CFPB building project submission to the National Capital Planning Commission

download CFPB building project submission to the National Capital Planning Commission

of 122

Transcript of CFPB building project submission to the National Capital Planning Commission

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    1/122

    Skidmore, Owings & Merrill LLPSOM

    CONSUMER FINANCIAL PROTECTION BUREAUWASHINGTON, DC

    NCPC PROJECT PLANS PRELIMINARY SUBMISSIONJANUARY 03, 2014

    Consumer Financial

    Protection Bureau

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    2/122

    Skidmore, Owings & Merrill LLP TABLE OF CONTENTSCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    E. Floor Plans Scale: 1 = 40 1. Lower Parking Level - Existing 2. Upper Parking Level - Existing 3. Basement Level Existing 4. Basement Level Proposed 5. First Level Existing 6. First Level Proposed 7. Second Level Existing 8. Second Level Proposed 9. Third Level Existing 10. Third Level Proposed 11. Fourth Level Existing 12. Fourth Level Proposed 13. Fifth Level Existing 14. Fifth Level Proposed 15. Sixth Level Existing 16. Sixth Level Proposed 17. Penthouse Level Existing 18. Penthouse Level Proposed

    F. Elevations Scale: 1 = 40 1. North Elevation (G St.) Existing

    2. North Elevation (G St.) Proposed 3. South Elevation (F St.) Existing 4. South Elevation (F St.) Proposed 5. East Elevation (17th St.) Existing 6. East Elevation (17th St.) Proposed 7. West Elevation Existing 8. West Elevation ProposedG. Cross Sections

    1. Building Section AA Existing Scale: 1 = 40 2. Building Section AA Proposed Scale: 1 = 40 3. Building Section BB Proposed Scale: 1 = 40 4. Wall Section AA (Typical) - Proposed NTS 5. Wall Section BB (Lobby) - Proposed NTS

    H. Roof Plan Scale: 1 = 40 1. Roof Plan Existing

    2. Roof Plan ProposedI. Construction and Equipment Drawings Not Included in Preliminary Submission

    PART A: NARRATIVE MATERIALS AND DATA 1. PROJECT REPORT

    A. Agency Project Manager B. Narrative Description of the Project B1. Existing Conditions B2. Design Process B3. Site Planning Concept B4. Architectural Concept B5. Sustainable Goals C. Site Area and Land Use Allocation D. Building Areas and Site Coverage E. Existing and Future Assigned Employment F. Relationship of Project to the Agency Masterplan G. Government Agency Coordination H. Community Participation I. Schedule of Construction and Occupancy J. Total Estimated Cost of Project and Funding Status K. Transportation Management Program

    2. ENVIRONMENTAL DOCUMENTATION

    3. HISTORIC PRESERVATION DOCUMENTATION

    4. FLOODPLAIN MANAGEMENT AND WETLAND PROTECTION

    PART B: MAPS AND DRAWINGS

    Drawings to scale required will be provided on the CD.

    A. Vicinity Plan Scale: 1 = 160

    1. Vicinity Plan Context 2. Vicinity Plan Zoning

    B. Site Plan Scale: 1 = 40 1. Site Plan Existing 2. Site Plan Proposed 3. Landscape Plan - Existing 3. Landscape Plan Proposed

    C. Grading Plan Scale: 1 = 40

    D. Stormwater Plan Not required in Preliminary Submission

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    3/122

    Skidmore, Owings & Merrill LLP TABLE OF CONTENTSCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART D: ADDITIONAL INFORMATION

    A. Existing Site Photos

    B. Building Components Diagram

    C. Materials 1. Landscape Materials Plan Proposed Scale: 1 = 40

    2. Landscape Materials Proposed 3. Exterior Building Materials Proposed

    D. Landscape1. Landscape Features Proposed Scale: 1 = 40

    2. Landscape Features Plan Proposed Scale: 1 = 40 3. Enlarged Plaza Plan Proposed Scale: 1 = 40 4. Enlarged Plaza Plan Alignments Proposed NTS 5. Plaza Sections Proposed NTS 6. Sunken Courtyard Sections Fountain Option 1 NTS 7. Sunken Courtyard Sections Fountain Option 2 NTS 8. Plaza Portal Sections Proposed NTS 9. Plaza Porch Canopy Elevation Proposed NTS 10. Plaza Porch Canopy Section Proposed NTS 11. Roof Play Yard Enlarged Plan Proposed NTS 12. Roof Play Yard Sections Proposed NTS

    E. Security1. Security Site Plan Proposed Scale: 1 = 40

    2. Security Enlarged Plan- Proposed NTS 4. Security Street View 1 - Proposed

    F. LEED Scorecard

    G. Design Addendum 1. Roof Play Yard View 1- Existing 2. Roof Play Yard View 1- Proposed 3. Roof Play Yard View 2- Existing 4. Roof Play Yard View 2- Proposed 5. Roof Play Yard View 3- Existing 6. Roof Play Yard View 3- Proposed

    7. Riggs Bank Elevation NTS 8. Riggs Bank Column Capital Site Plan SCALE: 1 = 40 9. Riggs Bank Column Capital Display Options

    PART C: PRESENTATION MATERIALS

    A. Vicinity Plan Proposed Scale: 1 = 160

    B. Site Plan - Proposed Scale: 1 = 40

    C. Rendered Floor Plans Scale: 1 = 40 1. Basement Level Proposed 2. First Level Proposed 3. Second Level Proposed 4. Third Level Proposed 5. Fourth Level Proposed 6. Fifth Level Proposed

    7. Sixth Level Proposed 8. Roof Plan - Proposed

    D. Rendered Elevations Scale: 1 = 40 1. North Elevation (G St.) Proposed 2. South Elevation (F St.) Proposed 3. East Elevation (17th St.) Proposed 4. West Elevation Proposed

    E. Rendered Sections 1. Wall Section AA (Typical) Proposed NTS 2. Wall Section BB (Lobby) Proposed NTS

    F. Rendered Perspectives 1. 17th Street View - Existing 2. 17th Street View - Proposed 3. View from 17th and G - Existing 4. View from 17th and G - Proposed 5. Lobby Exterior View from 17th - Existing 6. Lobby Exterior View from 17th - Proposed 7. Plaza Perspective - Existing 8. Plaza Perspective 1 - Fountain Option 1 9. Plaza Perspective 1 - Fountain Option 2 10. Plaza Perspective 2 - Proposed 11. Plaza Perspective 3 - Proposed 12. Plaza Perspective 4 - Proposed

    13. Plaza Perspective 5 - Proposed

    G. Massing Model

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    4/122

    Skidmore, Owings & Merrill LLP TABLE OF CONTENTSCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART E: APPENDIX

    A. Draft Environmental Assessment Report

    B. Historic Preservation Documentation

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    5/122

    Skidmore, Owings & Merrill LLP

    PROJECT TEAM

    Client

    Consumer Financial Protection Bureau1700 G St., NWWashington, DC 20552

    Lighting Design

    Domingo Gonzalez Associates25 Park PlaceNew York, NY 10007

    Architectural/Site Design/Interior Design

    Skidmore, Owings & Merrill LLP2001 K Street, NW,Suite 200Washington, DC, 20001

    Mechanical/Electrical/Plumbing

    Skidmore, Owings & Merrill LLP2001 K Street, NW, Suite 200Washington, DC, 20001

    Blast ConsultantHinman Consulting Engineers, Inc.One Bush StreetSuite 510San Francisco, CA 94104

    Tenant

    Consumer Financial Protection Bureau1700 G St, NWWashington, DC 20552

    Civil Engineering

    Wiles Mensch Corporation11860 Sunrise Valley Dr #200Reston, VA 20191

    Landscape Architecture

    Thomas Balsley Associates31 W 27th St, 9th FlrNew York, NY 10001

    Structural Engineering

    Skidmore, Owings & Merrill LLP224 S Michigan Ave, Suite 1000Chicago, IL, 60604

    Vertical Transportation

    Van Deusen & Associates5 Regent Street, Suite 524Livingston, NJ 07039

    Fire Protection/Fire Safety

    Rolf Jensen and Associates, Inc14502 Greenview DriveSuite 500Laurel, MD 20708

    Audio Visual/Acoustics/TelecommunicationShen Milsom Wilke, LLC1220 North Fillmore StreetSuite 360Arlington, VA 22201

    Security

    Strauchs LLC21931 Bramblebush TerraceStudio AAshburn, VA 20148

    Cost Estimating

    PMSI

    PROJECT TEAM

    PRO

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    6/122

    Skidmore, Owings & Merrill LLP

    PART A: NARRATIVE MATERIALS AND DA

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    7/122

    Skidmore, Owings & Merrill LLP

    SECTION 1: PROJECT REPORT

    A. AGENCY PROJECT MANAGER

    Michael DavisConsumer Financial Protection BureauOperations and Facilities Dept.1700 G St, NW

    Washington, DC 20552Ph 202-435-9405

    B. NARRATIVE DESCRIPTION OF THE PROJECT

    B.1 EXISTING CONDITIONS

    The project is a complete modernization of an existing building at 1700 G Street NW, Washington, DC,originally known as the Federal Home Loan Bank Board Headquarters. It was built in 1976 and is bounded by GStreet to the north, 17th Street to the east, the Winder building to the south and an existing building to the west, aswell as a large outdoor open plaza. The original architect for the building was Max Urbahn. The structure is a six-story federal office building, designed in the Brutalist style, with a gross area of319,916 square feet above grade and 182,683 square feet below grade. It consists of two perpendicular wingsthat also include a full basement, two parking sub-floors, and a mechanical level on the roof. It is set back fromG and 17th Streets by approximately 30 feet. The structure consists of reinforced concrete clad with limestone

    panels on all flat surfaces of exterior walls. The design is symmetrical and angular. The building exterior containsstory-height windows on every floor and around the entire perimeter of the building, inset from the exteriorstructural face three to five feet. The 90-foot long building floor plate bays are joined by interior vertical light wellsfrom the second to sixth floors to skylights through the roof. The ground floor houses the main entrance lobby ofthe CFPB, a variety of shops facing G Street, F Street, and the courtyard, and a Federal Credit Union. The main entrance lobby to 1700 G Street, NW is located on the northeast corner of the building near thecorner of G and 17th Streets. Another lobby entrance is on the opposite side of the main lobby. The main lobbyleads to the east elevator core and provides access to the offices on upper and lower levels. It is surrounded byfloor-to-ceiling glass windows with a decorative wood ceiling and walls painted and furnished with temporaryCFPB literature and decorative panels. It also contains a security station and utility area.

    The office areas on the 2nd through 6th floors in both wings feature two central elevator lobbies and publicrestrooms situated around each of the full height atria leading to a skylight penetrating the roof. Outdoor terracesare located at the ends of each building wing on the sixth floor. An additional sky lit room is located in the Eastwing on the sixth floor. The basement floor is surrounded by small light wells at the tops of walls along the buildingperimeter above. The basement area currently contains a child care center, offices, utility areas, and facilities

    services. Levels P1 and P2 allow parking for 232 cars and contain mechanical and electrical building componentsand storage areas. The parking garage is accessed through an F Street down ramp entrance and the garage exitramps up to G Street. On the ground floor the building is separated into four zones by open air breezeways that link the plaza

    to G St. The plaza is largely empty and composed of several different levels--a courtyard fountain flows durinthe summer season, but the area that was previously a skating rink is now typically unused and occasionallya daytime assembly area and a street-to-street cut through. Alongside the Winder Building, a greenhouse-likestructure, originally named the Galleria, runs nearly the entire length. The plaza is bound on the east and southe Winder building, and by retail shops on the ground level of 1700 to the north and west. The plaza is pavall in brick, much of it cracked and crumbling, with some brick planters interspersed. In the southeast cornelimestone clad structure that once housed the zamboni for the ice skating rink. This structure also houses anstairway from the basement floor.

    B.2 DESIGN PROCESS

    The CPFB headquarters project is a renovation and modernization of an existing building, so the desig

    process began by studying and understanding the existing building conditions. The formal massing of thebuilding creates a distinct impression from the street, and it was impor tant to preserve this from all possiblevantage points. Very little is being done to the existing masonry of the building, except for repairs and cleaninso the overall appearance of the exterior will remain unchanged. This will also keep intact the cornice height the east the front of the building, specifically designed to align with its historic neighbor, the Winder Building.Another main component of the original design is the open air plaza. Designed to have varied uses, the plazaonce included restaurants, open air cafes, a skating rink, fountains, etc. It was meant to be a dynamic spacebrought the community into the sphere of a government building for the first time. Furthering this link betwethe government building and the public sphere of the plaza were open-air breezeways that formed a connectibetween it and G St. and encouraged constant movement in and out. Consistent with those original goals, th

    revitalization of the plaza, with new water features, extensive seating areas and shady tree bosques, will re-enthe public and encourage them to visit and use the space. The existing materiality of the building was carefuchosen during the initial design to complement and respect its historic neighbor. The brick in the plaza and gplane and the limestone masonry on the sur faces of the building provide a contextual nature to the two verydifferent buildings. The renovation of the plaza, while using predominantly brick paving, will also utilize a varipre-cast or limestone elements in order to tie the new project back into the context of the historic neighbor, asas the existing CFPB building.

    The existing building components were also important in the design process. The perceived structurthe building is very much evident on the exterior of the building. Composed of a series of exposed round concolumns and heavy, deep limestone lintels and ver tical piers, it was important to respect and preserve all ofthese as was originally intended. The new glass profile on the ground floor will recess around corner columnspecifically to keep the language of the building consistent between new and old. The four structural skeletosections of the building are joined by solid masonry planes that correspond to the below open air breezewaysThese contribute to the heavy mass of the building and will be retained intact on the G St faade as well as thplaza faade. The existing horizontal ground plane of the building is composed of brick, and this was specific

    chosen, again, as a reference nod to the historic neighbor as well as the long history of the building site itselfThis link will be preserved with matching brick. Most importantly, perhaps, is that the building was originally designed as the first of the Living BuildProgram, which was a new breed of Federal buildings that attempted to engage and contribute to the surrou

    PROJECT REPORT

    PART A: NARRATIVE MATERIALS1. PROJE

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    8/122

    Skidmore, Owings & Merrill LLP PROJECT REPORT

    PART A: NARRATIVE MATERIALS1. PROJE

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    community. The ice skating rink, plaza, retail spaces and restaurants were all part of this goal. However, itwas not only a pioneer in the mixed-use concept of design for a government building, but it also sought to bemore functionally efficient for its employees. This was achieved by an open plan configuration that was ver ydifferent for government buildings of the time, as well as personal task lighting in lieu of row after row of overheadfluorescent lights. All of these together attempted to elevate the drab and sterile government concrete box of theprevious decade into a livelier and healthier place for work, as well as for recreation. The current design goals are, in many respects, a desire to recapture the ideals with which the buildingwas designed originally, while introducing new technology and systems. The plaza, which is now largely emptyand neglected, will return to being a place of vitality. The faded and worn interiors over the years have beenpartitioned and closed off. A new open and contemporary workplace, one with increased natural light and spacesfor collaboration, have been designed to foster health and innovation. This will also mirror the stated mission ofthe agency, which is tasked with, among other things, increasing transparency in the financial services sector.With this in mind, the floor plates are largely open with private offices located only on the North and West sides ofthe building. The existing atria will be further opened up to increase light, and new interconnecting stairs will beadded to increase collaboration. Fixed reflective panels will be installed at the top of each atrium, further bringingdaylight into the interior of the building. The lobby will be indicative of the agency transparency as well, with a newwall of clear glass to create an open and welcoming space for entry into the building. Educational venues will alsobe located in the lobby to inform the public about the CFPBs impor tant mission.

    B.3 SITE PLANNING CONCEPT

    The proposed landscape design draws respectfully from the existing context, channeling contemporarydesign cues from a historic past, while also preserving the historic Winder Buildings edge. The proposed pavingstrategy preserves the existing character by removing the existing damaged brick pavers and installing new brickpavers. Running east to west through the plaza, a reflective carnelian granite water table extends out of the plazaand interacts with the public sidewalk, luring in the curious passer-by. At this 17th street edge, visitors comfortablyascend broad 4 steps into an elevated plaza. At this upper plaza level, the water table becomes a flush reflectiveelement separating the plaza spatially as it unfolds into a series of diverse spaces. Parallel to the reflection feature,low flowering groundcover plantings assist in organizing the spaces. Located centrally in the plaza is a large openflexible space with a kiosk and 15 high wall. This living wall camouflages the ventilation shaft and egress stairwayfrom the basement level. Adjacent to this open brick area, is a calmer informal seating area under a shady treebosque. Under the trees, the soft contrast of the stone dust floor further implies a removed place of rest andcontemplation. Additional seating is provided along the Winder building edge at slightly elevated level. At thisplaza porch level, visitors can perch on timber lounges and over look the entire courtyard. This provides a greatvantage point of all plaza activity, as well as providing seating for a maximum number employees and visitors. A canopy over the porch provides shelter from the elements, intimacy in scale, and a transition to theWinder Building. The columns and framework of the canopy are dark bronze and the textured egg crate ceiling is

    a lighter bronze for light reflectivity. Flowering vines are planted at each column and trained up to rest on top of thecanopy, spilling over its edges to provide a hanging garden effect. At the western terminus of the skim fountain, a 42 high water table spills over and down into thebasement level below. This smooth water cube transitions into a rough split face granite water wall to the

    basement level. The water cascade creates an atmosphere of white noise as visitors peer over the glass railindown into the basement courtyard below. The ground level courtyard geometries are carried down into thebasement creating a visual connection. The courtyard living wall also recalls the living green wall within the pabove.

    Circulation through the plaza is highly encouraged. The four existing street edge entrances and spatiaorganization establish and reinforce the desired lines of circulation, encouraging clear and direct routes into athrough the plaza. Seating borders along paths provide opportunities of restful observation to gaze upon passvisitors. Limestone seatwalls on the north side of the skim water feature provides a sunny seating opportunityat the waters edge. Within the tree bosque, a casual and less hurried wandering occurs. This diverse circulatapproach promotes an environment, which facilitates chance interactions that make public urban spacessuccessful.

    A play yard for the child care center is incorporated onto the penthouse roof which is enclosed in acontinuous 8 high limestone wall. Along the base at the nor thern section of the play yard, stainless steel planwith planted climbing vines allow vegetation to scale the vertical wall and reduce sun reflection during the summonths. At the northern section, an overhead open egg crate canopy, provides shade and a sense of enclosThis shady outdoor room provides seating and large universally accessible picnic tables, which can be used foutdoor instruction and activities. Educational and interactive play equipment and movable stools are arrangeover a colorful play safety sur face at the southern end.

    B.4 ARCHITECTURAL CONCEPT

    The building renovation is designed to retain as much of the original building fabric as possible, whilethe same time meeting the CFPB occupancy goals and providing an up to date and dynamic headquarters.

    The lobby area is designed to reinforce the mission and goals of the CFPB, and thus is designed to beas transparent and open as possible. By opening up the space with large glass panels and light materials, thlobby displays the CFPB image identity and projects it out onto the street, while at the same time creating acontemporary and updated inset into the existing concrete and masonry building mass.

    The new building enclosure is an important element. All existing glazing and framework on the buildinbe replaced with a high per formance upgrade for energy efficiency and blast resistance.

    The interior of the renovation is designed to return to the goals of the original building by removingprivate offices as much as possible and returning them to open workspace floor plans. The largely open planencourage collaboration and communication between staff and foster innovation in thinking. A modern matepallet that introduces light materials and interior glass is also intended to visually open up the space and encoemployee interaction. The space will be further activated by the introduction of interconnecting stairs in the exopenings which will encourage flow of movement.

    Achieving proper perimeter control in accordance with Federal Building Security Standards is also apriority. Architectural bollards will be used at specific, localized locations, including the main lobby entrance corner of 17th and G Sts, as well as the courtyard entrance on 17th St. Additionally, either built-in informatio

    features and bollards will be employed at the public portal entrances and the secondary courtyard entrances tprovide security while allowing pedestrian flow. All of these security devices except a bare minimum at the mentrance on 17th St will be located on CFPB grounds and not on DC public property. Back of house protectioinclude guard booths at the garage and loading dock entrances, in addition to force protection plates to preveunauthorized vehicles.

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    9/122

    Skidmore, Owings & Merrill LLP PROJECT REPORT

    PART A: NARRATIVE MATERIALS1. PROJE

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    B.5 SUSTAINABLE GOALS

    The Design Team is committed to developing a sustainable design that will provide an energy efficient,Class A office and public space for CFPB to achieve its mission efficiently and effectively. The project will achieveat least LEED Silver and is currently targeting Gold, using the New Construction and Major Renovations v3.0rating system.

    The projects urban location contributes to more than half of the Sustainable Sites credits, includingdevelopment density, proximity to public transportation, below-grade parking and no new parking. Bicyclestorage, showers and changing rooms will be provided to encourage alternative commuting.

    The plaza provides significant opportunities for incorporating sustainable elements. The open space plazawill be designed to help mitigate the heat island effect through high albedo surfaces and shade from trees. It alsoprovides an opportunity to integrate the Living Machines system, a building and landscape integrated watertreatment facility, which helps address both the potable water and stormwater issues affecting the District. Thesites stormwater and buildings wastewater will be treated using a series of tanks and filters, ultimately providingtreated water for irrigation, toilet flushing, and mechanical makeup. Through the Living Machine system and lowflow fixtures, the project will achieve stormwater quantity and quality control, innovative wastewater technologies,and exemplary performance for reducing the potable water demand.

    Energy efficient measures will be implemented throughout the building, including high-performanceglazing systems, automatic daylighting controls, occupancy sensors, a high-efficient chiller plant with variableprimary pumping, condensing boilers for heating hot water and domestic hot water generation, variable frequencydrives on fans and pumps, outdoor air units with energy recovery components, EnergyStar office equipmentand appliances, and a building automation system for optimal start/stop operation. Chilled beams are beinginvestigated for providing an efficient means for heating and cooling the occupied space. An added benefit ofchilled beams is they can be integrated within the limited ceiling space.

    The renovation will maintain the majority of the buildings existing structural elements and encourage theselection of responsible materials. The contractor will implement a construction waste management program,with the goal of diverting at least 75% of demolition and construction debris from the landfill. Building materialsand products that have recycled content or are regionally extracted and manufactured regionally will be givenpreference. All wood-based materials will be tracked and preference will be given to products that have a ForestStewardship Council (FSC) chain-of-custody certificate. A dedicated area at the loading dock will be identified forthe collection and storage of recyclables, including paper, corrugated cardboard, glass, plastics and metal.

    Access to daylight and views are a p rimary goal, providing a connection between the indoors andoutdoors. The ventilation system will meet the outdoor air ventilation required by ASHRAE 62.1-2007, Ventilationfor Acceptable Indoor Air Quality and have a permanent outdoor air monitoring system to maintain designminimum requirements. The HVAC systems and building envelope will be designed to ASHRAE 55-2004, ThermalEnvironmental Conditions for Human Occupancy. The design team will specify low-emitting materials in order toreduce the quantity of indoor contaminants that are odorous, irritating and harmful to the comfort and well-beingof the construction workers and building occupants. In addition, the contractor will develop and implement an

    indoor air quality management plan during construction and before occupancy.

    C. SITE AREA AND LAND USE ALLOCATION

    Approximate Area Percentage of Total AreaLandscaped Space 16,700 SF 24.5%Building Footprints 51,500 SF 75.5%Surface Roads, Sidewalks, Parking 0 SF 0%Total Site Area 68,200 SF 100.0%

    D. BUILDING AREAS AND SITE COVERAGE

    The total footprint for the entire building structure is approximately 51,500 SF, which covers approximately75.5% of the total site area (68,200 SF).

    E. EXISTING AND FUTURE ASSIGNED EMPLOYMENT

    The CFPB is currently housed in the 1700 G St. facility and in multiple off site locations. This project willhouse over 1000 employees and contractors, with the remainder in an off site location yet to be determined.Approximately two-thirds of CFPBs DC based employees will be housed in 1700 G Street. It is estimated thahead count will be consistent at move-in in late 2016. Based on current growth plans, CFPB expects to mainthis projected head count in the 1700 G Street facility for the next 20 years.

    F. RELATIONSHIP OF THE PROJECT TO THE AGENCY MASTERPLAN

    The CFPB Headquarters project is a single building project and there is no applicable masterplan.

    G. GOVERNMENT AGENCY COORDINATION

    Public coordination for this project has been with NCPC, CFA, and SHPO. We have begun coordination with lDC government. There has been no coordination with COG to date.

    H. COMMUNITY PARTICIPATION

    The final version of the EA is complete and issued for public comment. No public comment was received.

    I. SCHEDULE FOR CONSTRUCTION AND OCCUPANCY

    The current CFPB schedule is to award a design build contract in May 2014. The project will be completed isingle phase. It is estimated that the completion of design and construction will have a 28-30 month durationoccupancy scheduled for 2017.

    J. TOTAL ESTIMATED COST OF PROJECT AND FUNDING STATUS

    Estimated cost of construction is $130 million. Funding is provided by CFPB. There are no appropriationsassociated with this project.

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    10/122

    Skidmore, Owings & Merrill LLP

    K. TRANSPORTATION MANAGEMENT PROGRAM

    At move in, CFPB will employ over 1000 people at their headquarters facility at 1700 G Street, NW. Theheadquarters building includes 2 levels of parking with a planned total of 232 parking spaces, unchanged fromcurrent capacity. As part of the LEED strategy, 5% of these spaces will be used for high occupancy/fuel efficientautomobiles. CFPB has evaluated the mode split of its personnel and found that approximately 79% of staff uses publictransportation, (with 56% taking transit subsidies), 1% bike to work, 1% walk, 1% rides a motorcycle, 4% carpool,and 14% drive in single occupancy vehicles. To mitigate the increased building population, while maintaining the existing building parking andencouraging CFPB staff to use alternate modes of transportation, CFPB has instituted multiple programs. CFPBoffers its employees subsidies for using Metro rail and Metro bus. At this time, CFPB provides these subsidiesfor 601 employees. To encourage bike riding, CFPB will provide bike racks in the building for approximately 70bicycles. CFPB will also provide lockers and shower facilities. To encourage car pooling, CFPB has instituted the following programs: preferred parking (parking closerto elevators) is provided to those who carpool and larger parking spaces are offered to oversize vehicles used forcarpooling. Currently under review, CFPB is considering reduced parking costs for those who carpool.

    SECTION 2: ENVIRONMENTAL DOCUMENTATION

    CFPB has completed an Environmental Assessment (EA) report for this project to evaluate the potentialenvironmental impacts. This report has been published to receive public comment, but has received none. NCPCis on the list and has received the final EA.

    We have included a copy of the final Environmental Assessment Report as par t of the appendix in the backof this submission.

    SECTION 3: HISTORIC PRESERVATION DOCUMENTATION

    CFPB headquarters is located at 1700 G Street, NW. CFPB initiated consultation for the National HistoricPreservation Act (Section 106) compliance for this project in March 2013 and has submitted the Determination ofEligibility Form to DC State Historic Preservation Office (SHPO) in late March.

    SHPO responded to the submission in late April 2013 with comments and a request for additionalinformation and clarifications. CFPB revised the Determination of Eligibility Form and re-submitted to SHPO in June2013. SHPO determined that 1700 G Street NW is eligible for the historic register. We have included the Determination of Eligibility Form, as well as the draft Memorandum of Understanding(MOU), as part of the appendix at the back of this submission.

    SECTION 4: FLOODPLAIN MANAGEMENT AND WETLANDS PROTECTION

    Not applicable for this submission

    PROJECT REPORT

    PART A: NARRATIVE MATERIALS1. PROJE

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    11/122

    Skidmore, Owings & Merrill LLP

    PART B: MAPS AND DRAWIN

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    12/122

    Skidmore, Owings & Merrill LLP VICINITY PLAN - CONTEXT

    PART B: MAPS AND A. VIC

    1. VICINITY PLAN

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 160

    PROJECT AREA

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    13/122

    Skidmore, Owings & Merrill LLP VICINITY PLAN - ZONING

    PART B: MAPS AND A. VIC

    2. VICINITY PLA

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 160

    PROJECT AREA

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    14/122

    Skidmore, Owings & Merrill LLP SITE PLAN - EXISTING

    PART B: MAPS AND B.

    1. SITE PLAN

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    SKYLIGHT

    COOLING TOWERS

    MEP

    OVERRUN TOWER

    COURTYARD

    WINDER BUILDIN

    CFPB HEADQUA

    17THSTREET

    G STREET

    F STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    15/122

    Skidmore, Owings & Merrill LLP SITE PLAN - PROPOSED

    PART B: MAPS AND B.

    2. SITE PLAN -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    GREEN ROOF ROOF TERRACE

    WINDER BUILDIN

    NEW PUBLICPLAZA

    GREEN ROOF ROOF TERRACE

    WINDER BUILDIN

    NEW SKYLIGHTS

    TO MATCH EXIST

    CHILDRENS PLAYAREA

    17THSTREET

    G STREET

    F STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    16/122

    SITE BOUNDARY

    24

    Skidmore, Owings & Merrill LLP

    PART B: MAPS AND B.

    3. LANDSCAPE PLAN

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM LANDSCAPE PLAN - EXISTING SCALE: 1 = 40

    17THSTREET

    G STREET

    F STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    17/122

    1 Stainless Steel Security Bollard, TYP2 Liriope Ground Cover3 ID Pylon, TYP4 Existing Street Tree, TYP5 Existing Brick Paving to Remain6 Sunken Garden and

    Shallow Water Basin7 Evergreen Shrub8 Universal Access Path9 Table and Chairs, TYP10Shaded Seating11 Wooden Banquette Seating12 Flowering Shrub

    13 Limestone Stone Seat Wall14 Green Wall and Green Roof15 Raised Water Table16Sculptural Seating17 Flush Reflecting Skim Fountain18 Wetwall Down to Basement Level19 Covered Porch Canopy with Wisteria20 Bronze Kiosk21 Visitor Bike Racks22 Brick Paving to Match Existing23 Existing Winder Building24 New Street Lamp

    22

    3

    6

    6

    13 13

    12

    12

    5

    10

    9

    14

    7

    5

    4

    16

    3

    1515

    5

    1717

    19

    20

    22

    21

    8

    18

    1

    11

    17THSTREET

    G STREET

    F STREET

    23

    242424 2424

    Skidmore, Owings & Merrill LLP

    PART B: MAPS AND B.

    4. LANDSCAPE FEATURES PLAN -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM LANDSCAPE PLAN - PROPOSED SCALE: 1 = 40

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    18/122

    Skidmore, Owings & Merrill LLP GRADING PLAN - PROPOSED

    PART B: MAPS AND C. GRADING PLAN -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    17THSTREET

    G STREET

    F STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    19/122

    Skidmore, Owings & Merrill LLP LOWER PARKING LEVEL - EXISTING

    PART B: MAPS AND E. FLO

    1. LOWER PARKING LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    RAMP DOWN

    RAMP UP TO UPPER PARKING

    STORAGE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    20/122

    Skidmore, Owings & Merrill LLP UPPER PARKING LEVEL - EXISTING

    PART B: MAPS AND E. FLO

    2. UPPER PARKING LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    RAMP DOWN FROM STREET

    RAMP TO LOWER PARKING

    RAMP UP TO G STREET

    MECHANICAL

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    21/122

    Skidmore, Owings & Merrill LLP BASEMENT LEVEL - EXISTING

    PART B: MAPS AND E. FLO

    3. BASEMENT LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    DAY CARE

    LIBRARY

    COMPUTER ROOM COPY CENTER EMPLOYEE LOUNGE

    MECHANICAL

    OFFICES

    ELECTRICAL

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    22/122

    Skidmore, Owings & Merrill LLP BASEMENT LEVEL - PROPOSED

    PART B: MAPS AND E. FLO

    4. BASEMENT LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    FITNESS CENTER

    CHILD CARE ELEVATOR

    OUTDOOR TERRACE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    REPROGRAPHICS/MAILSECURITY SUITE

    FURNITURE STORAGE

    CONFERENCE CENTER

    CONFERENCE

    PRE-FUNCTION AREA

    LOCKER ROOM

    OFFICE SUPPLIES

    BUILDING ENGINEER

    INTERCONNECTING S

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    23/122

    Skidmore, Owings & Merrill LLP FIRST LEVEL - EXISTING

    PART B: MAPS AND E. FLO

    5. FIRST LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    WINDER BUILDING

    RETAIL ENTRANCES

    BREEZEWAYBREEZEWAY

    BREEZEWAY

    CFPB LOBBY ENTRAN

    CFPB LOBBY ENTRAN

    CFPB SECONDARY ENTRANCE

    RETAIL ENTRANCES

    RETAIL ENTRANCE

    PARKING GARAGE ENTRANCE

    LOADING DOCK

    PARKING GARAGE EXIT

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    COURTYARD

    17THSTREET

    G STREET

    F STREET

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    24/122

    Skidmore, Owings & Merrill LLP FIRST LEVEL - PROPOSED

    PART B: MAPS AND E. FLO

    6. FIRST LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    WINDER BUILDING

    SECURITY

    EDUCATIONAL DISPLA

    CFPB LOBBY ENTRAN

    CFPB SECONDARY ENTRANCE

    FEATURE WALL

    PARKING GARAGE ENTRANCE

    LOADING DOCK

    INTERCONNECTING S

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    COURTYARD

    CREDIT UNION

    CHILDCARE

    CFPB LOBBY ENTRAN

    17THSTREET

    G STREET

    F STREET

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    25/122

    Skidmore, Owings & Merrill LLP SECOND LEVEL - EXISTING

    PART B: MAPS AND E. FLO

    7. SECOND LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    BASE OF ATRIUM

    ENCLOSED OFFICES BASE OF ATRIUM

    AUDITORIUM

    ENCLOSED OFFICES

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    26/122

    Skidmore, Owings & Merrill LLP SECOND LEVEL - PROPOSED

    E. FLO8. SECOND LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    INTERCONNECTING STAIR

    OPEN OFFICE

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ENCLOSED OFFICE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    BASE OF ATRIUM

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    27/122

    Skidmore, Owings & Merrill LLP THIRD LEVEL - EXISTING

    E. FLO9. THIRD LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    ATRIUM

    ENCLOSED OFFICES ATRIUM

    ENCLOSED OFFICES

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B: MAPS AND

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    28/122

    Skidmore, Owings & Merrill LLP THIRD LEVEL - PROPOSED

    E. FLO10. THIRD LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ENCLOSED OFFICE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    INTERCONNECTING STAIR

    ATRIUM

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    29/122

    PART B: MAPS AND E FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    30/122

    Skidmore, Owings & Merrill LLP FOURTH LEVEL - PROPOSED

    E. FLO12. FOURTH LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ENCLOSED OFFICE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    INTERCONNECTING STAIR

    ATRIUM

    PART B: MAPS AND E FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    31/122

    Skidmore, Owings & Merrill LLP FIFTH LEVEL - EXISTING

    E. FLO13. FIFTH LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    ATRIUM

    ENCLOSED OFFICES ATRIUM

    ENCLOSED OFFICES

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B: MAPS AND E FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    32/122

    Skidmore, Owings & Merrill LLP FIFTH LEVEL - PROPOSED

    E. FLO14. FIFTH LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ENCLOSED OFFICE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    INTERCONNECTING STAIR

    ATRIUM

    PART B: MAPS AND E. FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    33/122

    Skidmore, Owings & Merrill LLP SIXTH LEVEL - EXISTING

    E. FLO15. SIXTH LEVEL

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    ATRIUM

    ENCLOSED OFFICES ATRIUM

    ENCLOSED OFFICES

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B: MAPS AND E. FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    34/122

    Skidmore, Owings & Merrill LLP SIXTH LEVEL - PROPOSED

    16. SIXTH LEVEL -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    CLOSED OFFICE

    TEAM ROOM

    PANTRY

    ENCLOSED OFFICE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    EMPLOYEE LOUNGE

    TERRACE

    LIBRARY

    INTERCONNECTING STAIR

    INTERCONNECTING STAIR

    ATRIUM

    PART B: MAPS AND E. FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    35/122

    Skidmore, Owings & Merrill LLP

    17. PENTHOUSE LEVEL

    PENTHOUSE LEVEL - EXISTINGCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    WEST MECHANICAL ROOM

    COOLING TOWERS EAST MECHANICAL ROOM

    FITNESS CENTER

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    PART B: MAPS AND E. FLO

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    36/122

    Skidmore, Owings & Merrill LLP

    18. PENTHOUSE LEVEL -

    PENTHOUSE LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW MECHANICALPENTHOUSE EQUIPMENT

    SKYLIGHT TO ATRIUM

    SKYLIGHT TO ATRIUM

    ELEVATOR TO PENTHOUSE

    PLAY YARD

    NEW EGRESS STAIR FROMPENTHOUSE PLAY YARD

    SKYLIGHT

    PART B: MAPS AND F. E

    1 NORTH ELEVATION

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    37/122

    Skidmore, Owings & Merrill LLP NORTH ELEVATION (G ST.) - EXISTING

    1. NORTH ELEVATION

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    BREEZEWAY BREEZEWAY

    RETAIL ENTRANCES

    BRICK BASE

    CFPB LOBBY ENTRANCE

    GARAGE EXIT

    SOLID LIMESTONE PLANE MECHANICAL L

    PART B: MAPS AND F. E

    2 NORTH ELEVATION

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    38/122

    Skidmore, Owings & Merrill LLP NORTH ELEVATION (G ST.) - PROPOSED

    2. NORTH ELEVATION -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    CFPB LOBBY ENTRANCE

    NEW CHILDCAR

    WALL TO MATCLIMESTONE

    RESTORE LIMESTONESOLID PLANES AND VERTICALS

    RESTORE LIMESTONE AT

    PENTHOUSE ENCLOSURE

    RESTORE PRECASTCONCRETE COLUMNS

    AND SPANDRELS

    REHABILITATE M

    TO MATCH EXIS

    REHABILITATE EGLAZING WITH

    PERFORMANCE

    REHABILITATE MLOUVERS TO M

    EXISTING

    EXISTING ELEVA

    OVERRUN

    PART B: MAPS AND F. E

    3 SOUTH ELEVATION

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    39/122

    Skidmore, Owings & Merrill LLP SOUTH ELEVATION (F ST.) - EXISTING

    3. SOUTH ELEVATION

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    RETAIL ENTRANCES CFPB LOENTRAN

    BRICK BASEBREEZEWAYGARAGE

    ENTRANCEBREEZEWAY

    SOLID LIMESTONE PLANE

    EXISTING ELEVATOR OVERRUN

    PART B: MAPS AND F. E

    4 SOUTH ELEVATION -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    40/122

    Skidmore, Owings & Merrill LLP SOUTH ELEVATION (F ST.) - PROPOSED

    4. SOUTH ELEVATION -

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW BRICCOLOR OF

    NEW LOBBGLAZING

    CFPB LOBENTRANC

    NEW CHILDCARE PLAY AREA WALLTO MATCH EXISTING LIMESTONE

    RESTORERESTORE LIMESTONE AT

    PENTHOUSE ENCLOSURE

    RESTORE PRECASTCONCRETE COLUMNS

    AND SPANDRELS

    REHABILITATE MULLIONTO MATCH EXISTING

    REHABILITATE LOADINGDOCK DOORS TO

    MATCH EXISTING

    REHABILI

    GLAZING PERFORM

    EXISTING ELEVATOR OVERRUN

    PART B: MAPS AND F. E

    5 EAST ELEVATION

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    41/122

    Skidmore, Owings & Merrill LLP EAST ELEVATION (17TH ST.) - EXISTING

    5. EAST ELEVATION

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    BREEZEWAYRETAIL ENTRANCES

    SOLID LIMESTONE PLANE

    EXISTING ELEVATOR

    OVERRUN

    PART B: MAPS AND F. E

    6. EAST ELEVATION -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    42/122

    Skidmore, Owings & Merrill LLP EAST ELEVATION (17TH ST.) - PROPOSED

    6 S O

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW CHILDCARE PLAY AREA WALLTO MATCH EXISTING LIMESTONE

    RESTORE LIMESTONE

    RESTORE LIMESTONE AT

    PENTHOUSE ENCLOSURE

    REHABILITATE MECHANICAL

    LOUVERS TO MATCH EXISTING

    RESTORE PRECASTCONCRETE COLUMNS

    AND SPANDRELS

    REHABILITATE EXISTINGGLAZING WITH HIGH-

    PERFORMANCE GLAZING

    REHABILITATE MULLION TOMATCH EXISTING

    NEW BRICK BASE TO MATCHCOLOR OF EXISTING BRICK

    NEW LOBBY LOW-IRON

    GLAZING

    EXISTING ELEVATOR

    OVERRUN

    PART B: MAPS AND F. E

    7. WEST ELEVATION

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    43/122

    Skidmore, Owings & Merrill LLP WEST ELEVATION - EXISTING

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    BREEZEWAY

    EXISTING PENTHOUSEEXISTING ELEVATOR

    OVERRUN

    SOLID LIMESTONE PLANE

    PART B: MAPS AND F. E

    8. WEST ELEVATION -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    44/122

    Skidmore, Owings & Merrill LLP WEST ELEVATION - PROPOSED

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW CHILDCARE PLAY AREA WALLTO MATCH EXISTING LIMESTONE RESTORE LIMESTONE

    RESTORE LIMESTONE AT

    PENTHOUSE ENCLOSURE

    RESTORE PRECASTCONCRETE COLUMNS

    AND SPANDRELS

    REHABILITATE EXISTINGGLAZING WITH HIGH-

    PERFORMANCE GLAZING

    REHABILITATE MULLION TOMATCH EXISTING

    REHABILITATE MECHANICAL

    LOUVERS TO MATCH EXISTING

    EXISTING ELEVATOR OVERRUN

    PART B: MAPS AND G: CROSS

    1. BUILDING SECTION AA

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    45/122

    Skidmore, Owings & Merrill LLP BUILDING SECTION AA - EXISTING

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    BREEZEWAY

    ATRIUM

    SKYLIGHT

    PART B: MAPS AND G: CROSS

    2. BUILDING SECTION AA -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    46/122

    Skidmore, Owings & Merrill LLP BUILDING SECTION AA - PROPOSED

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW INTERCONNECTING STAIR

    NEW COLLABORATION HUBS

    NEW SKYLIGHT TO MATCH

    EXISTING

    NEW DAYLIGHT REFLECTORS

    PART B: MAPS AND G: CROSS

    3. BUILDING SECTION BB -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    47/122

    Skidmore, Owings & Merrill LLP BUILDING SECTION BB - PROPOSED

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    ENCLOSED OFFICE

    PART B: MAPS AND G: CROSS

    4. WALL SECTION AA (TYPICAL) -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    48/122

    Skidmore, Owings & Merrill LLP

    WALL SECTION AA (TYPICAL) - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM NOT TO SCALE

    WALL SECTION AAENLARGED LOBBY CURTAIN WALL ELEVATION AA

    RESTORE EXISTING

    CONCRETE COLUMNS

    REHABILITATE DARK BRONZEMULLION TO MATCH EXISTING

    MULLION WIDTH

    RESTORE EXISTINGCONCRETE SPANDREL

    REHABILITATE GUARD RAIL

    TO MATCH EXISTING

    WALL SECTION AA

    REHABILITATE EXISTING GLAZING

    WITH HIGH-PERFORMANCE

    GLAZING

    PART B: MAPS AND G: CROSS

    4. WALL SECTION BB (LOBBY) -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    49/122

    Skidmore, Owings & Merrill LLP

    WALL SECTION BB (LOBBY) - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    NEW LOW-IRON GLAZING

    NEW BRICK BASE TO MATCHEXISTING BRICK COLOR

    WALL SECTION BB

    NEW DARK BRONZE MULLION

    TO MATCH EXISTING MULLION WIDTH

    ENLARGED LOBBY CURTAIN WALL ELEVATION BB

    NEW DARK BRONZE

    C-CHANNEL

    NEW DARK BRONZEC-CHANNEL

    WALL SECTION BB

    RESTORE EXISTINGLIMESTONE

    NOT TO SCALE

    PART B: MAPS AND H. R

    1. ROOF PLAN

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    50/122

    Skidmore, Owings & Merrill LLP ROOF PLAN - EXISTING

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    SKYLIGHT

    SKYLIGHT

    SKYLIGHT

    COOLING TOWERS

    MEP

    ELEVATOR TOWER

    TERRACE

    PART B: MAPS AND H. R

    2. ROOF PLAN - GREEN ROOF

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    51/122

    Skidmore, Owings & Merrill LLP ROOF PLAN - PROPOSED

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW CHILDCAREPLAY YARD

    NEW SKYLIGHTS TMATCH EXISTING

    NEW SKYLIGHTS TO

    MATCH EXISTING

    NEW SKYLIGHTS TO

    MATCH EXISTING

    GREEN ROOF

    GREEN ROOF

    GREEN ROOF

    NEW COVERED

    PLAY AREA

    ROOF TERRACE

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    52/122

    Skidmore, Owings & Merrill LLP

    PART C: PRESENTATION MATERIA

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION A. VICINITY PLAN -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    53/122

    Skidmore, Owings & Merrill LLP VICINITY PLAN - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 160

    PROJECT AREA

    PART C: PRESENTATION B. SITE PLAN -

    G STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    54/122

    Skidmore, Owings & Merrill LLP SITE PLAN - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    GREEN ROOF ROOF TERRACE

    WINDER BUILDIN

    NEW PUBLICPLAZA

    GREEN ROOF ROOF TERRACE

    WINDER BUILDIN

    NEW SKYLIGHTS

    TO MATCH EXIST

    CHILDRENS PLAYAREA

    17THSTREET

    F STREET

    PART C: PRESENTATION C. RENDERED FLO

    1. BASEMENT LEVEL -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    55/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP BASEMENT LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    FITNESS CENTER

    CHILD CARE ELEVATOR

    OUTDOOR TERRACE

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    REPROGRAPHICS/MAILSECURITY SUITE

    FURNITURE STORAGE

    CONFERENCE CENTER

    CONFERENCE

    PRE-FUNCTION AREA

    LOCKER ROOM

    OFFICE SUPPLIES

    BUILDING ENGINEER

    INTERCONNECTING S

    PART C: PRESENTATION C. RENDERED FLO2. FIRST LEVEL -

    CFPB LOBBY ENTRAN

    SECURITY

    ELEVATOR LOBBY

    G STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    56/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP FIRST LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    WINDER BUILDING

    EDUCATIONAL DISPLA

    CFPB LOBBY ENTRAN

    CFPB SECONDARY ENTRANCE

    FEATURE WALL

    PARKING GARAGE ENTRANCE

    LOADING DOCK

    INTERCONNECTING S

    ELEVATOR LOBBY

    COURTYARD

    CREDIT UNION

    CHILDCARE

    17THSTREET

    G STREET

    F STREET

    PART C: PRESENTATION C. RENDERED FLO

    3. SECOND LEVEL -

    OPEN OFFICE INTERCONNECTING STAIRENCLOSED OFFICE

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    57/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP SECOND LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    INTERCONNECTING STAIR

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    BASE OF ATRIUM

    PART C: PRESENTATION C. RENDERED FLO4. THIRD LEVEL -

    OPEN OFFICEENCLOSED OFFICE INTERCONNECTING STAIR

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    58/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP THIRD LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    ATRIUM

    PART C: PRESENTATION C. RENDERED FLO

    5. FOURTH LEVEL -

    OPEN OFFICEENCLOSED OFFICE INTERCONNECTING STAIR

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    59/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP FOURTH LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    ATRIUM

    PART C: PRESENTATION C. RENDERED FLO6. FIFTH LEVEL -

    OPEN OFFICEENCLOSED OFFICE INTERCONNECTING STAIR

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    60/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP FIFTH LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    OPEN OFFICE

    TEAM ROOM

    PANTRY

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    INTERCONNECTING STAIR

    ATRIUM

    PART C: PRESENTATION C. RENDERED FLO7. SIXTH LEVEL -

    OPEN OFFICEENCLOSED OFFICE

    LIBRARY

    INTERCONNECTING STAIR

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    61/122

    Open Office

    Private Office

    Shared Ame

    Circulation

    Floor Suppor

    Building Infra

    Existing Reta

    Building Sup

    Skidmore, Owings & Merrill LLP SIXTH LEVEL - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    CLOSED OFFICE

    TEAM ROOM

    PANTRY

    ELEVATOR LOBBY

    ELEVATOR LOBBY

    WORKROOM

    CONFERENCE ROOM

    CONFERENCE ROOM

    TEAM ROOM

    EMPLOYEE LOUNGE

    TERRACE

    INTERCONNECTING STAIR

    ATRIUM

    PART C: PRESENTATION C. RENDERED FLO

    8. ROOF PLAN - GREEN ROOF

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    62/122

    Skidmore, Owings & Merrill LLP

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM ROOF PLAN - PROPOSED SCALE: 1 = 40

    NEW CHILDCAREPLAY YARD

    NEW SKYLIGHTS TMATCH EXISTING

    NEW SKYLIGHTS TO

    MATCH EXISTING

    NEW SKYLIGHTS TOMATCH EXISTING

    GREEN ROOF

    GREEN ROOF

    GREEN ROOF

    NEW COVERED

    PLAY AREA

    ROOF TERRACE

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    63/122

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    64/122

    PART C: PRESENTATION D. RENDERED E

    3. EAST ELEVATION -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    65/122

    Skidmore, Owings & Merrill LLP EAST ELEVATION (17TH ST.) - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW CHILDCARE PLAY AREA WALL

    TO MATCH EXISTING LIMESTONE

    RESTORE LIMESTONE

    RESTORE LIMESTONE ATPENTHOUSE ENCLOSURE

    REHABILITATE MECHANICAL

    LOUVERS TO MATCH EXISTING

    RESTORE PRECASTCONCRETE COLUMNS

    AND SPANDRELS

    REHABILITATE EXISTINGGLAZING WITH HIGH-

    PERFORMANCE GLAZING

    REHABILITATE MULLION TOMATCH EXISTING

    NEW BRICK BASE TO MATCHCOLOR OF EXISTING BRICK

    NEW LOBBY LOW-IRON

    GLAZING

    EXISTING ELEVATOR

    OVERRUN

    PART C: PRESENTATION D. RENDERED E

    4. WEST ELEVATION -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    66/122

    Skidmore, Owings & Merrill LLP WEST ELEVATION - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    NEW CHILDCARE PLAY AREA WALLTO MATCH EXISTING LIMESTONE RESTORE LIMESTONE

    RESTORE LIMESTONE ATPENTHOUSE ENCLOSURE

    RESTORE PRECASTCONCRETE COLUMNS

    AND SPANDRELS

    REHABILITATE EXISTINGGLAZING WITH HIGH-

    PERFORMANCE GLAZING

    REHABILITATE MULLION TOMATCH EXISTING

    REHABILITATE MECHANICAL

    LOUVERS TO MATCH EXISTING

    EXISTING ELEVATOR OVERRUN

    PART C: PRESENTATION E. RENDERED

    1. WALL SECTION A

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    67/122

    Skidmore, Owings & Merrill LLP WALL SECTION AA (TYPICAL) - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM NOT TO SCALE

    EAST ELEVATION

    WALL SECTION AAENLARGED LOBBY CURTAIN WALL ELEVATION AA WALL SECTION AA

    REHABILITATE EXISTING GLAZING

    WITH HIGH-PERFORMANCE

    GLAZING

    RESTORE EXISTING

    CONCRETE COLUMNS

    REHABILITATE DARK BRONZEMULLION TO MATCH EXISTING

    MULLION WIDTH

    RESTORE EXISTINGCONCRETE SPANDREL

    REHABILITATE GUARD RAIL

    TO MATCH EXISTING

    PART C: PRESENTATION E. RENDERED

    2. WALL SECTION

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    68/122

    Skidmore, Owings & Merrill LLP WALL SECTION BB (LOBBY) - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM NOT TO SCALE

    WALL SECTION BBENLARGED LOBBY CURTAIN WALL ELEVATION BB

    EAST ELEVATION

    WALL SECTION BB

    NEW LOW-IRON GLAZING

    NEW BRICK BASE TO MATCH

    EXISTING BRICK COLOR

    NEW DARK BRONZE MULLION

    TO MATCH EXISTING MULLION WIDTH

    NEW DARK BRONZEC-CHANNEL

    NEW DARK BRONZEC-CHANNEL

    RESTORE EXISTINGLIMESTONE

    PART C: PRESENTATION F. RENDERED PER

    1. 17TH STREET VIEW

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    69/122

    Skidmore, Owings & Merrill LLP 17TH STREET VIEW - EXISTINGCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    2. 17TH STREET VIEW -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    70/122

    Skidmore, Owings & Merrill LLP 17TH STREET VIEW - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    3. VIEW FROM 17TH AND G

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    71/122

    Skidmore, Owings & Merrill LLP VIEW FROM 17TH AND G - EXISTINGCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    4. VIEW FROM 17TH AND G -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    72/122

    Skidmore, Owings & Merrill LLP VIEW FROM 17TH AND G - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    5. LOBBY EXTERIOR VIEW FROM 17TH

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    73/122

    Skidmore, Owings & Merrill LLP LOBBY EXTERIOR VIEW FROM 17TH - EXISTINGCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    6. LOBBY EXTERIOR VIEW FROM 17TH -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    74/122

    Skidmore, Owings & Merrill LLP LOBBY EXTERIOR VIEW FROM 17TH -PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    7. PLAZA PERSPECTIVE

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    75/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE - EXISTINGCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    8. PLAZA PERSPECTIVE 1 - FOUNTAI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    76/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE 1 - FOUNTAIN OPTION 1CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    9. PLAZA PERSPECTIVE 1 - FOUNTAI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    77/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE 1 - FOUNTAIN OPTION 2CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    10. PLAZA PERSPECTIVE 2 -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    78/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE 2 - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    11. PLAZA PERSPECTIVE 3 -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    79/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE 3 - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    12. PLAZA PERSPECTIVE 4 -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    80/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE 4 - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION F. RENDERED PER

    13. PLAZA PERSPECTIVE 5 -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    81/122

    Skidmore, Owings & Merrill LLP PLAZA PERSPECTIVE 5 - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART C: PRESENTATION G. MASS

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    82/122

    Skidmore, Owings & Merrill LLP MASSING MODEL

    17THSTREET

    GST

    REE

    T

    WIND

    ERBUILD

    ING

    NEW CHILDCAREPLAY AREA

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    83/122

    17th and G Street NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOSCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    84/122

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - STREET LEVELCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    2

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    85/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - FACADECFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    2

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    86/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - CFPB ENTRANCECFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    2

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    87/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - COURTYARDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    2

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    88/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - COURTYARDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    12

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    89/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - COURTYARDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    2

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    90/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - PUBLIC PORTALSCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    12

    3

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    91/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - STREET LEVEL RETAILCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1 23

    1 2

    3

    PART D: ADDITIONAL INA. EXISTING SI

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    92/122

    G STREET NW

    17THSTREETNW

    F STREET NW

    Skidmore, Owings & Merrill LLP EXISTING SITE PHOTOS - WINDER BUILDINGCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    2

    3

    1 2

    3

    PART D: ADDITIONAL INB. BUILDING COMPONENTS

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    93/122

    Skidmore, Owings & Merrill LLP BUILDING COMPONENTS DIAGRAMCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PERCEIVED STRUCTURE SOLID PLANES

    BRICK BASEGLASS INFILL

    PART D: ADDITIONAL INC. M

    1. LANDSCAPE MATERIALS PLAN -

    G STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    94/122

    Skidmore, Owings & Merrill LLP LANDSCAPE MATERIALS PLAN - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    17TH

    STREET

    F STREET

    PART D: ADDITIONAL INC. M

    2. LANDSCAPE MATERIALS -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    95/122

    Skidmore, Owings & Merrill LLP LANDSCAPE MATERIALS - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    PART D: ADDITIONAL INC. M

    3. EXTERIOR BUILDING MATERIALS -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    96/122

    Skidmore, Owings & Merrill LLP EXTERIOR BUILDING MATERIALS - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    LIMESTONE CHATSAWN TEXTURE(TO MATCH EXISTING)

    MULLION PAINT COLOR(TO MATCH EXISTING)

    HIGH PERFORMANCE GLAZING(TO REPLACE EXISTING + ADDITIONS

    2 - 7TH FLOOR)

    LOW IRON GLAZING(GROUND FLOOR)

    CONCRETE (TO MATCH EXISTING)LIMESTONE CHATSAWN TEXTURE(TO MATCH EXISTING)

    NEW BRICK (TO MATCH EXISTING)RESTORED SHOT SAWN FINISHLIMESTONE

    RESTORED CONCRETE

    NEW LOW-IRON GLAZING

    (GROUND FLOOR LOBBY)

    NEW HIGH PERFORMANCE GLAZING

    TO REPLACE EXISTING GLAZING(FLOORS 2-7)

    DARK BRONZE FINISH

    (TO MATCH EXISTING MULLION)

    RESTORED SHOT SAWN FINISHLIMESTONE

    PART D: ADDITIONAL IND. L

    1. LANDSCAPE FEATURES -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    97/122

    Skidmore, Owings & Merrill LLP LANDSCAPE FEATURES - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    35

    4

    1

    24

    PART D: ADDITIONAL IND. L

    2. LANDSCAPE FEATURES PLAN -

    G STREET

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    98/122

    1 Stainless Steel Security Bollard, TYP2 Liriope Ground Cover3 ID Pylon, TYP

    4 Existing Street Tree, TYP5 Existing Brick Paving to Remain6 Sunken Garden and

    Shallow Water Basin7 Evergreen Shrub8 Universal Access Path9 Table and Chairs, TYP10Shaded Seating11 Wooden Banquette Seating12 Flowering Shrub13 Limestone Stone Seat Wall14 Green Wall and Green Roof15 Raised Water Table

    16Sculptural Seating17 Flush Reflecting Skim Fountain18 Wetwall Down to Basement Level19 Covered Porch Canopy with Wisteria20 Bronze Kiosk21 Visitor Bike Racks22 Brick Paving to Match Existing23 Existing Winder Building24 Street Lamp

    226

    6

    13 13

    12

    12

    10

    9

    14

    7

    16

    3

    1515

    5

    1717

    19

    23

    20

    22

    21

    8

    18

    11

    Skidmore, Owings & Merrill LLP LANDSCAPE FEATURES PLAN - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SCALE: 1 = 40

    5

    17THSTREET

    F STREET

    PART D: ADDITIONAL IND. L

    3. ENLARGED PLAZA PLAN -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    99/122

    SKIM FOUNTAINCONCESSIONS

    KIOSK

    LIVING MACHINESHADED

    SEATING

    URBAN

    PORCH

    SUNKEN

    GARDEN

    Skidmore, Owings & Merrill LLP ENLARGED PLAZA PLAN - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM NOT TO SCALE

    PART D: ADDITIONAL IND. L

    4. ENLARGED PLAZA PLAN ALIGNMENTS -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    100/122

    Skidmore, Owings & Merrill LLP ENLARGED PLAZA PLAN ALIGNMENTS - PROPOSEDCFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM

    1

    GLASS RAILING BEYOND

    POLISHED CARNELIAN GRANITEWATER TABLE BEYOND

    PART D: ADDITIONAL IND. L

    5. PLAZA SECTIONS -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    101/122

    POLISHED CARNELIANGRANITE WATER TABLE

    GLASS RAILINGMOUNTED ON SLAB

    WET SPLIT FACECARNELIANGRANITE WALL

    PROPOSED SHADETREE, TYP.

    TABLES ANDCHAIRS, TYP.

    GREEN ROOF

    DARK BRONZEMETAL FINISHKIOSK

    EGRESS STAIRWAYBULKHEAD

    GREEN WALL

    EXHAUST VENT

    WATER BASIN

    PROPOSED SHADE TREE, TYP.

    LIMESTONESEATWALLTYP.

    TABLE AND CHAIRS, TYP.

    1. North South Plaza Section

    2. East West Plaza Section

    Skidmore, Owings & Merrill LLP

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM PLAZA SECTIONS - PROPOSED NOT TO SCALE

    3

    WINDER BUILDING BEYONDGREEN WALL GREEN ROOF

    PROPOSEDSHADE TREE

    PART D: ADDITIONAL IN

    D. L5. PLAZA SECTIONS -

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    102/122

    WINDER BUILDING BEYOND

    SIGNAGE PYLON TO MATCHEXISTING DARK BRONZE

    SHALLOW SPLASHBASIN BEYOND

    POLISHED CARNELIANGRANITE WATER TABLE

    RAISED LIMESTONE GARDENAND TREE PLANTER

    PROPOSED TREE

    EXISTING STREET TREE

    BRICK TO MATCH EXISTING

    G LA SS WI ND OW D AR K B RO NZ EMETAL FINISH KIOSK

    BRICK PAVING ANDSTEPS TO MATCHEXISTING

    WOOD DECK

    DARK BRONZEMETAL TRELLISSTRUCTURE

    3. North South Plaza Elevation

    4. 17th Street Entry Steps

    Skidmore, Owings & Merrill LLP

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM PLAZA SECTIONS - PROPOSED NOT TO SCALE

    6

    5

    POLISHED CARNELIANGRANITE WATER TABLE

    PART D: ADDITIONAL IN

    D. L6. PLAZA SECTIONS - FOUNTA

  • 8/12/2019 CFPB building project submission to the National Capital Planning Commission

    103/122

    GLASS RAILINGMOUNTED ON SLAB

    POLISHED CARNELIANGRANITE WATER TABLE

    GLASS RAILINGMOUNTED ON SLAB

    WET SPLIT FACECARNELIAN

    GRANITE WALL

    GREEN WALL

    WET SPLIT FACECARNELIANGRANITE WALL

    WET POLISHEDCARNELIANGRANITE

    WATER BASIN

    5. East West Sunken Courtyard Section

    6. North South Sunken Courtyard Section

    Split face stonewater wall rises outof sunken courtyard

    Water over split face stonecreates pleasant sound

    WATER BASIN

    Skidmore, Owings & Merrill LLP

    CFPB Headquarters Renovation

    Washington, DCNCPC Project Plans Preliminary Submission

    Consumer Financial

    Protection Bureau

    SOM SUNKEN COURTYARD SECTIONS - FOUNTAINOPTION 1

    6

    5

    FORMATION OF 1/2"BRONZE RODS IN A GRIDAT 5" O.C.

    PART D: ADDITIONAL IN

    D. L7. SUNKEN COURTYARD SECTIONS - FOUNTAI