water resource specialists Contributors Andrey Shvidchenko, Brent Wolfe and Jimmy Pan (Northwest Hydraulic Consultants); Dan Charlton, Tesfaye Demissie, and Mark Johnson (Coachella Valley Water District); Soma Balachandran (GENTERRA); and Robert Bezek (FEMA) Certification Process for North Indio East Side Dike in the Coachella Valley September 7, 2016 Brady McDaniel (Northwest Hydraulic Consultants)

Transcript of Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of...

Page 1: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Contributors Andrey Shvidchenko, Brent Wolfe and Jimmy Pan (Northwest Hydraulic Consultants); Dan Charlton, Tesfaye Demissie, and Mark Johnson (Coachella Valley Water District);

Soma Balachandran (GENTERRA); and Robert Bezek (FEMA)

Certification Process for North Indio

East Side Dike in the Coachella Valley

September 7, 2016

Brady McDaniel (Northwest Hydraulic Consultants)

Presenter
Presentation Notes
Studies conducted for CVWD by NHC
Page 2: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Presentation Outline • Site Background • Description of Overall System • Local Levee Partnership Team (LLPT) • Hydrology and Hydraulics Study • Erosion and Scour • Geotechnical Investigation • FEMA Preliminary Review • Next Steps in Certification Process

Page 3: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

Thousand Palms Watershed

Morongo Wash Watershed

North Indio Watershed

East La Quinta Watershed

Bear Creek Watershed

Other Rancho Mirage

Watershed

Palm Valley Watershed

East & West Magnesia

Watershed

Deep Canyon Watershed

Dikes No. 2 & 4 Watershed

Mecca/North Shore SMP Watershed

Coachella Valley Water District Stormwater Unit Boundary

RCFCWCD

RCFCWCD Oasis Area Watershed

Mecca/North Shore Area Watershed

Salton Sea West Shore of Salton Sea Watershed

Imperial Co.

San Diego Co.

San Bernardino Co.

Riverside Co.

CVWD Watersheds

Presenter
Presentation Notes
General Overview of the CVWD Service Area Highlight the Morongo, Thousand Palms and North Indio Areas
Page 4: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

East Side Dike (Adams to I-10)

• Unaccredited • USBR Facility • CVWD Operated/Regional Flood

Control • Designed for Standard Project

Flood • Originally Built to Protect the

Coachella Canal and Downstream Farmland

• Development Downstream • 9 Mile Stretch of Levee Applying

for Certification • 144 Square Mile Watershed

Presenter
Presentation Notes
General Notes on the Facility
Page 5: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Presenter
Presentation Notes
Discuss the flood control facilities in this portion of the valley and how the ESD would provide protection
Page 6: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

FEMA Effective FIRM

Presenter
Presentation Notes
Discuss current flood map and how certification and other measures would minimize flooding
Page 7: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Local Levee Partnership Team (LLPT)

• Coordination with tribal, territorial, state, local officials and levee owners

• Participant List Developed by FEMA and CVWD • Participants

– FEMA, CVWD, NHC, USBR, Riverside County, Cabazon and 29 Palms Band of Mission Indians, Torres Martinez Desert Cahuilla Indians, Coachella Valley Association of Governments, City of Indio, City of Coachella, Local HOA’s and Others

Page 8: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

LLPT Meetings • Meetings held periodically to review available data,

documentation and information • Discuss the participants concerns • Provide preliminary maps • Outline potential next steps in the analysis and

mapping process • Meeting (#1) held after H&H Report was complete • Meeting (#2) held after Erosion and Geotechnical

Studies

Page 9: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Technical Study Overview

• Hydrology and Hydraulics • Erosion and Scour Study • Geotechnical Investigation • Erosion Protection Design (Next Step)

Presenter
Presentation Notes
Focus on Floodwaters entering from Morongo Wash, Long Canyon, East and West Wide Canyons, Willow Hole, Thousand Palms Canyon and small unnamed canyons and washes in the Indio Hills Updated Analysis for new CVWD standards and updated Updated hydrology then available for proposed development in the areas
Page 10: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Hydrology and Hydraulics • HEC-HMS Model

NOAA Atlas 14; Multiple Storm Centerings; CVWD Standards

• MIKE 2D Models – Floodplain Routing from Alluvial Fans – Sediment Analysis on Water Levels – Fine and Coarse Mesh

• Sufficient Freeboard Throughout

Presenter
Presentation Notes
Outline of what is to be covered
Page 11: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Watersheds

Page 12: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

2D Model Domain

Page 13: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Hydraulic Results

Page 14: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Hydraulic Results

Page 15: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Potential Flooding (Breach Scenario)

Page 16: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Erosion and Scour

• Potential Scour Calculation, using CVWD Standard Procedures (Blench Regime)

• MIKE Model Results Used • Peak Unit Discharge • Threshold Velocities • Effective Flow Width (Lacey Equation) • Scour Protection Needed for 12,300 feet of Dike

(~2.3 miles); Upstream Reach Only

Page 17: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Erosion Protection Reaches

Page 18: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Geotechnical Investigation • Completed by GENTERRA • Used H&H and Erosion and Scour Report Findings • Seepage and Slope Stability met Minimum Factors

of Safety • O&M Plan for Seismic Activity Required • Recommended Soil Cement Blanket Liner for

Areas of Potential Erosion • Estimated Cost of Soil Cement $6 Million to $7.5

Million

Page 19: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Overall Summary • Updated Hydrology and Hydraulics • Adequate Freeboard for Reach • Stability and Seepage Minimum Factors of Safety • Slope Protection Necessary for 2.3 miles of Dike • Recommendation of 8-foot wide soil cement

blanket liner where Erosion and Scour Analysis Showed Potential Erosion

Page 20: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

FEMA Review • FEMA Provided General Overall Review of CVWD

Documents – Hydrology and Hydraulics Report – Geotechnical Analysis – Erosion and Scour Analysis

• If recommendations are implemented the dike should meet the requirements of 44 CFR Section 65.10 of the NFIP Regulations

Page 21: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Certification Steps Completed

• H&H Report – Freeboard Estimation – Sediment Transport

• Erosion and Scour Study – Embankment Protection

• Geotechnical Investigation – Stability – Seepage – Potential Settling of Levee

Page 22: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Next Steps for Certification

• Feedback from LLPT Meeting #2 • Technical Review from FEMA • Detailed Design of Erosion Protection Measures,

Plans and Specifications • Complete Remaining 44 CFR 65.10 Requirements

– Topographic Workmap, Engineering Drawings, O&M Plan and Closure/Interior Drainage Reports

• LLPT Meeting #3 • Application for CLOMR

Page 23: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Timeline • Re-mapping of Flood Hazards (2 to 3 years)

– LAMP Procedure – Physical Map Revision (PMR)

• Certification of Levee (3 to 4 years) – Design of Erosion Protection and Environmental Studies (ESA) – CLOMR – Prepare Bid Document and Select Contractor – Construction followed by LOMR

• Moving Towards Certification Only

Page 24: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.

water resource specialists

Questions?