Cfms project (asrc)

14
Presented by Michael Davies CFMS-ASRC Business Manager CFMS-ASRC Bristol, September 2011

description

 

Transcript of Cfms project (asrc)

Page 1: Cfms project (asrc)

Presented by Michael Davies CFMS-ASRC Business Manager

CFMS-ASRC

Bristol, September 2011

Page 2: Cfms project (asrc)

advanced simulation research centre

Page 3: Cfms project (asrc)

TRANSFORMING SIMULATION What is CFMS?

“CFMS is an independent, not-for-profit organisation, committed to

accelerating the delivery of more intuitive and powerful design

processes.”

Page 4: Cfms project (asrc)

Rolls-Royce data-strictly private

CFMS Limited

• A not for profit company, limited by guarantee has been established to manage delivery of the CFMS Vision via the CFMS Framework*

• The company is known as CFMS Ltd

• Member Companies are: • Airbus

• BAE Systems

• Frazer-Nash Consultancy

• MBDA UK

• Rolls-Royce

• Williams F1

• Activities carried out by CFMS Ltd include: • Technology road-mapping

• Project scoping and facilitation

• Project management support

• Facilities provision

• All services are available to organisations beyond the Member companies of CFMS Ltd

The CFMS Framework is a co-ordinated programme of research and technology deployment projects, the scope of which has been defined to achieve the CFMS Vision

*

Page 5: Cfms project (asrc)

TRANSFORMING SIMULATION

Advanced Simulation Research Centre

Created to challenge our perceptions of a

“traditional working environment”

• On-site HPC cluster

• IT Lab (flexible infrastructure)

• Visualisation suite

• Integration room

• Collaborative working areas

• Hot-desking and touchdown-desking

• Meeting rooms & conference facilities

• Break-out areas

“An inspiring and stimulating environment to encourage collaboration and

innovation, alongside the cutting-edge facilities required to support the

development and demonstration of the latest technologies”

Page 6: Cfms project (asrc)

TRANSFORMING SIMULATION

Associates Scheme

Primary method of CFMS engagement

Brings together end users, technology developers

and researchers

Unique programme of activities to improve

awareness and identify longer-term developments

• Best practice exchange

• Road-mapping

• Demonstrations

• Networking

• Forums

• Technical notes/white papers

• Newsletters

“Introduce organisations to technologies and methodologies which will make their

design processes quicker, cheaper and more effective”

Page 7: Cfms project (asrc)

October 2010

7

Page 8: Cfms project (asrc)

Facility elements

Capability Lab a facility to support collaborative research & development

HPC – High Performance Computer

IT laboratory a facility to support R&D in emerging IT architectures

Page 9: Cfms project (asrc)

An open plan office space, with flexible partitioning

Focus on supporting CFMS programmes and methods

developments

Front office:

Desktop clients with docking stations for ‘approved’ laptops

Wireless internet access,

Wired access to HPC and IT Lab

Visualisation/Integration/Conferencing/Meeting Rooms

Back office servers:

18 Xeon-based severs (development, code, email,…etc)

3.6TB storage

Software stacks

Capability Lab

Page 10: Cfms project (asrc)

HPC

2880 core clusters – latest Nehalem (six-core) chipset

- Fast file server : 60TB usable

- QDR IB interconnect, 40Gbps bandwidth

- IBM iDataPlex, with water-cooled rear doors

1440 cores Rolls-Royce, 720 cores Airbus, 720 cores third-party

Head/login nodes

2 x PostProcessing-nodes

2 X Visualisation nodes, with Nvidia Quadroplex 2200S4 GPUs

OS: RHE v5.4

Scheduler: SunGridEngine

Page 11: Cfms project (asrc)

Rolls-Royce data-strictly private

Facility floor plan

*

Ground Floor Layout

ITLab HPC

v

vv

v Venus Integration

Room Mars Visualisation

Zone

Game Zone

Break-out Zone

15

16

17 18 19 20

22

21

23 24

Venus Integration

Room

Mars Visualisation

Zone

Max capacity = 25 people (8 people in baseline layout)

Max capacity = 25 people (12 people in baseline layout)

Page 12: Cfms project (asrc)

Rolls-Royce data-strictly private

Facility floor plan

*

First Floor Layout

CFMS

ASRCASRC

ASRCASRC

Saturn Room

Jupiter Room

Mercury Room

Neptune Room

Transit Zone

5

6

4 3

1 2

Neptune Room

Mercury Room

Saturn RoomJupiter Room Transit Zone

7

8

9

Max capacity = 40 people in seminar room layout (24 people in training room layout)

Max capacity = 25 people in seminar room layout (16 people in training room layout)

Max capacity = 20 people in seminar room layout (6people with baseline layout)

Max capacity = 14 people in seminar room layout (4people +2 desks with baseline layout)

Capacity = 6 people with baseline layout

10

11

12

13 14

Page 13: Cfms project (asrc)

Rolls-Royce data-strictly private

Organisation

Member Organisations

RR, Airbus, Williams F1, Fraser Nash, MBDA, BAE

CFMS Board

B Barzegar, I Martindale, P Best, N Buckland, A Burns, G Gapper, B Davis

ASRC Board

Martin Aston

Frank McQuade

Carolyn Webb

Andy Williams

Implementation

Manager

Mike Davies

Business Manager

Zoe Thorne

Administrator

Neil Whyld Paul Edwards

Outreach Manager Technical controller Operations/Facilities

Nathan Harper

IBM Support

Page 14: Cfms project (asrc)

Thank you for your attention