Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing...

27
Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, 2013 Canadian Geoexchange Coalition National Conference 2013

Transcript of Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing...

Page 1: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

Challenges of Designing Wastewater Heat

Recovery Systems

Mike Homenuke, P.Eng.

May 2, 2013

Canadian Geoexchange Coalition National Conference 2013

Page 2: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

2 Outline

• Wastewater 101

• What resources are available?

• Who is able to use them?

• How do you do it?

• What will it cost?

Page 3: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

3 Wastewater Sources

Homes & Businesses Industries

Sewers Wastewater

Treatment Plants

Page 4: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

4 Wastewater Components

Water Organics

Solids Others

99% of Wastewater

Primarily “used food”

Biodegradable

Fibres, Floatables, Grit

Dissolved Minerals

Heavy Metals

Trace Chemicals

Page 5: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

5 Wastewater Flows

Rain

Total Sewage Flow

Domestic Sewage

+ Groundwater

12-18 ºC

Inflow & Infiltration

2-10 ºC

Page 6: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

6 Typical Dry Weather Flow & Temperature

0.0

5.0

10.0

15.0

20.0

25.0

0

50

100

150

200

250

300

350

400

450

500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Sew

ag

e T

em

p.

(ºC

)

Ho

url

y S

an

itary

Flo

w (

L/)

s

Hour

Flow Measured Temperature

Page 7: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

7 Annual Sewage Temperature Profile

Data for Vancouver

0

5

10

15

20

25

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Tem

pe

ratr

e º

C

Heat Gain

Sewage

Drinking Water

Page 8: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

8 Sewage Heat Estimation

• Energy is proportional to flow x “delta T” (temperature drop)

• Consider minimum diurnal sewage flow

• Consider maximum allowable temperature drop

• Usually need a heat pump – add heat of compression

Sensible Heat: Q = m c T

Page 9: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

9 Typical Sewage Energy Profile

Design Load ~1500 kW

Page 10: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

10 Mapping Heat Resources

Trunk Sewers City Sewers

Page 11: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

11 Population and Sewage Heat

1 Single

Family Home

Produces*

0.2 kW

16 kW

700 kW

70 MW

1 Apartment

Building

Consumes (avg. annual)

2.3 kW

150 kW

9,000 kW

1,300 MW

Town of

10,000

City of

1 million

*5 deg C delta T

Page 12: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

12 Utilizing Sewage as Heat Medium

• Need solids-handling heat equipment and some way to clean it if

using raw sewage

• Heat generated from heat pump from 45 ºC to 80 ºC – return

temperature is critical!

• Typical use is for in-building heating or district energy, process uses

possible

• Can potentially be used as cooling medium as well

Page 13: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

13 Limitations & Challenges

• Treated effluent is preferred, but usually WWTP is located some distance away from population centre

• Sewage flow varies diurnally and may not be available in sufficient quantities at peak heat demand

• Raw sewage entering WWTP with some biological process needs to be at least 11 ºC

• Buildings with high temperature hot water requirements may not be able to effectively utilize sewer heat

• Can be costly and difficult to access trunk sewers and pump stations

Page 14: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

14 On-Site Raw Sewage Applications

• Sewage discharge follows production of hot water for showers, dishwashing

• May need to balance supply and demand using heat reservoirs

• Likely limited to recycling domestic hot water

• Example: Seven35 by Adera in North Vancouver – 35 kW domestic hot water recovery using “Sewage SHARC” technology

Sewage SHARC – seven35 Townhomes

Photo: Mike Homenuke

Page 15: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

15 District Energy Applications

• Hot water district heating or low-

temperature/ambient systems

• Requires large flow source such as

trunk sewer, major pump station or

WWTP

• Examples: Southeast False Creek

NEU (raw sewage/hot water),

Cheakamus Crossing (treated

effluent/ambient)

Page 16: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

16 Process Applications

• Industrial / wastewater processes

requiring low-grade heat:

• Wastewater Treatment Plant

• Digester Heating

• Biosolids Drying

• Process Water Pre-Heating

• Greenhouses

• Can be done on-site or from a district

energy system

Page 17: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

17 Types of Processes

Building Drains In-Line Heat Exchanger Off-Line Heat Exchanger Direct Heat Pump

Power Pipe Rabtherm /

KASAG Gravitytube,

Pressurepipe

Uhrig Therm-Liner

BB Heatliner

DDI Cube

Sewage SHARC

Huber

Plate / Frame (Clear Water)

Friotherm

TECSIR

Nova Thermal

Page 18: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

18

Typified Sewer Heat Recovery System

Design

Sewage Source: Gravity or Pressurized Flow?

Pipe, Pump Station or WWTP?

Solids Handling:

Grit Removal

Suspended Solids > 2 mm

Heat Exchanger (Optional):

Wide Gap

Anti-Fouling / Cleaning System Heat Pump:

Direct Sewage Exchange

Or Separated

Return screenings to sewer

15-20 deg C

12-17 deg C

7-12 deg C

45-80 deg C

35-65 deg C

12-17 deg C

Page 19: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

19 Sewage Handling Issues

• Access to sewage

• Hydraulic conditions

• Solids management

• Odour management

Page 20: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

20 Fats, Oils and Grease (FOG)

• Food service establishments are

primary source of FOG

• Floats on water surface, will encrust

on pipe walls, mechanical equipment

• Major nuisance for sewer systems

• Can heat recovery result in increased

FOG precipitation?

Page 21: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

21 Odours

• Sewer odours are mostly H2S, VOCs

• Transported through airflow in sewer headspace

• Turbulence, siphoning, changes in grade cause odour to escape system

• Solids handling and pump stations are common situations that lead to odour problems

• Need to design sewer heat project so that it does not create a new odour problem!

• Odour control is expensive

Page 22: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

22 Project Planning

Demand Analysis – Understand nature and size of heating and cooling loads to be served

Supply Analysis – Evaluate the sewage heat resource to understand what is available

Sewage Heat Concept Design – Specify the right components and processes to suit the size, nature and requirements of the application

Economic Feasibility Study – Conduct a lifecycle cost analysis to establish the cost of sewer heat recovery versus other alternatives

Key Project Elements

Page 23: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

23 Sewer Heat Recovery Lifecycle Costs

Capital 40%

Electricity 40%

O&M 20%

*Plant Only

Maintenance

Staff

Overhead

Consumables

Sewage Process

Heat Exchangers

Heat Pumps

Mechanical

Site Work

Building / Space

Electrical

Odour Control

Heat Pumps, Water Pumps, other Equipment

Demand Charge

Commodity Charge

Page 24: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

24 Optimizing Project Economics

Capital Costs Electricity O&M

• Locate to minimize distance between source and loads

• Co-install heat recovery process with sewer infrastructure project

• Treated effluent is less-expensive process than raw sewage, but too far from load density?

• Reducing electricity and O&M probably increases capital costs

• Reduce design supply/return temperatures to heat pump (where possible)

• Use higher-efficiency heat pumps

• Minimize sewage and hot water pumping by increasing delta T

• Automated cleaning system

• Proper sewage pumping design to avoid clogging

• Reduce mechanical components

Page 25: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

25 Current Rates

• Southeast False Creek NEU - $5.81/m2/year + $40/MWh

• Cheakamus Crossing DES - $4.58/m2/year + heat pump electricity

• BC Hydro Step 2 Residential Rate - $103/MWh $7.21/m2/year for

baseboard heating

2013 Pricing

Page 26: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

26 Summary

• Wastewater heat is everywhere, but best to have concentrated sources and loads

• Wastewater heat recovery potential is about 10% of total heating energy

• Consider practicalities of accessing sewage source

• Select appropriate processes for solids handling and odour management

• New DES projects in BC offer rates near cost of electricity

Page 27: Challenges of Designing Wastewater Heat Recovery Systems - 2… · Challenges of Designing Wastewater Heat Recovery Systems Mike Homenuke, P.Eng. May 2, ... • Major nuisance for

May 2, 2013

27 Thank you!

Mike Homenuke, P.Eng.

Kerr Wood Leidal Associates Ltd.

[email protected]

(604) 293-3242