Minnesota Pavement Conference Dave Newcomb Division Head
Materials & Pavement Texas A&M Transportation Institute
21st Century Asphalt Pavements
Challenges &
Opportunities
![Page 2: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/2.jpg)
Topics • Materials • Testing • Design • Construction • THE BIGGEST CHALLENGE!
![Page 3: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/3.jpg)
Warm Mix Modifiers
Recycling Agents Recycled Mixes
Future
Materials: This is Not Your Granny’s Asphalt!
![Page 4: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/4.jpg)
How have asphalt materials changed? • 1901 – 2000 Age of Uncomplicated
– Almost all unmodified asphalt – Recycling in 1970s – 90s: Low amounts of RAP – Almost all dense-graded mixes – Marshall and Hveem become displaced – Volumetric design works OK
Reincarnated as Roads
![Page 5: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/5.jpg)
How have asphalt materials changed? • 2000 – 2016
– PG System in full swing – Refineries change – asphalt gets expensive – Warm mix – PPA to make high PG – REOB to make low PG – Polymers – More RAP and RAS – Smaller NMAS – SMAs
![Page 6: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/6.jpg)
PG System • Much better asphalt specification • Mix design needed some tweaking
– Coarse gradations were not necessarily better
– Aggregate-crushing compaction – Lift thickness vs NMAS
• All states except one or two
![Page 7: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/7.jpg)
Refinery Changes • ROSE (Residuum Oil Supercritical Extraction) • Cokers • More terminal blenders
![Page 8: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/8.jpg)
REOB and PPA • Recycled Engine Oil Bottoms (Steve Escobar)
– Most common additive – High flash point, high visc. index, low wt. loss, low visc., etc. – Also paraffinic
• Polyphosphoric Acid (TRB Circular E-C160) – Commonly used additive – High visc., no free H2O, does not oxidize asphalt or lower m-
value – May react with anti-strip
• Both are dependent upon asphalt chemistry!
![Page 9: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/9.jpg)
Blending Requires Attention
Compatibility is Important
REOB Paraffin
RA
Tall Oil
Control
Aromatic
![Page 10: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/10.jpg)
Warm Mix • New, not radical, technology
– Additives – Plant Foaming
• Lower production and placement temperature – Reduced emissions – Better compaction – Late season paving – Reduced energy consumption?
• 65% of Asphalt Mix in Minnesota! • Future – Half Warm Mix?
![Page 11: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/11.jpg)
Yellowstone Paving Control
Temp = 320oF
Warm Mix Temp = 245oF
![Page 12: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/12.jpg)
2009-2014 >1/3 Total
Asphalt Tons!
![Page 13: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/13.jpg)
Polymers
Stroup-Gardiner
![Page 14: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/14.jpg)
Polymer Modified Asphalt • Lower Rutting
• Lower Fatigue Cracking
• Lower Trans Cracking
![Page 15: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/15.jpg)
RAP and RAS • Resource Conservation • Energy Conservation • Price Stabilization
![Page 16: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/16.jpg)
Greenhouse Gases
• Using RAP/RAS reduces CO2e about the same amount as removing 270,000 vehicles
3/17/2015 WOA High Binder Replacement Webinar 16
![Page 17: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/17.jpg)
Cost Savings
Reference Material Cost Savings
Zhou et al. (2006) 5% RAS 2 – 5%
Brock (2008) 20% RAP 50% RAP
>16% >40%
NCAT (Willis et al., 2012)*
25% RAP 50% RAP
14 – 20% 29 – 35%
3/17/2015 WOA High Binder Replacement Webinar 17
* Used different amounts and stiffness of virgin binders used in mixtures.
![Page 18: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/18.jpg)
RAP/RAS and PG
• RAP/RAS binder too stiff
• Solution: – Balanced mix design for
project-specific conditions
![Page 19: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/19.jpg)
Not What We’re Looking For!
![Page 20: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/20.jpg)
Balanced Mix Design Microstructure
Testing: Macro and Nano
![Page 21: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/21.jpg)
Balanced Mix Design • Current mix design methods
– Volumetrics + Stability • Hveem • Marshall
– Superpave method • Pure volumetrics; no mechanical testing
– Superpave plus • Volumetrics+Hamburg/APA/…
• Control cracking in current methods – VBE (=VMA-AV) to control cracking; OK for virgin mixes – No simple cracking test
![Page 22: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/22.jpg)
Cracking Tests Minnesota!
![Page 23: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/23.jpg)
RAP/RAS field test sections and performance
Test sections Highway Overlay/ new const.
Weather Traffic MESAL
OT cycles Performance
Amarillo
0%RAP IH40 (severely cracked thick asphalt pavement)
4 inch/ overlay
Cold 30
95 3 yrs: 100% refl. cracking
20%RAP 103
35%RAP 200 3 yrs: 57% refl. cracking
Pharr
0%RAP FM1017-Very good support
1.5 inch/ new const.
Very hot 0.8
28 3yrs: overall - good conditions
20%RAP 6
35%RAP 7
Laredo 20%RAP SH359-regular support
3 inch/ overlay
Very hot 1.5 3 3yrs: No cracking
Houston 15%RAP/5%RAS
SH146-Very good support
2 inch/new const.
hot 3.0 3 2.5yrs: No cracking
Dalhart 5%RAS US87 3 inch/ Overlay
Cold 3.0 48/96 96 cycles-20% RCR; 48 cycles-50%RCR
![Page 24: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/24.jpg)
What Asphalt Looks Like at Nano Level
Bee
Bee Casing
Interstitial Area
![Page 25: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/25.jpg)
Nano-Indentation Test • Use conical or spherical indenter • Apply constant load • Measure penetration with time
![Page 26: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/26.jpg)
AFM – Nano Scale Penetration Test
Time
Inde
ntio
n
Bee
Bee Casing
Interstitial Area
Hardness Interstitial Area > Bee Casing > Bee
![Page 27: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/27.jpg)
Microstructure
![Page 28: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/28.jpg)
Design: Sustainable and Long-Lasting
Perpetual Pavement
![Page 29: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/29.jpg)
Porous Pavement
![Page 30: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/30.jpg)
Demo
![Page 31: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/31.jpg)
Advantages • Reduced surface runoff • Better erosion control • Better water quality • Reduced storm sewer requirements • Maintain natural drainage paths • Reduced standing water nuisance • Better GWT recharge • Better skid resistance
![Page 32: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/32.jpg)
Surface Courses • Safety
– Skid resist. – low polish aggregate, microtexture important
– Visibility – OGFC
• Noise Mitigation – Smaller micotexture – OGFC – 9.5 or 12.5 mm
93
94
95
96
97
98
99
Noi
se L
evel
, dB
(A)
9.5 mm (Rt. 50) 12.5 mm (I-270) 12.5 mm (I-495) 19 mm (I-83)
NCAT Noise Trailer
![Page 33: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/33.jpg)
Perpetual Pavement Design
Ideas Born in Minnesota!
![Page 34: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/34.jpg)
Max Tensile Strain
Pavement Foundation
High Modulus Rut Resistant Material (Varies As Needed)
Durability Layer 3 - 4”
1.5 - 3” SMA, OGFC or Superpave } 4” to 6”
Zone Of High
Compression
![Page 35: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/35.jpg)
Costs
Save 44%
![Page 36: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/36.jpg)
Goal of Perpetual Pavement Design • Design the structure such that there are no deep
structural distresses – Bottom up fatigue cracking – Structural rutting
• All distresses can be quickly remedied from surface
• Result in a structure with ‘Perpetual’ or ‘Long Life’
![Page 37: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/37.jpg)
Avoid These!
April 21, 2014 Panel Briefing 37
Bottom-Up Fatigue
Structural Rutting
![Page 38: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/38.jpg)
Rapid Construction: Our New Reality – Faster and Better!
![Page 39: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/39.jpg)
FASTER! BETTER! • Accelerated construction means “. . .minimizing time
impacts to the public. . .” (Blanchard, 2009) • Currently takes 10 to 15 years to get project from
planning through construction. • Project delivery:
– Right attitudes and personalities • Both contractor and agency:
• Decision-making at lowest level • Remain customer focused
• Open to new approaches
![Page 40: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/40.jpg)
(a) Year 2011. (b) Year 2040.
![Page 41: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/41.jpg)
![Page 42: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/42.jpg)
Construction Productivity • Allow contractor creativity • Use existing in-place material
• Demolition is slowest process
• Repetition of tasks • Consider additional lanes to allow material
removal/delivery • Minimize mobilization/demob • Evaluate variety of traffic control scenarios • Real-time monitoring!
![Page 43: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/43.jpg)
Pave-IR Bar
![Page 44: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/44.jpg)
Intelligent Compaction Feedback
![Page 45: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/45.jpg)
![Page 46: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/46.jpg)
Has this ever been you?
![Page 47: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/47.jpg)
MultiCool Program Window
![Page 48: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/48.jpg)
Into the Future . . .
Paves Lower Layer Paves Upper Layer
Place two layers at once!
![Page 49: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/49.jpg)
THINK OUTSIDE THE PAVER!
![Page 50: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/50.jpg)
The adhesive road by Dura - Vermeer
• A 30 mm asphalt layer rolled out as a carpet • Can be attached and removed by using a switch
on/off system using microwaves.
![Page 51: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/51.jpg)
![Page 52: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/52.jpg)
![Page 53: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/53.jpg)
![Page 54: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/54.jpg)
Life Will Not Get Easier/Less Complicated
![Page 55: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/55.jpg)
OUR BIGGEST CHALLENGE!
![Page 56: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/56.jpg)
Education & Training • Universities
– Reduced emphasis on materials and pavements
• Trade Schools – Need material testing tracts
• Industry Efforts – Helps, but more is needed!
![Page 57: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/57.jpg)
Opportunities for Innovation • All weather paving
– Equipment – Quality – Materials
• Real time control/acceptance testing • Nano-scale improvements • Faster construction
– Equipment – Scheduling
![Page 58: Challenges Opportunities - Minnesota Department of ...](https://reader031.fdocuments.in/reader031/viewer/2022012016/615b01a990de4164af7df61d/html5/thumbnails/58.jpg)
Opportunities for Innovation • Lower energy consumption • Environmental/Safety improvements
– Lower fumes/emissions – Increase recycling – Lower noise
• Quality improvements – Longer surface life – Long-life structures – Better durability predictions
• Improved Education