CFOT Outline
-
Upload
yona-andegelile -
Category
Documents
-
view
222 -
download
0
Transcript of CFOT Outline
8/3/2019 CFOT Outline
http://slidepdf.com/reader/full/cfot-outline 2/6
ADMINISTRATION/INSTRUCTIONAL STAFF/PERSONNEL QUALIFICATIONS:
Francis Njuguna- Director/ Instructor
Francis has vast experience working and training under the International brotherhood of electrical workers Un
Local 5959th district California USA- Sound and Communications.
He has trained IT Managers, Installers, Apprentices and Customer on different techniques of termination,
cable management and troubleshooting Fiber Optics out in the field.
QUALIFICATIONS:
• Graduated from the International Brotherhood of electrical workers/ National Electrical Contractors
Association (IBEWINECA) - Foothill College California
• National Joint Apprenticeship Training Committee Sound and Communication Instructor
CERTIFICATIONS:
• BICSI (Building industry consulting service international)- Registered cabling Installer level 1 and 2• IBEWINECA- Integrated Building Systems Project Supervision Certification
• FLUKE NETWORKS.
• Certified Cabling Test Technician for Optifiber OTDR.
• Certified Cabling Test Technician for DSP-4000 series.
• Certified Cabling Test Technician for DTX Cable Analyzer.
• BOSCH SECURITY SYSTEM- G series Control Communicator Certification.
• STATEOF CALIFORNIA -Fire Alarm and life Safety Technician license.
• MICROSOFT NT 4.0- Networking Essentials, Ms Windows Server, Ms Windows
• Workstation
• OSHA 10 JOBSITE SAFETY CERTIFICATION.
• BASIC FIRST AID, CPR AND AED CERTIFICATION.
• Fiber Optics Association (Certified Fiber Optics Technician Certification! AFOT/S/Instructor).
AWARDS:
• California State Senate 2006 Outstanding Apprentice award North California Sound and
Communications Apprenticeship program.
8/3/2019 CFOT Outline
http://slidepdf.com/reader/full/cfot-outline 3/6
SESSIONS/ CLASS SCHEDULE
Day 1 Day 2 Day 3 Day 4 Day 5
Session 1. Session 5. Session 7. Session 9. Session 11
Basic Fiber Theory Mechanical Fusion Splicing Hands on Testing Designing the cable
Termination and Plant, Estimating,
Splicing Installation
Session 2. Session 5. Session 7. Session 9. Session 11.
Fiber Optics Mechanical Fusion Splicing Hands on Testing Designing the cable
Networks Termination and Plant, Estimating,
Splicing Installation
Session 3. Session 6. Session 8. Session 10. Session 12.
Cables Hands on Testing- Basic Testing OTDR Wrapup/ Q&A/
Termination Review.
Session 4. Session 6. Session 8 Session 10. Session 13
Hands on Cables Cont. + Testing Testing- Insertion Hand on OTDR Certification testing
Termination Loss (simulator)
8/3/2019 CFOT Outline
http://slidepdf.com/reader/full/cfot-outline 4/6
2011 Training Profile
CFOT- Curriculum.
Module 1 Introduction to Networks Module 2 Alight Overview Module 3 Fiber
Network Function Light Language
Transmission Types
Topologies
Components
The Fiber NetworkReview Questions
Behavior
Light Properties
Review Questions
Structure
Types and Characters
Performance
Review Questions
Structure
Types
NEC Compliance
Dielectric Design
Installation Characteristics
Standards
Review Questions
Module 6 Splices
Locations
Types
Structure
Performance
Review Questions
Function Structure
Performance
Connector Features
Types
Installation Methods
Review Questions
Function Structure
Performance
Connector Features
Types
Installation Methods
Review Questions
Module 7 Passive Devices Module 10 Cable Installation
Two Installation Concerns Principles
Couplers Introduction
Splitters Environmental Limits
Wavelength Division Demultiplexer Installation Limits
Review Questions Cable Placement
Planning and Management
IssuesSafety Issues
End Preparation
Module 8 0 toelectronicsInstallation Concern
Transmitter Types
Performance Characteristics
Summary
Review Questions
Module 11Connector Installation Princi~les -Introduction; Cable-Enclosure Compatibility
Attachment Locations; Attachment
Tray Preparation; Fiber End PreparationCleaving; Fusion Splicing; Mechanical Splicing
Fiber Placement; Tray Placement
TestAll Splices; Enclosure Closure
Summary; Review Questions
Module 9 HardwareFunctions
Types
Summary
Review Questions
Summary
Review Questions
Introduction
Cable End Preparation
AdhesivesEnd Finishing
Cleave and Crimp Installation
Summary
Review Questions
Module 12 S~licing Princi~les -
8/3/2019 CFOT Outline
http://slidepdf.com/reader/full/cfot-outline 5/6
2011 Training Profile
Module 13 Testing Principles Module 14 Certification Principles Module 15 Cable Preparation
Introduction
Insertion Loss Testing
Optical Domain Reflectometer
Reflectance Testing
Protocol Testing
Other EquipmentStandards
Review Questions
Introduction
Required Information
Insertion Loss Calculations
Develop Of a Strategy
Certification
An Alternative StrategySummary
Review Questions
Introduction; Tools and
Supplies; Fiber Handling
Loose Tube End Preparation
for Pulling; Tight Tube End
Preparation for Pulling
Loose Tube End Preparationfor Termination; Tight End
Preparation for Termination
Open Page Summary
Module 18 Connectorodule 16 Connector Module 17 Connector
Installation: Epoxy
Introduction
Materials and Supplies
Procedure
TroubleshootingSummary
INSTALLATIONS: Quick Cure
Adhesive
Introduction; Materials and
Supplies
Procedure; Single Mode PolishingFinal Cleaning; Inspect Connector
White Light Test; Final Assembly
Troubleshooting; Summary
Installation: Hot Melt
Adhesive
Introduction; Materials and
Supplies
Procedure; Final CleaningInspect Connector; White
Light Test
Salvage; Trouble Shooting
One Page Summary
Module 19 Connector Module 20 Connector Installation: Module 21 Connector
Installation: Cleave and Crimp
# 1
Introduction
Tools and Supplies
Procedure
Troubleshooting
Summary
Cleave and Crimp # 2
Introduction
Tools and Supplies Required
SC Procedure
ST Compatible Procedure
Test Loss
Troubleshooting
Summary
Inspection
Applicability
Equipment Required
Procedure
Trouble Shooting
Module 22 mid Span Splicing Module 23 Pig Tail Splicing
Introduction; Tools and Supplies Required
Cable End Preparation; Enclosure Preparation
Cable Attachment; Buffer Tube Attachment
Fiber Length Verification; OTDR Set Up
Splicing; Test Loss
Fiber Coiling; Buffer Tube Coiling
Tray Attachment; Enclosure Finishing
Trouble Shooting; Summary
End Preparation; Enclosure Preparation
Cable Attachment; Buffer Tube Attachment
Fiber Length Verification; OTDR
Splicing; Test Loss
Fiber Coiling; Buffer Tube Coiling
Enclosure Tray Attachment; Enclosure
Finishing
Troubleshooting; Summary
8/3/2019 CFOT Outline
http://slidepdf.com/reader/full/cfot-outline 6/6
2011 Training Profile
Module 24 Ribbon Splicin
Introduction; Tools and Supplies Required
Cable End Preparation; Enclosure
Preparation
Enclosure Preparation; Cable Attachment
Furcation Tube Attachment; Fiber Length
Verification
OTOR Set Up; Fusion Splicing
Process Completion; Troubleshooting
Summary
Module 25 A endices
Indices of Refraction
Glossary
Acronyms
Chapter 12Answers
Chapter 14Answers