r-
~.
'l1ffif WGfiRqovemment of India~~~=~cfJ{;t~W:~
Western Regional Power Committee~-3, ~~~~(,!,<),~-400093
F-3, MIDC Area, Andheri (East), Mumbai - 400 093~ Phone: 022- 28250004, 28221681;28200194;28200195;~ Fax: 022 - 28370193
Website: www.wrpc.gov.in E-mail: [email protected]
~
.~ ~'3TI g 9001-2008ISO: 9001-2008
~ : ~ ICllfOlfV:<:ICb-I/~ I~ Cblc:ltr~"112018/No. : WRPC/Comml.-I/CCM/Supp. Agenda/2018 I
Wrr1f ITa
~ : 17.07.2018Date: 17.07.2018
As per List (~cfi ~)
~/Sir,
Sub : Supplementary Agenda notes for 78th Commercial Committee Meeting(Item No 18).
~ q;r cfim~~ 19 107 12018 c€r 11800 ~, ~ ~, "Cf 1 ~ 1 fcr 1 ~, ~~
~, ~mr~, ~ 1fm cmrIT, CllfOlfV:<:ICb~ tt 78clT ~ tt ~ Cblc:ltrrj)~
~ ~ \3lTCl"~?:[q) ~ ~ ~ ~ 1 ~ ~ If m<rW1~ ~ aqUu fcf;<:rr \;fRfT ~ I
~~~~~ ~ajfll$OC: www.wrpc.nic.in1R~U~. ~'5I\3'1~il'5 ~I
Please find enclosed herewith Supplementary Agenda Notes for the 78th
Commercial Committee Meeting of WRPC to be held on 19.07.2018 at 11 :00 Hrs at
WRPC Secretariat, Mumbai . This is for your information and necessary action.
The Agenda notes for the meeting is
www.wrpc.nic.in, same may please be downloaded.
available on website
~ / Yours' faithfully.~
111011 \g(K. B. Jaqtap)
~~ ~ (CllfOlfV:<:ICfi)/ Superintending Engineer (Comml.)
Mailing list for 78th CCM
1. Executive Director (Finance), Gujarat Urja Vikas Nigam Ltd., Vadodara-390 0072. Chief Engineer (LD), Gujarat Energy Transmission Corpn. Ltd., Vadodara- 390 0213. Chief General Manager (Comml), MP Power Management Co.Ltd., Jabalpur-482 0084. Chief Engineer (LD), M P Power Transmission Company Ltd.,SLDC, Jabalpur 482 008.5. Chief Engineer (Comml), Chhattisgarh State Power Distribution Co. Ltd., Raipur – 492 0136. Chief Engineer (LD), Chhattisgarh State Power Transmission Co. Ltd., Bhilai-490 024.7. Chief Engineer (PP), Maharashtra State Electricity Distribution Co. Ltd., Mumbai-400 0518. Chief Engineer (LD), State Load Despatch Centre, MSETCL, New Mumbai - 400 7089. Chief Electrical Engineer, Panjim, Goa-403 00110. Executive Engineer, Electricity Department, Daman-396 21011. Executive Engineer (Elect),Electricity Department, Silvassa-396 23012. Addl. General Manager (Comml), Nuclear Power Corpn. of India Ltd., Mumbai-400 09413. General Manager (Comml), NTPC Ltd., New Delhi-110 00314. Regional Executive Director (West), NTPC Ltd., Mumbai-400 09315. General Manager (Com. & CP), NTPC SAIL Power Co. Pvt. Ltd., New Delhi -110 06616. Executive Director (Comml), PGCIL, Gurgaon, Haryana-122 00117. General Manager, WRTS-I, PGCIL, Nagpur-440 02618. Addl. General Manager (Comml), WRTS-I, PGCIL, Nagpur-440 02619. Executive Director, POSOCO,WRLDC, Mumbai-400 09320. Dy. General Manager (Comml), Ratnagiri Gas & Power Pvt. Ltd., Mumbai-400 09321. Vice President, Adani Power Limited, Ahmedabad – 38001522. Addl. Chief Engineer (R & C), Gujarat Energy Trans. Corpn. Ltd., Vadodara-390 00723. Chief Engineer (Trans. O&M), MSETCL, Mumbai-400 05124. General Manager (Comml), LANCO Amarkantak Power Private Ltd., Gurgaon – 122 01625. Member(Power), Narmada Control Authority, Indore.-452 01026. Vice President, Jindal Power Ltd., Tamnar, Raigarh, Chhattisgarh – 496 00127. Executive Director (Comml), Torrent Power Ltd., Ahmedabad- 380 00928. AVP(Power Trading),GMR Energy Trading Ltd., Bangalore-560 029.29. DGM Finance, CGPL, UMPP Mundra, Kutch-370 435.30. AGM(O&M/O&E) Ratnagiri Gas and Power Pvt Limited PO: Anjanvel, Taluka: Guhaghar
Disstt: Ratnagiri ( Maharastra) - Pin 41570331. Vice President (Powe CG) ACB India Ltd., 2*135 MW Kasaipali Power Project, Kasaipali, P.O.-
Jawali, Tehsil-Katghora, Korba –chhatisgarh-49544532. GM (O&M)Bharat Aluminium co. Ltd (BALCO), P.O. Balco Nagar, Distt. Korba -495684
Chhattisgarh33. AGM(F&A), DCPP JSPL, Dongamahua captive power plant(4*135 MW), Dhaurabhata(PO)
Raigarh-496107 (CG).34. Director, Jaypee Bina Thermal Power Plant, village sirchopi, Agasod P.O. Bina-470113 Distt.
Sagar(MP)35. Sr. Vice President (EPMPL), Essar Power MP Limited, Thana road, Near Chunkumari stadium,
Waidhan, Dist. Singrauli (MP)-486886.36. Vice-President, ACB India ltd. 7th floor , Corporate house, Ambience tower, National highway
Gurgaon-122001 Haryana.37. Sasan Power limited, Dhirubahi ambani knowledge city, 1 block, 2nd floor, north wing, Thane
belapur road, Navi Mumbai-400710.38. KSK Mahanadi Power CO. LTD, 8-2-293/82/A/431/A, Road no 22, Jubilee hills, Hyderabad-
50003339. Plant Head,GMR EMCO Energy ltd. B1, MIDC, Growth centre, Warora-post Chandrapur-
dist,Mahrashtra-44290740. Vice president(Comml.), Vandana Vidhut ltd., Vandana Bhavan, M.G. Road, Raipur-492001-CG41. Korba west power co. Limited, village chhotte bhandar, P.O. Babe Bhandar,Tehsil Pussore Dist.
Raigarh, chhattisgarh-49610
42. Ms. D B Power Ltd., 3rd floor, Naman corporate link, C-31, G-block, BKC Bandra eastMumbai-400051
43. Vice President-Power Infrastructure Plant- B MRSS, Essar Steel Ltd 27th km, Surat HaziraRoad,Surat-394270 Gujarat
44. Jaypee Nigrie Super Thermal Power Project( A Unit of Jaiprakash Power Ventures Limited )Vill-Nigrie, Tehsil- SaraiDistt.- Singrauli, MP-486669
45. GM-Coordination, Dhariwal Infrastruture LtdCESC ltd,CESC House, ChowringheeSquare,Kolkata-700001
46. Chief General Manager, RKM Powergen pvt ltd, Village Uchpinda, PO Dhurkot, Via chandrapur,Tehsil- Dabra, Janjgir-Champa dist, Chhattisgarh-495692.
47. GM (Operations)MB Power (Madhya Pradesh) LimitedHotel Govindam, Kotma Road,Anuppur,Madhya Pradesh – 484224
48. Head Project, Jhabua power ltd, Vill. Berela, post Attariya, Tehsil Ghansore, Dist-Seoni-480997(MP).
49. Sr. Vice-President (Power)TRN Energy Pvt ltd.18, Vasant EnclaveRao tula ram margNew Delhi-110057
50. Member Secretary, Northern Regional Power Committee, New Delhi 110 01651. Member Secretary, Southern Regional Power Committee, Bangalore 560 00952. Member Secretary, Eastern Regional Power Committee, Kolkata-700 03353. Member Secretary, North Eastern Regional Power Committee, Shillong 793 30354. Chief Engineer (GM), Central Electricity Authority, New Delhi –110 066.
Item no.18: Any other Item – Following additional items are received for
discussion/noting in the 78th CCM -
18.a. Correction of Time drift in energy meters
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that time drift
in Energy meters may result in computational errors in energy accounts. As per the
technical specifications of SEM, the DCD could be used to carry out corrections in SEM
clock by accelerating /retarding the SEM clock by 1min / week. The list of meters where
time drift has been reported / observed is enclosed as Annex-18.a
Concerned utilities to check the meter clock every week and
retard/advance the clock if required. The procedure for time drift correction
through DCD in L&T, Secure and Elster Meters is enclosed.
POWERGRID is carrying out testing of SEMs which are more than 5 years
old. Time drift correction in the SEM could be done along with the testing
of meters.
Committee may like to discuss
18.b. Submission of Test Reports of Special Energy Meters in Western
Region
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that WRTS-II
vide its letter ref. no. WRTS-II/VDR/AM/SK/260/1002 informed that testing of SEMs
more than 10 years old has already taken up. It was understood that the testing has
already completed at various locations in WR-2. POWERGRID to share the Meter Test
Report with the concerned beneficiaries as well as with WRPC and WRLDC.
Committee may like to discuss
18.c. Relocation of Check meters for ISGS evacuated through dedicated
lines
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that the
redundancy of interface energy metering of ISGS evacuating through dedicated lines
was reviewed. It was observed that even after removal of interim LILO of ISTS lines /
commissioning of dedicated lines, the check meters are yet to be shifted from the
Generating station to the interface points (at POWERGRID substation). Vide letter ref.
no. WRLDC/SO/Metering/774-90 dtd. 03.07.2018, WRLDC has advised relocation of
meters for twelve generating stations (IPPs). The list is enclosed as Annex-18.c. This
relocation is essential for ensuring redundancy of measurement and for better validation
of main meter data (at the interface point) used in energy accounting.
Concerned Utilities to update the progress.
Committee may like to discuss
18.d. Revision in metering points at Solapur (PG) for computation of
MSEDCL drawal
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that the
present metering philosophy at Solapur (PG) is as below:
At present, active energy drawal of Maharashtra from Solapur (PG) is computed through the
summation of ISTS elements (10 in nos.) at the 400 kV bus (i.e.
M1+M2+M3+M4+M5+M6+M7+M8+M9+M10) (total 10 meters)
It is proposed that Maharashtra active energy drawal at Solapur (PG) may be computed from
the summation of drawal through ICT-1, ICT-2, ICT-3, 400 kV Solapur-Solapur (Lamboti) line
and Statcom auxiliary drawal (i.e. = S17+S11+S12+S13+S18) (Total – 5 meters). As total no. of
meters will be half as that in present scenario, the meter error will be minimized. Commercial
Committee to endorse
1. Installation of one standby SEM on 400 kV Solapur-Lamboti line at Lamboti end
2. Revision in the formula for computing MSEDCL drawal (Active & Reactive) from
Solapur (PG)
Committee may like to discuss
18.e. Inclusion of SEMs on tertiary winding for computation of reactive
Energy drawal
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that back up
station supply at several POWERGRID substations is through the tertiary winding of
765/400 kV. The discom of the host State has also installed their energy meters for billing.
The SEMs installed on the tertiary side of the ICT are already added in the active energy
reports of the respective state. Committee may deliberate on the inclusion of SEMs
installed on tertiary side in computation of Reactive Energy Drawal.
Sr. No. Meter ID Description Reactive Report
1 NP-9212-A
33KV Tertiary side of 400/220/33KV ICT-1 at Durg(Raipur-PS)
CS
2 NP-9213-A
33KV Tertiary side of 400/220/33KV ICT-2 at Dharamjaygarh(PG)
CS
3 NP-5548-A
38.5 KV side of STATCOM Auxiliary transformer at SATNA
MP
4 NP-9897-A
38.5 KV side of STATCOM Auxiliary transformer at Aurangabad
MH
5 NP-8976-A
33 kV side of 765/400 kV ICT-2 at Warora (PG)
MH
6 NP-2319-A 11kV supply-1 from MSEB at Bhadravathi MH
7 NP-4216-A 11kV supply-2 from MSEB at Bhadravathi MH
Committee may like to discuss
18.f. Re-installation of SEM meter at tertiary side of 765/400/33 kV ICT-2 at
Warora (PG)
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that SEM
(NP-8976-A) installed at the 33 kV side of the 765/400/33 kV ICT-2 (used in
Maharashtra drawal) was removed by MSEDCL/Warora(PG) on 19.06.18 without taking
permission from WRLDC metering department. After removal of SEM, the energy drawn
from tertiary at Warora could not be added to Maharashtra drawal due to non-availability
of data.
It is required that SEM shall be reinstalled so that energy drawn by Warora (PG) for
meeting local substation demand may be added to Maharashtra drawal. MSEDCL has
already installed their own meter to bill Warora (PG) for this drawal.
MSEDCL / POWERGRID to take corrective action.
Committee may like to discuss
18.g. Installation of standby energy meters at Seoni, Kanhan and Mansar
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that WRLDC
vide its letter dated 03.01.18 had advised for installation of check meter at Pench HPS
and Standby meter at remote end. The check meters had been installed at Pench statin
by POWERGRID and main meters have been replaced with new meters as per the
following details.
Sr.No. Element name Main Meter Check Meter Standby meter 1 132kV Seoni line-1 at Pench Replaced (NR-3955-A) Installed (NR-3956- - 2 132kV Seoni line-2 at Pench Replaced (NR-4321-A) Installed (NR-3954- - 3 132kV Kanhan line at Pench Replaced (NR-3918-A) Installed (NR-3965- - 4 132kV Mansar line at Pench Replaced (NR-3957-A) Installed (NR-3962- - 5 132 kV Pench line-1 at Seoni - - To be installed 6 132 kV Pench line-2 at Seoni - - To be installed 7 132 kV Pench line at Kanhan - - To be installed 8 132 kV Pench line at Mansar - - To be installed
POWERGRID to apprise the CCM regarding the plan for installation of standby
energy meters at Seoni, Kanhan and Mansar end.
Committee may like to discuss
18.h. Interface Energy Meter Data Discrepancies
WRLDC vide email dated 17.07.18 (copy enclosed at Annex 18) informed that the
discrepancy report of SEMs is being forwarded to WRPC secretariat every week along with
the processed energy meter readings. These details are also posted on the WRLDC
website. The summary of these discrepancies is provided below:
a. 400kV side of ICT-2 at Aurangabad(PG)
The energy meter (NP-8716-A) data of 400kV side of ICT-2 at Aurangabad(PG) was corrupt
for the period 02.04.18 to 30.05.18. Therefore, 400 kV side data was replaced with the 220
kV side standby meter data.
b. 400kV Kansari Line-1 at Veloda
The energy meter (GJ-2971-A) data of 400kV Kansari Line-1 at Veloda was under recording
for the period 26.03.18 to 21.04.18. Therefore, Veloda end data was replaced with the
standby meter data at Kansari end.
c. 400kV Shujalpur line-1 at Nagda
The energy meter (NP-4229-A) of 400kV Shujalpur line-1 at Nagda, was under-recording for
the period 09.04.18 to 07.06.18. Therefore, Nagda end data was replaced with the standby
meter data at Shujalpur end.
d. 400kV GMR Warora line-1 at Bhadrawati
The energy meter (NP-2648-A) of 400kV GMR Warora line-1 at Bhadrawati was under-
recording for the period 26.04.18 to 25.05.18. Therefore, Bhadrawati end data was replaced
with the standby meter data at GMR Warora.
e. 400kV side of 400/220kV ICT-2 at ITARSI(PG)
The energy meter (NP-6222-A) data of 400kV side 400/220kV ICT-2 at ITARSI(PG) was
under-recording for the period 30.04.18 to 06.05.18. Therefore, 400kV side data was
replaced with the standby meter data at 220kV side of Itarsi ICT-2.
f. 400kV side of ICT-4 at Boisar(PG)
The date in the energy meter (NP-5511-A) of 400kV side 400/220kV ICT-4 at Boisar(PG)
was wrong for the period 04.05.18 to 21.05.18. Therefore, 400kV side data was replaced
with the standby meter data at 220kV side of Boisar ICT-4.
g. 400kV Bhadravati line-1 at Chandrapur
The energy meter (NP-2412-A) of 400kV Bhadravati line-1 at Chandrapur was under-
recording for the period 21.05.18 to 27.05.18. Therefore, Chandrapur end data was replaced
with the standby meter data at Bhadrawati end.
h. 220kV Korba line-3 at Budhipadar
The energy meter (NP-5944-A) of 400kV Korba line-3 at Budhipadar was under-recording
for the period 28.05.18 to 05.06.18. Therefore, Budhipadar end data was replaced with the
standby meter data at Korba end.
i. Other Stations with discrepancy of less than one week
The other Stations where meter related discrepancies were observed for a week/ less than 1
week are tabulated below for kind information of members:
S.No SEM ID Date Location Feeder/ICT Remarks
1 NP-5592-A 26.03.18 to
01.04.18 VSTPS-IV
400kV side of Vidhyachal (PS) ckt-III
Zero recording by both main & check meter.
2 GJ-2971-A 26.03.18 to
01.04.18 Veloda 400kV Zerda(kansari) line-1
Under recording (Action : Veloda)
3
NP-8918-A
02.04.18 Tamnar(PS)
400kV Trn Energy Line 2
Under recording (Action : Tamnar(PG)
S.No SEM ID Date Location Feeder/ICT Remarks
4 NP-5439-A
02.04.18
Nicole-2(Torrent)
400kV Dehgam Line
Wrong CT Polarity was Corrected
5 NP-5432-A 02.04.18
Nicole-2(Torrent)
400kV Pirana Line
Wrong CT Polarity was Corrected
6 NP-2115-A
04.04.18
Vindhyachal(PS)
400kV Line-1 to HVDC
Under recording (Action :Vindhyachal)
7 NP-5748-A 04.04.18 Gwalior
400kV Side Of ICT-1
Under recording (Action:Gwalior)
8 NP-5748-A 05.04.18 Gwalior
400kV Side Of ICT-1
Under recording at HV Side.Due to incorrect data of LV Side of ICT(due to mater testing), data replaced with ICT-2 data)
9 NP-6366-A 06.04.18 Gwalior 765KV Agra Line-2 Meter Testing At Gwalior.
10 NP-5755-A 10.04.18 Gwalior
765KV Jaipur(Phagi_NR) line 1
Under recording due to meter testing at Gwalior.
11 NP-5750-A
10.04.18
Gwalior
765KV Jaipur(Phagi_NR) Line-2
Under recording due to meter tesing.
12 NP-8918-A 09.04.18 to
10.04.18 Tamnar(PS) 400kV TRN Energy line-2
Faulty meter at Tamnar PS(PG) relaced on 10.04.18
13 NP-6420-A 19.04.18 Pirana(PG) 400kV Side of ICT-1
Meter testing at Pirana end. 220KV Side of ICT-1 under recording for past couple of months. Therefore, SEM data of 400kV side of ICT-2 used.
S.No SEM ID Date Location Feeder/ICT Remarks
14 NP-2631-A 27.04.18 Bilaspur 400kV ACBIL Line-1 Under-recording Action: Bilaspur (PG)
15 NP-6419-A 28.04.18 Pirana(PG) 400kV Side of ICT-2 Meter Testing at Pirana
16 NP-6312-A 28.04.18 Bhatapara(PG) 400kV Side Of ICT-1 Under recording Action: Bhatapara(PG)
17 NP-5720-A 28.04.18 Bhatapara(PG) 400kV Side Of ICT-2 Under recording Action: Bhatapara(PG)
18 NP-5748-A 01.05.18 Gwalior(PG) 400kV Side Of ICT-1 Under recording Action: Gwalior(PG)
19 NP-6432-A 01.05.18 Pirana(PG) 400kV Pirana(TPL) Line-2
Meter Calibration was done
20 NP-6431-A 02.05.18 Pirana(PG) 400kV Pirana(TPL) Line-1
Meter Calibration was done
21 NP-6383-A 07.05.18 Vadavi(GETCO) 400kV Veloda Line Under recording Action:GETCO
22 NP-6346-A 08.05.18 Vadavi(GETCO) 400kV Zerda(Kansari) Line-2 Under recording Action:GETCO
23 NP-6424-A 09.05.18 Vadavi(GETCO) 400kV Bhachau Line-1 Under recording Action:GETCO
24 NP-6425-A 10.05.18 Vadavi(GETCO) 400kV Bhachau Line-2 Under recording Action:GETCO
25 NP-6381-A 11.05.18 Kansari(Getco) 400kV Kankroli line-1 Under recording Action:GETCO
26 NP-6382-A 12.05.18 Kansari(Getco) 400kV Kankroli line-1 Under recording Action:GETCO
27 NP-6226-A 14.05.18 Zerda(Kansari) 400kV Vadavi Line-1 Under recording Action:GETCO
28 NP-6348-A 15.05.18 Zerda(Kansari) 400kV Vadavi Line-2 Under recording
S.No SEM ID Date Location Feeder/ICT Remarks
Action:GETCO
29 NP-5526-A 26.05.18 Kawas 22KV Ichapur Line-1 Meter Testing At Kawas
30 NP-2147-A 23.05.18 Vindhyachal STPS
400kV Side of ICT-3 Under recording
31 NP-5620-A 23.05.18 Betul GIS 400kV Side of ICT-1 Zero recording Action: Betul (PG)
32 NP-5539-A 23.05.18 Betul GIS 400kV Side of ICT-2 Zero recording Action: Betul (PG)
33 NP-2732-A 23.05.18 Vav 220KV Kawas Line-1 Meter Testing at Vav end
34 NP-6791-A 22.05.18 Auraiya 220KV Mehgaon Line Under Recording
35 NP-2604-A 22.05.18 Ichapur 220KV Kawas Line-2 Meter testing at Ichapur end
36 NP-2156-A 21.05.18 Balaghat 132KV Dongargarh Line Under Recording Action: Balaghat(MPPTCL)
37 NP-5511-A 21.05.18 Boisar 400kV Side Of ICT-4 Wrong date in meter rectified on 21.05.18
38 NP-4190-A
31.05.18
Magarwada
220KV Vapi(PG) Line-1
Under recording Action:DDED
39 GJ-1514-A
07.06.18 To 08.06.18
Kosamba(Getco) 400kV Gandhar Line
Under recording Action:GETCO
40 NP-2156-A
08.06.18 To 09.06.18
Balaghat/Bhanegaon
132KV Dongargarh Line
Under recording Action:MPPTCL
41 NP-6427-A 16.06.18 Dehgam 400kV Nicole Line-2 Meter Testing at Dehgam
42 NP-8626-A 12.06.18 Magarwada 400kV Side of ICT-1 Mater Testing at Magarwada
43 NP-8604-A 12.06.18 Magarwada 400kV Side of ICT-2 Mater Testing at
S.No SEM ID Date Location Feeder/ICT Remarks
Magarwada
44 NP-5765-A 15.06.18 Dehgam 400kV Nagda Line-2 Meter Testing at Dehgam
45 NP-5764-A 15.06.18 Dehgam 400kV Nagda Line-1 Meter Testing at Dehgam
46 NP-6380-A 17.06.18 Dehgam 400kV Sami Line-1 Meter Testing at Dehgam
47 NP-6379-A 17.06.18 Dehgam 400kV Sami Line-2 Meter Testing at Dehgam
48 NP-6426-A 16.06.18 Dehgam 400kV Pirana (PG) Line-1 Meter Testing at Dehgam
49 NP-6432-A
15.06.18 Pirana(PG) 400kV Pirana(TPL) Line-2
Under – Recording Action: Pirana
50 NP-6221-A 23.06.18 Varsana(Getco) 400kV Bhachau Line-2 Meter Testing At Varsana
51 NP-2462-A 23.06.18 Taps 220KV Borivali Line Meter Testing At TAPS
52 NP-6220-A 22.06.18 Varsana(Getco) 400kV Bhachau Line-1 Meter Testing At Varsana
53 NP-2540-A 22.06.18 Taps 220KV Boisar Line Meter Testing At TAPS
54 NP-2777-A 21.06.18 Mansar 400kV Chornia Line Meter Testing At Mansar
55 NP-2609-A 21.06.18 Mansar 400kV Bhachau Line Meter Testing At Mansar
56 NP-2416-A 20.06.18 Boisar 400kV side of ICT-1 Meter Testing At Boisar(PG)
57 NP-2414-A 20.06.18 Boisar 400kV Side of ICT-3 Meter Testing At Boisar(PG)
58 NP-2785-A 20.06.18 Jetpur 400kV CGPL LINE-1 Meter Testing At Jetpur
59 NP-2202-A 19.06.18 Boisar 400kV Side of ICT-2
Due to Meter Testing(Both HV&LV Side)at Boisar, Wrong meter data, since, ICT was out of service, therefore wrong reading replaced with zero
60 NP-2784-A 19.06.18 Jetpur 400kV CGPL Line-2 Meter Testing At Jetpur
S.No SEM ID Date Location Feeder/ICT Remarks
61 NP-2747-A 19.06.18 Kasor 400kV Rajgarh(PG) Line-2 Meter Testing At Kasor
62 NP-6428-A 18.06.18 Limbdi 400kV Mansar Line Meter Testing At Limbdi(Chornia)
63 NP-2430-A 18.06.18 Kasor 400kV Rajgarh(PG) Line-1 Meter Testing At Kasor
64 NP-6435-A 18.06.18 Limbdi 400kV Bhachau Line-1 Meter Testing At Limbdi(Chornia)
65 NP-2558-A 30.06.18 Taps 220KV Bhilad Line Meter Tesing at Taps
66 NP-6444-A 30.06.18 Vapi 220KV Vapi(GEB) Line Meter Tesing at Vapi(PG)
67 NP-6433-A 28.06.18 Bhachau 400kV Side Of ICT-1 Meter Tesing at Bhachau
68 NP-6442-A 27.06.18 Bhachau 400kV Side Of ICT-2 Meter Tesing at Bhachau
69 NP-6439-A 27.06.18 Vapi(PG) 220KV Bhilad Line-1 Meter Tesing at Vapi(PG)
69 NP-6443-A 27.06.18 Vapi(PG) 220KV Bhilad Line-3 Meter Tesing at Vapi(PG)
70 NP-2438-A 26.06.18 Taps 220KV Vapi Line Meter Tesing at Taps
Committee may like to note
18.i. SEM Data discrepancy at Bhadrawti station
GMR Warora vide their email dated 17.07.18 informed that there was discrepancy in SEM
data (SEM Sr no-2648A) at PGCIL Bhadrawati end which has resulted into variations in
their weekly DSM settlement. Further they informed that from 46th time block of 26thApr’18,
there was sudden variation in the readings which continued till 46th block of 25thMay’18.
Total Line Loss has increased from 0.3% to 1.6% from 26th Apr’18 leading to loss in
injection quantum in DSM calculations.
GMR Warora have intimated to WRLDC vide mail dated 25th May’18. Followed by letter
dated 1st June’18 & reply letter on 29th June’18 (copy enclosed at Annex 18.i).
GMR Warora informed that they have dedicated 400KV D/C line of 33Kms length
connected to bhadrawati & considering generally adopted practice is penalizing us when
actual line losses are coming in the range of 0.16 to 0.30%. Since check meter are not
installed at PGCIL end, as per adopted procedure injection readings were computed based on
the notional loss of 2% by WRLDC.
GMR Warora have request CCM to kindly consider this as special case and evaluate the
readings as per actual line losses and accordingly modify the DSM bills of the said period.
Committee may like to discuss
Annex-18.a
LIST OF SEMS WHERE TIME DRIFT NEEDS TO BE CHECKED/CORRECTED
Sr.No. Meter Id Description Time drift
correction to be
done by
1 NP-5447-A 400kV Side Of ICT-2 At Vadodara(PG) POWERGRID
2 NP-5449-A 220KV Side Of ICT-2 At Vadodara(PG) POWERGRID
3 NP-2726-A 765KV ICT-2 At BHOPAL(BDTCL) BDTCL
4 NP-2719-A 400kV Bhopal(MP) Line-2 At BHOPAL(BDTCL) BDTCL
5 NP-2742-A 400kV ICT-1 At BHOPAL(BDTCL) BDTCL
6 NP-2741-A 400kV Bhopal(MP) Line-1 At BHOPAL(BDTCL) BDTCL
7 NP-2727-A 765KV Indore(PGCILl) Line-1 At BHOPAL(BDTCL) BDTCL
8 NP-2720-A 400kV ICT-2 At BHOPAL(BDTCL) BDTCL
9 NP-2713-A 765KV Jabalpur(PS)(PGcil) Line At BHOPAL(BDTCL) BDTCL
10 NP-8809-A 765KV Vadodara(PG) Line At Dhule(BDTCL) BDTCL
11 NP-8791-A 400kV DHULE (MSETCL) Line-2 At DHULE(BDTCL) BDTCL
12 NP-8798-A 400kV Side Of ICT-2 At Dhule (BDTCL) BDTCL
13 NP-8790-A 765kV Side Of ICT-2 At Dhule (BDTCL) BDTCL
14 NP-8800-A 765kV Aurangabad Line At Dhule (BDTCL) BDTCL
15 NP-8818-A 765kV Side Of ICT-1 At Dhule (BDTCL) BDTCL
16 NP-8817-A 400kV DHULE (MSETCL) Line-1 At DHULE(BDTCL) BDTCL
17 NP-8799-A 400kV Side Of ICT-1 At Dhule (BDTCL) BDTCL
18 NP-8754-A 400kV Kotra(PG) Line-1 At SKS SKS
19 NP-8755-A 400kV Kotra(PG) Line-1 At SKS SKS
20 NP-8756-A 400kV Kotra(PG) Line-2 At SKS SKS
21 NP-8757-A 400kV Kotra(PG) Line-2 At SKS SKS
22 NP-8726-A 400kV Side GT-1 At SKS POWER SKS
23 NP-8733-A 400kV Side GT-2 At SKS POWER SKS
24 NP-8759-A 400kV SKS Line-2 At Kotra(PG) POWERGRID
25 NP-5719-A 400kV Korba Line At Bhatapara(PG) POWERGRID
26 NP-5718-A 400kV Bhilai Line At Bhatapara(PG) POWERGRID
27 NP-6306-A 220kV Side Of ICT-2 At Bhatapara(PG) POWERGRID
28 NP-6312-A 400kV Side Of ICT-1 At Bhatapara(PG) POWERGRID
29 NP-5720-A 400kV Side Of ICT-2 At Bhatapara(PG) POWERGRID
30 NP-5763-A 400kV Nicol Line At Pirana(PG) POWERGRID
31 NP-6231-A 765KV Wardha(PG) Line-2 At Seoni(PG) POWERGRID
32 NP-6233-A 765kV Side Of 765/400kV ICT-3 At Seoni(PG) POWERGRID
33 NP-6232-A 765kV Wardha Line-1 At Seoni(PG) POWERGRID
34 NP-5742-A 400kV Khandwa Line-1 At Seoni(PG) POWERGRID
35 NP-6234-A 765kV Side Of 765/400 kV ICT-2 At Seoni(PG) POWERGRID
36 NP-5739-A 400kV Side Of 765/400 kV ICT-1 At Seoni(PG) POWERGRID
37 NP-5738-A 220kV Side Of 400/220 kV ICT-2 At Seoni(PG) POWERGRID
38 NP-5740-A 400kV Khandwa Line-2 At Seoni(PG) POWERGRID
39 NP-6230-A 765kV Bina(PG) Line At Seoni(PG) POWERGRID
40 NP-5745-A 400kV Satpura Line At Seoni(PG) POWERGRID
41 NP-5741-A 400kV Side Of 400/220 kV ICT-1 At Seoni(PG) POWERGRID
42 NP-5737-A 765kV Side Of 765/400kV ICT-1 At Seoni(PG) POWERGRID
43 NP-5743-A 400kV Side Of 400/220kV ICT-2 At Seoni(PG) POWERGRID
44 NP-5736-A 220kV Side Of 400/220kV ICT-1 At Seoni(PG) POWERGRID
45 NP-6229-A 400kV Side Of 765/400kV ICT-3 At Seoni(PG) POWERGRID
46 NP-5744-A 400kV Side Of 765/400kV ICT-2 At Seoni(PG) POWERGRID
47 NP-5746-A 400kV Bhiali Line At Seoni(PG) POWERGRID
48 NP-2878-A 765kV Side Of ICT-2 At Kotra(PS) POWERGRID
49 NP-2871-A 765kV Side Of ICT-4 At Kotra(PS) POWERGRID
50 NP-9189-A 400kV KWPCL Line-I At Kotra(PS) POWERGRID
51 NP-2879-A 765KV Tamnar(PS) Line-1 At Kotra(PS) POWERGRID
52 NP-2869-A 400kV Side Of ICT-3 At Kotra(PS) POWERGRID
53 NP-2852-A 400kV Raigarh(PG) Line-1 At Kotra(PS) POWERGRID
54 NP-9190-A 400kV KWPCL Line-II At Kotra(PS) POWERGRID
55 NP-2870-A 765KV Durg(Raipur-PS) Line-2 At Kotra(PS) POWERGRID
56 NP-2851-A 400kV Raigarh(PG) Line-2 At Kotra(PS) POWERGRID
57 NP-2895-A 765kV Side Of ICT-3 At Kotra(PS) POWERGRID
58 NP-8906-A 400kV Rkm Power Line-1 At Kotra POWERGRID
59 NP-2877-A 400kV Side Of ICT-2 At Kotra(PS) POWERGRID
60 NP-8758-A 400kV SKS Line-1 At Kotra(PG) POWERGRID
61 NP-8908-A 400kV Rkm Power Line-2 At Kotra POWERGRID
62 NP-2855-A 400kV Side Of ICT-1 At Kotra(PS) POWERGRID
63 NP-2893-A 400kV Korba-1 Line At Bhilai CSPTCL
64 NP-2133-A 220kV Budhipadar Line-III At Korba(E) CSPTCL
65 NP-2122-A 20kV Budhipadar Line-II At Korba(E) CSPTCL
66 NP-4220-A 400kV Bina(PG) Line-1 At Bina(MP) MPPTCL
67 NP-2715-A 400kV BINA(PG) Line-3 At Bina(MP) MPPTCL
68 NP-2714-A 400kV BINA(PG) Line-4 At Bina(MP) MPPTCL
69 NP-2345-A 220kV Navsari Line-1 At Nasik MSETCL
70 NP-2199-A 220kV Navsari Line-2 At Nasik MSETCL
71 NP-8808-A 400kV Side Of ST-01 At RKM POWER RKM
72 NP-8805-A 400kV Side Of GT-01 At RKM Power RKM
73 NP-8806-A 400kV Kotra Line-1 At RKM Power RKM
74 NP-8807-A 400kV Kotra Line-2 At RKM Power RKM
75 NP-8794-A 400kV Kotra Line-1 At RKM Power RKM
76 NP-2695-A 765KV Satna Line-2 at Sasan SASAN
77 NP-2687-A 400kV Side Of St-1 At Sasan SASAN
78 NP-2662-A 765KV Side of GT-5 at Sasan SASAN
79 NP-2667-A 765KV Satna Line-1 at Sasan SASAN
80 NP-2663-A 765kV Side Of ICT-1 At Sasan SASAN
81 NP-2665-A 400kV Side of ICT-2 AT Sasan SASAN
82 NP-2668-A 765KV Satna Line-1 at Sasan SASAN
83 NP-2614-A 400kV Side of GT-2 at Mahan(Essar) ESSAR MAHAN
84 NP-2611-A 400kV Side of GT-1 at Mahan(Essar) ESSAR MAHAN
85 NP-2612-A 400kV Vindhyachal line-1 at Mahan(Essar) ESSAR MAHAN
86 NP-2350-A 66kV Dhokadwa at Diu D&D
87 NP-2399-A 66kV Una line at Diu D&D
88 NP-8628-A 33KV BARC LINE-4 at TAPS Zone-III NPCIL
89 NP-8629-A 33KV BARC LINE-6 at TAPS Zone-III NPCIL
90 NP-2436-A 220kV side of TT-2 at TAPS NPCIL
91 NP-2459-A 220kV side of GT-2 at TAPS NPCIL
92 NP-2449-A 220kV Boisar line at TAPS NPCIL
93 NP-2241-A 220kV TAPS 3&4 line at TAPS 1&2 NPCIL
94 NP-2440-A 220kV side of TT-1 at TAPS NPCIL
95 NP-2150-A 220kV side of GT-2 at TAPS NPCIL
96 NP-2423-A 220kV Borivali line at TAPS NPCIL
97 NP-2540-A 220kV Boisar line at TAPS NPCIL
98 NP-2558-A 220kV Bhilad line at TAPS NPCIL
99 NP-2889-A 33kV TAPS 3&4 line-2 at TAPS 1&2 NPCIL
100 NP-2467-A Zone 1 to Zone 3 at TAPS NPCIL
101 NP-2439-A 220kV side of GT-1 at TAPS NPCIL
102 NP-2239-A 33kV TAPS 3&4 line at TAPS 1&2 NPCIL
103 NP-2161-A 132kV side of ICT-2 VSTPS NTPC
104 NP-2387-A 220kV side of SUT-1 at TAPS NPCIL
105 NP-2115-A 400kV line-1 to HVDC at Vindhyachal STPS NTPC
106 NP-8929-A 400KV Rihand line-1 at Vindhyachal (PS) POWERGRID
107 NP-8948-A 400KV Rihand line-2 at Vindhyachal (PS) POWERGRID
108 NP-2684-A 400KV VINDHYACHAL(PS)LINE-2 at VSTPS-IV NTPC
109 LT-0033-A 400kV side of LANCO(Pathadi) line-2 at Bilaspur POWERGRID
110 NP-2225-A 500 220kV Boisar line at TAPS3&4 TAPS3&4
111 NP-2551-A 400kV Dhule line-2 at SSP(Main) SSP
112 NP-2549-A 400kV Rajgarh line-2 at SSP(Main) SSP
113 NP-2526-A 400kV Dhule line-1 at SSP(Main) SSP
114 NP-2155-A 220kV Amarkantak line-II at Kotmikala Maharashtra
115 NP-6774-A 220kV Budhipadar line-I at Raigarh(CSEB) Chhattisgarh
116 NP-6758-A 400kV Akola line-2 at WARDHA POWERGRID
117 NP-5590-A 220kV Kalmeshwar line at Pandurna Madhya Pradesh
118 NP-2117-A 220kV Amona line at Tillari Maharashtra
119 NP-5713-A 400kV Sundergarh(Jharsuguda) line at Raigarh(PG) POWERGRID
120 NP-6288-A 400kV Sundargarh(Jharsuguda) line at Raigarh(PG) POWERGRID
121 NP-5604-A 400KV BINA(MP) line-3 at Bina(PG) POWERGRID
122 NP-5759-A 400KV BINA(MP) line-4 at Bina(PG) POWERGRID
123 NP-2624-A 400KV INDORE(PG) LINE-1 AT INDORE(MP) Madhya Pradesh
124 NP-6304-A 400KV PUNE(GIS)(PG) LINE-1 AT PUNE(PG) POWERGRID
125 NP-2162-A 400KV JABALPUR(PS) LINE-I at JHABUA POWER Jhabua Power
126 NP-5755-A 765KV Jaipur(Phagi_NR) line 1 at Gwalior(PG) POWERGRID
127 NP-5750-A 765KV Jaipur(Phagi_NR) line 2 at Gwalior(PG) POWERGRID
128 NP-2451-A 400kV Kolhapur(GIS) Line-1 at Kolhapur(Telagade) POWERGRID
129 NP-2400-A 400kV Kolhapur(GIS) Line-2 at Kolhapur(Telagade) POWERGRID
130 NP-8824-A 400kV Aurangabad(PG) line-2 at Aurangabad(MSEB) Maharashtra
131 NP-8816-A 400KV DHULE (BDTCL) line-1 at DHULE(MSETCL) Maharashtra
132 NP-9656-A 400KV DHULE (BDTCL) line-2 at DHULE(MSETCL) Maharashtra
133 NP-4229-A 400kV Shujalpur line-1 at Nagda Madhya Pradesh
134 NP-2282-A 400kV Shujalpur line-2 at Nagda Madhya Pradesh
135 NP-2341-A 220kV Haldarwa line-1 at Gandhar NTPC
136 NP-2347-A 220kV Haldarwa line-1 at KAPS NPCIL
137 NP-5450-A 220kV Haldarwa line-1 at Kawas NTPC
138 NP-5765-A 400kV Nagda line-2 at Dehgam POWERGRID
139 NP-6382-A 400kV BHINMAL line at Zerda GETCO
140 GJ-0850-A 400KV PIRANA(PG) LINE-1 AT PIRANA(TPL) GETCO
141 GJ-0851-A 400KV PIRANA(PG) LINE-2 AT PIRANA(TPL) GETCO
142 NP-2778-A 400KV Vadodara(PG) line-2 at ASOJ GETCO
143 NP-2779-A 400KVVadodara(PG) line-1 at ASOJ GETCO
144 NP-2430-A 400KV Rajgarh(PG) line-1 at Kasor(Reliance line) GETCO
145 GJ-1298-A 400KV Navsari(PG) line at Ukai(GETCO) GETCO
146 NP-4221-A 400kV Bina(PG) line-2 at Bina(MP) Madhya Pradesh
147 NP-2213-A 400kV Rajgarh line-1 at Nagda Madhya Pradesh
148 NP-2211-A 400kV Rajgarh line-2 at Nagda Madhya Pradesh
149 NP-4227-A 400kV Itarsi line at Satpura Madhya Pradesh
150 NP-8782-A 400KV Balco line-2 at Dharamjaygarh(Dedicated line) POWERGRID
151 NP-8783-A 400KV Balco line-1 at Dharamjaygarh(Dedicated line) POWERGRID
152 NP-8853-A 400KV Solapur STPS(PG) line-2 at Solapur(NTPC) NTPC
153 NP-8871-A 400KV Solapur STPS(PG) line-3 at Solapur(NTPC) NTPC
154 NP-8867-A 400KV Solapur STPS(PG) line-4 at Solapur(NTPC) NTPC
155 NP-6226-A 400KV Ranchhodpura(Vadavi) Line-1 at Zerda
(Kansari) GETCO
156 NP-6226-A 400KV Ranchhodpura(Vadavi) Line-1 at Zerda
(Kansari) GETCO
157 NP-6383-A 400KV Zerda (Kansari) line-1 at Ranchhodpura(Vadavi) GETCO 158 NP-8936-A 400KV Vindhyachal(NTPC) line 2 at Vindhyachal(PS) POWERGRID
159 NP-6308-A 400kV side of Raipur line at Pathadi(LANCO) LANCO
160 NP-2218-A 220kV TAPS 3&4 line at Boisar(PG) POWERGRID
161 NP-2294-A 400kV SSP line-2 at Dhule Maharashtra
162 NP-6341-A 400kV SSP line-2 at Rajgarh(PG) POWERGRID
163 NP-2464-A 400kV SSP line-1 at Dhule Maharashtra
164 NP-4218-A 220kV Kotmikala line-II at Amarkantak Madhya Pradesh
165 NP-6268-A 400kV Wardha line-2 at Akola Maharashtra
166 NP-2313-A 220kV Pandurna line at Kalmeshwar Maharashtra
167 NP-2221-A 220kV Tillari line at Amona Goa
168 NP-2976-A 400KV INDORE(MP) LINE-1 AT INDORE(PG) POWERGRID
169 NP-8849-A 400KV Pune(PG) line-1 at Pune(GIS)(LILO of Pune- POWERGRID
Parli-1)
170 NP-2960-A 400KV JHABUA POWER LINE-I at JABALPUR(PS) POWERGRID
171 NP-8842-A 400KV Kolhapur(MSEB) line-2 at Kolhapur(GIS) POWERGRID
172 NP-8844-A 400KV Kolhapur(MSEB) line-1 at Kolhapur(GIS) POWERGRID
173 NP-8747-A 400KV Aurangabad(MSEB) line-2 at Aurangabad(PG) POWERGRID
174 NP-6369-A 400KV Nagda line-1 at Shujalpur(PG) POWERGRID
175 NP-6355-A 400KV Nagda line-2 at Shujalpur(PG) POWERGRID
176 NP-4167-A 220kV Gandhar line-1 at Haldarwa GETCO
177 NP-4160-A 220kV KAPS-1 at Haldarwa GETCO
178 NP-4163-A 220kV Kawas-1 at Haldarwa GETCO
179 NP-2238-A 400kV Dehgam line-2 at Nagda(MP) Madhya Pradesh
180 NP-6431-A 400KV PIRANA(TPL) LINE-1 AT PIRANA(PG) POWERGRID
181 NP-6432-A 400KV PIRANA(TPL) LINE-2 AT PIRANA(PG) POWERGRID
182 NP-2985-A 400KV Asoj line-2 at Vadodara(PG) POWERGRID
183 NP-2986-A 400KV Asoj line-1 at Vadodara(PG) POWERGRID
184 NP-6357-A 400KV Kasor line-1 at Rajgarh(PG)(Reliance line) POWERGRID
185 NP-6349-A 400KV Ukai line at Navsari(PG) GIS POWERGRID
186 NP-5757-A 400kV Bina(MPPTCL) line-2 at Bina(PG) POWERGRID
187 NP-6336-A 400kV Nagda line-1 at Rajgarh(PG) POWERGRID
188 NP-6344-A 400kV Nagda line-2 at Rajgarh(PG) POWERGRID
189 NP-2441-A 400kV Satpura at Itarsi POWERGRID
190 NP-2799-A 400kV Korba line-1 at BALCO BALCO
191 NP-2800-A 400kV Birshinghpur line at BALCO BALCO
192 NP-8796-A 400KV Solapur STPS(NTPC) line-2 at Solapur(PG) POWERGRID
193 NP-8868-A 400KV Solapur STPS(NTPC) line-3 at Solapur(PG) POWERGRID
194 NP-8870-A 400KV Solapur STPS(NTPC) line-4 at Solapur(PG) POWERGRID
195 GJ-2971-A 400KV ZERDA(KANSARI) Line-1 at Veloda Gujarat
196 GJ-2971-A 400KV ZERDA(KANSARI) Line-1 at Veloda Gujarat
197 GJ-2968-A 400KV Ranchhodpura(Vadavi) Line-1 at Veloda Gujarat
Annex-18.c
LIST OF ISGS EVACUATING THROUGH DEDICATED LINES WHERE CHECK
METERS NEED TO BE RELOCATED
S.No
Name of Generating
Station
Evacuation Path
Interface point Remote end Recommendation
Main Standby Check
1 LANCO 400kV Lanco-Bilaspur line-1
Bilaspur Lanco Lanco Check meter to be shifted from Lanco to Bilaspur
2 LANCO 400kV Lanco-Bilaspur line-1
Bilaspur Lanco Lanco Check meter to be shifted from Lanco to Bilaspur
3 ACBIL 400kV ACBIL-Bilaspur line
Bilaspur ACBIL ACBIL Check meter to be shifted from ACBIL to Bilaspur
4 MCCPL 400kV MCCPL-Bilaspur line
Bilaspur MCCPL MCCPL Check meter to be shifted from MCCPL to Bilaspur
5 BALCO 400kV BALCO-Dharamjaygarh line-1
Dharamjaygarh BALCO BALCO Check meter to be shifted from Balco to Dharamjaygarh
6 BALCO 400kV BALCO-Dharamjaygarh line-2
Dharamjaygarh BALCO BALCO Check meter to be shifted from Balco to Dharamjaygarh
7 Jhabua Power
400kV Jhabua-Jabalpur(PS) line-1
Jabalpur (PS) Jhabua Jhabua Check meter to be shifted from Jhabua to Jabalpur(PS)
8 Jhabua Power
400kV Jhabua-Jabalpur(PS) line-1
Jabalpur (PS) Jhabua Jhabua Check meter to be shifted from Jhabua to Jabalpur(PS)
S.No
Name of Generating
Evacuation Path
Interface point Remote end Recommendation
9 DB Power 400kV DB Power-Kotra(PS) line-1
Kotra (PS) DB Power DB Power Check meter to be shifted from DB Power to Kotra(PS)
10 DB Power 400kV DB Power-Kotra(PS) line-2
Kotra (PS) DB Power DB Power Check meter to be shifted from DB Power to Kotra(PS)
11 KWPCL 400kV KWPCL-Kotra(PS) line-1
Kotra (PS) KWPCL KWPCL Check meter to be shifted from KWPCL to Kotra (PS)
12 KWPCL 400kV KWPCL-Kotra(PS) line-2
Kotra (PS) KWPCL KWPCL Check meter to be shifted from KWPCL to Kotra (PS)
13 RKM 400kV RKM-Kotra(PS) line-1
Kotra(PS) RKM RKM Check meter to be shifted from RKM to Kotra(PS)
14 RKM 400kV RKM-Kotra(PS) line-2
Kotra(PS) RKM RKM Check meter to be shifted from RKM to Kotra(PS)
15 SKS 400kV SKS-Kotra(PS) line-1
Kotra(PS) SKS SKS Check meter to be shifted from SKS to Kotra(PS)
16 SKS 400kV SKS-Kotra(PS) line-2
Kotra(PS) SKS SKS Check meter to be shifted from SKS to Kotra(PS)
17 Jaypee Nigrie
400kV Jaypee Nigrie-Satna line-1
Satna Jaypee Nigrie
Jaypee Nigrie
Check meter to be shifted from Jaypee Nigrie to Satna
18 Jaypee Nigrie
400kV Jaypee Nigrie-Satna line-2
Satna Jaypee Nigrie
Jaypee Nigrie
Check meter to be shifted from Jaypee Nigrie to Satna
19 DGEN 400kV DGEN-Navsari line-1
Navsari DGEN DGEN Check meter to be shifted from Dgen to Navsari
20 DGEN 400kV DGEN-Navsari line-2
Navsari DGEN DGEN Check meter to be shifted from Dgen to Navsari
21 GMR Chhattisgarh
400kV GMR Chhattisgarh-Durg(PS) line-1
Durg(PS) GMR Chhattisgarh
GMR Chhattisgarh
Check meter to be shifted from GMR Chhattisgarh to Durg (PS)
S.No
Name of Generating
Evacuation Path
Interface point Remote end Recommendation
22 GMR Chhattisgarh
400kV GMR Chhattisgarh-Durg(PS) line-1
Durg(PS) GMR Chhattisgarh
GMR Chhattisgarh
Check meter to be shifted from GMR Chhattisgarh to Durg (PS)
28/05/2018 Gmail - SEM data discrepancy in SEM S.No.2648A at Bhadrawati Station
https://mail.google.com/mail/u/0/?ui=2&ik=9a30166b8b&jsver=-dxVNc9Y02g.en.&cbl=gmail_fe_180516.06_p8&view=pt&msg=1639647247dd73d6&q=bhadrawa
WRLDC SEM <[email protected]>
SEM data discrepancy in SEM S.No.2648A at Bhadrawati Station
Ranjith Kumar Panigrahi {रंजीत कुमार पािण�ही} <[email protected]> Fri, May 25, 2018 at 1:15 PMTo: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>Cc: Raj Kishor Dash {राज िकशोर दाश} <[email protected]>, Naval Kishor Meena {Naval Kishor Meena}<[email protected]>
Dear sir,It is to inform you that the SEM data discrepancy in energy Meter S.No.2648A (Bhadrawati-EMCO ckt # 1) isattended.While attending the above issue, it is observed that the CT currents R-Ph & Y-Ph are not reporting the SEM meterand the same is corrected in the TTB connections.At present the CT,PT values are reporting healthy to the SEM meter. Regards,Ranjith K panigrahi,Jr Engineer,8275039152
दावा�ाग : यह ईमेल पावरि�ड के दावा�ाग िनयम व शत� �ारा शािसत है िजसे http://apps.powergridindia.com/Disclaimer.htm पर देखा जा सकता है। Disclaimer: This e-mail is governed by the Disclaimer Terms & Conditions of POWERGRID which may be viewed at http://apps.powergridindia.com/Disclaimer.htm