C:\fakepath\industrial training cement

48
SEMINAR ON INDUSTRIAL TRAINING TOUR SEMINAR ON INDUSTRIAL TRAINING TOUR JAYPEE HIMACHAL CEMENT PLANT JAYPEE HIMACHAL CEMENT PLANT NITIN KUMAR NITIN KUMAR ABHISHEK ABHISHEK KATOCH KATOCH BALDEV BALDEV SINGH SINGH MOHIT GULERIA MOHIT GULERIA ANKUL BANYAL ANKUL BANYAL (MECH.ENGG) PRESENTED BY PRESENTED BY

Transcript of C:\fakepath\industrial training cement

Page 1: C:\fakepath\industrial training cement

SEMINAR ON INDUSTRIAL TRAINING TOURSEMINAR ON INDUSTRIAL TRAINING TOUR JAYPEE HIMACHAL CEMENT PLANTJAYPEE HIMACHAL CEMENT PLANT

NITIN KUMARNITIN KUMAR

ABHISHEKABHISHEK KATOCHKATOCH

BALDEVBALDEV SINGHSINGH

MOHIT GULERIAMOHIT GULERIA

ANKUL BANYALANKUL BANYAL

(MECH.ENGG)

PRESENTED BYPRESENTED BY

Page 2: C:\fakepath\industrial training cement

INTRODUCTIONINTRODUCTION

Sh. Jai Prakash Gaur ji, Chairman of the group founded the construction company in 1979 there after company made its foray into many areas of operation and came to be known as Jaypee Group.

The motto of Jaypee Group ensures that its employees work towards achieving greater heights. Its motto is

“ “ No Dream Too Big”No Dream Too Big”

Page 3: C:\fakepath\industrial training cement

AIM & OBJECTIVEAIM & OBJECTIVE: INDUSTRIAL TRAININGINDUSTRIAL TRAINING

To expose student to engineering experience and knowledge, which is required in industry , where these are not taught in lectures room.

To use the experienced gained from the industrial training in discussion held in the lecture rooms.

To get a feel of the ‘work environment’. To gain experience in writing report in engineering works / project. To expose students to the engineer responsibilities and ethics. To expose the student to future employers. With all the experience and knowledge acquired, it is hoped at the student

will able to choose appropriate work upon graduation. Industrial training also provides a systematic introduction to the ways of

industry and developing talent and attitudes, so that one can understand how Human Resource Development works.

Systematic introduction to the ways of industry and developing talent and attitudes, so that he / she can enjoy fully, a career in engineering while recognizing his / her responsibilities as a professional engineer of the future.

Page 4: C:\fakepath\industrial training cement

JAYPEEJAYPEE CEMENT PLANTSCEMENT PLANTS Jaypee group is the 3rd largest cement producer in the country. The groups Jaypee group is the 3rd largest cement producer in the country. The groups

cement facilities are located in the Satna Cluster (U.P), which has one of the cement facilities are located in the Satna Cluster (U.P), which has one of the highest cement production growth rates in India. But in Himachal only two highest cement production growth rates in India. But in Himachal only two plants are situated , one is Jaypee Himachal cement plant, BAGA. And other is plants are situated , one is Jaypee Himachal cement plant, BAGA. And other is Jaypee himachal cement grinding & blending unit , BAGHERI.Jaypee himachal cement grinding & blending unit , BAGHERI.

Jaypee cement limited (JCL) was earlier a part of Jaypee industry limited (JIL) Jaypee cement limited (JCL) was earlier a part of Jaypee industry limited (JIL) but now JCL has been merged with JIL and renamed or JAL (Cement Division). but now JCL has been merged with JIL and renamed or JAL (Cement Division). Jaypee Rewa Plant under its fold has two plant . Plant 1 having 1MT capacity Jaypee Rewa Plant under its fold has two plant . Plant 1 having 1MT capacity was commissioned in December 1986. Plant 2 having with a production was commissioned in December 1986. Plant 2 having with a production capacity of 1.5MT was commissioned in April 1991capacity of 1.5MT was commissioned in April 1991

Keeping pace with the advancement in the IT industry, all the 140 cement Keeping pace with the advancement in the IT industry, all the 140 cement dumps are networked using TDM/TDMA VSATs along with a dedicated hub to dumps are networked using TDM/TDMA VSATs along with a dedicated hub to provide 24/7 connectivity between the plants and all the 120 points of cement provide 24/7 connectivity between the plants and all the 120 points of cement distribution.distribution.

In the near future, the group plans to expand its cement capacities via In the near future, the group plans to expand its cement capacities via acquisition and Greenfield addition to maximize economies of scale and build acquisition and Greenfield addition to maximize economies of scale and build on vision to focus on large size plant from inception.on vision to focus on large size plant from inception.

Page 5: C:\fakepath\industrial training cement

HISTORICAL DEVELOPMENT OFHISTORICAL DEVELOPMENT OF CEMENT IN INDIACEMENT IN INDIA

The Indian cement industry occupies predominant position not only as one of the basic industries for infrastructure development , but also because it is the second largest producer of cement in India.

In India , Portland cement was manufactured first in 1904, near madras now in Chennai by “ South Indian industry company ltd”“ South Indian industry company ltd” in a 30 ton capacity plant.

In 1936, all the existing cement companies except the “SONE VALLEY“SONE VALLEYPORTLAND CEMENT COMPANIES LTD”.PORTLAND CEMENT COMPANIES LTD”. Agreed to merge with “ASSOCIATED CEMENT COMPANIES LTD”.(ACC).“ASSOCIATED CEMENT COMPANIES LTD”.(ACC). This is the most significant event in the history of Indian cement industry.

JOSEPH ASPDINJOSEPH ASPDIN was first manufactured Portland cement as known as today in 1824 by hitting powder chalk with clay mud of river med day.

Page 6: C:\fakepath\industrial training cement

The word cement in its broadest sense denotes any kind of adhesive in building and civil engineering it means a substance , which can be used to bind together the sand broken stone or aggregate into a solid mass.

Cement is a crystalline compound of calcium silicates and other calcium compounds having hydraulic properties.

Page 7: C:\fakepath\industrial training cement

GEOLOGY (RAW MATERIAL)GEOLOGY (RAW MATERIAL) The fundamental chemical compound to produce cement clinker are:

Lime (Ca O) Silica (SiO2)

Alumina (Al2 O3)

Iron oxide (Fe2O3)

Raw material used in the production of clinker cement:

Page 8: C:\fakepath\industrial training cement

TYPES OF CEMENTTYPES OF CEMENT

Two types of cement mainly used in the building industry are as follow:

Hydraulic cement

Non hydraulic cement

Page 9: C:\fakepath\industrial training cement

HYDRAULIC CEMENTHYDRAULIC CEMENT

Hydraulic Cement sets and hardens by action of water. Such as Portland Cement

In other words it means that hydraulic cement are:

“ Any cements that turns into a solid product in the presence of water (as well as air) resulting in a material that does not disintegrate in water.” Most common hydraulic cement is Portland cement

Page 10: C:\fakepath\industrial training cement

NON HYDRAULIC CEMENTNON HYDRAULIC CEMENT

Any cement that does not require water to transform it into a solid product.

Two common Non hydraulic Cement are:

a) Lime- derived from limestone /chalk

b) Gypsum

Page 11: C:\fakepath\industrial training cement

PORTLAND CEMENTPORTLAND CEMENT

Chemical composition of Portland Chemical composition of Portland Cement:Cement:

a) Tricalcium Silicate (50%)a) Tricalcium Silicate (50%)

b) Dicalcium Silicate (25%)b) Dicalcium Silicate (25%)

c) Tricalcium Aluminate (10%)c) Tricalcium Aluminate (10%)

d) Tetracalcium Aluminoferrite (10%)d) Tetracalcium Aluminoferrite (10%)

e) Gypsum (5%)e) Gypsum (5%)

Page 12: C:\fakepath\industrial training cement

CEMENT MANUFACTURING PROCESS

Quarry face

loader

dumper

crushing

conveyor

storage at the plant

1. BLASTING 2. TRANSPORT

1. BLASTING : The raw materials that are used to manufacture cement (mainlylimestone and clay) are blasted from the quarry.2. TRANSPORT : The raw materials are loaded into a dumper.

3. CRUSHING AND TRANSPORTATION : The raw materials, after crushing, are transported to the plant by conveyor. The plant stores the materials before they are homogenized.

Page 13: C:\fakepath\industrial training cement

CEMENT MANUFACTURING PROCESS

storage at the plant

conveyor

Raw mill

Raw mix

preheating

kiln

cooling

clinker

RAW GRINDING

BURNING & COOLONG

1. RAW GRINDING : The raw materials are very finely ground in order to produce the raw mix. 2. BURNING : The raw mix is preheated before it goes into the kiln, which is heated by a flame that can be as hot as 2000 °C. The raw mix burns at 1500 °C producing clinker which, when it leaves the kiln, is rapidly cooled with air fans. So, the raw mix is burnt to produce clinker : the basic material needed to make cement.

Page 14: C:\fakepath\industrial training cement

CEMENT MANUFACTURING PROCESS

clinker storage

Gypsum and the secondary additives are added to the clinker.

Finish grinding

silos

bags

GRINDING

STORAGE , PACKING , DISPATCH

1.GRINDING : The clinker and the gypsum are very finely ground giving a “pure cement”. Other secondary additives and cementations materials can also be added to make a blended cement.2. STORAGE, PACKING, DISPATCH :The cement is stored in silos before being dispatched either in bulk or in bags to its final destination.

Page 15: C:\fakepath\industrial training cement

FLOW SHEET OF CEMENT PROCESS

Page 16: C:\fakepath\industrial training cement

TRAINING SITETRAINING SITE: : CEMENT PLANTCEMENT PLANT

Page 17: C:\fakepath\industrial training cement

JAYPEE HIMACHAL CEMENT GRINDING & BLENDING UNITJAYPEE HIMACHAL CEMENT GRINDING & BLENDING UNIT AT BAGHERI, (H P)AT BAGHERI, (H P)

After transported the clinker from Baga to this plant, we grind & After transported the clinker from Baga to this plant, we grind & blend the clinker for making cement and it has a packing plant where blend the clinker for making cement and it has a packing plant where we pack the material and load into the truck.we pack the material and load into the truck.

Page 18: C:\fakepath\industrial training cement

JAYPEE HIMACHAL CEMENT PLANTJAYPEE HIMACHAL CEMENT PLANT AT BAGA (H P)AT BAGA (H P)

Page 19: C:\fakepath\industrial training cement

JAYPEE HIMACHAL CEMENT PLANTJAYPEE HIMACHAL CEMENT PLANTBAGHERI & BAGABAGHERI & BAGA

JAIPRAKASH ASSOCIATES LTD’s, a subsidinary of Jaypee group have established a cement plant in Himachal Pradesh on April 2009. the group have established 3 MTPA capacity plant in BAGA & BAGHERI village in the Solan district with investment of Rs 2000 crore.

The state-level single window clearance and monitoring authority had cleared the project in September 2004 and with other requisite clearances and approvals, the construction of the plant was started in 2005.

The plant, having an annual capacity to produce 1.75 million tonne cement, will help in overall development of not only the region but also the entire state

It has plans to raise the capacity by 1.5MTPA with an investment of Rs 700 crore by 2010.

The company has installed pollution control equipments to keep emission below 50 mg/Nm 3.

Jaypee group has emerged as the biggest private sector investor in Himachal Pradesh with the investment of nearly Rs 9000 crore in cement and hydro power sector.

Jaypee Himachal cement grinding & blending unit, BAGHERI is the only plant have a blending unit in all over other cement plant of Jaypee group.

Page 20: C:\fakepath\industrial training cement

PRODUCTIONPRODUCTION

Three types of cement mainly produced in Jaypee Himachal cement grinding & blending unit in Bagheri :

1. ORDINARY PORTLAND CEMENT (OPC 43 Grade)

2. ORDINARY PORTLAND CEMENT (OPC 53 Grade)

3. POZZOLANE PORTLAND CEMENT

Continue

Page 21: C:\fakepath\industrial training cement

PORTLAND PORTLAND CEMENTCEMENT

POZZOLANEPOZZOLANEORDINARYORDINARY

ORDINARY PORTLAND CEMENTORDINARY PORTLAND CEMENT

CLINKER + GYPSUM (3%)CLINKER + GYPSUM (3%)

POZZOLANE PORTLAND CEMENTPOZZOLANE PORTLAND CEMENT

CLINKER + GYPSUM(3%) + FLYASH(35%) CLINKER + GYPSUM(3%) + FLYASH(35%)

Page 22: C:\fakepath\industrial training cement

RAW MATERIAL : FOR MAKING RAW MATERIAL : FOR MAKING CEMENT IN JAYPEE PLANTCEMENT IN JAYPEE PLANT

CLINKERCLINKERCOALCOAL

SHALESHALE

LIMESTONELIMESTONE

LATERITELATERITE

Continue

Page 23: C:\fakepath\industrial training cement

CEMENTCEMENT

CLINKERCLINKER GYPSUMGYPSUM FLYASHFLYASH

Page 24: C:\fakepath\industrial training cement

RAW MATERIAL FOR CEMENT

Limestone is calcareous sedimentary rocks formed at the bottom of lakes and seas with the accumulation of shells, bones and other calcium rich goods. It is composed of calcite (CaCO3).

Physical Properties of Limestone Hardness 3 to 4 on Moh's Scale Density 2.5 to 2.65 Kg/m3 Compressive Strength 1800 to 2100 Kg/cm2 Water Absorption Less than 1% Porosity Quite low Weather Impact Resistant Chemical Properties of Limestone Lime (CaO) 38-42% Silica (SiO2) 20-25% Alumina (Al2O3) 2-4% Other Oxides like Na, Mg 1.5 to 2.5% Loss On Ignition (LOI) 30-32%

Uses of Limestone Flooring Wall cladding Vanity tops Furniture Cement Production Refining Metals Blackboard chalk Ocurrances of Limestone Texas Lampasas River area India Khasi, Jayantia and Garo Hills of Meghalaya, Satna limstone belt, Madhya Pradesh.

LIMESTONE LIMESTONE

Page 25: C:\fakepath\industrial training cement

GYPSUM GYPSUM

Gypsum is a very soft mineral composed of calcium sulfate dihydrate, with the chemical formula CaSO4·2H2O.

Gypsum is a common mineral, with thick and extensive evaporite beds in association with sedimentary rocks

Gypsum is also formed as a by-product of sulfide oxidation, amongst others by pyrite oxidation, when the sulfuric acid generated reacts with calcium carbonate.

Page 26: C:\fakepath\industrial training cement

SHALESHALE

Shale is a fine-grained, elastic sedimentary rock composed of mud that is a mix of flakes of clay minerals and tiny fragments (silt-sized particles) of other minerals, especially quartz and calcite. The ratio of clay to other minerals is variable. Shale is characterized by breaks along thin laminae or parallel layering or bedding less than one centimeter in thickness, called fissility. Mudstones, on the other hand, are similar in composition but do not show the fissility.

Shales are typically composed of variable amounts of clay minerals and quartz grains and the typical color is gray.

Page 27: C:\fakepath\industrial training cement

CLINKER Cement clinkers are formed by the

heat processing of cement elements in a kiln. Limestone, clay, bauxite, and iron ore sand in specific proportions are heated in a rotating kiln at 2,770° Fahrenheit (1,400° Celsius) until they begin to form cinder lumps, which are also known as cement clinkers. Cement clinkers are usually ground with gypsum to produce the fine powder later mixed with liquid to produce cement, although some manufacturers ship cement clinkers in their lump form to cut down on dust.

When the cement clinkers are ground

with approximately 5% gypsum, they form Portland cement. These compounds allow cement to set when combined with water and to form strong bonds that can withstand pressure, water immersion, and other elements.

Page 28: C:\fakepath\industrial training cement

FLYASH Fly ash, also known as Pulverized Fuel Ash

(PFA), is an industrial ash created when coal is burned to create electrical power.

Fly ash, which is largely made up of silicon dioxide and calcium oxide, can be used as a substitute for Portland cement, or as a supplement to it. The materials which make up fly ash are pozzolanic, meaning that they can be used to bind — or cement — materials together. Pozzolanic materials, including fly ash cement, add durability and strength to concrete

Fly ash cement is also known as green concrete. It binds the toxic chemicals that are present in the fly ash in a way that should prevent them from contaminating natural resources. Using fly ash cement in place of or in addition to Portland cement uses less energy, requires less invasive mining, and reduces both resource consumption and CO2 emissions.

Page 29: C:\fakepath\industrial training cement

MANUFACTURING PROCESSMANUFACTURING PROCESS JAYPEE CEMENTJAYPEE CEMENT

The process is divided into four main section in The process is divided into four main section in Jaypee cement plant at Bagheri as under Jaypee cement plant at Bagheri as under categorized :categorized :

# RAW MATRERIAL HANDLING

# ROLL PRESS & CEMENT MILL

# FLYASH SEPERATION SYSTEM

# PACKING PLANT

Page 30: C:\fakepath\industrial training cement
Page 31: C:\fakepath\industrial training cement

MANUFACTURING PROCESS JAYPEE CEMENT

MINING The cement manufacturing process starts from the mining of limestone,

which is the main raw material for making cement. Limestone is excavated from open cast mines after drilling and blasting and loaded on to dumpers which transport the material and unload into hoppers of the limestone crushers.

CRUSHING STACKING & RECLAIMING The LS Crushers crush the limestone to minus 80 mm size and

discharge the material onto a belt conveyor which takes it to the stacker via the Bulk material analyser. The material is stacked in longitudinal stockpiles. Limestone is extracted transversely from the stockpiles by the reclaimers and conveyed to the Raw Mill hoppers for grinding of raw meal.

Page 32: C:\fakepath\industrial training cement

CRUSHING STACKING & RECLAIMING OF COAL CRUSHING STACKING & RECLAIMING OF COAL The process of making cement clinker requires heat. Coal is used as

the fuel for providing heat. Raw Coal received from the collieries is stored in a coal yard. Raw Coal is dropped on a belt conveyor from a hopper and is taken to and crushed in a crusher. Crushed coal discharged from the Coal Crusher is stored in a longitudinal stockpile from where it is reclaimed by a reclaimer and taken to the coal mill hoppers for grinding of fine coal.

RAW MEAL DRYING/ GRINDING & HOMOGENISATIONRAW MEAL DRYING/ GRINDING & HOMOGENISATION Reclaimed limestone along with some laterite stored in their

respective hoppers is fed to the Raw Mill for fine grinding. The hot gasses coming from the clinkerisation section are used in the raw mill for drying and transport of the ground raw meal to the Electrostatic Precipitator / Bag House, where it is collected and then stored and homogenised in the concrete silo. Raw Meal extracted from the silo (now called Kiln feed) is fed to the top of the preheater for pyroprocessing.

Page 33: C:\fakepath\industrial training cement

CLINKERISATIONCLINKERISATION Cement Clinker is made by pyroprocessing of Kiln feed in the

preheater and the rotary kiln. Fine coal is fired as fuel to provide the necessary heat in the kiln and the Precalciner located at the bottom of the 5/6 stage preheater. Hot clinker discharged from the Kiln drops on the grate cooler and gets cooled. The cooler discharges the clinker onto the pan / bucket conveyor and it is transported to the clinker stockpiles / silos. The clinker is taken from the stockpile / silo to the ball mill hoppers for cement grinding.

CEMENT GRINDING & STORAGECEMENT GRINDING & STORAGE Clinker and Gypsum (for OPC) and also Pozzolane (for PPC) are

extracted from their respective hoppers and fed to the Cement Mills. These Ball Mills grind the feed to a fine powder and the Mill discharge is fed to an elevator, which takes the material to a separator, which separates fine product and the coarse. The latter is sent to the mill inlet for regrinding and the fine product is stored in concrete silos.

PACKING PACKING Cement extracted from silos is conveyed to the automatic electronic

packers where it is packed in 50 Kgs. We are having two 8 spouts & two 6 spouts packers. Polythene bags and dispatched in trucks.

Page 34: C:\fakepath\industrial training cement

CEMENT BRANDSCEMENT BRANDS: : JAYPEE CEMENTJAYPEE CEMENT

Jaypee produces a wide variety of cements, which are specifically designed to cater to the customer’s requirements for different types of cements in each of its markets. All the brands, which the Company produces, are so evolved in their characteristics and properties that they will surpass BIS Standards. For each brand, the relevant BIS standards are mentioned in enclosed table along with a comparison with the BIS requirement.

All brands are marketed in attractive HDPE bags, containing 50 Kgs of quality cement from Jaypee. Bags are identified with a conspicuous Jaypee Logo, which also over the years has come to be regarded as a “Hallmark” of quality.

Jaypee produces & markets both Portland Pozzolana Cement (PPC) & all grades of Ordinary Portland Cement (OPC)

Page 35: C:\fakepath\industrial training cement

CEMENT BRANDCEMENT BRAND:JAYPEE CEMENT(OPC-43 GRADE)JAYPEE CEMENT(OPC-43 GRADE)

Jaypee Cement (OPC-43 Grade) is produced from enriched limestone most suited to make high quality clinker, which on grinding gives a cement with characteristics surpassing those specified in Indian Standards. Jaypee Cement (OPC-43 Grade) is available in 50 Kgs HDPE bags of a distinctive design and cover.

Jaypee Cement (OPC-43 Grade), has emerged as the top choice of Engineers and Engineering Companies engaged in construction of mega projects – such as National Highways, Bridges, Transmission lines, power plants, Industrial and Residential structures.

Page 36: C:\fakepath\industrial training cement
Page 37: C:\fakepath\industrial training cement

CEMENT BRANDSJAYPEE CEMENT(OPC-53 GRADE)

Jaypee Cement (OPC-53 Grade), because of its fine nature, good particle size distribution, optimal phase composition, imparts the properties of higher strength to the structures. The Chemical & Physical properties of Jaypee Cement (OPC-53 Grade) surpasses the properties of OPC 53 grade as defined in IS.

OPC-53 Grade has been the mainstay for fast paced construction of high strength, heavy load bearing Structures viz., Bridges, prestressed elements, penstocks, precast elements etc. requiring very high strength to negotiate the heavy static & dynamic loads.

Page 38: C:\fakepath\industrial training cement
Page 39: C:\fakepath\industrial training cement

CEMENT BRANDS : JAYPEE CEMENT(PPC)

Jaypee Cement (PPC) is a market leader among all blended/composite cements in the markets of U.P, Bihar, M.P., Punjab, Haryana, Delhi & Nepal.

Fine particles of Jaypee Cement (PPC) when mixed with water readily form a smooth paste, which results in a smooth surface. When used with sand and aggregates it yields a very strong & durable concrete. Jaypee Cement (PPC) helps to produce more cohesive concrete and mortar which is also less prone to segregation and bleeding. Due to this quality, Jaypee Cement (PPC) is suitable for any type of structural application. *(Curing is done as per specified norms)

Jaypee Cement (PPC) is being used for a number of applications like housing, commercial complexes, roads, wells, canals, dams etc. which establishes Jaypee Cement (PPC) as the preferred choice of the discerning customer. It is particularly well suited for the tropical climatic conditions of India

Page 40: C:\fakepath\industrial training cement
Page 41: C:\fakepath\industrial training cement

QUALITIES OF JAYPEE CEMENT(PPC)

Better workability due to spherical shape of flyash particles and better slump retention.

Better pump ability – provides more cohesive concrete and mortar. Superfine particles provide great finish to the structure. Provides un-segregated concrete of better integrity. Low heat of hydration. Reduced shrinkage and swelling. Better pore refinement, reduced permeability. Better resistance to chloride and sulphate attack Better resistance to alkali-silica reaction. Resistance to corrosive attack on steel reinforcement. Reduced lime leaching. High compressive strength. High modulus of elasticity especially at later ages. Improved bondage of concrete to steel. Long term strength gain.

Page 42: C:\fakepath\industrial training cement

PERFORMANCE RECORDPERFORMANCE RECORD

Page 43: C:\fakepath\industrial training cement

DATA ON AMBIENT AIR QUALITY AND CRITICAL POLLUTANTSDATA ON AMBIENT AIR QUALITY AND CRITICAL POLLUTANTS

Page 44: C:\fakepath\industrial training cement
Page 45: C:\fakepath\industrial training cement

ACHIEVEMENTS OF JAYPEE CEMENT DIVISION

YEAR 2005B. FIMI’s Environment Award “Abheraj Baldota Environment Award” for Naubasta

Limestone Mine.C. Award Presented by Indian Bureau of Mines During Mines Environment &

Mineral Conservation Week (Jabalpur Region) to Jaypee Rewa Plant for Overall Performance, Afforestation and Water Quality Management.

YEAR 2006E. National Energy Conservation Award 2005, for cement sector conferred by

Govt. of India, Ministry of Power.

YEAR 2007 G. FLS (F.L. Smidth) Energy Award 2007 for Maximum percentage reduction in

Thermal Energy (Kcal) consumption per kg of Clinker production over year 2005-06 (Jaypee Rewa Plant) & Minimum % of Auxiliary power consumption with respect to Thermal power generation (Jaypee Bela Unit, Captive Power Plant, 2005-06).

H. Award for Management of Sub- Grade Mineral received by Jaypee Limestone Mine of Jaiprakash Associates Limited during Mines Environment & Mineral Conservation Week

Continue

Page 46: C:\fakepath\industrial training cement

YEAR 2008n Award presented for Overall Performance, 'Use of Explosives & Dust Suppression

and Safety Education during Metalliferous Mines Safety Week Celebration Jabalpur Region.

n Naubasta Limestone Mine of Jaiprakash Associates Limited.National Safety Award for the year 2006 to Jaypee Rewa Plant for longest Accident Free Period.

YEAR 2009F. Jaypee Rewa Plant, Jaypeenagar and Jaypee Bela Plant, Jaypeepuram (Both Units of

Jaiprakash Associates Limited) were awarded Five Star Rating by the British Safety Council, London, U.K. for Health and Safety Management System.

YEAR 2010I. Indian Economic Development and Research Association National Award for

outstanding contribution in the field of mining by Jaiprakash Associated Limited.J. NSCI Safety Award, Presented by National Safety Council for the Overall Performance

of the Cement division of Jaiprakash Associates Limited.

Page 47: C:\fakepath\industrial training cement

CONCLUSIONCONCLUSION I have learned how science and engineering can interact in

useful ways and how remarkable training can occur even when it is profit driven at jaypee group while deadlines and budgets are important , creativity is not limited and true innovation occurs.

I was enough lucky to work with a group of enthusiastic and communicative people, who for whatever reason share enjoying what they are doing , the atmosphere at jaypee group is unique and hope that it stays that way.

It has been a unique opportunity and one that I will not soon forget; I am looking forward to continuing work there as a thesis student. My time there has been eye opening and I thoroughly recommend the experience to any other student who is thinking of applying.

Page 48: C:\fakepath\industrial training cement