE
GROUND FAULT INTERRUPTER
FULL VOLTAGE, REVERSING
LOCAL CONTROL PANEL
MILLIAMPERES
COMMUNICATION HANDHOLE
COMMUNICATION MANHOLE
CONTROL POWER TRANSFORMER
CONTINUED, CONTINUATION
CURRENT TRANSFORMER
CWP
DISC
DIAG
DIA
DC
CS
CT
CR
CP
COLD WATER PIPE
DIAGRAM
DIRECT CURRENT
DISCONNECT
DIAMETER
CONTROL SWITCH
CONTROL RELAY
CONTROL PANEL
CO
CPT
CONT
COMM
COND
CMH
CKT
CHH
CL
CONDUIT ONLY
CONDUCTOR
COMMUNICATION
CHLORINE
CIRCUIT
LPS
LT(S)
(M)
mA
LTG
LIGHT(S)
MODIFIED
LIGHTING
LP
LCP
KWH
KW
KV
KVARH
KVAR
KVA
HOURS
KCMIL
KA
I/O
JB
AUTO/MANUAL CONTROLLER
CIRCUIT BREAKER AUX. CONTACT,
AMERICAN WIRE GAGE
CLOSED WHEN BREAKER IS OPEN
AUTOMATIC TRANSFER SWITCH
CONDUIT, CONTACTOR
CONTROL CABLE, CLOSING COIL
BARE COPPER GROUND
C
CC
CB
CAB
CAP
BLDG
BCG
b
CABINET
CIRCUIT BREAKER
CAPACITOR
BUILDING
AT
AWG
AUX
AUTO
ATS
APPROX
AS
A/M
AMMETER TRIP
AUTOMATIC
AUXILIARY
APPROXIMATE
AMMETER SWITCH
HV
IND LT
INSTR
HZ
HTR
HPS
HORIZ
HP
HEATER
H O
HMI
HOR
HOA
22
HH
GND
GRS
GEN
GFI
GROUND
CIRCUIT BREAKER AUX. CONTACT,
AMMETER, AMPERES
ALTERNATING CURRENT
ANALOG TO DIGITAL
CLOSED WHEN BREAKER IS CLOSED
AMPERES INTERRUPTING CAPACITY
ABOVE FINISHED FLOOR
AIC
ALT
AL
AFF
ADJ
AF
A/D
AC
ALUMINUM
ALTERNATOR
ADJUSTABLE
AMPERE FRAME
a
A
FVNR
FWD
GALV
GA
FVR
GAUGE
(F)
FU
FREQ
FT
FUSE
FUTURE
FLUOR
PLC PROGRAMMABLE LOGIC CONTROLLER
3/4"C-3#12
SMOKE DETECTOR
SECTION
SUPPLY FAN
SHEET
SPECIFICATIONS
SIGNAL
SWITCH
SYNCHRONIZING
SWITCHGEAR
SWITCHBOARD
SURGE PROTECTIVE DEVICE
SECONDS, SECONDARY
SINGLE POLE, DOUBLE THROW
TERMINAL BLOCK
STAINLESS STEEL, SOLID STATE
SIGNAL HANDHOLE
TELEPHONE CABINET
SWBD
SWGR
SYNC
TB
TC
SPDT
SPD
SW
SS
SF
SPECS
SIG
SHH
SHT
SECT
SEC
SD
PANEL
PANELBOARD
RELOCATE
RELOCATED
RECEPTACLE
POWER
ROOM
REQUIRED
RESET TIMER
PRESSURE SWITCH
SILICON CONTROLLED RECTIFIER
REVOLUTIONS PER MINUTE
POLYVINYL CHLORIDE
REPEAT CYCLE TIMER
POUNDS PER SQUARE INCH
PRIMARY
RT
SCR
RM
RPM
RCPT
(RLD)
REQD
RCT
PS
PWR
(RL)
PVC
PSI
PNLBD
PRI
PNL
PHOTOELECTRIC
PHASE
POWER FACTOR
PHOTOELECTRIC CELL
PULLBOX, PUSHBUTTON
POWER FACTOR RELAY
POSITIVE DISPLACEMENT
PH
PF
PFR
PE
PEC
PB
PD
PLAN SYMBOLS
OH
ELEMENTARY DIAGRAM SYMBOLS
TRANSIENT VOLTAGETVSS
SURGE SUPPRESSOR
FINISHED FLOORFF
FLEX FLEXIBLE
OVERHEAD
OVER TEMPERATURE
THERMAL OVERLOAD RELAY
OH
OL
OT
CONDUIT AND WIRE LAYOUT FOR LIGHTING
AND RECEPTACLES NOT SHOWN. PROVIDE
PER NEC.
DELAYED
ELEMENTARY DIAGRAMS
NAMEPLATE INSCRIPTIONS.
NUMBERS AND LETTERS IDENTIFY DEVICE.
DEVICE. ANY ADDITIONAL NAMEPLATES ARE
LIGHT, SELECTOR SWITCH, ETC. INDICATE THE
"NORMAL" STATUS OF SWITCHES OR CONTACTS IS
LEGEND PLATE REQUIREMENT FOR THAT PARTICULAR
INDICATED ON ELEVATIONS WITH THE REQUIRED
UNDERLINED WORDS SHOWN AT A PUSHBUTTON,
E3
E2
THE SHELF POSITION.
E1
CLOSED INSTANTANEOUS
*
**
OPEN TO
CLOSE ON REACHING LIMIT
CLOSE ON LEAVING LIMIT
TIMED CONTACTS
CLOSED
DELAYED
INSTANTANEOUS
INSTANTANEOUS
LIMIT SWITCHES
NORMALSYMBOL
CLOSED
OPEN
OPEN
CLOSED TO
DELAYED
DELAYED
INSTANTANEOUS
OPEN
SENSING SWITCHES
RISING
CLOSE ON
FALLING
TEMPERATURE
PRESSURE
LEVEL
SENSED VARIABLE
FLOW
ON THE OTHER DIAGRAM
IF OMITTED, THEN THE SPEC.
NORMALLY CLOSED CONTACT
SPARE CONTACTS APPLY.
REQUIREMENTS REGARDING
SPARE CONTACTS ON RELAY.
ON THIS DIAGRAM
CROSS REFERENCE TO
NORMALLY OPEN CONTACT
ANOTHER DIAGRAM
ST
100
GEN
OL
AS
K
#
SINGLE LINE SYMBOLS
MOTOR STARTER
NUMBER INDICATES NEMA SIZE
POWER CIRCUIT BREAKER DRAWOUT
ABOVE 1500V RATING AS NOTED
2
VS
VFD
1
*
*
ETMM
?
?
OFFON
START
STOP
H
O
A
O
H R
X1 X2
H1 H4H3 H2
MOTOR HEATER
CR
NO
CR
NC
OL
CR
1
2-2, 3, 0, 0
FS FS
LS LS
TS TS
ZS
ZS
TR
TR
TR
TR
S
MS
SAP
S
ab
S
*
FACP
SEMI CIRCLE DENOTES
DOWNWARD CONDUIT RISER
COMBINATION MOTOR STARTER
FIBER OPTICFO
**
START
STOP
PSPS
OFFON
5
SPD
GROUND CONNECTION
SWITCH, 3 POLE EXCEPT WHERE
NOTED. RATING IN AMPERES AS
NOTED
AUTOMATIC TRANSFER
SWITCH 3 POLE, RATING AS
NOTED
SHUNT TRIP
FUSE
FUSE CUTOUT
CIRCUIT BREAKER, 3-POLE EXCEPT WHERE
NOTED. RATING IN AMPERES AS NOTED.
TOP INDICATION IS FRAME SIZE, BOTTOM IS
TRIP RATING.
CURRENT TRANSFORMER
VOLTAGE TRANSFORMER
POWER OR DISTRIBUTION
TRANSFORMER RATING AS NOTED
MOTOR. NUMBER INDICATES
HORSEPOWER
GENERATOR
CONTROL PACKAGE PROVIDED
WITH THE DRIVEN EQUIPMENT
BUS STAB ON MCC OR SWITCHGEAR, CORD
& PLUG CONNECTION FOR MOTORS
OR MEDIUM VOLTAGE LOAD BREAK
CONNECTOR
THERMAL OVERLOAD
A - AMMETER
V - VOLTMETER
WH - WATTHOUR METER
GS - GROUND FAULT SENSOR
AMMETER SWITCH
VOLTMETER SWITCH
ELEMENTARY DIAGRAM
REFERENCE NUMBER
KIRK KEY INTERLOCK
POWER RECEPTACLE FOR
PORTABLE EQUIPMENT
RELAY DEVICE FUNCTION, #
PER ANSI NUMBER C37.2
TERMINATOR / POTHEAD
SPLICE, TERMINATION
CAPACITOR - KVAR INDICATED
VFD - VARIABLE FREQUENCY DRIVE
SS - SOLID STATE STARTER
SURGE PROTECTIVE DEVICE
FUSE. RATING IN
AMPERES
ELAPSED TIME
METER
MOTOR
CONTROL DEVICE COIL. PREFIX
NUMBER, WHEN USED,
DISTINGUISHES BETWEEN DEVICES
OF THE SAME TYPE.
ALT - ALTERNATOR
CR - CONTROL RELAY
GR - GENERAL RELAY
ISR - INTRINSICALLY
SAFE RELAY
LR - LATCH RELAY
SV - SOLENOID VALVE
PR - PROBE RELAY
TD - TIME DELAY RELAY
INDICATING LIGHT
PUSH-TO-TEST INDICATING LIGHT
COLORS:
A - AMBER
B - BLUE
C - CLEAR
G - GREEN
R - RED
N - NEON
W - WHITE
Y - YELLOW
SINGLE POLE SWITCH
NORMALLY OPEN /
CLOSED
EMERGENCY PUSHBUTTON
NORMALLY OPEN / CLOSED
PUSHBUTTON
NORMALLY OPEN / CLOSED
SWITCH
1-POLE /
3-POLE
MULTI-POSITION
SELECTOR SWITCH
HAND-OFF-AUTOMATIC
SWITCH X-INDICATES
CONTACTS CLOSED
HAND-OFF-REMOTE SWITCH
X-INDICATES CONTACTS
CLOSED
TERMINAL
CONTROL POWER
TRANSFORMER
MOTOR HEATER
CIRCUIT BREAKER, MCP
1-POLE / 3-POLE
GROUND CONNECTION
CONTACT
NORMALLY OPEN / CLOSED
BUS STAB ON MCC; CORD & PLUG
CONNECTION FOR MOTORS
THERMAL OVERLOAD
TR - TIMING RELAY
OVERHEAD POWER LINE
UNDERGROUND CONDUIT
MULTIPLE CONDUIT RUN
CONDUIT CONCEALED
IN FLOOR
CONDUIT CONCEALED
IN WALL OR CEILING
CONDUIT EXPOSED
CALLOUT INDICATING
CONDUIT SIZE, NUMBER OF
WIRES AND WIRE SIZE
CALLOUT INDICATING
CONDUIT PER SCHEDULE
CONDUIT RUN, HATCH MARKS
INDICATE NO. OF #12 CONDUCTORS
NO HATCH MARKS IS 2#12 UNLESS
OTHERWISE NOTED
HOME RUN TO PANELBOARD
OR AS INDICATED
FLEXIBLE CONDUIT
CONDUIT RUN, BROKEN
AND CONTINUED ON SAME
SHEET OR AS NOTED
CAP ON CONDUIT STUB
OPEN CIRCLE DENOTES
UPWARD CONDUIT RISER
INDICATES REMOVAL
FIRE ALARM CONDUIT
TELEPHONE CONDUIT
SURFACE MOUNTED PANELBOARD
MOTOR
DISCONNECT SAFETY SWITCH
MANUAL MOTOR STARTER
CONTROL STATION
EQUIPMENT MOUNTING STAND
GROUND ROD AND BOX
INSTRUMENT
INTRUSION REMOTE KEY PAD
INTRUSION DOOR SWITCH
SECURITY ALARM PANEL
SINGLE POLE SWITCH
2 = 2 POLE, 3 = 3 WAY, 4 = 4 WAY,
K = KEY OPERATED
WR = WEATHER RESISTANT
D = DIMMER
P = SWITCH WITH PILOT LIGHT
SINGLE POLE SWITCH (NOTE P2)
FIXTURE (NOTE P2)
SEE FIXTURE SCHEDULE
FIXTURE WITH NIGHT LIGHTING
(UNSWITCHED) OR FIXTURE WITH
SELF-CONTAINED EMERGENCY
BALLAST/BATTERY
WALL/CEILING MOUNTED
FIXTURE
WALL/CEILING MOUNTED
FIXTURE NIGHT LIGHTING
(UNSWITCHED)
POLE MOUNTED FIXTURE
WALL/CEILING MOUNTED EXIT
LIGHT - DIRECTIONAL ARROW
WHERE INDICATED, SHADED
AREA INDICATES ILLUMINATED
FACE
EMERGENCY LIGHT WITHOUT
SELF CONTAINED BATTERY
LIGHT FIXTURE
IDENTIFICATION
SINGLE RECEPTACLE, 120V
SINGLE RECEPTACLE, 240V
DUPLEX WALL RECEPTACLE, 120V
WR = WEATHER RESISTANT
G = GROUNDED
IG = ISOLATED GROUND
GFI = GROUND FAULT
INTERRUPTER
DOUBLE DUPLEX WALL
RECEPTACLE, 120V
DUPLEX FLOOR RECEPTACLE,
120V
RECEPTACLE, 480V
WALL/CEILING MOUNTED
JUNCTION BOX
FLOOR RECESS MOUNTED
JUNCTION BOX
THERMOSTAT, WALL MOUNTED
FIRE ALARM PULL STATION
FIRE ALARM FLASHING LIGHT
FIRE ALARM HORN
BELL
BUZZER
HEAT DETECTOR
SMOKE DETECTOR
FIRE ALARM CONTROL PANEL
WALL SENSOR
S
SECURITY SYSTEM CONDUIT
INSTRUMENT
A
ELEV
CTK #
D
S
M
J
J
J
T
F
F
F
B
S
H
K
100AF
100AT
AMPS
POLES
AMP/FRAME
#A
1
TB-#
ANTENNA
135
SCR
MEASURE OF ACIDITY OR ALKALINITYpH
MAIN LUG ONLYMLO
MCBMAIN CIRCUIT BREAKER
KILOVOLT AMPERES REACTIVE
LOCAL-OFF-REMOTELOR
ASD ADJUSTABLE SPEED DRIVE (DC)
100A
MCP
TM
100AT
MCP CIRCUIT BREAKER, 3-POLE EXCEPT
WHERE NOTED. RATING IN AMPERES AS
NOTED. TOP INDICATION IS CONTINUOUS
CURRENT RATING.
THERMAL-MAGNETIC CIRCUIT BREAKER,
3-POLE EXCEPT WHERE NOTED. RATING IN
AMPERES AS NOTED. BOTTOM INDICATION
IS INSTANTANEOUS TRIP RATING.
EXP = CLASS 1, DIV 1 AND 2
ACTIVE HARMONIC FILTERAHF
DCS
DISTRIBUTED CONTROL SYSTEM
CCTV
SECURITY CAMERA
G GROUNDING
EQUIPMENT CONNECTION
SLUDGE HOLDING TANKSHT
N
NGO/NOGO FLASHING LIGHT
GO/NOGO HORN
CONDUIT WITH SEAL FITTING
EQUIPMENT CONNECTION
WITH CONDUIT SEAL
GAS CHROMATOGRAPH
GC
REGENERATIVE THERMAL OXIDIZERRTO
RFB
RFB
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
ABBREVIATIONS AND SYMBOLS
E-001
1876001.00-E-001-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
1
1 2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT F
VFD
200 25
PANEL
PNL-LP
120/208V
XFMR-2
1000 kVA
12470V-480V
3Ø, 4W
XFMR-T1
75 kVA
480V-120/208V
3Ø, 4W
FROM PLANT POWER SYSTEM
(E) TU7
VIA MH8 (15MH01)
480V, 3Ø, 4W, 1200 A, 65 kAIC
SPDMONITOR
POWER
UFER GND
GND ROD (TYP)
PANEL
PNL-DP
480/277V
1200AT
1200AF
TM
40A
TM
400A
TM
70A
TM
300A
TM
350A
TM
70A
TM
100A
AHF
40
TM
100A
25
TM
100A
25
SWBD-01
MAIN
BREAKER
15 kV
60A
UPS
0001
0002
PANEL
PNL-UPS
08BLR07-01 08CPR07-02 08CPR07-01 08PMP07-01 08PMP07-02
RAW GAS
BLOWER
BOOSTER
COMP
BIOGAS
COMP
VACUUM
PUMP 1
VACUUM
PUMP 2
SP
AC
E
SP
AC
E
VFDVFD VFD VFD
CHILLER
TM
20AT
08HEX07-08
RADIATOR
5
30A
MCP
08EF07-01
BIOGAS
PROCESSING
ROOM FAN
1/2
08VLV07-02
PSA
DRIVE
VFD
1
OL
MCC-01
TM
200A
2
15A
MCP
08PMP07-05
COOLING
WATER PUMP
NO. 1
1
OL
2
15A
MCP
08PMP07-06
COOLING
WATER PUMP
NO. 2
1
OL
08CHW07-01
480V, 3Ø, 4W, 600 A, 65 kAIC
SPD
TM
40A
NOTE: NOT ALL EQUIPMENT SHOWN ON THIS SHEET IS FURNISHED BY THE CONTRACTOR.
SEVERAL EQUIPMENT PACKAGES ARE INCLUDED UNDER THIS CONTRACT WHICH INCLUDES
MOTORS, CONTROL PANELS, ETC. AND AT LEAST ONE PACKAGE IS DIRECTLY PROCURED BY
THE OWNER. SUCCESSFUL BIDDER SHALL COORDINATE WITH THE OWNER TO OBTAIN
CORRECT AND COMPLETE DRAWINGS AND LISTS OF EQUIPMENT TO BE PROCURED
SEPARATELY FROM SYSTEM VENDOR(S), AND SHALL NOT FURNISH THIS EQUIPMENT, BUT
SHALL INSTALL IT ACCORDING TO THE VENDORS DRAWINGS. ELECTRICAL AND I&C
SUBCONTRACTORS SHALL COORDINATE WITH THE SUCCESSFUL BIDDER TO DETERMINE
EXACT SCOPE OF EQUIPMENT SUPPLY, AND EQUIPMENT INTERFACING REQUIREMENTS. SEE
SPECIFICATIONS 01630 AND 11602 FOR DETAILS.
XX
XX
RTO
CONTROL
PANEL
FOR FUTURE
TRANSFORMER
CONNECTION
SIZE PER
S&S
SUBMITTAL
45"
2 3
30"
1
MAIN BREAKER
AHF
RAW GAS BLOWER
BOOSTER COMPRESSOR
VACUUM PUMP NO 2
CHILLER
SPD
PNL-DP
POWER MONITOR
VACUUM PUMP NO 1
BIOGAS COMPRESSOR
DESCRIPTIONNO.
NAMEPLATE SCHEDULE
TAG
RNG CONTROL PANEL
PLC-001
08PLC07-01
60
"
72"
08BLR07-01
08CPR07-02
08CPR07-01
08PMP07-01
08PMP07-02
08CHW07-01
20"
4" THICK CONCRETE PAD
SEE STRUCTURAL DWGS
1
2
3
4
5
6
7
8
9
10
11
12
13A
14
15
16
17
18
30"
RAW GAS BLOWER
VFD
VACUUM PUMP 1
VFD
12"
40
"
BOOSTER
COMPRESSOR
VFD
VACUUM PUMP 2
VFD
8"
11
10
5
12
7
SPACE
RADIATOR FANS
6
4
8 9
SPACE
SPACE
SPACE
20"
SPACE
SPACE
SPACE
MLO
3
24VDC
POWER SUPPLY
ETHERNET
COOLING WATER PUMP 1
COOLING WATER PUMP 2
BIOGAS PROCESSING ROOM FAN
MCC-01
13A
14
15
16
08HEX07-08
08PMP07-05
08PMP07-06
13BRTO CONTROL PANEL
13B
08EF07-01
SAK/JL
JL
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
SINGLE LINE DIAGRAM
E-002
1876001.00-E-002-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
MCC-01 AND SWBD-01 - ELEVATION
0 2
3/4"=1'-0"
1
1
1
1
1
1
1
2-20-20
LOAD SUMMARYEQUIPMENT
CONNECTED LOAD DEMAND CALCULATED LOAD
HP AMPERES FACTOR AMPERES
BIOGAS COMPRESSOR 200 240 240
BOOSTER COMPRESSOR 25 34 34
RAW GAS BLOWER 40 52 52
VACUUM PUMP 1 25 21 21
VACUUM PUMP 2 25 21 21
REGENERATIVE THERMAL OXIDIZER 24 24
CHILLER 270 270
MCC-01 48 48
PNL-DP 184 184
25% OF LARGEST MOTOR - 60 1 60
25% OF CONTINUOUS LOAD 46 46
AMPS AT 480/277 VOLTS TOTALS 1000
1
1
1
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT G
(E)
TRANSFORMER
XFMR-1
(NEW)
TRANSFORMER
XFMR-2
SWBD-01
RNG CONTROL PANEL
PLC-001
08PLC07-01
PSA CONTROL PANEL
PLC-004
08PLC07-04
480V DISTRIBUTION
PANEL
PNL-DP
XFMR
T1
PNL-LPBRIDGE
CRANE
08CRN07-01
INSTRUMENT AIR
COMPRESSOR
08CPR07-03
HVAC SPLIT
SYSTEM HEAT
PUMP
08HPU07-01
ELECTRICAL
ROOM AIR
HANDLING UNIT
08AHU07-01
UPS
PNL-UPS
0001
0002
0028
0031
0025
0026
0027
HVAC BIOGAS
PROCESS ROOM
08ASU07-01
0024
ANALYZER ROOM
UNIT HEATER
08HTR07-01
0027
0240
0114 0115
MCC-01
0010
001
0
VFD
000
3
RAW GAS
BLOWER
0017
RAW GAS
BLOWER
CONTROL
PANEL
0310
08BLR07-01
VFD
000
7
BOOSTER
COMP
0022
BOOSTER
CONTROL
PANEL
0315
08CPR07-02
VFD
000
4
BIOGAS
COMP
0018
BIOGAS
COMP
CONTROL
PANEL
0311
08CPR07-01
VFD
000
5
VACUUM
PUMP 1
0020
08PMP07-01
VFD
000
6
VACUUM
PUMP 2
0021
08PMP07-02
000
8
CHILLER PANEL
08PNL07-03
0262
0261
0238
JB ON
VACUUM
SKID
030
3
026
0
011
7
RADIATOR
0013
08HEX07-08
BIOGAS
PROCESSING
ROOM FAN
0012
08EF07-01
COOLING
WATER PUMP
NO. 1
0014
08PMP07-05
COOLING
WATER PUMP
NO. 2
0015
08PMP07-06
PSL-07-01
80DGV07-61
SMOKE
DETECTORS
TIT-07-23
GO/NOGO
STATIONS
0206
0250
0244
PSL-07-02
PIT-07-22
E-STOP
STATIONS
PSL-07-03
FIT-07-01
FIT-07-02
FIT-07-03
0207
0245
0208
0246
0247
0248
08DGV07-053
08DGV07-052
FIT-07-04
0210
0209
0249
AIT-0005,
0006,0007
PIT-07-01
0200
PIT-07-02
0201
0023
0010
08VLV07-02
NWN
RECEIPT
POINT
FACILITY
050
0
GAS
CHROMAT
PACKAGE
023
9
YAGI
ANTENNA @
RNG BLDG
0502
040
0
0501
0116
ROLL UP
DOOR
CONTROLLER
0035
ROLL UP
DOOR
RTO
VFD
PSA VALVE
0019
0032
0063
0064
0062
025
3
MOISTURE
ANALYZER
0122
VIDEO
CAMERAS
0257
0033
COMPRESSOR
ROOM UNIT
HEATER
08HTR07-02
(E) OPERATIONS
BUILDING
(E) DIGESTER
UTILIDOR
(N) JB SOUTH OF
(E) WOOD SHED
(E) BOILER
PATCH PANEL IN
BOILER BLDG
TANKLESS
WATER
HEATER
ACTIVE
HARMONIC
FILTER
0011
0038
030
1
030
2
030
0
025
4
AIT-100
H2S
ANALYZER
0016
0205
0241
0237
0211 - 0216 0217 - 0219
0220 - 0225 0233 - 0236
WIFI
HOT SPOTS
0256
0259
0258
0123 - 01270121
0034
INSTRUMENT
AIR COMPRESSOR
08CPR07-04
0029
HEAT TRACING
0131 LSH
OIL/WATER
SEPARATOR
0255
0238
(E) VAULT BETWEEN
(E) WOOD SHED
AND (E) UTILIDOR
(E) PULLBOX
IN (E) UTILIDOR
(N) WIFI
ACCESS
POINT
(E) SHT
CONTROL
PANEL
0401
0402
0403
0404
CONDUIT
BY OTHERS
EXISTING FIBER PATCH PANEL TO BE SUPPLIMENTED BY AN
ADDITIONAL CORING CABLE SYSTEMS WIC-11 PATCH PANEL.
KEY NOTES:
1
1
0130
0035 - 0037
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
LGR
SAK
LGR
ADDENDUM 1 - REVISED ENTIRE SHEET 02/20/20 LGR
ELECTRICAL
CONDUIT SCHEMATIC
E-003
1876001.00-E-003-ADD1.dwg
1 2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT H
ANGLE BRACKET (2 PER
SECTION) 3/8" DIA BOLTS MIN
ANCHOR TO WALL
6" SKIRT ON ALL
EXPOSED SIDES
OF ENCLOSURE.
SEE STRUCTURAL
FOR ANCHORING
EQUIPMENT
1/8" AIR SPACE
GROUND BUS
GROUND ROD
PVC CONDUIT
(UNDERGROUND)
EQUIPMENT
FRAME, SHIM
AS REQUIRED
TO LEVEL
CL
ROUND CORNERS TO
1/2" RADIUS (TYP)
AL PL 3/8"
AL CS6 x 4.03
1/2"Ø SST
CONC ANCHORS
1" NON-SHRINK
GROUT
1. WHERE SEPARATE FOUNDATION IS REQD, SEE ELEVATION B.
2. COAT ALUMINUM SURFACES IN CONTACT W/CONCRETE PER SPECS.
3. USE SST FASTENERS FOR MOUNTING DEVICES.
4. WEIGHT OF DEVICE(S) SHALL NOT EXCEED 100 POUNDS.
ELEVATION A
ELEVATION B
SECTION C-C
C C
NOTES:
TYP DEVICE
1/4
4'-6
" M
AX
1" M
IN
A
LL
AR
OU
ND
D
EV
IC
E
3"
2'-6
" M
IN
EM
BE
DM
EN
T
1'-4" SQ
1/2"Ø SST
CONC ANCHORS
1" NON-SHRINK
GROUT
AL CS6
#3 @ 6"
4 - #5
1/4
5/8" AL PL
10"
1" (TYP)
3/8
"
6"
18"
3"
3" (TYP)
3"
3" (TYP)
3"
6"
3"
RED WARNING TAPE
COMPACTED FILL
INSTRUMENTATION &
SIGNAL CONDUIT (TYP)
FINISHED GRADE
RED DYED CONCRETE
POWER & 120V
CONTROL CONDUIT
(TYP)
ALL DIMENSIONS ARE
MINIMUMS.
1.
NOTES:
ADD 6" FOR RUNS
BENEATH ROADS.
2.
12" MIN.
SEPARATION
TO "WET"
UTILITIES
WHERE
APPLICABLE
6" DIA SUMP
CONCRETE OR TRAFFIC
COVER AS REQUIRED COVER
TO BE MARKED "POWER"
"CONTROL", OR "SIGNAL"
CONCRETE PULLBOX TO BE APPROPRIATE SIZE FOR
NUMBER AND SIZE OF CONDUITS ENTERING AND
EXITING.
ALL SPLICES WITH-IN THE CONCRETE PULLBOX ARE TO
BE SEALED WITH AN INSULATING AND ENCAPSULATING
RESIN PACK, SCOTCHCAST 4 OR EQUAL
CONDUIT (NUMBER
AS REQUIRED). ALL
CONDUIT WITHIN
THE CONCRETE
PULLBOX ARE TO
BE SEALED WITH
RTV DUCT SEAL TO
PREVENT WATER
ENTERING CONDUIT
SYSTEM.
18" DEEP OF 3/4"
PEA GRAVEL
10" CABLE HOOK
(2 PER RACK) AS
REQUIRED
PLASTIC CABLE
TIE EVERY 6" (TYP)
CABLE RACK INSULATOR
(3 PER HOOK) AS
REQUIRED
PULLING
DEVICES (TYP)
CONDUIT BUSHING
(TYP) SEAL WITH
GROUT
EXTENSION RING
AS REQUIRED
FINISHED GRADE
PLASTIC CIRCUIT TAG
PERMANENTLY MARKED
WITH CIRCUIT NAME
CABLE RACK AS REQUIRED
-
2MAJOR EQUIPMENT MOUNTING
-
3TYPICAL TRENCH
-
1HANDHOLE/PULLBOX INSTALLATION
-
9DEVICE SUPPORT AND MOUNTING
NTSNTS
NTS
NTS
11
3
/4
"
9 3
/4
"
1
3
/
8
"
8-7/8"
12-3/8"
9"
7 1/8"
8 1/4"
20'-0" MIN.
ELECTRICAL EQUIPMENT
COPPER GROUND BUS
CONNECT WITH UL
GROUND CLAMPS
GROUND
CONNECTION
BOND TO INTERIOR
METALLIC COLD WATER
PIPING SYSTEM WHERE
AVAILABLECONCRETE
FOUNDATION,
SLAB, OR FOOTING
GROUND CONDUCTOR
NO 4 AWG BARE COPPER
CONDUCTOR UNLESS
OTHERWISE INDICATED ON THE
DRAWINGS
1" CLEAR FOR
ELEVATED SLABS
3" CLEAR FOR SLABS
ON GRADE OR
FOOTING
CAST IRON TRAFFIC COVER
EMBOSSED "GROUND ROD"
CAST IRON GRADE RING.
ADJUST TO FINISHED GRADE
PRECAST CONCRETE BOX
GROUND CONNECTOR
BURNDY TYPE GAR,
GD OR GK
BARE COPPER
GROUNDING CONDUCTOR
PEA GRAVEL
COMPACTED EARTH
CONDUIT
GROUND ROD 3/4"X10'-0"
COPPER-CLAD STEEL
BARE COPPER
GROUNDING
CONDUCTOR
FINISHED
GRADE
4"
MIN
12
"
9" MIN. DIA.
10-3/8" MIN. DIA.
2"
2"
LIGHT
FIXTURE
EXTERIOR
CMU
CONDULET LB
USE 'MYERS' HUB OR EQUAL
FOR CONDUIT/CONDUCTOR
THROUGH SIDING, ASSURE
SIDING IS SEALED FOR
WATER, MOISTURE, AND
DUST (NOT SHOWN).
CLASS 1 DIV 2 AREA
STEEL CONDUIT SHALL BE PLASTIC COATED
OR PROVIDE 2 LAYER TAPE 1/2 LAPPED, 6"
ABOVE AND BELOW GRADE
LIQUID TIGHT FLEXIBLE
CONDUIT SLOPE TO MIDDLE
4x5.4 STEEL
CHANNEL
STANCHION
BARE COPPER
GROUNDING
CONDUCTOR TO
BUILDING GROUND
SYSTEM, NO. 8 AWG
SOLID.
CONDUIT
MOTOR TERMINAL BOX
EQUIPMENT GROUNDING
CONDUCTOR
MOTOR GROUNDING LUG
HORIZONTAL
24"
GALVANIZED STEEL
ANCHOR BOLTS
SUPPLIED
WITH POLE, INSTALL,
POLE PER
MANUFACTURER'S
INSTRUCTIONS.
1", 45° TOOLED EDGE.
CONDUIT
7'-0
"4
2"
CAST IN-PLACE
CONCRETE BASE.
18" DIAMETER
CONCRETE
STEEL REINFORCING
BAR CAGE, 6-#5
VERTICAL BARS
WITH #3
HORIZONTAL HOOPS
ON 12" CENTER TIED
TO VERTICAL BARS.
4" ROUND POLE. FOR
FIXTURE INFORMATION SEE
LUMINAIRE SCHEDULE.
FOR FIXTURE INFORMATION
SEE LUMINAIRE SCHEDULE
VIBRATION DAMPENER.
RECEPTACLE WITH
WEATHERPROOF
IN-USE COVER WHERE
INDICATED ON PLANS.
COMPACTED
FINISH GRADE
DOUBLE NUT FOR
LEVELING MAKE
POLE PLUMB
BASE COVER
CONNECT GROUND WIRE
TO GROUNDING LUG OF
POLE AT HAND HOLE.
36" OF SLACK POWER
CONDUCTORS AT BASE OF
POLE, PROTECT WITH PLASTIC
COVERING UNTIL POLE
INSTALLATION. PLUG
CONDUITS TO PREVENT
WATER COLLECTING IN
CONDUITS
NOTE:
FIXTURE WIRE THROUGH
POLE TO LUMINAIRE TO BE
RATED FOR 150°F.
METALLIC SHRINKAGE
RESISTANT GROUT.
(3) #3ɸ REINFORCING
STEEL HOOPS WITHIN
TOP 5"
-
7CONC GROUNDING ELECTRODE BOX
NTS
-
4MOTOR CONNECTION
NTS
-
8UFER GROUND
NTS
-
6GROUND ROD AND BOX
NTS
-
5EXTERIOR WALL LUMINAIRE MOUNTING
NTS
-
11POLE MOUNTED FIXTURE MOUNTING
NTS
SEAL-OFF
SEAL-OFF
UNCLASSIFIED
TO SECOND SEAL
NEAR FLOOR
CMU ANCHOR
-
10FIXTURE MOUNTED ON GUARDRAIL
NTS
DETAIL-SIDE VIEW
TOP VIEW
CONDUIT BODY OR JB
CLOSE NIPPLE
REDUCER 2" TO 3/4"
SEE ENLARGED DETAIL
SS FULL HEX LOCK
NUT WITH CURVED
WASHER
3/8" P END CAP
(TYP 2)
LIGHT FIXTURE
ROTATE FIXTURE AS NEEDED
2" GRS CONDUIT
1/2" GRS PIPE SLEEVE
3/8"Ø OVAL HEAD 18.8 SS
CARRIAGE SCREW, IF
DISTANCE IS GREATER THAN
6", PROVIDE 3/8"Ø SS
THREADED ROD WITH WASHER
AND SS CAP NUT
GUARDRAIL
LOCK NUT
STEEL PLATFORM
1/2"Ø SS BOLT (TYP 2) AT
CENTER OF PLATE
8"
1-1
/2
" (T
YP
)
2-1/2"
1-1
/2
"
2-1
/2
"
10
'-0
"
5"x5"x1/2"
3/16
I-BEAM @ PLATFORM TOP
1/2" PL
TO BM3/16
PVC COATED CAST TYPE EYS
SEALING FITTING FOR
VERTICAL INSTALLATION AS
REQUIRED.
GALVANIZED RIGID STEEL/PVC
COATED CONDUIT.
13
13WITH CONDUIT SEAL
NTS
FLOOR PENETRATION
7'-0
" M
AX
2'-0
" M
IN
ESTCODE
E-103
12FIXTURE MOUNTED ON PARAPET
LIGHT FIXTURE
2" GRS CONDUIT
TACK WELD
ALL AROUND
CLOSE NIPPLE
REDUCER 2" TO 3/4"
1/2"Ø SS BOLT (TYP 2) AT
CENTER OF PLATE
NTS
CONDUIT BODY OR JB
CMU PARAPET
SLEEVE
LGR/JL
JL/SAK
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
DETAILS
E-004
1876001.00-E-004-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
1
1 2-20-20
1
1
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT I
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
LGR
JL
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
PANEL AND LUMINAIRE SCHEDULES
E-010
1876001.00-E-010-ADD1.dwg
pw
:\\kjce-pw
.bentley.com
:kjce-pw
\D
ocum
ents\C
lients\M
etropolitan W
astew
ater M
anagem
ent C
om
mission\P
rojects\R
NG
U
PG
RA
DE
S_1876001.00\10-D
esign\10.06-D
raw
ings\E
lectrical\1876001.00-E
-010-A
DD
1
PNL-DP FED FROM: MCC-01
480 VOLTS, THREE PHASE, 3 WIRE
BUS: 225 AIC: 42KA MAIN: MLO
CKT. NO. DESCRIPTION
CONNECTED KVA
TRIP
AMPS/
POLES
CKT. NO. DESCRIPTION
CONNECTED KVA
TRIP
AMPS/
POLESA B C
1
HVAC BIOGAS PROC RM 08ASU07-01 (OUTSIDE)
3.9
30/3
2
HVAC SPLIT SYS HEAT PUMP 08AHU07-01 (IN ELEC RM)
3.4
25/3
3 3.9 4 3.4
5 3.9 6 3.4
7
HVAC SPLIT SYS HEAT PUMP 08HPU07-01 (ON ROOF)
4.2
30/3
8
HVAC ANALYZER ROOM UNIT HEATER 08HTR07-01
1.7
15/3
9 4.2 10 1.7
11 4.2 12 1.7
13
INSTRUMENT AIR COMPRESSOR 08CPR07-03
3.0
20/3
14
INSTRUMENT AIR COMPRESSOR 08CPR07-04
3.0
20/3
15 3.0 16 3.0
17 3.0 18 3.0
19
BRIDGE CRANE 08CRN07-01
5.0
30/3
20
XFMR-T1
6.9
40/3
21 5.0 22 5.0
23 5.0 24 2.3
25
HVAC COMPRESSOR ROOM UNIT HEATER 08HTR07-02
1.7
15/3
26
PSA - VFD
0.3
5/3
27 1.7 28 0.3
29 1.7 30 0.3
31
TANKLESS WATER HEATER
7.0
30/3
32
ROLL UP DOOR
1.0
10/3
33 7.0 34 1.0
35 7.0 36 1.0
37
BIOGAS PROC RM 08EF07-01
2.1
20/3
38
HEAT TRACE 1
10.0
40/1
39 2.1 40
HEAT TRACE 2
10.0
40/1
41 2.1 42
HEAT TRACE 3
10.0
40/1
PHASE SUBTOTALS (KVA):
26.9 26.9 26.9 26.3 24.4 21.7
PHASE TOTALS (KVA):
53.2 51.3 48.6
PHASE TOTALS (AMPS):
192.1 184.9 175.2
TOTAL (KVA):
153.1 KVA
MAX PHASE AMPS 192.1 A
PERCENT LOAD MAX PHASE: 85.4 %
TOTAL (AMPERES):
184 A
PNL-LP FED FROM: PANEL DP VIA XFMR-T1
208/120 VOLTS, THREE PHASE, 4 WIRE
BUS: 100 AIC: 10KA MAIN: 200A/3P MOUNTING: SURFACE
CKT. NO. DESCRIPTION
CONNECTED KVA
TRIP
AMPS/
POLES
CKT. NO. DESCRIPTION
CONNECTED KVA
TRIP
AMPS/
POLESA B C A B C
1 ELEC AND COMPR ROOM EXIT AND EMERG LTG 0.1 20/1 2 ELECTRICAL AND COMPRESSOR ROOM RCPTS 0.9 20/1
3 BIOGAS PROCESSING ROOM EXIT LTG 0.1 20/1 4 BIOGAS PROCESSING ROOM RCPTS 1.0 20/1
5 ANALYZER ROOM EMERG LTG 0.1 20/1 6 ANALYZER ROOM RCPTS 0.4 20/1
7 H2S REMOVAL SYSTEM LTG 0.3 20/1 8 RNG BLDG RCPTS - EXTERIOR 0.8 20/1
9 SPARE 0.0 20/1 10 ROOF COMPRESSOR RM FAN 08EF07-03 0.3 20/1
11 RNG BLDG EXTERIOR LTG 0.2 20/1 12 ROOF ANALYZER RM FAN 08EF07-02 0.3 20/1
13 SPARE 20/1 14 RNG BLDG ROOF RCPTS 0.5 20/1
15 REFRIGERATED AIR DRYER 08ADU07-01 20/1 16 SPARE 0.0 20/1
17 SPARE 0.4 20/1 18 BIOGAS PROCESSING ROOM LIGHTS 0.4 20/1
19 RTO EXTERIOR LTG 0.2 20/1 20
UPS
4.1
40/2
21 20/1 22 3.6
23
PROCESS EXTERIOR LTG
0.4 20/1 24 ELECTRICAL ROOM LIGHTS 0.1 20/1
25 20/1 26 20/1
27 20/1 28 20/1
29 20/1 30 20/1
31 20/1 32 20/1
33 20/1 34 20/1
35 20/1 36 20/1
37 20/1 38 20/1
39
20/2
40 20/1
41 42 20/1
PHASE SUBTOTALS (KVA):
0.6 0.1 1.1 6.3 4.9 1.2
PHASE TOTALS (KVA):
6.9 5.0 2.3
PHASE TOTALS (AMPS):
57.8 41.2 18.8
TOTAL (KVA):
14.2 KVA
MAX PHASE AMPS 57.8 A
PERCENT LOAD MAX PHASE: 57.8 %
TOTAL (AMPERES):
39 A
PNL-UPS FED FROM: UPS VIA PNL-LP
240/120 VOLTS, SINGLE PHASE, 3 WIRE
BUS: 100A AIC: 10 KA MAIN: 60A/2P MOUNTING: SURFACE
CKT.
NO.
DESCRIPTION
CONNECTED KVA
TRIP
AMPS/
POLES
CKT.
NO.
DESCRIPTION
CONNECTED KVA
TRIP
AMPS/
POLESA B A B
1GC SYSTEM QMA
0.2 20/1 2 GC SCS ENCLOSURE 0.3 20/1
3 SAMPLE PROBE TO SCS TUBE HEATING 0.5 20/1 4 SCS TO GC TUBE HEAT 0.2 20/1
5 ANALYZER ROOM - LTG 0.1 20/1 6 ELECTRICAL AND COMPR ROOM - LTG 0.2 20/1
7 GAS CHROMATOGRAPH 08CCHR07-01 1.2 20/1 8 BIOGAS PROCESSING ROOM - LTG 0.2 20/1
9 RNG CP 08PLC07-01 1.0 20/1 10 COMPRESSION SYSTEM CP 08PLC07-02 1.0 20/1
11 AIT-100 H2S ANALYZER 0.2 20/1 12 RNG BLDG EXTERIOR LTG 0.2 20/1
13 MOISTURE ANALYZER 08MST07-01 0.2 20/1 14 OIL/WATER SEP. HIGH LEVEL INSTRUMENT 0.1 20/1
15 SPARE 0.0 20/1 16SCS TO QMA TUBE HEAT
0.2 20/1
17 SPARE 0.0 20/1 18
NWN FEEDER
1.0
50/2
19 SPARE 0.0 20/1 20 1.0
PHASE SUBTOTALS (KVA):
1.5 1.9 2.6 1.7
PHASE TOTALS (KVA):
4.1 3.6
TOTAL KVA: 7.7 KVA
TOTAL AMPERES: 32 A
NOTES:
1. 120 VAC 1200 VA FOR THE GAS CHROMATOGRAPH (GC).
2. 120 VAC 240 VA FOR THE MOISTURE ANALYZER. SINCE THIS ANALYZER USES 24 VDC, GC
MANUFACTURER WILL PROVIDE 24 VDC 10A POWER SUPPLY SUITABLE FOR CLASS 1, DIVISION 2.
3. 120 VAC 300 VA FOR THE HEATER IN THE SAMPLE CONDITIONING SYSTEM (SCS) ENCLOSURE.
4. 120 VAC 450 VA FOR THE HEATED BUNDLE FROM THE SAMPLE PROBE TO THE SCS.
5. 120 VAC 150 VA FOR THE HEATED SAMPLE BUNDLE FROM THE SCS TO THE GC.
6. 120 VAC 150 VA FOR THE HEATED SAMPLE BUNDLE FROM THE SCS TO THE MOISTURE
ANALYZER.
LUMINAIRE SCHEDULE
TYPE DESCRIPTION LAMPS
WATTS
/FIXTURE
MANUFACTURER CATALOG NUMBER MOUNTING
B3 SURFACE 1' X 4' LED FIXTURE
LED 41
LITHONIA #RTLX4 40L EZ1 LP840 N80 OR EQUAL SURFACE
CEILING
EM2 EMERGENCY LIGHT, TWO 3.6V, 0.75W LED LAMPS, 120V INPUT (2) 0.75W
LED
1.5
LITHONIA #ERE T
SURFACE WALL
EM3 EMERGENCY LIGHT, 120V AC ONLY, 2.5W LED LAMPS, CLASS 1,
DIV 2 RATED
(4) 2.5W LED
10
BEGHELLI #PL-HZ-HT-UNV OR EQUAL
SURFACE WALL
EX1 LED EXIT LIGHT, SINGLE FACE, GREEN LETTERING
LED 3
LITHONIA #LQM S W 3 G 120/277
SURFACE
EX3 LED EXIT LIGHT, SINGLE FACE, GREEN LETTERING, CLASS 1 DIV
2 RATED
LED 2W
BEGHELLI #RBO-E-HT-LG-1-W-120/277V
SURFACE WALL
F1 WALLPACK, LED WITH TAMPER PROOF SCREWS, WITH
MOTION/AMBIENT LIGHT SENSOR
LED 25
LITHONIA #WST LED P2 30K VF MVOLT BBW PIR DBLXR OR
EQUAL
SURFACE WALL
F2 WALLPACK, LED HAZARDOUS LOCATIONS
LED 39W
HOLOPHANE #HW4G 10C 1000 40K T3M MVOLT BKSDP
SURFACE WALL
N1 AREA LUMINAIRE, TYPE 4 OPTICS POLE MOUNTED LED WITH
NEMA TWIST LOCK AND PHOTOCELL
LED 75
LITHONIA #AS1 LED 63B 350 40K SR4 MVOLT SPA PER DBLXD
DLL127F 1.5JU OR EQUAL
POLE
N3 AREA LUMINAIRE, TYPE 4 OPTICS POLE MOUNTED LED WITH
NEMA TWIST LOCK AND PHOTOCELL
LED 75
LITHONIA #AS1 LED 42C 530 40K SR4 MVOLT SPA PER DBLXD
DLL127F 1.5JU OR EQUAL
POLE
P1 POLE, STEEL 4" SQUARE, 18' LITHONIA #SSS 18 4C DM19AS DBL OR EQUAL
X2 HAZARDOUS AREA FIXTURE, CLASS 1, DIV 1&2, CLASS 2, DIV 1,
WITH MOUNTING CEILING MOUNTING KIT
LED 47
HOLOPHANE #HXPL 5L4 2T AS 3500K WITH #HXPLWCMK OR
EQUAL
SURFACE
CEILING
1
1
1
1
1
1
1
1
1
1
1
1
2-20-201
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT J
LGR
JL
LGR
ADDENDUM 1 - REVISED ENTIRE SHEET 02/20/20 LGR
ELECTRICAL
CONDUIT AND WIRE SCHEDULE - 1
E-011
1876001.00-E-011-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
CONDUIT AND WIRE SCHEDULE
NUMBER GROUP FROM TO CONDUIT WIRE COMMENTS
TAG DESCRIPTION TAG DESCRIPTION
SIZE P (") SIZE C (") SIZE S (")
POWER CONTROL SIGNAL
480 VOLT POWER
0001 A XFMR-1 TRANSFORMER BY 15MH01 XFMR-2 RNG FACILITY TRANSFORMER 4
3-4/0 15 kV, 1-#1G
COORDINATE WITH MWMC
0002 A XFMR-2 RNG FACILITY TRANSFORMER SWBD-01 RNG FACILITY SWITCHBOARD 3-3"
3 RUNS 3-500 KCM, #3/0G
0003 - SWBD-01 RNG FACILITY SWITCHBOARD SC-01 RAW GAS BLOWER VFD 1"
3-#8, 1-#10G
0004 - SWBD-01 RNG FACILITY SWITCHBOARD SC-02 BIOGAS COMPRESSOR VFD 3"
3-350KCM, 1-#2G
VFD IN BIOGAS CONTROL PANEL
0005 - SWBD-01 RNG FACILITY SWITCHBOARD SC-04 VACUUM PUMP 1 VFD 1"
3-#8, 1-#10G
0006 - SWBD-01 RNG FACILITY SWITCHBOARD SC-05 VACUUM PUMP 2 VFD 1"
3-#8, 1-#10G
0007 - SWBD-01 RNG FACILITY SWITCHBOARD SC-06 BOOSTER COMPRESSOR VFD 1"
3-#6, 1-#10G
0008 B SWBD-01 RNG FACILITY SWITCHBOARD CH-001 CHILLER 2- 2-1/2"
2 SETS 3-#4/0, #3G
0009 - SWBD-01 RNG FACILITY SWITCHBOARD MCC-01 RNG FACILITY MCC 3"
3-250 KCM, 1-#6G
0010 - SWBD-01 RNG FACILITY SWITCHBOARD PNL-DP PANEL DP 3"
3-350KCM, 1-#2G
0011 - SWBD-01 RNG FACILITY SWITCHBOARD AHF-01 ACTIVE HARMONIC FILTER 2"
3-#2, 1-#8G
0012 - MCC-01 RNG FACILITY MCC 08EF07-01 BIOGAS PROCESSING ROOM EXHAUST FAN 3/4"
3#12, #12G
0013 - MCC-01 RNG FACILITY MCC RF-001 RADIATOR FAN 1 3/4"
3#12, #12G
0014 - MCC-01 RNG FACILITY MCC CWP-001 COOLING WATER PUMP 1 3/4"
3#12, #12G
0015 - MCC-01 RNG FACILITY MCC CWP-002 COOLING WATER PUMP 2 3/4"
3#12, #12G
0016 MCC-01 RNG FACILITY MCC 08PLC07-06 RTO CONTROL PANEL 1"
3#10, #12G
0017 - SC-01 RAW GAS BLOWER VFD 08BLO07-01 RAW GAS BLOWER 1"
3-#8, 1-#10G
0018 H SC-02 BIOGAS COMPRESSOR VFD 08CPR07-01 BIOGAS COMPRESSOR 3"
3-250KCM, 1-#2G
VFD IN BIOGAS CONTROL PANEL
0019 J SC-03 PSA VALVE VFD 08PSA07-01 PSA VALVE 1"
3#12, #12G
0020 I SC-04 VACUUM PUMP 1 VFD 08PMP07-01 VACUUM PUMP 1 1"
3-#8, 1-#10G
0021 I SC-05 VACUUM PUMP 2 VFD 08PMP07-02 VACUUM PUMP 2 1"
3-#6, 1-#10G
0022 - SC-06 BOOSTER COMPRESSOR VFD 08CMP07-02 BOOSTER COMPRESSOR 1"
3-#6, 1-#10G
0023 - PNL-DP PANEL DP XFMR-T1 LIGHTING TRANSFORMER 1-1/2"
3-#2, 1-#8G
0024 - PNL-DP PANEL DP 08ASU07-01 BIOGAS PROCESSING ROOM AIR SUPPLY UNIT 3/4"
3#10, #10G
0025 - PNL-DP PANEL DP 08ACU07-01 ELECTRICAL ROOM AIR CONDITIONING UNIT 1" 3/4"
3-#8, 1-#12G
T-stat cable
0026 - PNL-DP PANEL DP 08AHU07-01 ELECTRICAL ROOM AIR HANDLING UNIT 3/4"
3#12, #12G
0027 - PNL-DP PANEL DP 08HTR07-01 ANALYZER ROOM UNIT HEATER 3/4"
3#12, #12G
0028 - PNL-DP PANEL DP 08CPR07-03 INSTRUMENT AIR COMPRESSOR 1 3/4"
3#10, #12G
0029 - PNL-DP PANEL DP 08CPR07-04 INSTRUMENT AIR COMPRESSOR 2 3/4"
3#10, #12G
0030 - PNL-DP PANEL DP RUDC ROLL UP DOOR CONTROLLER 3/4"
3#12, #12G
0031 - PNL-DP PANEL DP 08CRN07-01 BRIDGE CRANE 3/4"
3#12, #10G
0032 - PNL-DP PANEL DP SC-03 PSA VALVE VFD 3/4"
3#12, #12G
0033 - PNL-DP PANEL DP 08HTR07-02 COMPRESSOR ROOM UNIT HEATER 3/4"
3#12, #12G
0034 - PNL-DP PANEL DP 08TWHTR-01 TANKLESS WATER HEATER 3/4"
3#10, #12G
0035 - PNL-DP PANEL DP HT 1 HEAT TRACE 1 1"
2#8, #12G
PER GREENLANE DRAWINGS
0036 - PNL-DP PANEL DP HT 2 HEAT TRACE 2 1"
2#8, #12G
PER GREENLANE DRAWINGS
0037 - PNL-DP PANEL DP HT 3 HEAT TRACE 3 1"
2#8, #12G
PER GREENLANE DRAWINGS
0038 - RUDC ROLL UP DOOR CONTROLLER RUD ROLL UP DOOR 3/4"
3#12, #12G
120/208 VOLT POWER AND CONTROL
0100 - XFMR-T1 LIGHTING TRANSFORMER PNL-LP PANEL LP 1-1/2"
3#1, 1- #6N, #8G
0101 - PNL-LP PANEL LP LTG 1 COMPRESSOR ROOM LIGHTING 3/4"
2#12, #12G
0102 - PNL-LP PANEL LP LTG 2 ELECTRICAL ROOM LIGHTING 3/4"
2#12, #12G
0103 - PNL-LP PANEL LP LTG 3 ANALYZER ROOM LIGHTING 3/4"
2#12, #12G
0104 PNL-LP PANEL LP LTG 4 YARD LIGHTING 3/4"
2#12, #12G
0105 PNL-LP PANEL LP LTG 5 OUTDOOR LIGHTING 3/4"
2#12, #12G
0106 PNL-LP PANEL LP RCP 1 COMPRESSOR ROOM RECEPTACLES 3/4"
2#12, #12G
0107 PNL-LP PANEL LP RCP 2 ELECTRICAL ROOM RECEPTACLES 3/4"
2#12, #12G
0108 PNL-LP PANEL LP RCP 3 ANALYZER ROOM RECEPTACLES 3/4"
2#12, #12G
0109 PNL-LP PANEL LP RCP 4 YARD RECEPTACLES 3/4"
2#12, #12G
0110 PNL-LP PANEL LP RCP 5 ROOF RECEPTACLES 1 3/4"
2#12, #12G
0111 PNL-LP PANEL LP RCP 6 ROOF RECEPTACLES 2 3/4"
2#12, #12G
0112 PNL-LP PANEL LP 08EXF07-02 ANALYZER ROOM EXHAUST FAN 3/4"
2#12, #12G
0113 PNL-LP PANEL LP RAD 1 REFRIGERATED AIR DRYER 1"
2#12, #12G
0114 - PNL-LP PANEL LP UPS UPS 1"
2#6, 1- #12N #12G
0115 - UPS UPS PNL-UPS PNL-UPS 1"
2#6, 1- #12N #12G
0116 - PNL-UPS PNL-UPS 08PLC07-01 RNG CONTROL PANEL 3/4"
2#12, #12G
0117 K PNL-UPS PNL-UPS 08PLC07-02 RAW GAS BLOWER CONTROL PANEL 3/4"
2#12, #12G
0118 L PNL-UPS PNL-UPS 08PLC07-03 BIOGAS COMPRESSOR CONTROL PANEL 3/4"
2#12, #12G
0119 M PNL-UPS PNL-UPS 08PLC07-04 PSA CONTROL PANEL 3/4"
2#12, #12G
0120 N PNL-UPS PNL-UPS 08PLC07-05 BOOSTER COMPRESSOR CONTROL PANEL 3/4"
2#12, #12G
0121 P PNL-UPS PNL-UPS UIT-07-01 GAS CHROMATOGRAPH 3/4"
2#12, #12G
0122 - PNL-UPS PNL-UPS AIT-07-01 MOISTURE ANALYZER 3/4"
2#12, #12G
1 2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT K
LGR
JL
LGR
ADDENDUM 1 - REVISED ENTIRE SHEET 02/20/20 LGR
ELECTRICAL
CONDUIT AND WIRE SCHEDULE - 2
E-012
1876001.00-E-012-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
1 2-20-20
CONDUIT AND WIRE SCHEDULE
NUMBER GROUP FROM TO CONDUIT WIRE COMMENTS
TAG DESCRIPTION TAG DESCRIPTION
SIZE P (") SIZE C (") SIZE S (")
POWER CONTROL SIGNAL
120/208 VOLT POWER AND CONTROL
0123
-
PNL-UPS PNL-UPS SC ENCLGC SYSTEM QMA
3/4"
2#12, #12G
0124
-
PNL-UPS PNL-UPS SC ENCL GC SCS ENCLOSURE 3/4"
2#12, #12G
0125
-
PNL-UPS PNL-UPS SC ENCL SAMPLE PROBE TO SCS TUBE HEATING 3/4"
2#12, #12G
0126
-
PNL-UPS PNL-UPS SC ENCL SCS TO GC TUBE HEAT 3/4"
2#12, #12G
0127
-
PNL-UPS PNL-UPS SC ENCLSCS TO QMA TUBE HEAT
3/4"
2#12, #12G
0128
-
PNL-UPS PNL-UPS EM LTG 1 COMPRESSOR ROOM EMERGENCY LIGHTING 3/4"
2#12, #12G
0129
-
PNL-UPS PNL-UPS EM LTG 2 ELECTRICAL ROOM EMERGENCY LIGHTING 3/4"
2#12, #12G
0130
-
PNL-UPS PNL-UPS AIT-100 H2S ANALYZER 3/4"
2#12, #12G
0131
-
PNL-UPS PNL-UPS 08OWS07-01 OIL/WATER SEPARATOR 3/4"
2#12, #12G
LEVEL SWITCH
24 VOLT AND SIGNAL
0200
C
08PLC07-01 RNG CONTROL PANEL PIT-07-01 GAS TO WG BURNER #2 3/4" 1-#16 TSP
0201
C
08PLC07-01 RNG CONTROL PANEL PIT-07-02 GAS TO WG BURNER #1 3/4" 1-#16 TSP
0202
C
08PLC07-01 RNG CONTROL PANEL 08DGV-01 OSG TO BURNER 1 CLOSED 3/4" 2-#14
0203
C
08PLC07-01 RNG CONTROL PANEL 08DGV-02 OSG TO BURNER 2 CLOSED 3/4" 2-#14
0204
C
08PLC07-01 RNG CONTROL PANEL 08DGV-03 OSG TO RGB CLOSED 3/4" 2-#14
0205
-
08PLC07-01 RNG CONTROL PANEL 08PLC07-02 RAW GAS BLOWER CONTROL PANEL 3/4" 1-#16 TSP
0206
-
08PLC07-01 RNG CONTROL PANEL PSL-07-01 ASU PRESSURE 3/4" 2-#14
0207
-
08PLC07-01 RNG CONTROL PANEL PSL-07-02 COMPRESSOR ROOM EXHAUST FAN 3/4" 2-#14
0208
-
08PLC07-01 RNG CONTROL PANEL PSL-07-03 AIR COMPRESSOR LOW PRESSURE 3/4" 2-#14
0209
D
08PLC07-01 RNG CONTROL PANEL 08DGV07-52 BIOGAS VALVE TO BOOSTER COMPRESSOR 3/4" 8-#14
0210
D
08PLC07-01 RNG CONTROL PANEL 08DGV07-53 BIOGAS VALVE TO OFFSPEC GAS LINE 3/4" 4-#14
0211
-
08PLC07-01 RNG CONTROL PANEL AS-01 BIOGAS ROOM SMOKE DETECTOR 1 3/4" 2-#14
0212
-
08PLC07-01 RNG CONTROL PANEL AS-02 BIOGAS ROOM SMOKE DETECTOR 2 3/4" 2-#14
0213
-
08PLC07-01 RNG CONTROL PANEL AS-03 BIOGAS ROOM SMOKE DETECTOR 3 3/4" 2-#14
0214
-
08PLC07-01 RNG CONTROL PANEL AS-04 BIOGAS ROOM SMOKE DETECTOR 4 3/4" 2-#14
0215
-
08PLC07-01 RNG CONTROL PANEL AS-05 BIOGAS ROOM SMOKE DETECTOR 5 3/4" 2-#14
0216
-
08PLC07-01 RNG CONTROL PANEL AS-06 BIOGAS ROOM SMOKE DETECTOR 6 3/4" 2-#14
0217
-
08PLC07-01 RNG CONTROL PANEL AIT 0005 COMBUSTIBLE GAS DETECTOR - ANALYZER ROOM 3/4" 1-#16 TSP
0218
-
08PLC07-01 RNG CONTROL PANEL AIT 0006 COMBUSTIBLE GAS DETECTOR 1 - BIOGAS PROCESSING ROOM 3/4" 1-#16 TSP
0219
-
08PLC07-01 RNG CONTROL PANEL AIT 0007 COMBUSTIBLE GAS DETECTOR 2 - BIOGAS PROCESSING ROOM 3/4" 1-#16 TSP
0220
-
08PLC07-01 RNG CONTROL PANEL 08GNG07-01 GO/NOGO 1 3/4" 4-#14
0221
-
08PLC07-01 RNG CONTROL PANEL 08GNG07-02 GO/NOGO 2 3/4" 4-#14
0222
-
08PLC07-01 RNG CONTROL PANEL 08GNG07-03 GO/NOGO 3 3/4" 4-#14
0223
-
08PLC07-01 RNG CONTROL PANEL 08GNG07-04 GO/NOGO 4 3/4" 4-#14
0224
-
08PLC07-01 RNG CONTROL PANEL 08NG07-01 NOGO 1 3/4" 2-#14
0225
-
08PLC07-01 RNG CONTROL PANEL 08NG07-02 NOGO 2 3/4" 2-#14
0226
-
08PLC07-01 RNG CONTROL PANEL HRN1 HORN 1 3/4" 2-#14
0227
-
08PLC07-01 RNG CONTROL PANEL HRN2 HORN 2 3/4" 2-#14
0228
-
08PLC07-01 RNG CONTROL PANEL HRN3 HORN 3 3/4" 2-#14
0229
-
08PLC07-01 RNG CONTROL PANEL HRN4 HORN 4 3/4" 2-#14
0230
-
08PLC07-01 RNG CONTROL PANEL HRN5 HORN 5 3/4" 2-#14
0231
-
08PLC07-01 RNG CONTROL PANEL HRN6 HORN 6 3/4" 2-#14
0232
-
08PLC07-01 RNG CONTROL PANEL HRN7 HORN 7 3/4" 2-#14
0233
-
08PLC07-01 RNG CONTROL PANEL HS-0011 E-STOP STATION 1 3/4" 2-#14
0234
-
08PLC07-01 RNG CONTROL PANEL HS-0012 E-STOP STATION 2 3/4" 2-#14
0235
-
08PLC07-01 RNG CONTROL PANEL HS-0013 E-STOP STATION 3 3/4" 2-#14
0236
-
08PLC07-01 RNG CONTROL PANEL HS-0014 E-STOP STATION 4 3/4" 2-#14
0237
-
08PLC07-01 RNG CONTROL PANEL 08PLC07-06 RTO CONTROL PANEL 3/4" 1- CAT 6 ETHERNET
0238 B 08PLC07-01 RNG CONTROL PANEL CH-001 CHILLER 3/4" 1- CAT 6 ETHERNET
0239
-
08PLC07-01 RNG CONTROL PANEL
UIT-07-01
GAS CHROMATOGRAPH 3/4" 1- CAT 6 ETHERNET
0240
-
08PLC07-01 RNG CONTROL PANEL 08PLC07-02 RAW GAS BLOWER CONTROL PANEL 3/4" 8-#14 1- CAT 6 ETHERNET CONFIRM TOTAL WIRE COUNT WITH GREENLANE
0241
-
08PLC07-01 RNG CONTROL PANEL SWBD-01 RNG FACILITY SWITCHBOARD 3/4" 1- CAT 6 ETHERNET
FOR POWER MONITOR
0242
-
08PLC07-01 RNG CONTROL PANEL 08CPR07-03 INSTRUMENT AIR COMPRESSOR 1 3/4" 2-#14
FAIL ALARM
0243
-
08PLC07-01 RNG CONTROL PANEL 08CPR07-04 INSTRUMENT AIR COMPRESSOR 2 3/4" 2-#14
FAIL ALARM
0244
-
08PLC07-01 RNG CONTROL PANEL TIT07-23 COOLING WATER FROM RADIATOR 3/4" 1-#16 TSP
0245
-
08PLC07-01 RNG CONTROL PANEL PIT-07-22 WASTE GAS TO BURNERS 3/4" 1-#16 TSP
0246
-
08PLC07-01 RNG CONTROL PANEL FIT-07-01 FEED GAS TO RAW GAS BLOWER 3/4" 1-#16 TSP
0247
-
08PLC07-01 RNG CONTROL PANEL FIT-07-02 WASTE GAS TO RTO 3/4" 1-#16 TSP
0248
-
08PLC07-01 RNG CONTROL PANEL FIT-07-03 OSG TO WASTE GAS BURNERS 3/4" 1-#16 TSP
0249
-
08PLC07-01 RNG CONTROL PANEL FIT-07-04 PRODUCT GAS TO NWN 3/4" 1-#16 TSP
0250
-
08PLC07-01 RNG CONTROL PANEL 08DGV07-61 NWN REJECT GAS TO OSG 3/4" 8-#14
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT L
LGR
JL
LGR
ADDENDUM 1 - NEW SHEET 02/20/20 LGR
ELECTRICAL
CONDUIT AND WIRE SCHEDULE - 3
E-013
1876001.00-E-013-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
CONDUIT AND WIRE SCHEDULE
NUMBER GROUP FROM TO CONDUIT WIRE COMMENTS
TAG DESCRIPTION TAG DESCRIPTION
SIZE P (") SIZE C (") SIZE S (")
POWER CONTROL SIGNAL
24 VOLT AND SIGNAL
0251
-
08PLC07-01 RNG CONTROL PANEL 08PLC07-02 RAW GAS BLOWER CONTROL PANEL 3/4" 2-#16 TSP
0252
-
08PLC07-01 RNG CONTROL PANEL MCC-01 RNG FACILITY MCC 1" 12-#14
0253
-
08PLC07-01 RNG CONTROL PANEL AIT-07-01 MOISTURE ANALYZER 3/4" 1-#16 TSP
0254
-
08PLC07-04 PSA CONTROL PANEL AIT-100 H2S ANALYZER 3/4" 1-#16 TSP
0255
-
08PLC07-01 RNG CONTROL PANEL 08OWS07-01 OIL/WATER SEPARATOR 3/4" 2-#14
HIGH LEVEL ALARM
0256
-
08PLC07-01 RNG CONTROL PANEL WF1 WIFI UNIT 1 3/4" 1- CAT 6 ETHERNET
POE
0257
-
08PLC07-01 RNG CONTROL PANEL WF2 WIFI UNIT 2 3/4" 1- CAT 6 ETHERNET
POE
0258
-
08PLC07-01 RNG CONTROL PANEL VC1 CAMERA 1 3/4" 1- CAT 6 ETHERNET
POE
0259
-
08PLC07-01 RNG CONTROL PANEL VC2 CAMERA 2 3/4" 1- CAT 6 ETHERNET
POE
0260
-
08PLC07-04 PSA CONTROL PANEL SC-03 PSA VALVE VFD 3/4" 3/4" 4-#14 2-#16 TSP
0261
-
08PLC07-04 PSA CONTROL PANEL SC-04 VACUUM PUMP 1 VFD 3/4" 3/4" 4-#14 2-#16 TSP
0262
-
08PLC07-04 PSA CONTROL PANEL SC-05 VACUUM PUMP 2 VFD 3/4" 3/4" 4-#14 2-#16 TSP
0263
G
08PLC07-02 RAW GAS BLOWER CONTROL PANEL SC-01 RAW GAS BLOWER VFD 3/4" 3/4" 4-#14 2-#16 TSP
0264
H
08PLC07-05 BOOSTER COMPRESSOR CONTROL PANEL SC-06 BOOSTER COMPRESSOR VFD 3/4" 3/4" 4-#14 2-#16 TSP
GREENLANE SYSTEM INTERCONNECTIONS
0300
G
08PLC07-04 PSA CONTROL PANEL 08PLC07-03 BIOGAS COMPRESSOR CONTROL PANEL 2" 2-1" COMMENTS COMMENTS
PER GREENLANE SHOP DRAWINGS (NOTE 1)
0301
K
08PLC07-04 PSA CONTROL PANEL 08PLC07-02 RAW GAS BLOWER CONTROL PANEL 2" 2-1" COMMENTS COMMENTS
PER GREENLANE SHOP DRAWINGS (NOTE 1)
0302
H
08PLC07-04 PSA CONTROL PANEL 08PLC07-05 BOOSTER COMPRESSOR CONTROL PANEL 2" 2-1" COMMENTS COMMENTS
PER GREENLANE SHOP DRAWINGS (NOTE 1)
0303
I
08PLC07-04 PSA CONTROL PANEL VPB01
VACUUM PUMP SKID JUNCTION BOX(S)
1" 2-1" COMMENTS COMMENTS
PER GREENLANE SHOP DRAWINGS (NOTE 1)
0304
J
08PLC07-04 PSA CONTROL PANEL PSA01
PSA SKID JUNCTION BOX(S)
2" 2-1" COMMENTS COMMENTS
PER GREENLANE SHOP DRAWINGS (NOTE 1)
RTO SYSTEM INTERCONNECTIONS
0350
F
08PLC07-06 RTO CONTROL PANEL JB-TOS1 RTO SKID 480 VOLT JUNCTION BOX NOTE 2
PER RTO MANUFACTURER (NOTE 2)
0351
F
08PLC07-06 RTO CONTROL PANEL JB-TOS2 RTO SKID 120 VOLT JUNCTION BOX NOTE 2
PER RTO MANUFACTURER (NOTE 2)
0352
F
08PLC07-06 RTO CONTROL PANEL JB-TOS3 RTO SKID 24 VOLT JUNCTION BOX NOTE 2
PER RTO MANUFACTURER (NOTE 2)
FIBER OPTIC CABLE
0400
E
08PLC07-01 RNG CONTROL PANEL PB-FO PULL BOX NEAR RTO
(N) 2"
12 STRAND FO
0401
E
PB-FO PULL BOX NEAR RTO -
(E) VAULT NEAR BOILER BLDG (E) 1-1/4"
12 STRAND FO
0402
E
-
(E) VAULT NEAR BOILER BLDG
-
(E) PULL BOX IN UTILIDOR (E) 1-1/4"
12 STRAND FO
0403
E
-
(E) PULL BOX IN UTILIDOR
-
(E) BOILER FIBER PATCH PANEL BOX (N) 2"
12 STRAND FO
0404
-
-
(E) BOILER FIBER PATCH PANEL BOX
-
(E) SHT CONTROL PANEL (E) 1"
2-STRAND FO
NWN FACILITY
0500 N 08PLC07-01 RNG CONTROL PANEL
CP-NWN
NWN TRANSFER STATION CONTROL PANEL 3/4" 1- CAT 6 ETHERNET
0501 N PNL-UPS PNL-UPS CP-NWN NWN TRANSFER STATION CONTROL PANEL 1"
2#6, 1- #12N #12G
0502 N NWN-YAGI NWN TRANSFER STATION ANTENNA CP-NWN NWN TRANSFER STATION CONTROL PANEL 1" PER NWN SPEC
NOTES:
1. THE GREENLANE SYSTEM CONSISTS OF EQUIPMENT ON FIVE EQUIPMENT
SKIDS AS WELL AS SEVERAL LOOSE ITEMS. THE RAW GAS BLOWER AND
BOOSTER COMPRESSOR SKIDS HAVE CONTROL PANELS MOUNTED ON
THEM. THE BIOGAS COMPRESSOR SKID CONNECTS TO A COMBINED PLC
CONTROL PANEL AND VFD LOCATED IN THE ELECTRICAL ROOM. THE PSA
SKID AND THE VACUUM PUMP SKID CONNECT TO THE PSA CONTROL
PANEL, ALSO IN THE ELECTRICAL ROOM. SKID MOUNTED MOTORS WILL
WIRE BACK TO THE RESPECTIVE VFDS IN THE ELECTRICAL ROOM
WITHOUT PASSING THROUGH JUNCTION BOXES OR CONTROL PANELS.
CONTROL, SIGNAL AND NETWORKING WIRING WILL BE PREWIRED ON
SKIDS WITH CONTROL PANELS. OTHER SKIDS MAY HAVE SOME
COMBINATION OF 120 VOLT CONTROL WIRING, 24 VOLT ANALOG SIGNAL
WIRING, AND/OR INTRINSICALLY SAFE WIRING TO CONNECT TO THE
REMOTE CONTROL PANEL. THIS CONTRACT DRAWING CALLS FOR ONE 120
VOLT CONDUIT FOR ALL 120 VOLT SIGNALS, ONE SIGNAL CONDUIT FOR
ALL 24 VOLT SIGNAL AND/OR NETWORK WIRING, AND ONE CONDUIT FOR
ANY INTRINSICALLY SAFE WIRING. CONTRACTOR MAY, UPON RECEIPT OF
THE FINAL SHOP DRAWINGS FROM GREENLANE, DELETE ANY CONDUITS
WHICH ARE NOT REQUIRED BY SHOP DRAWINGS.
2. WIRING BETWEEN RTO CONTROL PANEL AND RTO UNIT SHALL BE
ACCORDING TO RTO MANUFACTURER. WIRING WILL CONSIST OF 480 VOLT
POWER, 120 VOLT SIGNALS AND SMALL SOLENOIDS, AND 24 VOLT ANALOG
SIGNAL AND THERMOCOUPLE WIRING. THERMOCOUPLE WIRING MAY BE
COMBINED WITH 24 VOLT ANALOG WIRING. PROCURE CORRECT TYPE OF
THERMOCOUPLE WIRE PER TYPE LISTED ("J" OR "K").
1 2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT M
MH
-7
3
E-004
3
E-004
S AS
3
9
6
3
9
6
TU
8A
-B
10"PD
02WTV01
REDUCERS
02WOV07
ECENTRIC
(2) 54" X 48"
(HH14)
02HH02
(HH18)
02HH06
12" PD
(
E
)
1
0
"
S
W
02HH03
(HH17)
(HH20)
14HH04
(H
H77)
14MH02
02WOV06 02WOV02
(MH7)
TU
-6
6"R
OO
F D
08HH04
(HH21)
20-06
02SGV
08HH04
2-1"1-3"
08H
H03
(E)6"PSM
08HH05
6
"
P
D
12"SW
3" HW
(HH11)
6"P
SD
(H
H29)
07HH01
(
E
)
6
"
T
W
A
S
(E
)6"0F
(E)4"D
(E
)12" P
D
(E)8"W2
(E
)8" S
W
(HH25)
2"HWR
2"HWS
10HH03
10HH01
(E
)4" S
W
(HH31)
(E)12" SW
(HH78)
(HH77)
(HH79)
15HH01
(E
)18" S
W
14M
H01
HH97
15HH05
(H
H28)
15M
H01
4
"
S
4
"
S
4"
14HH05
(E)2"HWS
(E)2"HWR
4"H
W
4"HW
07WOV01-0107WTV02-01
(HH59)
08H
H08
07H
H03
07H
H02
02CB03
02CB04
02CB05
02CB06
07CB01
15CB03
15CB04
08CB03
10CB05
15CB02
10" PD
02CV20-07
02SGV20-07
02WTV11
02PSV11
(S
L10)
(PL2-11)
02SLP99-02
02SLP99-03
(PL2-6)
02SLP99-04
14SLP99-01
(SL14, SL15)
10SLP99-02
(SL18)
15SLP99-02
C
E
D
B
CE
DRAIN
(HH84)
(HH83)
(MH24)
(M
H23)
14H
H03
(SL19)
14HH02
14HH01
15SLP99-01
15HH04
(HH27)
(HH81)
(M
H8)
15H
H03
15H
H02
10SLP99-03
(SL17)
10HH02
(HH30)
02SLP99-15
02SLP99-10
(HH19)
02HH01
(HH15)
(HH16)
(SL02)
02HH04
02HH05
02HH07
(SL04)
(SL03)
02MH02
08HH02
(H
H21)
08HH10
08HH01
08S
LP
99-03
(HH75)
08HH06
(SL13)
(HH23)
(HH23)
(HH24)
08H
H07
(HH26)
02CB07
(
E
)
6
"
S
W
6
"
S
W
TU-7
MH-7
G
1
4
"
P
D
8" P
D
42" TERRY STREET FM
48" T
ER
RY
S
TR
EE
T F
M
54" W
ILLA
KE
NZ
IE
O
WA
SS
O F
M
54" W
ILLA
KE
NZ
IE
U
ND
ER
R
IV
ER
F
M
24" OA
18" O
A
6" O
A
6" O
A
3
"
H
W
3
"
H
W
SD
SD
SD
3
E-004
TIE-IN POINT FOR (N) MV FEEDER
TO NEW RNG FACILITY
0
1"=30'
20 40 60
OVERALL SITE PLAN
RNG BLDG
H2S REMOVAL SYSTEM
(N) XFMR-2 FOR
(N) RNG FACILITY
EXISTING
WOODEN SHED
1. PROVIDE CONDUIT SEALS AS REQUIRED BY NEC
IN ALL CLASSIFIED AREAS.
2. SEE CONDUIT SCHEMATIC ON E-003.
GENERAL NOTES:
CLASS 1, DIVISION 2
10 FT ENVELOPE AROUND
MEDIA VESSELS
CLASS 1, DIVISION 2 AREA
CLASS 1, DIVISION 1 AREA
LGR
JL
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
OVERALL SITE PLAN
E-100
1876001.00-E-100-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
(N) MV FEEDER
FOR (N) RNG
FACILITY
(APPROX 545')
NWN RECEIPT
POINT FACIILITY
(E) GRAVITY
BELT THICKENER
(F)
GRAVITY
BELT
THICKENER
SEE SHEET E-101
PRESSURE SWING
ADSORPTION (PSA)
(E) WASTE GAS
BURNERS
(E) FACILITIES
SHOP
(E) NO. 1
SLUDGE HOLDING
TANK
(E) NO. 2
SLUDGE HOLDING
TANK
(E) TELEMETRY SYSTEM
(E) SHT CONTROL PANEL
CP-04
RTO
CLASSIFIED AREA ENVELOPE ASSOCIATED WITH WASTE GAS
BURNERS AND REGENERATIVE THERMAL OXIDIZER (RTO) IS
10 FT CLASS I, DIVISION I, GROUP D
AROUND FIXTURES, APPURTENANCES AND HOUSING,
5 FT CLASS I, DIVISION II, GROUP D BEYOND CLASS 1, DIV 1
ENVELOPE ON SIDES (AND 15 FT ABOVE)
NFPA 820 TABLE 6.2.2(a), ROW 20.
KEY NOTES:
1
CLASSIFIED AREA ENVELOPE ASSOCIATED WITH
BIOGAS UPGRADING EQUIPMENT IS
CLASS I, DIVISION I, GROUP D UP TO 5 FT SURROUNDING EQUIPMENT,
AND CLASS I, DIVISION 2, GROUP D FROM 5 FT TO 10 FT SURROUNDING
EQUIPMENT.
2
1
1
2
BIOGAS PROCESSING ROOM - CLASS I, DIVISION 2, GROUP D BASED ON
VENTILATION AT 12 ACH, EXCEPT CLASS I, DIVISION I
WITHIN 5 FT OF EQUIPMENT
NFPA 820 TABLE 6.2.2(a), ROW 18b AND 18c.
ANALYZER ROOM - CLASS 1, DIVISION 2, GROUP B
3
3
CHILLERRADIATOR
(E) TU-7
(E) 15MH01 (MH8)
1
(E) SOUTH
STORE
BLDG
(E) JB
(E) BOILER BLDG
(E) FIBER
PATCH PANEL
(N) JB
(E) 1 1/4"C
(E) SIGNAL HH
(E) 1 1/4"C
1
1
2-20-20
1
1
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT N
S AS
SEE SHEET E-100
FOR CONTINUATION
P I T
07-02
P I T
07-01
M
M M
XFMR-2
RTO
RNG BUILDING
H2S REMOVAL SYSTEM
480V FEEDER FOR
(N) RNG FACILITY (APPROX 20')
(N) MV FEEDER FOR
(N) RNG FACILITY
(APPROX 545')
0
1"=10'
10 20
ENLARGED SITE PLAN
ELECTRICAL ROOM
CONDUITS AND INSTRUMENT
AIR PIPE TO GAS UTILITY
RECEIPT POINT FACILITY
SEE SHEETS E-100 AND E-102
EXISTING WOODEN SHED
N3
N3
N3
P1
P1
P1
LGR
JL
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
ENLARGED SITE PLAN
E-101
1876001.00-E-101-ADD1.dwg
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
WASTE GAS
BURNERS
(E) GRAVITY BELT THICKENER
(F) GRAVITY BELT THICKENER
PLC-003
(E) JUNCTION BOX WITH
(E) 1 1/4" CONDUIT MARKED
FOR FIBER BUNDLE TO
BOILER PATCH PANEL
SEE SITE PLAN, E-100
PRESSURE SWING
ADSORPTION (PSA)
CHILLER
RADIATOR
KEY NOTES:
1
ELECTRICAL CLASSIFICATION: CLASS 1, DIVISION 2
WITHIN 5 FEET OF DIGESTER GAS PROCESSING
EQUIPMENT.
GENERAL NOTES:
1. PROVIDE CONDUIT SEALS AS REQUIRED BY NEC
IN ALL CLASSIFIED AREAS.
2. SEE CONDUIT SCHEMATIC ON E-003.
ANALYZER
ROOM
08HEX07-08
08CHW07-01
08PMP07-05
COOLING WATER PUMPS
RADIATOR CONTROL PANEL
(480V POWER FROM MCC PLUS
30#14 CONTROL WIRES TO
08PLC07-01)
FLOWMETERS
CHILLER CONTROL PANEL
(480V POWER FROM SWBD
PLUS ETHERNET TO
08PLC07-01)
PSA ROTARY VALVE MOTOR
TO VFD
PSA JUNCTION BOX
TO 08PLC07-01
TO 08PLC07-01
0002
0001
80FIT07-03
80FIT07-02
80FIT07-01
80PIT07-22
TO 08PLC07-01
INSTALL SEAL PER NEC, ARTICLE 500
LSH
RTO CONTROL PANEL
FURNISHED BY S&SE
SOUTH STORE BLDG
OIL / WATER SEPARATOR
08PMP07-06
2
PULL 12-STRAND BUNDLE FROM THIS PULL BOX TO RNG
CONTROL PANEL AND TERMINATE AT PATCH PANEL.
PULL REMAINDER FIRST TO PULLBOX IN UTILIDOR, AND
THEN TO OPERATIONS BLDG PATCH PANEL. TOTAL
LENGTH IS EXPECTED TO BE LESS THAN 900'.
2
08PLC07-03
SEE E-102 AND E-104
6
E-004
GROUND
ROD (TYP)
08PSA07-01
08OWS07-01
COMPRESSOR
ROOM
BIOGAS PROCESSING ROOM
N3 P1
N3 P1
N3 P1
N3 P1
EXISTING LIGHT POLE,
ADD NEW LUMINAIRE
LP-19
LP-7
LP-23
LP-23
LP-23
LP-23
LP-23
CONTINUATION
SHOWN ON SHEET E-102
1
1
1
2-20-20
0200 - 0205
0400
0237
0016
0016
0200 - 0205
0400
0237
0016
1
1
1
N3
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT O
S AS
UIT
07-01
AIT
07-01
GO/NOGO 2
MCC-01
TRANSFORMER
XFMR-2
GO/NOGO 1
E-STOP 2
08PLC07-01
E-STOP 1
C
C
T
V
BIOGAS PROCESSING ROOM
INSTRUMENT AIR COMPRESSORS
08CPR07-03
GAS
CHROMATOGRAPH
08CHR07-01
MOISTURE
ANALYZER
08MST07-01
ANALYZER ROOM
SAMPLE
CONDITIONING
ENCLOSURE
08SCE07-01
REFRIGERATED DRYER
08ADU07-01
J
J
UPS-13
LP-13
BRIDGE CRANE
08CRN07-01
BIOGAS COMPRESSOR
VFD CONTROL PANEL
J
DP-19, 21, 23
(BRIDGE CRANE)
UPS-1,2,3,4
LP-10
PLC-001
UPS-7
TO PLC-001
UPS-15
PLC-001
TO PLC-001
TO PLC-001
08GNG07-01
08ES07-01
08GNG07-02
08ES07-02
DP-13, 15, 17
FOR CONTINUATION
SEE SHEET E-100
COMPRESSOR ROOM
RAW GAS
BLOWER
08BLR07-01
BOOSTER
COMPRESSOR
08CPR07-02
BIOGAS
COMPRESSOR
08CPR07-01
VACUUM
PUMP NO 2
08PMP07-02
VACUUM
PUMP NO 1
08PMP07-01
SWBD-01
XFMR-T1
PNL-DP
PNL-LP
PNL-UPS
VFD
M
MOTORIZED
ROLL-UP DOOR
JB
DP-32,34,36
GO/NOGO 3
E-STOP 3
TO PLC-001
(TYP)
08GNG07-03
08ES07-03
CCTV
CONTINUED ON E-101
TANKLESS
WATER HEATER
DP-31,33,35
M
HYDROGEN SULFIDE
VESSEL NO 2
08TNK07-02
HYDROGEN SULFIDE
VESSEL NO 1
08TNK07-01
LIMITED HEIGHT AREA
FOR HVAC
CLEAR AREA
FOR HVAC
08DGV07-53
S AS
08DGV07-52
CONTROL
PANEL
N
N
N
N
UPS
HAZARDOUS AREA
CLASS 1, DIV 2, GROUP B (PER NEC)
UNCLASSIFIED AREA
(PER NEC)
HAZARDOUS AREA
CLASS 1, DIV 2, GROUP D (PER NEC)
N N
TO PLC-001
N
TO PLC-001
TO PLC-001
GO/NOGO 4
E-STOP 4
08ES07-04
08GNG07-04
N
TO PLC-001
(TYP)
N
TO
PLC-001
CONDUIT SEAL
(TYP)
POINT OF CONNECTION
WITH CONDUIT SEAL (TYP)
WIFI ACCESS
POINT #1
WIFI ACCESS POINT #2
IN NEMA 4X PLASTIC ENCLOSURE
JB
(GL)
(GL)
PSA CONTROL
PANEL (GL)
N
PSA
VALVE VFD
YAGI ANTENNA
(ON ROOF)
TO PLC-001
08CPR07-04
DP-14, 16, 18
AHF
RNG CONTROL PANEL
08PLC07-03
0265
VFD(GL)
0130
0017
0209
0210
0022
0008
0013
0014
0015
00210020
0018
ELECTRICAL ROOM
UNCLASSIFIED AREA (PER NEC)
00220017
0021
0020
0008
0015
0014
0013
0002
08PLC07-04
AIT-100
0019
POWER AND SIGNAL PLAN
LGR
JL
LGR
ADDENDUM 1 02//20/20 LGR
ELECTRICAL
RNG BUILDING
E-102
1876001.00-E-102-ADD1.dwg
pw
:\\kjce-pw
.bentley.com
:kjce-pw
\D
ocum
ents\C
lients\M
etropolitan W
astew
ater M
anagem
ent C
om
mission\P
rojects\R
NG
U
PG
RA
DE
S_1876001.00\10-D
esign\10.06-D
raw
ings\E
lectrical\1876001.00-E
-102-A
DD
1
POWER AND SIGNAL PLAN
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
3/8"=1'-0"
0 2 4
GENERAL NOTES:
1. PROVIDE CONDUIT SEALS AS REQUIRED BY NEC IN ALL CLASSIFIED AREAS.
2. SEE CONDUIT SCHEMATIC ON E-003.
3. ITEMS MARKED WITH (GL) ARE FURNISHED BY GREENLANE.
0
TO NWN RECEIPT
POINT FACILITY
FOR CONTINUATION
SEE SHEET E-100
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
1
2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT P
M
M
M
S
M
WP, GFI
WP, GFI
1"C-2#12, 1#12G
ELECTRICAL EQUIPMENT (BELOW)
LP-14
LP-14
ANALYZER ROOM FAN
LP-12
DP-7, 9, 11
BIOGAS
PROCESSING ROOM
EXHAUST FAN
PSL
08EF07-03
08HPU07-01
08RHD07-01
08EF07-01
08EF07-02
COMPRESSOR ROOM FAN
M
S
M
LP-10
TO MCC-01
LP-14
S
TO PLC-001
LADDER
ANTENNA
N1
JL/LGR
JL
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
RNG BUILDING
E-103
1876001.00-E-103-ADD1.dwg
ROOF - POWER, SIGNAL AND HVAC PLAN
RNG BUILDING ROOF PLAN
3/8"=1'-0"
0 2 4
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
1. PROVIDE CONDUIT SEALS AS REQUIRED BY NEC
IN ALL CLASSIFIED AREAS.
2. SEE CONDUIT SCHEMATIC ON E-003.
GENERAL NOTES:
1
1 2-20-20
12
E-004
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT Q
S
3
S
3
S
S
3
S
3
F1
EX1
9'-0"
LP-1
EM2
9'-0"
LP-1
EM3
9'-0"
LP-3
F1
EX1
9'-0"
LP-1
(TYP)
(TYP OF 8)
EX3
9'-0"
LP-3
WP
GFI
EXP
GFI
EXP
GFI
EXP
GFI
EXP
GFI
EXP
GFI
WP
GFILP-8
8
LP-8
LP-2
LP-6
LP-4
LP-6
LP-2
LP-4
EX3
9'-0"
LP-3
EX3
9'-0"
LP-3
EM3
9'-0"
LP-5
T
PSL
T
08HTR07-01
UNIT HEATER
DP-8,10,12
BRIDGE CRANE
08CRN07-01
B38'-0"
LP-18
S
SS
ELECTRICAL ROOM
COMPRESSOR ROOM
ANALYZER ROOM
EDA B FC
1
2
3
BIOGAS PROCESSING ROOM
08AHU07-01
08ASU07-01
M
M
08HTR07-02
SWBD-01
MCC-01
PNL-UPS
PNL-LP
PNL-DP
DP-25,27,29
B3
11'-0"
S
3
S
3
H2S REMOVAL SYSTEM
DP-1,3,5
M
X222'-0"
LP-24
X211'-0"
UPS-5
UPS-6
LP-2
LP-2
UPS-6
LP-4
UPS-5
LP-4
EXP
GFI
EXP
GFI
LP-4
LP-11
WP
GFI
LP-8
WP
GFI
UPS-8
BIOGAS
PROCESSING ROOM
AIR SUPPLY UNIT
M
DP-2,4,6
UPS-8
X222'-0"
UPS-8
X222'-0"
UPS-8
X222'-0"
UPS-8
X222'-0"
F2
LP-11
LP-11LP-11
F1
UPS-12
F1
LP-11
F1
LP-11
F1 UPS-12
F1
UPS-12
F1
UPS-12
F1
UPS-12
N1N1
F1F1
LP-7LP-7
UPS-6LP-24
UPS-6
UPS-12
(TYP)
UNCLASSIFIED AREA
(PER NEC)
HAZARDOUS AREA
CLASS 1, DIV 2, GROUP B (PER NEC)
HAZARDOUS AREA
CLASS 1, DIV 2, GROUP D (PER NEC)
UNCLASSIFIED AREA (PER NEC)
S
S
X222'-0"
X222'-0"
X222'-0"
ANTENNA (ON ROOF)
B38'-0"
B38'-0"
B38'-0"
X222'-0"
X222'-0"
X222'-0"
X222'-0"
N1LP-7
LIGHTING AND HVAC PLAN
1/4"=1'-0"
30 6
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
RFB/JL
RFB/JL
LGR
ADDENDUM 1 02/20/20 LGR
ELECTRICAL
RNG BUILDING
E-104
1876001.00-E-104-ADD1.dwg
LIGHTING AND HVAC PLAN
1. PROVIDE CONDUIT SEALS AS REQUIRED BY NEC
IN ALL CLASSIFIED AREAS.
2. SEE CONDUIT SCHEMATIC ON E-003.
GENERAL NOTES:
KEY NOTES:
SEE ARCHITECTURAL SHEET A-102 FOR MOUNTING LOCATION.
1
1 2-20-20
1
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT R
YOKOGAWA/ALLEN-BRADLEY
ETHERNET/IP CONVERTER
YOKOGAWA DCS
PRIMARY RNG PLC
PANELVIEW
CCTV INTERFACE
POINT
VIDEO
UNMANAGED
SWITCH
YOKOGAWA/ALLEN-BRADLEY
ETHERNET/IP CONVERTER
YOKOGAWA DCS
PRIMARY RNG PLC
E
CCTV INTERFACE
POINT
-
1NETWORK DATA CONNECTION DIAGRAM
NONE
08PLC07-01
(E) OPERATIONS BUILDING
RNG AREA
MODBUS
INTERFACE
08PLC07-04
PSA
08PLC07-06
RTO
08PLC07-03
BIOGAS
COMPRESSOR
08PLC07-02
RAW GAS
BLOWER
08PLC07-05
BOOSTER
COMPRESSOR
GAS
CHROMAT
CHILLER NWN PLC
08PLC07-01
MODBUS
INTERFACE
E
SWITCH
UNMANAGED
ETHERNET/IP
SWITCH
UNMANAGED
MODBUS
TCP/IP
1. PLCS BY OTHERS (08PLC07-02-06 AND THE NWN PLC)
MAY CONTAIN HMIs AND OTHER NETWORK DEVICES.
NETWORK SWITCHING FOR THESE IS PART OF THEIR
RESPECTIVE SCOPES OF SUPPLY. THIS DESIGN
ASSUMES A SINGLE ETHERNET POINT OF CONNECTION
FOR EACH PANEL.
NOTES:
LAPTOP
PORT
08PLC07-06
RTO
GAS
CHROMAT
CHILLER
NWN
PLC
CCTV
CAMERA
PANELVIEW
VIDEO
UNMANAGED
SWITCH
WITH POE
FIBER PATCH
PANEL IN
RNG PLC
PANEL
FO
FO
FO
FO
FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
E
E
EE
EE
EE
EE
EE
E
E
CCTV
CAMERA
E
CCTV
CAMERA
E
CCTV
CAMERA
LAPTOP
PORT
WIFI INTERFACE
POINT
WIFI CONNECTION
POINT SWITCH
WIFI #1 WIFI #2
WIFI INTERFACE
POINT
WIFI CONNECTION
POINT SWITCH
PoE
WIFI #1
E
WIFI #2
E
FO
FOFOFOFOFO
FO
FO FO FO FO FO
FO
FO
FO
FO
POWER
MONITOR
E
WIRELESS
GATEWAY
(E) SHT
POWER
MONITOR
(E) OPERATIONS BUILDING
RNG AREA
(E) FIBER PATCH PANEL
WIRELESS
GATEWAY
SHT
FO FO
FO
(E) BOILER BLDG
SWITCH
UNMANAGED
ETHERNET/IP
08PLC07-02
RAW GAS
BLOWER
08PLC07-03
BIOGAS
COMPRESSOR
08PLC07-04
PSA
08PLC07-05
BOOSTER
COMPRESSOR
EE
EE
E
EE
E
EE
E
E
PANELVIEW
SWITCHBOARD
ELECTRICAL ROOM
PSA
CONTROL
PANEL
FIELD
RNG
CONTROL
PANEL
FIELD
ANALYZER
ROOM
FO
FO
FO
EE
EE
EE
*
LEGEND:
ETHERNET WITH PoEE
POWER OVER ETHERNETPoE
* *
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
LGR
SAK/JL
JF
ADDENDUM 1 02/20/20 LGR
PROCESS & INSTRUMENTATION DIAGRAM
NETWORK DIAGRAMS
I-002
1876001.00-I-002-ADD1.dwg
1
1
1
1
1
1
1
2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT S
AIAH
07-01
H2
AIAH
07-02
TOT S
AIAH
07-03
N2
GAS CHROMATOGRAPH
2" OSG
AIAH
07-01
H2O
AIAH
07-04
CO2
AIAH
07-05
H2S
AIAH
07-06
O2
AIAH
07-07
RSH
AIAL
07-01
BTU/
SCF
A IAH
07-08
INERTS
+ 02
S
VENTIAS
S
AIT
A I
COMB
GAS
ZSC
FC
FC
VENT
IAS
ZSO ZSC
\\
\\
\\
\\
\\
\\
\\
\
\\
\\
\\
\\
\\
\\
\\
\\
\\
\\
U I T
07-01
AE
07-01
GC
120V
GAS
CHROMATOGRAPH
08CHR07-01
1/4
" V
1/4" VENT
SAMPLE
PORT
AIT
07-01
AE
07-01
GC
120V
P I
2" PG
1/4" SA
1/4" SA
(CARRIER GAS)
TO
CONDENSATE
DRAIN
1/4" SA
(CARRIER GAS)
1/4" SA
(CARRIER GAS)
1/4" SA
3/8" D
1" V
SAMPLE
EXTRACTION PROBE
08PRB07-01
1"
1/4" SA
1/4" S
A
1/4
" V
VENT TO
ATMOSPHERE
1/4"
SAMPLE
CONDITIONING
ENCLOSURE
08SCE07-01
MOISTURE
ANALYZER
08MST07-01
08DGV07-64
08DGV07-49 08DGV07-51
08DGV07-50
120V
\ \
\
HS
OPEN/
CLOSE
ZIO
OPENED
ZIC
CLOSED
\ \
\
ZSO
\
\
\
\
08DGV07-53
08DGV07-52
SAMPLE PORT
08YAF
07-XX
\\
\\
\\
\\
08YAF
07-XX
\\
\\
\
08PAL
07-XX
\\
\\
\\
\
UPS
INSTRUMENT AIR
COMPRESSOR
08PSL
07-XX
2"x1"
1"x1/4"
GAS CHROMATOGRAPH
PACKAGE BY GAS
CHROMATOGRAPH VENDOR
480V M
1" IA
08CPR07-03
1" D
PLC 001
08PLC07-01
08PRV07-04
I-006 / A
FROM PSA
I-006 / G
FROM PSA
6" OSG
2" PG
I-008/ A
TO BOOSTER
COMPRESSOR
I-008 / G
TO OFFSPEC LINE
6" OSG
2" PG
MODBUS TCP / IP
MODBUS TCP/IP MODULE
IN ALLEN BRADLEY PLC
I/O RACK
AIAL
07-02
BTUd/
SCF
A I
07-01
CH4
1. ALL INSTRUMENT TAG NUMBERS ARE PRECEDED BY 08.
NOTES:
AIT
07-01
A I
COMB
GAS
AIT
A I
COMB
GAS
(E) DCS
ANALYZER
ROOM
COMPRESSOR ROOM
HS
OPEN/
CLOSE
ZIO
OPENED
ZIC
CLOSED
PRODUCT GASPG
SAMPLESA
OFF-SPEC GASOSG
LEGEND:
I-005 / G
FROM BIOGAS
COMPRESSOR
3" OSG
AS
\\
AHH
SMOKE DETECTORS
AS
\\
AHH
AS
\\
AHH
AS
\\
AHH
\ \
AS
\ \
AS
BIOGAS
PROCESSING
ROOM
ANALYZER
ROOM
COMPRESSOR
ROOM
ELECTRICAL
ROOM
\\
\\
\\
\\
\\
\\
INSTRUMENT AIR
COMPRESSOR
480V M
08CPR07-04
1" D
08YAF
07-XX
1
1
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
LGR/BB
GS/JL
JF
ADDENDUM 1 02/20/20 LGR
PROCESS & INSTRUMENTATION DIAGRAM
GAS CHROMATOGRAPH AND
I-007
1876001.00-I-007-ADD1.dwg
MOISTURE ANALYZER
1 2-20-20
MWMC Project No. P80095
ADDENDUM 1
ATTACHMENT T
F I T
07-04
FE
07-04
F I
07-04
FLOW
120V
2" PG
I-003 / G
BOOSTER
COMPRESSOR
08CPR07-02
BOOSTER COMPRESSOR SKID
(BY VENDOR)
480V
P I T
07-21
T I T
07-07
P I T
07-18
M
I-007 / A
2" RNG
6" OSG
TO 4" RNG PIPING
TO (E) WASTE
GAS BURNERS
FROM GAS
CHROMATOGRAPH
I-011 / D
ELECTRICAL
ROOM
P I
07-18
SUCTION
PRESS
P I
07-21
DISCH
PRESS
T I
07-07
DISCH
TEMP
ETHERNET/IP
GATEWAY
CONNECTION
MWMC RNG
FACILITY
NWN RECEIPT
POINT FACILITY
VENT
FQI
07-04
FLOW
HS
START/STOP
HK
SPEED
SC
VFD
Y I
RUN
S I
SPEED
YA
FAIL
I-011 / C
FROM CHILLER
F I
07-03
FLOW
FQI
07-03
FLOW
F I T
07-03
FE
07-03
120V
ZSC
ZSO
6" OSG
UT
AE
GC
DRAIND
PRODUCT GASPG
RENEWABLE NATURAL GASRNG
OFF-SPEC GASOSG
V
P I T
07-22
P I
07-22
PRESS
S
IASVENT
ZSO
07-02
ZSC
07-02
2" RNG
\\\\\\\
\\\\\
\\
\\
\\
\\
\\
\\
\\
\\
\\
ZAC
07-02
1. ALL INSTRUMENT TAG NUMBERS ARE PRECEDED BY 08.
NOTES:
PLC 001
08PLC07-01
HS
OPEN/
CLOSE
Z I O
OPENED
Z I C
CLOSED
\ \
08DGV07-55
08DGV07-58 08DGV07-6008DGV07-59
08DGV07-62 08DGV07-64
08PRV07-05
08DGV07-61
08DGV07-65
FROM FUTURE
RNG FACILITY
BOOSTER COMPRESSION SYSTEM
(VENDOR CONTROL PANEL)
(CONTAINS PLC-005)
08PLC07-05
1" V
BOOSTER
COMPRESSOR HEAT
EXCHANGER NO. 1
08HEX07-06
BOOSTER
COMPRESSOR HEAT
EXCHANGER NO. 2
08HEX07-07
6" OSG
I-007 / G
OFFSPEC GAS
FROM RADIATOR
T I
07-08
P I
07-20
T I T
07-10
T I
07-10
DISCH
TEMP
I-011 / C
I-011 / D
TO RADIATOR
3/4" CWS
1/2" CHWS
TO CHILLER
1/2" CHWR
3/4" CWR
1/2" CHWR
3/4" CWR
1/2
" C
HW
S
3/4
" C
WR
(E) NWN TELEMETRY SYSTEM
AT SLUDGE HOLDING TANKS
3/4
" C
WS
1/2
" C
HW
R
SES SES
COOLING WATER SUPPLYCWS
COOLING WATER RETURNCWR
LEGEND:
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
VENT
08DGV07-63
3"x6"6"x3"
3" OSG
3" OSG
08DGV07-57
08DGV07-56
3" RNG
1 1/2"x2"
1 1/2" PG
2" RNG
T I
07-11
T I
07-09
4"x3"
3" PG
//
//
//
//
S
FC
VENT
AS
1 1/2"x4"
I-005 / H
FROM BIOGAS
COMPRESSOR
2" V
//
//
//
//
S
FC
VENT
AS
08DGV07-54
1/2
" P
G
P
INLET
1" PG
P I T
07-19
P I
07-03
PRESS
SASA
3"x1 1/2"
1" V
VENT TO
ATMOSPHERE
2" V
1"x2"
4" PG
1 1/2" PG
S
3"x2"
2" O
SG
2"x6"
2"x3" 3"x2"
3" OSG
\\
\\
\
\\
\\
FO
FO
FC
I-003 / I
TO CONDENSATE
TANK
1" D
MODBUS TCP / IP
CONNECTION
(E) DCS
RNG
BUILDING
(E) TOWER
(E) NWN
CONTROL
CENTER
I /PIAS
P I T
F I Q
AE/AIT
MULTIPLE
ANALYZERS
F I T
FY
P I T T I T
OUT OF SCOPE
RADIO
\\
\
1
4
3
2
1
0
0
USE OF DOCUMENTS
NO. REVISION DATE
25mm
BY
SCALES
1"
CHECKED
DESIGNED
DRAWN
0
DATE
SHEET
FILE NAME
KJ PROJECT NO.
D E F G HA B C
IF THIS BAR IS NOT
DIMENSION SHOWN,
ADJUST SCALES
ACCORDINGLY.
THIS DOCUMENT, INCLUDING THE INCORPORATED
DESIGNS, IS AN INSTRUMENT OF SERVICE FOR THIS
PROJECT AND SHALL NOT BE USED FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION
OF KENNEDY/JENKS CONSULTANTS ©.
1876001.00
FEBRUARY 2020
P80095 RNG UPGRADES
LGR/BB
GS/JL
JF
ADDENDUM 1 02/20/20 LGR
PROCESS & INSTRUMENTATION DIAGRAM
BOOSTER COMPRESSOR AND
I-008
1876001.00-I-008-ADD1.dwg
RECEIPT POINT FACILITY