Producer of the World’s Highest-Grade Graphite
Disclaimer
This presentation includes certain statements that may be deemed forward looking statements. All statements in this discussion, other than
statements of historical facts, which address future production, reserve potential, exploration activities and events or developments that the
Company expects, are forward looking statements. Such forward-looking statements include, without limitation: (i) estimates of future
graphite prices, supply, demand and/or production; (ii) estimates of future cash costs; (iii) estimates of future capital expenditures; (iv)
estimates regarding timing of future development, construction, production or closure activities; (v) statements regarding future exploration
results; (vi) statements regarding cost structure, project economics, or competitive position, and; (vii) statements comparing the Company’s
properties to other mines, projects or metals. Although the Company believes the expectations expressed in such forward-looking statements
are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may
differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward
looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general
economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance, that
the Company expressly disclaims any responsibility for revising or expanding the forward-looking statements to reflect actual results or
developments, and that actual results or developments may differ materially from those projected, in the forward- looking statements. The
projections contained in the presentation are speculative and have not demonstrated economic viability and are not (NI 43-101) complaint.
The geological information / technical information of this presentation has not been reviewed and approved by arms length qualified person
under NI 43-101 and therefore not to be relied upon. The information received is for personal use. Investing involves a great deal of risk,
including the loss of all or a portion of your investment, as well as emotional distress. Nothing contained herein should be construed as a
warranty of investment results or advice. All risks, losses and costs associated with investing, including loss of principal, are your
responsibility.
TSXV: CYL
Ceylon Graphite’s current mission is to be the low cost, low impact, global supplier of the highest quality graphite products 100 % trackable and transparent, to a rapidly growing energy storage market.
• Highest grade in situ graphite on the planet -90% +Cg
• Estimated total cost to production per mine US$ 2/2.5 mn
• 2/3 years construction and permitting time frame
• 121 mine sites
• Estimated mine life 50 years
• K 1 mine in commercial production -5000tons pa
• M1 mine will be in production 2nd half of2021
• Battery grade certified
• Lowest quartile production costs – US$220/ton
• Breakeven cash flows on smallproduction
• Energy storage supply chain looking forglobal
sourcing diversity
TSXV: CYL
Mantra: Production Production Production
• Graphite is a mineral with unique thermal, chemical,
and electrical properties.
• Derived from carbon, it is biocompatible.
• Has been designated a critical mineral by the United
States due to its supply chain vulnerability and its
importance to national security.
• All the products shown require some form of
refined/purified form of graphite.
Steel /
Refractory
What is Graphite? Lubricants Electric Cars
Batteries/Energy
Storage
Lightweight
Composites
Coatings/
Inks
Water
Treatment
Biomedical
Devices
Smart Materials &
IOT
TSXV: CYL
Graphite Demand
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
At present, EVs account for 200,000 tpa of graphite demand in a
market of between 700-800,000tpa. However, BMI forecasts the
EV figure will soar to nearly 3Mtpa in 2030 in a 4Mtpa market
TSXV: CYL
Carburisation Lubricants Graphite shapesRefractory and foundry Expandable Graphite Friction productsCarbon brushes Other uses Li-ion battery
Graphite deficit
2022: Deficitfrom existing
operations
2028: Deficit
with all potential
new resources
0
2500000
5000000
7500000
2021
2018
2027
Tonnes
10000000
2020
2037
2015
2035
2016
2039
2033
2017
2019
2022
2031
2023
2024
2029
2025
2026
2034
2028
2030
2032
2036
2038
2040
Total Demand
Possible additonal tonnes
© Benchmark Mineral Intelligence 2019
Probable additonal tonnes
Highly Probable additonal tonnes
Operational supply
Graphite is used in the production of the anode for the lithium ion cell
Anode Electrolyte Cathode
Lithium Ion Cell - Diagram
Separator
Electrolyte
ELON MUSK
“ Our Cells should be called Nickel-Graphite, because primarily the cathode is nickel and the anode side is
graphite with silicon oxide [there's] a little bit of lithium in there, but it's like the salt on the salad
TSXV: CYL
Lithium
25,000 tonnes
Nickel
19,000 tonnes
Cobalt
6,000 tonnes
Graphite anode
33,000 tonnes
How much raw material does a
30GWh battery mega factory consume?
How Much Graphite is there in an EV
Vehicle (all 2019 model year) MSRP (USA)
Battery Pack Cost (1) Graphite
(2)
US$ kWh US$@$100/ kWh
kg
Tesla Model S 79,990 100 10,000 71
Hyundai Kona Electric SEL 36,950 64 6,400 45
Kia Niro EV 38,500 64 6,400 45
Chevrolet Bolt EV LT 36,620 60 6,000 43
Nissan Leaf S Plus 36,550 62 6,200 44
Audi e-Tron 74,800 95 9,500 67
BMW i3 44,450 42 4,200 30
Volkswagen e-Golf 31,895 36 3,600 26
1. Actual pack costs are currently higher than numbers quoted – these are target costs – Bloomberg NEF quotes 2020 average as US$110/ kWh
2. Assumptions: operating voltage at 3.92V. “for optimum range” and 360 mAh/g average capacity.
Actually: excess anode active material used (up to 20%); some use of 4 to 8% SiOx
TSXV: CYL
Strong Management Team
Anuka SozaDirector – Sarcon Development ( Pvt) Ltd
Manages day to day business in Sri Lanka. A
serial entrepreneur and successful multisector
businessman.
Ranjit PremasiriConsultant Geologist
Sasha JacobFounder & Strategic Advisor
Chair of the Canadian arm of The Nature Conservancy, Ex Vice Chair of
WorldWildlife Fund Serial Entrepreneur,
Canada’sFirst banker in Renewables and
Cleantech – raised over $ 8 bn.status
Bharat ParasharChairman/Chief Executive
42 years Asia Experience. CEO EMP Daiwa
Asia, DHead AIG Asia Infrastructure Fund
1,Co Head Citigroup Asia, CEO American
Express India. Head of Chemical Bank
Investment banking in Asia.
TSXV: CYL
Dr. Mallika BohmTechnical Director
Dr. Siva BohmChief Scientific Executive
1. Avissawella
2. Rathnapura
3. Balangoda
4. Ambalangoda
5. Morawaka
6. Nuwaraeliya
7. Mathugama
8. Kegalle
9. Attanagalle
10. Malsiripura
4 grids
25 grids
2grids
8grids
2grids
2grids
24grids
22grids
29grids(K1)
5 grids(M1)Map of Sarcon properties
9. 8.
1.
2. 3. 6.7.
5.4.
1010
• Total land package: 121 km2
(121 grids at 1x1 km) with
Exploration Licenses issued
by the Geological Society and
Mines Bureau (“GSMB”).
• Highest purity of in situ
graphite globally – Cg 90% +
( average).
• Comprises most of the
geologically identified graphite
resources in Sri Lanka (excl.
mines currently in production).
• K1 site in production and M1
to follow shortly.
Largest Land Package in Sri Lanka
Map of Ceylon Graphite GridsTSXV: CYL
Ceylon Graphite Production Highlights
Ceylon Graphitewas
established on
Jan 2 2017
December 2019,K1
announces
Commercial
Production
Dorfner ANZAPLAN
and AETC verifythat
graphite expandable
and spheroidizable.
Quality of graphite
exceptional.
May 2021 M1 site to
start Commercial
Production
H1 and P1 sites
expected to comeon
stream late 2022
Mid 2023
Upgrading/
Processingplant
December2023
mines 5 and6
commence
production
December 2024.
Mine 10 comeson
stream. Natural
Graphite capacity
50,000 tons
• Highest Grade in situ graphite
• Estimated total cost to production per mine US$ 2/2.5 million.
• Estimated cost of production per ton US$ 220.
• Estimated production per mine 5,000 tons per annum.
• Estimated mine life 50 years
• Battery grade certified
TSXV: CYL
K1 – In Production
ShaftArea Shaft at depth
First Production First Production
Shaft at depth
Miners at depth
TSXV: CYL
M1 – Production By 3rd Quarter
Graphite inShaft New Shaft Graphite inShaft
Size of GraphiteVeins Veins Keep GettingBigger
TSXV: CYL
Will Be A Technology Company
TSXV: CYL
Hired Globally Acknowledged Value Creators for Ceylon Graphite –
Will create next-gen graphene-enhanced technology applications
Are recognized developers of IP for practical applications to advance developmentPursuers of better products for commercialization of new techniques for people and the environment
Focus• Few Layer Graphene• LiB Anode Silicon Graphene Composite Nanotechnology• Smarter Paints/Coatings/Corrosion Protection• Energy Storage applications – Stationary/fast charge• Graphene based Building Materials - High Strength and CO2 reduction• Flow Batteries• CFRC Composite Products for the Aerospace Industry
Ceylon Graphite Highest Grade – Lowest Cost
Ticker Market Capitalization CapExGrade Cg Resource
Cost per Ton Location
Syrah Resources Ltd ASX: SYR AU$ 431mn US$300mn 11.00% US$475 Mozambique
Nouveau Monde Mining TSX-v: NOU C$ 186.7mn US$230mn 4.00% US$532 Canada
Zen Graphene TSX-v: ZEN C$ 135.11mn US$411mn 3.90% US$2,046 Canada
Magnis Energy ASX:MNS AU$ 123.3.7mn US$269mn 5.40% US$502 Tanzania
Ecograf ASX: EGR AU$ 65.5mn US$77.5mn 8.30% US$500 Tanzania
Walkabout Resources ASX:WKT AU$ 54.13mn US$27.8mn 10.80% US$347 Tanzania
Mason Graphite TSX.v: LLG C$ 51.2mn C$258mn 28.00% US$484 Canada
Battery Minerals ASX:BAT AU$ 48.2mn US$39.5mn 8.10% US$361 Mozambique
Triton Minerals ASX:TON AU$ 45.5mn US$99.4mn 6.20% US$634 Mozambique
SRG Graphite TSX-v:SRG C$ 45mn US$105.1mn 5.60% US$502 Guinea
Nextsource Materials TSX: NEXT C$ 41.86mn C$18.4mn 6.10% US$353 Madagascar
Leading Edge Materials TSX.v: LEM C$ 39.54mn US$16.7mn 9.30% US$730 Sweden
Ceylon Graphite TSX-v: CYL C$ 41.7 mn C$6.75mn 90%+ (vein) US$220 Sri Lanka
Source: Chris Ecclestone Hallgarten & Co
TSXV: CYL
Current Graphite Prices
Source :Benchmark GraphiteAssessment
Graphite Current Price Source
FLAKE, 94-95% Cg, -100 MESH US$ 540/ton China/Africa*
FLAKE, 94-95% Cg,+100 MESH US$ 768/ton China/Africa*
FLAKE, 94-95% Cg, +50 MESH US$ 1410/ton China/Africa*
VEIN, 94-95% Cg
* Largest Producers
US$ 2000/ton Sri Lanka
TSXV: CYL
Cash Flows
TSXV: CYL
Production (tons) 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
K1 1,000 3,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
M1 100 1,000 3,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 3 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 4 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 5 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 6 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 7 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 8 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 9 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Mine 10 500 2,500 4,000 5,000 5,000 5,000 5,000 5,000 5,000
Total Production 1,100 8,000 28,000 42,000 50,000 50,000 50,000 50,000 50,000 50,000
Net Revenue $1,742,400 $12,672,000 $44,352,000 $70,224,000 $88,000,000 $92,400,000 $96,800,000 $101,200,000 $105,600,000 $110,000,000
Gross Profit $1,373,900 $9,712,000 $32,928,000 $51,353,400 $63,288,500 $64,742,350 $65,476,585 $67,959,336 $69,310,270 $72,858,116
Margin % 69% 67% 65% 64% 63% 62% 60% 59% 58% 58%
EBITDA $413,900 $8,642,000 $31,748,000 $50,063,400 $61,888,500 $63,242,350 $63,976,585 $66,209,336 $67,310,270 $70,608,116
Margin % 21% 60% 63% 63% 62% 60% 58% 58% 56% 56%
Project cash flow $0 -$7,086,100 -$858,000 $27,248,000 $46,563,400 $60,888,500 $62,242,350 $62,976,585 $65,209,336 $66,310,270 $69,608,116
Debt issued (repaid) $7,000,000 -$1,400,000 -$1,400,000 -$1,400,000 -$1,400,000 -$1,400,000 $0 $0 $0 $0
Option & warrants exercised $8,375,396 $1,351,085
Net Cash $1,783,333 $9,572,629 $7,965,714 $33,253,714 $77,997,114 $137,205,614 $197,907,964 $260,884,549 $326,093,885 $392,404,155 $462,012,271
US$
Ceylon Graphite TSXV Performance
Market Capitalization : $ 39,447,919
Total Shares: 123,274,747
Warrants : 75,378,556
Options : 8,007,870
Insiders: 18,537,845 (15.16%)
Debt: 0
Convertible Debt - $ 1,185,000 @ C$ .25c
As of 2/25/2021.
TSXV: CYL
2020: A new decade will usher a new generation in energy storage
The PastGrowth in portable electronics continues to
grow but has quickly been overtaken by expansions in EVs
The PresentAdoption of passenger electric vehicles will bethe main driver of the industry over the comingdecade
The FutureESS applications have the potential to far
outstrip battery demand in EVs andrevolutionise the way energy is stored anddistributed
© Benchmark Mineral Intelligence 2020
TSXV: CYL
Ceylon Graphite is well positionedto grow Shareholder Value as demand for Graphite grows rapidly over the next few years
Product certified as battery grade
( spherical) marketable and expandable
Graphite is the “new oil” used in
Anodes for Batteries and Energy Storage.
Highest grade natural graphiteon the planet in situ is available at Ceylon Graphite Cg 90% +. K1 site in production and M1is anticipated to
follow shortly
Cheapest and quickest – Ceylon
Graphite builds a mine in 2 years and for US$ 2.5 mm.
Average cost of production US$ 220/ton.
Demand for natural graphite is
being driven by the energy storage and electric vehicle sectors.
Geographically well positionedfor the Eastern markets –China, Japan and Korea and Western markets Canada and USA.
TSXV: CYL
Contact
Bharat ParasharChairman and Chief Executive Officer
+1(202) 352-6022
Mailing Address
1100-1110 Melville Street
Vancouver, BC V6E 4A6
Canada
Corporate Communications
+1(202)352-6022
www.ceylongraphite.com @ceylongraphite @ceylongraphite
TSXV: CYL