Cetrel Case Study in English

26
Fotos: Araquém Alcântara January 2013

Transcript of Cetrel Case Study in English

Page 2: Cetrel Case Study in English
Page 3: Cetrel Case Study in English

CAMAÇARI INDUSTRIAL COMPLEX

► Over 90 chemical companies, petrochemical and other industries such as

automotive, pulp, copper metallurgy, textiles, fertilizers, energy drinks and

services.

► CETREL is responsible for the treatment and final disposal of the industrial

effluents and waste, as well as for the environmental monitoring of the

industrial complex and of its entire area of influence.

Page 4: Cetrel Case Study in English

CETREL

► Created in 1978 to operate together with the other industries of Camaçari

Industrial Pole.

► The company defines actions for diagnosis and remediation of

contaminated areas integrated into a number of strategies for the

sustainable management of water resources.

► Makes investments every year into new technologies and processes

equivalent to 7% of the company’s total invoicing, always aiming to

generate the best solutions, adding value and competitiveness to its

clients.

Page 5: Cetrel Case Study in English

► Integrate the new tools with the internal laboratory systems LIMS – MyLIMS and financial

systems, providing a planned workflow and reduction of failures for the involved

departments.

► Store and manage large amounts of environmental data (more than two thousand

monitoring wells and about two million analytical results) in a secure, reliable and fast

processing environment while also increasing quality control of the data.

► Ensure efficient data collection of multiple field technicians generating data simultaneously.

► Increase productivity in performing routine activities such as reducing the time to collect

and analyze data.

► Improve the customer relationship reflecting greater speed and quality in the delivery of

data analysis.

► Establish quality guidelines and create workflows without deviations, allowing decision

making with greater credibility.

Page 6: Cetrel Case Study in English

Worked in partnership with GEOKLOCK integrating systems, creating a workflow with fully planned sampling, execution of fieldwork, association with analytical results and financial close.

Implemented EarthSoft’s EQuIS Sample Planning Module (SPM) tool for the development of the Management Plan for Water Resources directed primarily to the demands of the Camaçari Industrial Pole.

Implemented EarthSoft’s EQuIS Data Gathering Engine (EDGE) on mobile electronic devices to replace paper forms to use in accordance with fieldwork (in the first week, 30% of reduction in time to collect field data and to insert into the database).

Standardized chain of custody, allowed to conduct standards for the most diverse types of data and increased the level of internal organization.

Provided greater employee motivation and customer satisfaction, making the development and delivery of consistent and reliable reports more functional and faster.

Page 7: Cetrel Case Study in English

Worked in partnership with GEOKLOCK to create the integration of systems, creating a complete workflow with planning of sampling, execution of fieldwork, association with analytical results and financial closure.

Examples of the revenue forecast ( Córdoba ) interacting with EQuIS Examples of the LIMS ( My Lims ) interacting with EarthSoft’s EQuIS

Page 8: Cetrel Case Study in English

Worked in partnership with GEOKLOCK to create the integration of systems, creating a complete workflow with planning of sampling, execution of fieldwork, association with analytical results and financial closure.

Implemented EarthSoft’s EQuIS Sample Planning Module (SPM) tool for the development of the Management Plan for Water Resources directed primarily to the demands of the Camaçari Industrial Pole.

Examples of Scheduling a Task and Planning Samples in EQuIS Sample Planning Module (SPM)

Page 9: Cetrel Case Study in English

Worked in partnership with GEOKLOCK to create the integration of systems, creating a complete workflow with planning of sampling, execution of fieldwork, association with analytical results and financial closure.

Implemented a planning tool SPM for the development of the Management Plan for Water Resources directed primarily to the demands of the Petrochemical Pole.

Implemented EDGE in mobile electronic devices to replace paper forms in the realization of fieldwork (in the first week, 30% of reduction in time to collect field data and to insert them in the database).

Example of measuring water levels Example of In Situ Parameters Stabilization

Page 10: Cetrel Case Study in English

Worked in partnership with GEOKLOCK to create the integration of systems, creating a complete workflow with planning of sampling, execution of fieldwork, association with analytical results and financial closure.

Implemented EarthSoft’s EQuIS Data Gathering Engine (EDGE) in mobile electronic devices to replace paper forms to use in accordance with fieldwork (in the first week, 30% of reduction in time to collect field data and to insert into the database).

Standardized chain of custody, allowed to conduct standards for the most diverse types of data and increased the level of internal organization.

Example of the EQuIS Data Gathering Engine’s (EDGE) automated COC

Page 11: Cetrel Case Study in English
Page 16: Cetrel Case Study in English

- The field data are uploaded into the EQuIS Database - First, this data will pass through a validation process in the EQuIS Data Processor (EDP)

EQuIS Database

SPM

Billing System

EDGE

EDD

EDP

Laboratory System

Page 22: Cetrel Case Study in English
Page 23: Cetrel Case Study in English
Page 24: Cetrel Case Study in English
Page 25: Cetrel Case Study in English