![Page 1: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/1.jpg)
1
Th. Raßhofer, Linde AG Linde Engineering11th European Pressure Equipment Conference
Fürstenfeldbruck, June 30th 2015
Challenges for plant engineering in the Customs Union (Russian Federation)Experiences of an engineering company with the new regulations
![Page 2: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/2.jpg)
Contents
1. Challenging environment
2. New approach # Eurasian Customs Union (EACU) & Member states
3. Demarcation of legal requirements
4. Legal obligations
5. List of recognized standards
6. Conformity assessment scheme – at a glance
206/2015 Th.Raßhofer, ENQS
6. Conformity assessment scheme – at a glance
7. Project execution – Building permit to L2O
8. Process plant – 'placing on the market'
9. Summary
![Page 3: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/3.jpg)
1. Challenging environmentA Déjà-vu with Europe
New legal requirements and changes of given legal requirements result in
• confusion about execution model regarding conformity assessment of single equipment and
package units, piping and process plant
• changes in split of legal responsibilties of SUPPLIER, LINDE Engineering, LE Rus
and USER / CLIENT
• changes in work-flow and interfaces
306/2015 Th.Raßhofer, ENQS
• changes in work-flow and interfaces
• necessity of involving partnes located in EACU
• new compulsory and recommended codes & standards
ü The change is neither completed nor uniform adopted
![Page 4: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/4.jpg)
Equipment not covered by a TR CU
The obligation for attestation acc. to member
state requirements remains valid
TR CU 010/2011 ".On the safety of machinery and equipment"
TR CU 032/2013 "About safety of equipment operating
under excessive pressure"
TR CU 012/2011 "On the safety of equipment for works in explosive
atmosphere"
TR CU 020/2011 "Electromagnetic compatibility of technical equipment"
TR CU 004/2011 "On safety of low-voltage
equipment
TR CU 011/2011 "On safety of lifts
32 Technical regulations of Customs Union
2. Eurasian Customs Union (CU) & Member statesNew approach (Superordinate & federal set-up)
Belarus RussiaKazakhstan
4
Equipment neither covered by any regulation
SUPPLIER may provide an exemption letter, known as
'Letter of Refusal'.
Equipment covered by member state regulation:
• Pattern Approval (Metrology R), for all measuring
devices that fall under Federal Law “About Measuring
Unity”
• State registration certificate
(EEC hygienic registration)
06/2015 Th.Raßhofer, ENQS
KyrgyzstanArmenia
ü Certification bodies and testing laboratories accredited in the CU
monitor and assess compliance with the EACU market rules
ü Clarify application of TR CU regulations for Armenia and Kyrgyzstan
![Page 5: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/5.jpg)
3. Demarcation of legal requirementsSurveillance power and responsibly – in the past
Design Installation
"116-FZ Federal Law on Industrial Safety of Hazardous Industrial Objects"
OperationMaintenance,
Repair,
Disposal
506/2015 Th.Raßhofer, ENQS
Responsibility
USER
ü Russia: Rostekhnadzor (RTN)
Federal State
Survelliance body
![Page 6: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/6.jpg)
3. Demarcation of legal requirementsSurveillance power and responsibly - today
Design Fabrication
"Placing on the market"
OperationMaintenance,
Repair,
Disposal
"Intended operation"
606/2015 Th.Raßhofer, ENQS
Responsibility
Manufacturer
Responsibility
USER
ü Russia: Despite of the division of market surveillance an agreement of collaboration between
Rosakkreditatia and Rostekhnadzor (RTN) still exists !
Supranational
Survelliance body
Federal State
Survelliance body
![Page 7: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/7.jpg)
4. Legal obligationsNew roles and duties influence supply-chain and lead times
Subject Reference What to observe
Legal entity See definitions in applicable TR CU's and EAC decision no. 621 dated 07.04.2011 andEAC decision no. 76 dated 09.04.2013
Attention: TR CU applicant must be registered in accordance with the legislation of the Russian Federation on its territory; with other words a legal entity is needed. I.e. responsibility is with an 'OOO' (like a GmbH, Ltd.)
Identification by means of the state main registration number of the company (OGRN) and tax number (INN).
Ratification of 'applicant contract' may become time
7Th.Raßhofer, ENQS
Ratification of 'applicant contract' may become time consuming
Manufacturer responsibility
For equipment subject to TR CU regulations dedicated persons/organizations and statutory obligations are defined, i.e. designer, manufacturer (or his authorized person), user and certification body.
Comparable to EU regulations like inDirective on machinery and Directive on Pressure Equipment etc.
Products subject to a TR CU must be affixed with the unified turn over mark and/or Ex mark.
Warranty EAC decision no. 621 dated 07.04.2011
Legal body to affirm
06/2015
![Page 8: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/8.jpg)
5. List of recogonized standardsManufacturer is obliged to obtain presumption of conformity
List of standards which ensures compliance
with
TR CU 032/2013 "Pressure equipment "
(EEC Decision No. 22, dated Feb 25, 2014)
List of standards which ensures compliance
with
TR CU 010/2011 "Machinery & Equipment "
(EEC Decision No. 823, dated Oct 18, 2011)
Equipment shall be designed and manufactured so that it ensures its conformance to safety
requirements in the course of its intended use, operation and maintenance.
Compliance of the equipment to the safety requirements is provided by:
806/2015 Th.Raßhofer, ENQS
European (EN) and ISO standards adopted by Russian Federation and Belarus are considered to
provide presumption of conformity with the respective TR CU essential safety requirements
ü Use of other standards requires a particular assessment by the manufactuer & A.B
against TR CU essential requirements and standards listed in the applicable EEC Decisions
(EEC Decision No. 22, dated Feb 25, 2014) (EEC Decision No. 823, dated Oct 18, 2011)
ü Not a single American standard is cited
ü For machinery and equipment sourced in one of the member states of the EACU, locally
established code of construction should be selected from the respective list of accepted standards
![Page 9: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/9.jpg)
6. Conformity assessment - at a glanceEEC decision no. 621 – An approach similar to Europe ?
Conformity assessment schemes have to applied
Manufacturer to provide a set of 'compulsory documents' at the time 'placing a product' on the market
Manufacturer to form documents to show compliance with the essential TR CU requirements
ü 'Placing on the market'
A product is placed on the market when it is made available for the first time on the Union market
9Th.Raßhofer, ENQS06/2015
ü Russia; RTN 'permit for operation' for new objects is not required and not issued anymore.
Previously issued permits remain useful for reference purposes and as additional confirmation of
safety. Expert Conclusions can still be obtained, if requested by the USER/CLIENT
For products out of TR CU scope federal attestation process have to be complied with
![Page 10: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/10.jpg)
6. Conformity assessment - at a glanceTR CU 032/2013 and TR CU 010/2011, overlap for some products
For example …..
TR CU 032/2013Scope
§ Pressure Vessels
§ Valves, larger DN 25
TR CU 010/2011Scope
§ item 9. Chemical and oil and gas refining equipment
§ item 59. Industrial piping accessories
10Th.Raßhofer, ENQS06/2015
ü European manufacturer's associations have an opinion about. In CU no recognized discussion.
ü As a consequence, manufacturer should be prepared to serve both TR CU
Query è A contradiction, ambiguity or a conscious requirement ?
The consideration of application-related hazards should help to solve this subject in question
![Page 11: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/11.jpg)
6. Conformity assessment - at a glanceEach TR CU has it's particular set-up; Example TR CU 032/2013
Hazardcategory
Production type SchemeTests
conducted by
Production assessment(audit) by
Manufacturingsupervision by
Declarant
1, 2
Batch (serial) -producedequipment
1 d- Test lab., or- Accr. test lab.
n/a Manufacturer- Manufacturer or- Person authorized by manufacturer
Single batch of equipment(or one-off item)
2 d- Test lab., or- Accr. test lab.
n/a n/a- Manufacturer,- Vendor, or- Person authorized by manufacturer
Batch-produced components and component parts(for equipment of hazard cat. 1 or 2)
3 d - Accr. test lab. n/a Manufacturer- Manufacturer or- Person authorized by Manufacturer
Single batch of components and component parts(for equipment of hazard cat. 1 or 2)
4 d - Accr. test lab. n/a n/a- Manufacturer,- Vendor, or- Person authorized by manufacturer
1, 2, 3, 4 Equipment which is finalized using 5 d- Equipment type examination 1)
by cert. bodyn/a Manufacturer
- Manufacturer or- Person authorized by manufacturer
Batch (serial) - produced
11Th.Raßhofer, ENQS06/2015
1, 2, 3, 4 Equipment which is finalized using permanent joining at site
5 dby cert. body
n/a Manufacturer- Person authorized by manufacturer
3, 4
Batch (serial) -producedequipment
1 c- Accr. test lab.,- Evaluation by cert. body
Cert. body Cert. body- Manufacturer or- Person authorized by manufacturer
Single batch of equipment 3 c- Accr. test lab.,- Evaluation by cert. body
n/a n/a- Manufacturer,- Vendor, or- Person authorized by manufacturer
One-off item 4 c- Accr. test lab.,- Evaluation by cert. body
n/a n/a- Manufacturer,- Vendor, or- Person authorized by manufacturer
Equipment purposed for launching into batch and mass production as well as in case of planning equipment modifications
7 c- Equipment type examination
by cert. bodyCert. body Cert. body
- Manufacturer or- Person authorized by manufacturer
1) Type-examination certificate in the Eurasian Economic Commission approved form. This certificate shall be an essential part of the DoC
ü What about conformity assessment of components for equipment of hazard category 3 and 4?
ü Do not apply scheme 5d for field constructed piping spools and piping systems (pipelines)
![Page 12: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/12.jpg)
6. Conformity assessment - at a glance
Process – foreign scenario
The Manufacturer’s authorised (Applicant) is to perform
all the obligations of a foreign Manufacturer to ensure
compliance with the regulations of the CU
12Th.Raßhofer, ENQS06/2015
![Page 13: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/13.jpg)
7. Process Plant – Building permit to L2O A statutory predefined sequence for new Hazardous Industrial Objects
Stage # Action Legal Reference
Building
Permit
1 Licence for project planning/engineering (SRO membership; SRO = self-regulated organizations) Prikaz No. 624 dated 30.12.2009
2 Basic data / basic engineering Regulation dated 30.01.2002
3 Engineering - technical researching (SRO licence) Prikaz No. 624 dated 30.12. 2009
4 Unified system for design documentation, Specifications GOST 2.114-95 dated 01.07.1996
5 Basic engineering - (SRO licence) Decree No. 87 dated 16.02.2008
6.1 Expertise of the Project P documentation Decree No. 145 dated 05.03.2007
6.2 àGLAVGOSTEXPERTISA 190-FZ dated 29.12.2004, Art. 49, P. 4.2.
7 Construction (Licence) and supervising Prikaz No. 624 dated 30.12.2009, CN 11-110-89
8 Inspection and confirmation of ZOS (GOSTSTROINADZOR) Decree No. 54 dated 01.02.2006
9 Permit after Construction Codex 190-FZ dated 29.12.2004, Art. 55
13Th.Raßhofer, ENQS
Licence to
operate
(L2O)
11 Change in surveillance power in legislative acts 186-FZ dated 02.07.2013
12 Categorization of hazardous production facility – process plant116-FZ dated 20.06.1997, Art. 2
amended by 22-FZ dated 04.03.2013
13.1 Conclusion of Expertise of Industrial Safety for the process plant 116-FZ dated 20.06.1997, Art. 13
amended by 22-FZ dated 04.03.201313.2 Registration within 5 working days in Register of Industrial Safety Expertise Conclusions
14.1 Development of Declaration of Industrial Safety 116-FZ dated 20.06.1997, Art. 14
amended by 22-FZ dated 04.03.201314.2 Registration within 5 working days in Register of Industrial Safety Declarations
15 Expertise PLAS, Attestation of involved personnel116-FZ from 20.06. 1997
amended by 22-FZ dated 04.03.2013
16 Program and Methods for Acceptance Testing in Service (i.e. ISI)116-FZ dated 20.06.1997, Art. 16
amended by 22-FZ dated 04.03.2013
17 L2O of process plant by RTN, incl. plant registration in the state register Postanovlenie No. 454 dated 05.05. 2012
Conformity
Assessment
10.1Conformity assessment acc. to TR CU or GOST R/TR for equipment constituting process plant by
manufacturer or applicantEEC Decisions 319, 620, 621
10.2 Applicant must be a legal body registered in the EACU 129-FZ dated 08.08.2001
10.3 Issued DoC or CoC to be registered in Unified Register of DoC and CoC 99-FZ dated 04.05.2011
06/2015
![Page 14: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/14.jpg)
8. Process Plant – 'Placing on the market'Assessment of Machinery Units and Package Units acc. to TR CU 010/2011
14Th.Raßhofer, ENQS
Burning platform : Is a machinery unit, a package unit or a process plant subject to an conformity
assessment in acc. with TR CU 010/2011?
• Machinery unit è always
• Package unit è depends, may be voluntary
• Process plant è legally not required and even not prohibited
06/2015
ü Clarify expectation with the USER/CLIENT
ü Assembly approach like in the PED hasn't adopted
![Page 15: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/15.jpg)
8. Process Plant – 'Placing on the market'Superordinate EACU market rules meets RF federal rules
'Project P'
documentation
USE
R/
CLIE
NTRegister to
RTN
Rules of industrial
safety of hazard
facilities
USER
&
RTN
Inspection &
DocumentsFeed/Basic documents
RDI
1506/2015 Th.Raßhofer, ENQS
Eng
ine
eri
ng
co
mp
an
y
TR CU
CertificationPID
HAZOPConformity
Assessment
Manufacturers
Equipment
Documentation
Engineering
Documentation
E.C.
&
A.B.
Handover
Documentation
ü USER is required to have and perform a 'program of inspections'
Documents
![Page 16: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/16.jpg)
9. SummaryRecommendations to manage the challenges
Establish on a early stage a concept for the conformity assessment
Consider currently longer lead times and higher efforts
Clarify in due time responsibilities and scope
16Th.Raßhofer, ENQS
ü Lead an active communication with the parties involved
06/2015
Select as soon as possible an accredited body or a service provider
Pay utmost attention to the content of the 'Project P documentation'
Establish a handling process for the 'compulsory documents'
![Page 17: Challenges for plant engineering in the Customs Union · PDF fileTR CU 020/2011 "Electromagnetic compatibility of technical equipment" TR CU 004/2011 "On safety of low-voltage equipment](https://reader031.fdocuments.in/reader031/viewer/2022011722/5a73f1117f8b9a1b688b726d/html5/thumbnails/17.jpg)
Thanks for your attention.
Refrain from trying to understand Russia, just belief in it.