Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The...

24
RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk 1 Amaro Signalling Ltd Supplier Name 2641 Supplier Number is now qualified by Audit on RISQS 20/12/2020 Audit Expiry: This is to certify that

Transcript of Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The...

Page 1: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

RISQS Scheme Manager

Certificate of Audit

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

1

Amaro Signalling LtdSupplier Name

2641Supplier Number

is now qualified by Audit on RISQS

20/12/2020Audit Expiry:

This is to certify that

Page 2: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

2

Industry Minimum Requirements,Safe Work Planning,Sentinel

Modules Covered

2641Supplier ID:

Amaro Signalling LtdSupplier Name:

Product Code Product Name Result

Temporary Labour (Electrification) ServiceA.A.1.2N

Heritage Automatic Train Protection (ATP) unit DesignB.B.2Q

Heritage Automatic Train Protection (ATP) unit CommissionB.B.2T

Heritage Automatic Train Protection (ATP) unit MaintainB.B.2V

Heritage Automatic Train Protection (ATP) unit InstallB.B.2X

Heritage Automatic Train Protection (ATP) unit ModifyB.B.2Y

Heritage Automatic Train Protection (ATP) unit DecommissionB.B.2Z

Track Circuits (including Level Crossings) DesignB.C.1.1.1Q

Track Circuits (including Level Crossings) CommissionB.C.1.1.1T

Track Circuits (including Level Crossings) MaintainB.C.1.1.1V

Track Circuits (including Level Crossings) OverhaulB.C.1.1.1W

Track Circuits (including Level Crossings) InstallB.C.1.1.1X

Track Circuits (including Level Crossings) ModifyB.C.1.1.1Y

Track Circuits (including Level Crossings) DecommissionB.C.1.1.1Z

Track Circuit Interrupters DesignB.C.1.1.2Q

Track Circuit Interrupters CommissionB.C.1.1.2T

Track Circuit Interrupters MaintainB.C.1.1.2V

Track Circuit Interrupters OverhaulB.C.1.1.2W

Track Circuit Interrupters InstallB.C.1.1.2X

Track Circuit Interrupters ModifyB.C.1.1.2Y

Track Circuit Interrupters DecommissionB.C.1.1.2Z

Axle Counters (including Level Crossings) DesignB.C.1.1.3Q

Axle Counters (including Level Crossings) CommissionB.C.1.1.3T

Axle Counters (including Level Crossings) MaintainB.C.1.1.3V

Axle Counters (including Level Crossings) OverhaulB.C.1.1.3W

Axle Counters (including Level Crossings) InstallB.C.1.1.3X

Axle Counters (including Level Crossings) ModifyB.C.1.1.3Y

Axle Counters (including Level Crossings) DecommissionB.C.1.1.3Z

Treadles (including Level Crossings) DesignB.C.1.1.4Q

Treadles (including Level Crossings) CommissionB.C.1.1.4T

Treadles (including Level Crossings) MaintainB.C.1.1.4V

Treadles (including Level Crossings) OverhaulB.C.1.1.4W

Treadles (including Level Crossings) InstallB.C.1.1.4X

Treadles (including Level Crossings) ModifyB.C.1.1.4Y

Treadles (including Level Crossings) DecommissionB.C.1.1.4Z

Colour Light Signals DesignB.C.1.2.1Q

Colour Light Signals CommissionB.C.1.2.1T

Colour Light Signals MaintainB.C.1.2.1V

Colour Light Signals OverhaulB.C.1.2.1W

Colour Light Signals InstallB.C.1.2.1X

Colour Light Signals ModifyB.C.1.2.1Y

Colour Light Signals DecommissionB.C.1.2.1Z

Banner Signals DesignB.C.1.2.2Q

Banner Signals CommissionB.C.1.2.2T

Banner Signals MaintainB.C.1.2.2V

Page 3: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

3

Product Code Product Name Result

Banner Signals OverhaulB.C.1.2.2W

Banner Signals InstallB.C.1.2.2X

Banner Signals ModifyB.C.1.2.2Y

Banner Signals DecommissionB.C.1.2.2Z

Draw Ahead Signals DesignB.C.1.2.3Q

Draw Ahead Signals CommissionB.C.1.2.3T

Draw Ahead Signals MaintainB.C.1.2.3V

Draw Ahead Signals OverhaulB.C.1.2.3W

Draw Ahead Signals InstallB.C.1.2.3X

Draw Ahead Signals ModifyB.C.1.2.3Y

Draw Ahead Signals DecommissionB.C.1.2.3Z

Ground Position Light Signals DesignB.C.1.2.4Q

Ground Position Light Signals CommissionB.C.1.2.4T

Ground Position Light Signals MaintainB.C.1.2.4V

Ground Position Light Signals OverhaulB.C.1.2.4W

Ground Position Light Signals InstallB.C.1.2.4X

Ground Position Light Signals ModifyB.C.1.2.4Y

Ground Position Light Signals DecommissionB.C.1.2.4Z

Signal Lamps (including LEDs) & Lamp Holders DesignB.C.1.2.5Q

Signal Lamps (including LEDs) & Lamp Holders CommissionB.C.1.2.5T

Signal Lamps (including LEDs) & Lamp Holders MaintainB.C.1.2.5V

Signal Lamps (including LEDs) & Lamp Holders OverhaulB.C.1.2.5W

Signal Lamps (including LEDs) & Lamp Holders InstallB.C.1.2.5X

Signal Lamps (including LEDs) & Lamp Holders ModifyB.C.1.2.5Y

Signal Lamps (including LEDs) & Lamp Holders DecommissionB.C.1.2.5Z

Signal Lenses DesignB.C.1.2.6Q

Signal Lenses CommissionB.C.1.2.6T

Signal Lenses MaintainB.C.1.2.6V

Signal Lenses OverhaulB.C.1.2.6W

Signal Lenses InstallB.C.1.2.6X

Signal Lenses ModifyB.C.1.2.6Y

Signal Lenses DecommissionB.C.1.2.6Z

Points Indicators DesignB.C.1.2.7Q

Points Indicators CommissionB.C.1.2.7T

Points Indicators MaintainB.C.1.2.7V

Points Indicators OverhaulB.C.1.2.7W

Points Indicators InstallB.C.1.2.7X

Points Indicators ModifyB.C.1.2.7Y

Points Indicators DecommissionB.C.1.2.7Z

Right Away/Close Door Indicators (RA/CD) DesignB.C.1.2.8Q

Right Away/Close Door Indicators (RA/CD) CommissionB.C.1.2.8T

Right Away/Close Door Indicators (RA/CD) MaintainB.C.1.2.8V

Right Away/Close Door Indicators (RA/CD) OverhaulB.C.1.2.8W

Right Away/Close Door Indicators (RA/CD) InstallB.C.1.2.8X

Right Away/Close Door Indicators (RA/CD) ModifyB.C.1.2.8Y

Right Away/Close Door Indicators (RA/CD) DecommissionB.C.1.2.8Z

Off Indicators DesignB.C.1.2.9Q

Off Indicators CommissionB.C.1.2.9T

Off Indicators MaintainB.C.1.2.9V

Off Indicators OverhaulB.C.1.2.9W

Page 4: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

4

Product Code Product Name Result

Off Indicators InstallB.C.1.2.9X

Off Indicators ModifyB.C.1.2.9Y

Off Indicators DecommissionB.C.1.2.9Z

Train Ready To Start (TRTS) DesignB.C.1.2.10Q

Train Ready To Start (TRTS) CommissionB.C.1.2.10T

Train Ready To Start (TRTS) MaintainB.C.1.2.10V

Train Ready To Start (TRTS) OverhaulB.C.1.2.10W

Train Ready To Start (TRTS) InstallB.C.1.2.10X

Train Ready To Start (TRTS) ModifyB.C.1.2.10Y

Train Ready To Start (TRTS) DecommissionB.C.1.2.10Z

Marker Posts - Shunt & SPAD Indicators DesignB.C.1.2.11Q

Marker Posts - Shunt & SPAD Indicators CommissionB.C.1.2.11T

Marker Posts - Shunt & SPAD Indicators MaintainB.C.1.2.11V

Marker Posts - Shunt & SPAD Indicators OverhaulB.C.1.2.11W

Marker Posts - Shunt & SPAD Indicators InstallB.C.1.2.11X

Marker Posts - Shunt & SPAD Indicators ModifyB.C.1.2.11Y

Marker Posts - Shunt & SPAD Indicators DecommissionB.C.1.2.11Z

Level Crossing Controls DesignB.C.1.3.1Q

Level Crossing Controls CommissionB.C.1.3.1T

Level Crossing Controls MaintainB.C.1.3.1V

Level Crossing Controls OverhaulB.C.1.3.1W

Level Crossing Controls InstallB.C.1.3.1X

Level Crossing Controls ModifyB.C.1.3.1Y

Level Crossing Controls DecommissionB.C.1.3.1Z

Level Crossing Mechanical Equipment e.g. Booms & Barriers DesignB.C.1.3.2Q

Level Crossing Mechanical Equipment e.g. Booms & Barriers CommissionB.C.1.3.2T

Level Crossing Mechanical Equipment e.g. Booms & Barriers MaintainB.C.1.3.2V

Level Crossing Mechanical Equipment e.g. Booms & Barriers OverhaulB.C.1.3.2W

Level Crossing Mechanical Equipment e.g. Booms & Barriers InstallB.C.1.3.2X

Level Crossing Mechanical Equipment e.g. Booms & Barriers ModifyB.C.1.3.2Y

Level Crossing Mechanical Equipment e.g. Booms & Barriers DecommissionB.C.1.3.2Z

Level Crossing Warning Devices DesignB.C.1.3.3Q

Level Crossing Warning Devices CommissionB.C.1.3.3T

Level Crossing Warning Devices MaintainB.C.1.3.3V

Level Crossing Warning Devices OverhaulB.C.1.3.3W

Level Crossing Warning Devices InstallB.C.1.3.3X

Level Crossing Warning Devices ModifyB.C.1.3.3Y

Level Crossing Warning Devices DecommissionB.C.1.3.3Z

Light Units/Wig Wags DesignB.C.1.3.4Q

Light Units/Wig Wags CommissionB.C.1.3.4T

Light Units/Wig Wags MaintainB.C.1.3.4V

Light Units/Wig Wags OverhaulB.C.1.3.4W

Light Units/Wig Wags InstallB.C.1.3.4X

Light Units/Wig Wags ModifyB.C.1.3.4Y

Light Units/Wig Wags DecommissionB.C.1.3.4Z

Audible Devices - Bells DesignB.C.1.3.5Q

Audible Devices - Bells CommissionB.C.1.3.5T

Audible Devices - Bells MaintainB.C.1.3.5V

Audible Devices - Bells OverhaulB.C.1.3.5W

Audible Devices - Bells InstallB.C.1.3.5X

Page 5: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

5

Product Code Product Name Result

Audible Devices - Bells ModifyB.C.1.3.5Y

Audible Devices - Bells DecommissionB.C.1.3.5Z

Signage DesignB.C.1.3.6Q

Signage CommissionB.C.1.3.6T

Signage MaintainB.C.1.3.6V

Signage OverhaulB.C.1.3.6W

Signage InstallB.C.1.3.6X

Signage ModifyB.C.1.3.6Y

Signage DecommissionB.C.1.3.6Z

Predictor (New Level Crossing Train Detection System) DesignB.C.1.3.7Q

Predictor (New Level Crossing Train Detection System) CommissionB.C.1.3.7T

Predictor (New Level Crossing Train Detection System) MaintainB.C.1.3.7V

Predictor (New Level Crossing Train Detection System) OverhaulB.C.1.3.7W

Predictor (New Level Crossing Train Detection System) InstallB.C.1.3.7X

Predictor (New Level Crossing Train Detection System) ModifyB.C.1.3.7Y

Predictor (New Level Crossing Train Detection System) DecommissionB.C.1.3.7Z

HPSS DesignB.C.1.4.1Q

HPSS CommissionB.C.1.4.1T

HPSS MaintainB.C.1.4.1V

HPSS OverhaulB.C.1.4.1W

HPSS InstallB.C.1.4.1X

HPSS ModifyB.C.1.4.1Y

HPSS DecommissionB.C.1.4.1Z

Clamplock Points DesignB.C.1.4.2Q

Clamplock Points CommissionB.C.1.4.2T

Clamplock Points MaintainB.C.1.4.2V

Clamplock Points OverhaulB.C.1.4.2W

Clamplock Points InstallB.C.1.4.2X

Clamplock Points ModifyB.C.1.4.2Y

Clamplock Points DecommissionB.C.1.4.2Z

Point Machines DesignB.C.1.4.3Q

Point Machines CommissionB.C.1.4.3T

Point Machines MaintainB.C.1.4.3V

Point Machines OverhaulB.C.1.4.3W

Point Machines InstallB.C.1.4.3X

Point Machines ModifyB.C.1.4.3Y

Point Machines DecommissionB.C.1.4.3Z

Mechanical Backdrive DesignB.C.1.4.4Q

Mechanical Backdrive CommissionB.C.1.4.4T

Mechanical Backdrive MaintainB.C.1.4.4V

Mechanical Backdrive OverhaulB.C.1.4.4W

Mechanical Backdrive InstallB.C.1.4.4X

Mechanical Backdrive ModifyB.C.1.4.4Y

Mechanical Backdrive DecommissionB.C.1.4.4Z

Powerlink Backdrive DesignB.C.1.4.5Q

Powerlink Backdrive CommissionB.C.1.4.5T

Powerlink Backdrive MaintainB.C.1.4.5V

Powerlink Backdrive OverhaulB.C.1.4.5W

Powerlink Backdrive InstallB.C.1.4.5X

Powerlink Backdrive ModifyB.C.1.4.5Y

Page 6: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

6

Product Code Product Name Result

Powerlink Backdrive DecommissionB.C.1.4.5Z

SO (Hydraulic Backdrive) DesignB.C.1.4.6Q

SO (Hydraulic Backdrive) CommissionB.C.1.4.6T

SO (Hydraulic Backdrive) MaintainB.C.1.4.6V

SO (Hydraulic Backdrive) OverhaulB.C.1.4.6W

SO (Hydraulic Backdrive) InstallB.C.1.4.6X

SO (Hydraulic Backdrive) ModifyB.C.1.4.6Y

SO (Hydraulic Backdrive) DecommissionB.C.1.4.6Z

Patrolman Switch DesignB.C.1.5.1Q

Patrolman Switch CommissionB.C.1.5.1T

Patrolman Switch MaintainB.C.1.5.1V

Patrolman Switch InstallB.C.1.5.1X

Patrolman Switch ModifyB.C.1.5.1Y

Patrolman Switch DecommissionB.C.1.5.1Z

ATWS DesignB.C.1.5.2Q

ATWS CommissionB.C.1.5.2T

ATWS MaintainB.C.1.5.2V

ATWS InstallB.C.1.5.2X

ATWS ModifyB.C.1.5.2Y

ATWS DecommissionB.C.1.5.2Z

Route Relay Interlocking Free Wired Both Yellow Book & Western Region DesignB.C.1.6.1Q

Route Relay Interlocking Free Wired Both Yellow Book & Western Region CommissionB.C.1.6.1T

Route Relay Interlocking Free Wired Both Yellow Book & Western Region MaintainB.C.1.6.1V

Route Relay Interlocking Free Wired Both Yellow Book & Western Region OverhaulB.C.1.6.1W

Route Relay Interlocking Free Wired Both Yellow Book & Western Region InstallB.C.1.6.1X

Route Relay Interlocking Free Wired Both Yellow Book & Western Region ModifyB.C.1.6.1Y

Route Relay Interlocking Free Wired Both Yellow Book & Western Region DecommissionB.C.1.6.1Z

West Pac 1,2,3,4 DesignB.C.1.6.2Q

West Pac 1,2,3,4 CommissionB.C.1.6.2T

West Pac 1,2,3,4 MaintainB.C.1.6.2V

West Pac 1,2,3,4 OverhaulB.C.1.6.2W

West Pac 1,2,3,4 InstallB.C.1.6.2X

West Pac 1,2,3,4 ModifyB.C.1.6.2Y

West Pac 1,2,3,4 DecommissionB.C.1.6.2Z

GEC Geographical DesignB.C.1.6.3Q

GEC Geographical CommissionB.C.1.6.3T

GEC Geographical MaintainB.C.1.6.3V

GEC Geographical OverhaulB.C.1.6.3W

GEC Geographical InstallB.C.1.6.3X

GEC Geographical ModifyB.C.1.6.3Y

GEC Geographical DecommissionB.C.1.6.3Z

SSI DesignB.C.1.6.4Q

SSI CommissionB.C.1.6.4T

SSI MaintainB.C.1.6.4V

SSI OverhaulB.C.1.6.4W

SSI InstallB.C.1.6.4X

SSI ModifyB.C.1.6.4Y

SSI DecommissionB.C.1.6.4Z

SIMS W DesignB.C.1.6.5Q

SIMS W CommissionB.C.1.6.5T

Page 7: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

7

Product Code Product Name Result

SIMS W MaintainB.C.1.6.5V

SIMS W OverhaulB.C.1.6.5W

SIMS W InstallB.C.1.6.5X

SIMS W ModifyB.C.1.6.5Y

SIMS W DecommissionB.C.1.6.5Z

Ansaldo DesignB.C.1.6.6Q

Ansaldo CommissionB.C.1.6.6T

Ansaldo MaintainB.C.1.6.6V

Ansaldo OverhaulB.C.1.6.6W

Ansaldo InstallB.C.1.6.6X

Ansaldo ModifyB.C.1.6.6Y

Ansaldo DecommissionB.C.1.6.6Z

Signal Control Panel NX DesignB.C.1.7.1Q

Signal Control Panel NX CommissionB.C.1.7.1T

Signal Control Panel NX MaintainB.C.1.7.1V

Signal Control Panel NX OverhaulB.C.1.7.1W

Signal Control Panel NX InstallB.C.1.7.1X

Signal Control Panel NX ModifyB.C.1.7.1Y

Signal Control Panel NX DecommissionB.C.1.7.1Z

Signal Control Panel - One Switch NX DesignB.C.1.7.2Q

Signal Control Panel - One Switch NX CommissionB.C.1.7.2T

Signal Control Panel - One Switch NX MaintainB.C.1.7.2V

Signal Control Panel - One Switch NX OverhaulB.C.1.7.2W

Signal Control Panel - One Switch NX InstallB.C.1.7.2X

Signal Control Panel - One Switch NX ModifyB.C.1.7.2Y

Signal Control Panel - One Switch NX DecommissionB.C.1.7.2Z

VDU Based Systems DesignB.C.1.7.3Q

VDU Based Systems CommissionB.C.1.7.3T

VDU Based Systems MaintainB.C.1.7.3V

VDU Based Systems OverhaulB.C.1.7.3W

VDU Based Systems InstallB.C.1.7.3X

VDU Based Systems ModifyB.C.1.7.3Y

VDU Based Systems DecommissionB.C.1.7.3Z

IECC Signal Control & Indication Equipment DesignB.C.1.7.4Q

IECC Signal Control & Indication Equipment CommissionB.C.1.7.4T

IECC Signal Control & Indication Equipment MaintainB.C.1.7.4V

IECC Signal Control & Indication Equipment InstallB.C.1.7.4X

IECC Signal Control & Indication Equipment ModifyB.C.1.7.4Y

IECC Signal Control & Indication Equipment DecommissionB.C.1.7.4Z

RETB Signal Control & Indication Equipment DesignB.C.1.7.5Q

RETB Signal Control & Indication Equipment CommissionB.C.1.7.5T

RETB Signal Control & Indication Equipment MaintainB.C.1.7.5V

RETB Signal Control & Indication Equipment OverhaulB.C.1.7.5W

RETB Signal Control & Indication Equipment InstallB.C.1.7.5X

RETB Signal Control & Indication Equipment ModifyB.C.1.7.5Y

RETB Signal Control & Indication Equipment DecommissionB.C.1.7.5Z

Train Describers (Mechanical) DesignB.C.1.8.1Q

Train Describers (Mechanical) CommissionB.C.1.8.1T

Train Describers (Mechanical) MaintainB.C.1.8.1V

Train Describers (Mechanical) OverhaulB.C.1.8.1W

Page 8: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

8

Product Code Product Name Result

Train Describers (Mechanical) InstallB.C.1.8.1X

Train Describers (Mechanical) ModifyB.C.1.8.1Y

Train Describers (Mechanical) DecommissionB.C.1.8.1Z

Train Describers (Electronic) DesignB.C.1.8.2Q

Train Describers (Electronic) CommissionB.C.1.8.2T

Train Describers (Electronic) MaintainB.C.1.8.2V

Train Describers (Electronic) OverhaulB.C.1.8.2W

Train Describers (Electronic) InstallB.C.1.8.2X

Train Describers (Electronic) ModifyB.C.1.8.2Y

Train Describers (Electronic) DecommissionB.C.1.8.2Z

Ground Frames Manual DesignB.C.1.9.1Q

Ground Frames Manual CommissionB.C.1.9.1T

Ground Frames Manual MaintainB.C.1.9.1V

Ground Frames Manual OverhaulB.C.1.9.1W

Ground Frames Manual InstallB.C.1.9.1X

Ground Frames Manual ModifyB.C.1.9.1Y

Ground Frames Manual DecommissionB.C.1.9.1Z

Ground Frames Powered DesignB.C.1.9.2Q

Ground Frames Powered CommissionB.C.1.9.2T

Ground Frames Powered MaintainB.C.1.9.2V

Ground Frames Powered OverhaulB.C.1.9.2W

Ground Frames Powered InstallB.C.1.9.2X

Ground Frames Powered ModifyB.C.1.9.2Y

Ground Frames Powered DecommissionB.C.1.9.2Z

Lever Frames (Mechanical & Electro Mechanical) DesignB.C.1.9.3Q

Lever Frames (Mechanical & Electro Mechanical) CommissionB.C.1.9.3T

Lever Frames (Mechanical & Electro Mechanical) MaintainB.C.1.9.3V

Lever Frames (Mechanical & Electro Mechanical) OverhaulB.C.1.9.3W

Lever Frames (Mechanical & Electro Mechanical) InstallB.C.1.9.3X

Lever Frames (Mechanical & Electro Mechanical) ModifyB.C.1.9.3Y

Lever Frames (Mechanical & Electro Mechanical) DecommissionB.C.1.9.3Z

Semaphore Signals DesignB.C.1.9.4Q

Semaphore Signals CommissionB.C.1.9.4T

Semaphore Signals MaintainB.C.1.9.4V

Semaphore Signals InstallB.C.1.9.4X

Semaphore Signals ModifyB.C.1.9.4Y

Semaphore Signals DecommissionB.C.1.9.4Z

Mechanical & Fabricated Equipment DesignB.C.1.9.5Q

Mechanical & Fabricated Equipment CommissionB.C.1.9.5T

Mechanical & Fabricated Equipment MaintainB.C.1.9.5V

Mechanical & Fabricated Equipment InstallB.C.1.9.5X

Mechanical & Fabricated Equipment ModifyB.C.1.9.5Y

Mechanical & Fabricated Equipment DecommissionB.C.1.9.5Z

Block Instruments DesignB.C.1.9.6Q

Block Instruments CommissionB.C.1.9.6T

Block Instruments MaintainB.C.1.9.6V

Block Instruments InstallB.C.1.9.6X

Block Instruments ModifyB.C.1.9.6Y

Block Instruments DecommissionB.C.1.9.6Z

Token Instruments CommissionB.C.1.9.7T

Page 9: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

9

Product Code Product Name Result

Token Instruments InstallB.C.1.9.7X

Token Instruments ModifyB.C.1.9.7Y

Token Instruments DecommissionB.C.1.9.7Z

ATP Equipment DesignB.C.1.10.1Q

ATP Equipment CommissionB.C.1.10.1T

ATP Equipment MaintainB.C.1.10.1V

ATP Equipment InstallB.C.1.10.1X

ATP Equipment ModifyB.C.1.10.1Y

ATP Equipment DecommissionB.C.1.10.1Z

AWS Track Equipment DesignB.C.1.10.2Q

AWS Track Equipment CommissionB.C.1.10.2T

AWS Track Equipment MaintainB.C.1.10.2V

AWS Track Equipment InstallB.C.1.10.2X

AWS Track Equipment ModifyB.C.1.10.2Y

AWS Track Equipment DecommissionB.C.1.10.2Z

TPWS & Associated Equipment DesignB.C.1.10.3Q

TPWS & Associated Equipment CommissionB.C.1.10.3T

TPWS & Associated Equipment MaintainB.C.1.10.3V

TPWS & Associated Equipment InstallB.C.1.10.3X

TPWS & Associated Equipment ModifyB.C.1.10.3Y

TPWS & Associated Equipment DecommissionB.C.1.10.3Z

Tilt Authorisation & Speed Supervision Equipment DesignB.C.1.10.4Q

Tilt Authorisation & Speed Supervision Equipment CommissionB.C.1.10.4T

Tilt Authorisation & Speed Supervision Equipment MaintainB.C.1.10.4V

Tilt Authorisation & Speed Supervision Equipment OverhaulB.C.1.10.4W

Tilt Authorisation & Speed Supervision Equipment InstallB.C.1.10.4X

Tilt Authorisation & Speed Supervision Equipment ModifyB.C.1.10.4Y

Tilt Authorisation & Speed Supervision Equipment DecommissionB.C.1.10.4Z

Reed FDM Vital DesignB.C.1.11.1Q

Reed FDM Vital CommissionB.C.1.11.1T

Reed FDM Vital MaintainB.C.1.11.1V

Reed FDM Vital InstallB.C.1.11.1X

Reed FDM Vital ModifyB.C.1.11.1Y

Reed FDM Vital DecommissionB.C.1.11.1Z

Reed FDM Non Vital DesignB.C.1.11.2Q

Reed FDM Non Vital CommissionB.C.1.11.2T

Reed FDM Non Vital MaintainB.C.1.11.2V

Reed FDM Non Vital InstallB.C.1.11.2X

Reed FDM Non Vital ModifyB.C.1.11.2Y

Reed FDM Non Vital DecommissionB.C.1.11.2Z

TDM DesignB.C.1.11.3Q

TDM CommissionB.C.1.11.3T

TDM MaintainB.C.1.11.3V

TDM InstallB.C.1.11.3X

TDM ModifyB.C.1.11.3Y

TDM DecommissionB.C.1.11.3Z

Signalling Cable DesignB.C.1.11.4Q

Signalling Cable CommissionB.C.1.11.4T

Signalling Cable MaintainB.C.1.11.4V

Signalling Cable OverhaulB.C.1.11.4W

Page 10: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

10

Product Code Product Name Result

Signalling Cable InstallB.C.1.11.4X

Signalling Cable ModifyB.C.1.11.4Y

Signalling Cable DecommissionB.C.1.11.4Z

Condition Monitoring DesignB.C.1.12.1Q

Condition Monitoring CommissionB.C.1.12.1T

Condition Monitoring MaintainB.C.1.12.1V

Condition Monitoring OverhaulB.C.1.12.1W

Condition Monitoring InstallB.C.1.12.1X

Condition Monitoring ModifyB.C.1.12.1Y

Condition Monitoring DecommissionB.C.1.12.1Z

Electronic Digital System Event Loggers DesignB.C.1.12.2Q

Electronic Digital System Event Loggers CommissionB.C.1.12.2T

Electronic Digital System Event Loggers MaintainB.C.1.12.2V

Electronic Digital System Event Loggers OverhaulB.C.1.12.2W

Electronic Digital System Event Loggers InstallB.C.1.12.2X

Electronic Digital System Event Loggers ModifyB.C.1.12.2Y

Electronic Digital System Event Loggers DecommissionB.C.1.12.2Z

Voltage Free Relay Event Loggers DesignB.C.1.12.3Q

Voltage Free Relay Event Loggers CommissionB.C.1.12.3T

Voltage Free Relay Event Loggers MaintainB.C.1.12.3V

Voltage Free Relay Event Loggers OverhaulB.C.1.12.3W

Voltage Free Relay Event Loggers InstallB.C.1.12.3X

Voltage Free Relay Event Loggers ModifyB.C.1.12.3Y

Voltage Free Relay Event Loggers DecommissionB.C.1.12.3Z

Telephone Exchanges (Including Switching Equipment) DesignB.C.2.1.1Q

Telephone Exchanges (Including Switching Equipment) CommissionB.C.2.1.1T

Telephone Exchanges (Including Switching Equipment) InstallB.C.2.1.1X

Telephone Exchanges (Including Switching Equipment) ModifyB.C.2.1.1Y

Telephone Exchanges (Including Switching Equipment) DecommissionB.C.2.1.1Z

Telephone Concentrators (Including Switching Equipment) DesignB.C.2.1.2Q

Telephone Concentrators (Including Switching Equipment) CommissionB.C.2.1.2T

Telephone Concentrators (Including Switching Equipment) InstallB.C.2.1.2X

Telephone Concentrators (Including Switching Equipment) ModifyB.C.2.1.2Y

Telephone Concentrators (Including Switching Equipment) DecommissionB.C.2.1.2Z

Recording Equipment DesignB.C.2.1.3Q

Recording Equipment CommissionB.C.2.1.3T

Recording Equipment DisposeB.C.2.1.3U

Recording Equipment InstallB.C.2.1.3X

Recording Equipment ModifyB.C.2.1.3Y

Recording Equipment DecommissionB.C.2.1.3Z

UPS DesignB.C.2.1.4Q

UPS CommissionB.C.2.1.4T

UPS DisposeB.C.2.1.4U

UPS InstallB.C.2.1.4X

UPS ModifyB.C.2.1.4Y

UPS DecommissionB.C.2.1.4Z

Battery Back-up - Rectifier DesignB.C.2.1.5Q

Battery Back-up - Rectifier CommissionB.C.2.1.5T

Battery Back-up - Rectifier InstallB.C.2.1.5X

Battery Back-up - Rectifier ModifyB.C.2.1.5Y

Page 11: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

11

Product Code Product Name Result

Battery Back-up - Rectifier DecommissionB.C.2.1.5Z

Lineside Telephones DesignB.C.2.1.6Q

Lineside Telephones CommissionB.C.2.1.6T

Lineside Telephones InstallB.C.2.1.6X

Lineside Telephones ModifyB.C.2.1.6Y

Lineside Telephones DecommissionB.C.2.1.6Z

Transmission Systems DesignB.C.2.2.1Q

Transmission Systems CommissionB.C.2.2.1T

Transmission Systems DisposeB.C.2.2.1U

Transmission Systems InstallB.C.2.2.1X

Transmission Systems ModifyB.C.2.2.1Y

Transmission Systems DecommissionB.C.2.2.1Z

Telecommunication Housing & Enclosures - Active (Forced Ventilation/Heating etc.) DesignB.C.2.2.2Q

Telecommunication Housing & Enclosures - Active (Forced Ventilation/Heating etc.) CommissionB.C.2.2.2T

Telecommunication Housing & Enclosures - Active (Forced Ventilation/Heating etc.) DisposeB.C.2.2.2U

Telecommunication Housing & Enclosures - Active (Forced Ventilation/Heating etc.) InstallB.C.2.2.2X

Telecommunication Housing & Enclosures - Active (Forced Ventilation/Heating etc.) ModifyB.C.2.2.2Y

Telecommunication Housing & Enclosures - Active (Forced Ventilation/Heating etc.) DecommissionB.C.2.2.2Z

Telecommunication Housing & Enclosures - Passive DesignB.C.2.2.3Q

Telecommunication Housing & Enclosures - Passive CommissionB.C.2.2.3T

Telecommunication Housing & Enclosures - Passive DisposeB.C.2.2.3U

Telecommunication Housing & Enclosures - Passive InstallB.C.2.2.3X

Telecommunication Housing & Enclosures - Passive ModifyB.C.2.2.3Y

Telecommunication Housing & Enclosures - Passive DecommissionB.C.2.2.3Z

Telecomm Cabling (Multiple Pair Copper) DesignB.C.2.2.4Q

Telecomm Cabling (Multiple Pair Copper) CommissionB.C.2.2.4T

Telecomm Cabling (Multiple Pair Copper) InstallB.C.2.2.4X

Telecomm Cabling (Multiple Pair Copper) ModifyB.C.2.2.4Y

Telecomm Cabling (Multiple Pair Copper) DecommissionB.C.2.2.4Z

Telecomm Cabling (Co-Ax) DesignB.C.2.2.5Q

Telecomm Cabling (Co-Ax) CommissionB.C.2.2.5T

Telecomm Cabling (Co-Ax) InstallB.C.2.2.5X

Telecomm Cabling (Co-Ax) ModifyB.C.2.2.5Y

Telecomm Cabling (Co-Ax) DecommissionB.C.2.2.5Z

Telecomm Cabling (Data Cabling) DesignB.C.2.2.6Q

Telecomm Cabling (Data Cabling) CommissionB.C.2.2.6T

Telecomm Cabling (Data Cabling) InstallB.C.2.2.6X

Telecomm Cabling (Data Cabling) ModifyB.C.2.2.6Y

Telecomm Cabling (Data Cabling) DecommissionB.C.2.2.6Z

Telecomm Cabling (Fibre) DesignB.C.2.2.7Q

Telecomm Cabling (Fibre) CommissionB.C.2.2.7T

Telecomm Cabling (Fibre) InstallB.C.2.2.7X

Telecomm Cabling (Fibre) ModifyB.C.2.2.7Y

Telecomm Cabling (Fibre) DecommissionB.C.2.2.7Z

UPS DesignB.C.2.2.8Q

UPS CommissionB.C.2.2.8T

UPS InstallB.C.2.2.8X

UPS ModifyB.C.2.2.8Y

UPS DecommissionB.C.2.2.8Z

Battery Back-up - Rectifier DesignB.C.2.2.9Q

Page 12: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

12

Product Code Product Name Result

Battery Back-up - Rectifier CommissionB.C.2.2.9T

Battery Back-up - Rectifier DisposeB.C.2.2.9U

Battery Back-up - Rectifier InstallB.C.2.2.9X

Battery Back-up - Rectifier ModifyB.C.2.2.9Y

Battery Back-up - Rectifier DecommissionB.C.2.2.9Z

Modem Services DesignB.C.2.2.10Q

Modem Services CommissionB.C.2.2.10T

Modem Services DisposeB.C.2.2.10U

Modem Services InstallB.C.2.2.10X

Modem Services ModifyB.C.2.2.10Y

Modem Services DecommissionB.C.2.2.10Z

Radio Systems DesignB.C.2.3.1Q

Radio Systems CommissionB.C.2.3.1T

Radio Systems DisposeB.C.2.3.1U

Radio Systems InstallB.C.2.3.1X

Radio Systems ModifyB.C.2.3.1Y

Radio Systems DecommissionB.C.2.3.1Z

Wireless Services DesignB.C.2.3.2Q

Wireless Services CommissionB.C.2.3.2T

Wireless Services DisposeB.C.2.3.2U

Wireless Services InstallB.C.2.3.2X

Wireless Services ModifyB.C.2.3.2Y

Wireless Services DecommissionB.C.2.3.2Z

Microwave Transmission Systems DesignB.C.2.3.3Q

Microwave Transmission Systems CommissionB.C.2.3.3T

Microwave Transmission Systems DisposeB.C.2.3.3U

Microwave Transmission Systems InstallB.C.2.3.3X

Microwave Transmission Systems ModifyB.C.2.3.3Y

Microwave Transmission Systems DecommissionB.C.2.3.3Z

Masts (Including Earthing & Lightening Protection) DesignB.C.2.3.4Q

Masts (Including Earthing & Lightening Protection) CommissionB.C.2.3.4T

Masts (Including Earthing & Lightening Protection) DisposeB.C.2.3.4U

Masts (Including Earthing & Lightening Protection) InstallB.C.2.3.4X

Masts (Including Earthing & Lightening Protection) ModifyB.C.2.3.4Y

Masts (Including Earthing & Lightening Protection) DecommissionB.C.2.3.4Z

CCTV DOO Systems DesignB.C.2.4.1Q

CCTV DOO Systems CommissionB.C.2.4.1T

CCTV DOO Systems InstallB.C.2.4.1X

CCTV DOO Systems ModifyB.C.2.4.1Y

CCTV DOO Systems DecommissionB.C.2.4.1Z

CCTV Surveillance Systems DesignB.C.2.4.3Q

CCTV Surveillance Systems CommissionB.C.2.4.3T

CCTV Surveillance Systems DisposeB.C.2.4.3U

CCTV Surveillance Systems InstallB.C.2.4.3X

CCTV Surveillance Systems ModifyB.C.2.4.3Y

CCTV Surveillance Systems DecommissionB.C.2.4.3Z

CIS DesignB.C.2.5Q

CIS CommissionB.C.2.5T

CIS DisposeB.C.2.5U

CIS InstallB.C.2.5X

Page 13: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

13

Product Code Product Name Result

CIS ModifyB.C.2.5Y

CIS DecommissionB.C.2.5Z

Remote Condition Monitoring DesignB.C.3.1Q

Remote Condition Monitoring CommissionB.C.3.1T

Remote Condition Monitoring DisposeB.C.3.1U

Remote Condition Monitoring MaintainB.C.3.1V

Remote Condition Monitoring OverhaulB.C.3.1W

Remote Condition Monitoring InstallB.C.3.1X

Remote Condition Monitoring ModifyB.C.3.1Y

Remote Condition Monitoring DecommissionB.C.3.1Z

Overhead Line Monitoring DesignB.C.3.2Q

Overhead Line Monitoring CommissionB.C.3.2T

Overhead Line Monitoring DisposeB.C.3.2U

Overhead Line Monitoring MaintainB.C.3.2V

Overhead Line Monitoring OverhaulB.C.3.2W

Overhead Line Monitoring InstallB.C.3.2X

Overhead Line Monitoring ModifyB.C.3.2Y

Overhead Line Monitoring DecommissionB.C.3.2Z

Hot Axle Box Detectors DesignB.C.3.3Q

Hot Axle Box Detectors CommissionB.C.3.3T

Hot Axle Box Detectors DisposeB.C.3.3U

Hot Axle Box Detectors MaintainB.C.3.3V

Hot Axle Box Detectors InstallB.C.3.3X

Hot Axle Box Detectors ModifyB.C.3.3Y

Hot Axle Box Detectors DecommissionB.C.3.3Z

Wheel Monitoring DesignB.C.3.4Q

Wheel Monitoring CommissionB.C.3.4T

Wheel Monitoring DisposeB.C.3.4U

Wheel Monitoring MaintainB.C.3.4V

Wheel Monitoring OverhaulB.C.3.4W

Wheel Monitoring InstallB.C.3.4X

Wheel Monitoring ModifyB.C.3.4Y

Wheel Monitoring DecommissionB.C.3.4Z

Selecting Door Opening Balises DesignB.C.3.5Q

Selecting Door Opening Balises CommissionB.C.3.5T

Selecting Door Opening Balises DisposeB.C.3.5U

Selecting Door Opening Balises InstallB.C.3.5X

Selecting Door Opening Balises ModifyB.C.3.5Y

Selecting Door Opening Balises DecommissionB.C.3.5Z

NDT Inspection Equipment DesignB.C.3.6Q

NDT Inspection Equipment CommissionB.C.3.6T

NDT Inspection Equipment DisposeB.C.3.6U

NDT Inspection Equipment MaintainB.C.3.6V

NDT Inspection Equipment OverhaulB.C.3.6W

NDT Inspection Equipment InstallB.C.3.6X

NDT Inspection Equipment ModifyB.C.3.6Y

NDT Inspection Equipment DecommissionB.C.3.6Z

TIMS DesignB.C.3.7Q

TIMS CommissionB.C.3.7T

TIMS DisposeB.C.3.7U

Page 14: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

14

Product Code Product Name Result

TIMS MaintainB.C.3.7V

TIMS OverhaulB.C.3.7W

TIMS InstallB.C.3.7X

TIMS ModifyB.C.3.7Y

TIMS DecommissionB.C.3.7Z

Butterfly Valve Operation (Mechanical & Motorised) DesignB.C.3.8Q

Butterfly Valve Operation (Mechanical & Motorised) CommissionB.C.3.8T

Butterfly Valve Operation (Mechanical & Motorised) DisposeB.C.3.8U

Butterfly Valve Operation (Mechanical & Motorised) MaintainB.C.3.8V

Butterfly Valve Operation (Mechanical & Motorised) OverhaulB.C.3.8W

Butterfly Valve Operation (Mechanical & Motorised) InstallB.C.3.8X

Butterfly Valve Operation (Mechanical & Motorised) ModifyB.C.3.8Y

Butterfly Valve Operation (Mechanical & Motorised) DecommissionB.C.3.8Z

Bridge Strike Monitoring DesignB.C.3.9Q

Bridge Strike Monitoring CommissionB.C.3.9T

Bridge Strike Monitoring DisposeB.C.3.9U

Bridge Strike Monitoring MaintainB.C.3.9V

Bridge Strike Monitoring OverhaulB.C.3.9W

Bridge Strike Monitoring InstallB.C.3.9X

Bridge Strike Monitoring ModifyB.C.3.9Y

Bridge Strike Monitoring DecommissionB.C.3.9Z

Rock Fall (& Other) Detectors DesignB.C.3.10Q

Rock Fall (& Other) Detectors CommissionB.C.3.10T

Rock Fall (& Other) Detectors DisposeB.C.3.10U

Rock Fall (& Other) Detectors MaintainB.C.3.10V

Rock Fall (& Other) Detectors OverhaulB.C.3.10W

Rock Fall (& Other) Detectors InstallB.C.3.10X

Rock Fall (& Other) Detectors ModifyB.C.3.10Y

Rock Fall (& Other) Detectors DecommissionB.C.3.10Z

Weather Stations DesignB.C.3.11Q

Weather Stations CommissionB.C.3.11T

Weather Stations DisposeB.C.3.11U

Weather Stations MaintainB.C.3.11V

Weather Stations OverhaulB.C.3.11W

Weather Stations InstallB.C.3.11X

Weather Stations ModifyB.C.3.11Y

Weather Stations DecommissionB.C.3.11Z

Mobile Temperature Monitoring DesignB.C.3.12Q

Mobile Temperature Monitoring CommissionB.C.3.12T

Mobile Temperature Monitoring DisposeB.C.3.12U

Mobile Temperature Monitoring MaintainB.C.3.12V

Mobile Temperature Monitoring OverhaulB.C.3.12W

Mobile Temperature Monitoring InstallB.C.3.12X

Mobile Temperature Monitoring ModifyB.C.3.12Y

Mobile Temperature Monitoring DecommissionB.C.3.12Z

Geotechnical Monitoring DesignB.C.3.13Q

Geotechnical Monitoring CommissionB.C.3.13T

Geotechnical Monitoring DisposeB.C.3.13U

Geotechnical Monitoring MaintainB.C.3.13V

Geotechnical Monitoring OverhaulB.C.3.13W

Page 15: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

15

Product Code Product Name Result

Geotechnical Monitoring InstallB.C.3.13X

Geotechnical Monitoring ModifyB.C.3.13Y

Geotechnical Monitoring DecommissionB.C.3.13Z

Plain Line DesignC.B.1.1Q

Plain Line CommissionC.B.1.1T

Plain Line MaintainC.B.1.1V

Plain Line InstallC.B.1.1X

Plain Line ModifyC.B.1.1Y

Plain Line DecommissionC.B.1.1Z

Plain Line (Absolute Geometry) DesignC.B.1.2Q

Plain Line (Absolute Geometry) CommissionC.B.1.2T

Plain Line (Absolute Geometry) InstallC.B.1.2X

Plain Line (Absolute Geometry) ModifyC.B.1.2Y

Plain Line (Absolute Geometry) DecommissionC.B.1.2Z

Gauge Measurement (Discreet Restrictions) CommissionC.B.1.3T

Gauge Measurement (Discreet Restrictions) InstallC.B.1.3X

Gauge Measurement (Discreet Restrictions) ModifyC.B.1.3Y

Gauge Measurement (Discreet Restrictions) DecommissionC.B.1.3Z

Gauge Measurement (Tunnels) DesignC.B.1.4Q

Gauge Measurement (Tunnels) CommissionC.B.1.4T

Gauge Measurement (Tunnels) DisposeC.B.1.4U

Gauge Measurement (Tunnels) MaintainC.B.1.4V

Gauge Measurement (Tunnels) OverhaulC.B.1.4W

Gauge Measurement (Tunnels) InstallC.B.1.4X

Gauge Measurement (Tunnels) ModifyC.B.1.4Y

Gauge Measurement (Tunnels) DecommissionC.B.1.4Z

Track on Longitudinal Timbers DesignC.B.1.5Q

Track on Longitudinal Timbers CommissionC.B.1.5T

Track on Longitudinal Timbers InstallC.B.1.5X

Track on Longitudinal Timbers ModifyC.B.1.5Y

Track on Longitudinal Timbers DecommissionC.B.1.5Z

Direct Fastening Track Systems (e.g. Slab Track/Viper) DesignC.B.1.6Q

Direct Fastening Track Systems (e.g. Slab Track/Viper) CommissionC.B.1.6T

Direct Fastening Track Systems (e.g. Slab Track/Viper) DisposeC.B.1.6U

Direct Fastening Track Systems (e.g. Slab Track/Viper) MaintainC.B.1.6V

Direct Fastening Track Systems (e.g. Slab Track/Viper) OverhaulC.B.1.6W

Direct Fastening Track Systems (e.g. Slab Track/Viper) InstallC.B.1.6X

Direct Fastening Track Systems (e.g. Slab Track/Viper) ModifyC.B.1.6Y

Direct Fastening Track Systems (e.g. Slab Track/Viper) DecommissionC.B.1.6Z

Switches & Crossings Conventional DesignC.B.2.1Q

Switches & Crossings Conventional CommissionC.B.2.1T

Switches & Crossings Conventional InstallC.B.2.1X

Switches & Crossings Conventional ModifyC.B.2.1Y

Switches & Crossings Conventional DecommissionC.B.2.1Z

Switches & Crossings (Absolute Geometry) DesignC.B.2.2Q

Switches & Crossings (Absolute Geometry) CommissionC.B.2.2T

Switches & Crossings (Absolute Geometry) InstallC.B.2.2X

Switches & Crossings (Absolute Geometry) ModifyC.B.2.2Y

Switches & Crossings (Absolute Geometry) DecommissionC.B.2.2Z

Switches & Crossings (Modular Systems) DesignC.B.2.3Q

Page 16: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

16

Product Code Product Name Result

Switches & Crossings (Modular Systems) CommissionC.B.2.3T

Switches & Crossings (Modular Systems) InstallC.B.2.3X

Switches & Crossings (Modular Systems) ModifyC.B.2.3Y

Switches & Crossings (Modular Systems) DecommissionC.B.2.3Z

Track Drainage DesignC.B.3Q

Track Drainage CommissionC.B.3T

Track Drainage InstallC.B.3X

Track Drainage ModifyC.B.3Y

Track Drainage DecommissionC.B.3Z

Masonry Structures (Including Brickwork) DesignC.C.1.3.2Q

Masonry Structures (Including Brickwork) DisposeC.C.1.3.2U

Masonry Structures (Including Brickwork) InstallC.C.1.3.2X

Masonry Structures (Including Brickwork) ModifyC.C.1.3.2Y

Gantries DesignC.C.2.1Q

Gantries DisposeC.C.2.1U

Gantries MaintainC.C.2.1V

Gantries InstallC.C.2.1X

Gantries ModifyC.C.2.1Y

Gantries ConstructionC.C.2.1S

Cantilevers DesignC.C.2.2Q

Cantilevers DisposeC.C.2.2U

Cantilevers MaintainC.C.2.2V

Cantilevers InstallC.C.2.2X

Cantilevers ModifyC.C.2.2Y

Cantilevers ConstructionC.C.2.2S

Straight Posts DesignC.C.2.3Q

Straight Posts DisposeC.C.2.3U

Straight Posts MaintainC.C.2.3V

Straight Posts InstallC.C.2.3X

Straight Posts ModifyC.C.2.3Y

Straight Posts ConstructionC.C.2.3S

Equipment Foundations DesignC.C.2.4Q

Equipment Foundations DisposeC.C.2.4U

Equipment Foundations MaintainC.C.2.4V

Equipment Foundations InstallC.C.2.4X

Equipment Foundations ModifyC.C.2.4Y

Equipment Foundations ConstructionC.C.2.4S

Equipment Support Structures ServiceC.C.3.1.2.1N

Roped Access ServiceC.C.3.2.1N

Piling DesignC.C.3.2.12Q

Piling CommissionC.C.3.2.12T

Piling DisposeC.C.3.2.12U

Piling MaintainC.C.3.2.12V

Piling InstallC.C.3.2.12X

Piling ModifyC.C.3.2.12Y

Piling DecommissionC.C.3.2.12Z

Piling ConstructionC.C.3.2.12S

Specialist Access (Platforms etc.) DesignC.C.3.2.17Q

Specialist Access (Platforms etc.) CommissionC.C.3.2.17T

Specialist Access (Platforms etc.) DisposeC.C.3.2.17U

Page 17: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

17

Product Code Product Name Result

Specialist Access (Platforms etc.) InstallC.C.3.2.17X

Specialist Access (Platforms etc.) ModifyC.C.3.2.17Y

Specialist Access (Platforms etc.) DecommissionC.C.3.2.17Z

Surfacing for Level Crossings DesignC.C.3.2.20Q

Surfacing for Level Crossings DisposeC.C.3.2.20U

Surfacing for Level Crossings InstallC.C.3.2.20X

Surfacing for Level Crossings ModifyC.C.3.2.20Y

Temporary Works DesignC.C.3.2.21Q

Temporary Works CommissionC.C.3.2.21T

Temporary Works DisposeC.C.3.2.21U

Temporary Works InstallC.C.3.2.21X

Temporary Works ModifyC.C.3.2.21Y

Temporary Works DecommissionC.C.3.2.21Z

Track Support Concrete (Slab Track) DesignC.C.3.2.23Q

Track Support Concrete (Slab Track) DisposeC.C.3.2.23U

Track Support Concrete (Slab Track) InstallC.C.3.2.23X

Track Support Concrete (Slab Track) ModifyC.C.3.2.23Y

Provision of Protection & Warning Staff (not including LOWS) ServiceA.A.9.1N

Electrical Isolation Staff (DC Conductors) ServiceA.A.9.3N

Electrical Isolation Staff (OHLE) ServiceA.A.9.4N

Thermic Welding ServiceC.C.3.4.5.1N

Flash Butt Welding ServiceC.C.3.4.5.3N

Rail Stressing ServiceC.C.3.4.5.4N

Stress Assessment (Verse Testing) ServiceC.C.3.4.5.5N

Ultrasonic Testing (Non Train-Borne) ServiceC.C.3.4.5.6N

Rail Lubrication Applicators DesignC.C.3.4.6.1Q

Rail Lubrication Applicators DisposeC.C.3.4.6.1U

Rail Lubrication Applicators InstallC.C.3.4.6.1X

Rail Lubrication Applicators ModifyC.C.3.4.6.1Y

Foundations (Piled) DesignC.D.1.1Q

Foundations (Piled) MaintainC.D.1.1V

Foundations (Piled) InstallC.D.1.1X

Foundations (Piled) ModifyC.D.1.1Y

Foundations (Piled) ConstructionC.D.1.1S

Minor Building Work (Including Ancillary Buildings & Alterations to Existing Buildings) DesignC.D.2.11Q

Minor Building Work (Including Ancillary Buildings & Alterations to Existing Buildings) OverhaulC.D.2.11W

Minor Building Work (Including Ancillary Buildings & Alterations to Existing Buildings) InstallC.D.2.11X

Minor Building Work (Including Ancillary Buildings & Alterations to Existing Buildings) ModifyC.D.2.11Y

Forced Ventilation Systems DesignC.D.3.4Q

Forced Ventilation Systems CommissionC.D.3.4T

Forced Ventilation Systems MaintainC.D.3.4V

Forced Ventilation Systems OverhaulC.D.3.4W

Forced Ventilation Systems InstallC.D.3.4X

Forced Ventilation Systems ModifyC.D.3.4Y

Forced Ventilation Systems DecommissionC.D.3.4Z

Electrical Installations DesignC.D.3.5Q

Electrical Installations CommissionC.D.3.5T

Electrical Installations MaintainC.D.3.5V

Electrical Installations OverhaulC.D.3.5W

Electrical Installations InstallC.D.3.5X

Page 18: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

18

Product Code Product Name Result

Electrical Installations ModifyC.D.3.5Y

Electrical Installations DecommissionC.D.3.5Z

Modular Buildings & REBs (For Equipment Installation) CommissionC.D.4.9T

Modular Buildings & REBs (For Equipment Installation) InstallC.D.4.9X

Modular Buildings & REBs (For Equipment Installation) DecommissionC.D.4.9Z

User & Footpath Crossing Surfacing DesignC.D.8.4Q

User & Footpath Crossing Surfacing DisposeC.D.8.4U

User & Footpath Crossing Surfacing InstallC.D.8.4X

User & Footpath Crossing Surfacing ModifyC.D.8.4Y

LV Switchgear DesignD.E.1.1Q

LV Switchgear CommissionD.E.1.1T

LV Switchgear DisposeD.E.1.1U

LV Switchgear MaintainD.E.1.1V

LV Switchgear OverhaulD.E.1.1W

LV Switchgear InstallD.E.1.1X

LV Switchgear ModifyD.E.1.1Y

LV Switchgear DecommissionD.E.1.1Z

UPS up to 10 KVA DesignD.E.1.2Q

UPS up to 10 KVA CommissionD.E.1.2T

UPS up to 10 KVA DisposeD.E.1.2U

UPS up to 10 KVA MaintainD.E.1.2V

UPS up to 10 KVA OverhaulD.E.1.2W

UPS up to 10 KVA InstallD.E.1.2X

UPS up to 10 KVA ModifyD.E.1.2Y

UPS up to 10 KVA DecommissionD.E.1.2Z

UPS above 10 KVA DesignD.E.1.3Q

UPS above 10 KVA CommissionD.E.1.3T

UPS above 10 KVA DisposeD.E.1.3U

UPS above 10 KVA InstallD.E.1.3X

UPS above 10 KVA ModifyD.E.1.3Y

UPS above 10 KVA DecommissionD.E.1.3Z

UPS Batteries DesignD.E.1.4Q

UPS Batteries CommissionD.E.1.4T

UPS Batteries DisposeD.E.1.4U

UPS Batteries InstallD.E.1.4X

UPS Batteries ModifyD.E.1.4Y

UPS Batteries DecommissionD.E.1.4Z

Diesel Generators (Permanent) DesignD.E.1.5Q

Diesel Generators (Permanent) CommissionD.E.1.5T

Diesel Generators (Permanent) DisposeD.E.1.5U

Diesel Generators (Permanent) InstallD.E.1.5X

Diesel Generators (Permanent) ModifyD.E.1.5Y

Diesel Generators (Permanent) DecommissionD.E.1.5Z

Temporary Generation/Construction Power Supplies DesignD.E.1.6Q

Temporary Generation/Construction Power Supplies CommissionD.E.1.6T

Temporary Generation/Construction Power Supplies DisposeD.E.1.6U

Temporary Generation/Construction Power Supplies InstallD.E.1.6X

Temporary Generation/Construction Power Supplies ModifyD.E.1.6Y

Temporary Generation/Construction Power Supplies DecommissionD.E.1.6Z

LV Distribution Cabling DesignD.E.1.7Q

Page 19: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

19

Product Code Product Name Result

LV Distribution Cabling CommissionD.E.1.7T

LV Distribution Cabling DisposeD.E.1.7U

LV Distribution Cabling MaintainD.E.1.7V

LV Distribution Cabling InstallD.E.1.7X

LV Distribution Cabling ModifyD.E.1.7Y

LV Distribution Cabling DecommissionD.E.1.7Z

Substation Switchgear (Including Control & Protection) DesignD.E.2.1Q

Substation Switchgear (Including Control & Protection) CommissionD.E.2.1T

Substation Switchgear (Including Control & Protection) DisposeD.E.2.1U

Substation Switchgear (Including Control & Protection) MaintainD.E.2.1V

Substation Switchgear (Including Control & Protection) OverhaulD.E.2.1W

Substation Switchgear (Including Control & Protection) InstallD.E.2.1X

Substation Switchgear (Including Control & Protection) ModifyD.E.2.1Y

Substation Switchgear (Including Control & Protection) DecommissionD.E.2.1Z

HV Transformers DesignD.E.2.2Q

HV Transformers CommissionD.E.2.2T

HV Transformers DisposeD.E.2.2U

HV Transformers MaintainD.E.2.2V

HV Transformers OverhaulD.E.2.2W

HV Transformers InstallD.E.2.2X

HV Transformers ModifyD.E.2.2Y

HV Transformers DecommissionD.E.2.2Z

HV Cabling DesignD.E.2.3Q

HV Cabling CommissionD.E.2.3T

HV Cabling DisposeD.E.2.3U

HV Cabling InstallD.E.2.3X

HV Cabling ModifyD.E.2.3Y

HV Cabling DecommissionD.E.2.3Z

Lighting Equipment (Including Luminaires & Control Equipment) DesignD.E.3.1Q

Lighting Equipment (Including Luminaires & Control Equipment) CommissionD.E.3.1T

Lighting Equipment (Including Luminaires & Control Equipment) DisposeD.E.3.1U

Lighting Equipment (Including Luminaires & Control Equipment) MaintainD.E.3.1V

Lighting Equipment (Including Luminaires & Control Equipment) OverhaulD.E.3.1W

Lighting Equipment (Including Luminaires & Control Equipment) InstallD.E.3.1X

Lighting Equipment (Including Luminaires & Control Equipment) ModifyD.E.3.1Y

Lighting Equipment (Including Luminaires & Control Equipment) DecommissionD.E.3.1Z

Lighting Support Equipment (Including Winch Mechanisms) DesignD.E.3.2Q

Lighting Support Equipment (Including Winch Mechanisms) CommissionD.E.3.2T

Lighting Support Equipment (Including Winch Mechanisms) DisposeD.E.3.2U

Lighting Support Equipment (Including Winch Mechanisms) MaintainD.E.3.2V

Lighting Support Equipment (Including Winch Mechanisms) OverhaulD.E.3.2W

Lighting Support Equipment (Including Winch Mechanisms) InstallD.E.3.2X

Lighting Support Equipment (Including Winch Mechanisms) ModifyD.E.3.2Y

Lighting Support Equipment (Including Winch Mechanisms) DecommissionD.E.3.2Z

Gas Points Heating Systems DesignD.E.4.1Q

Gas Points Heating Systems CommissionD.E.4.1T

Gas Points Heating Systems DisposeD.E.4.1U

Gas Points Heating Systems InstallD.E.4.1X

Gas Points Heating Systems ModifyD.E.4.1Y

Gas Points Heating Systems DecommissionD.E.4.1Z

Page 20: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

20

Product Code Product Name Result

Electric Points Heating Systems DesignD.E.4.2Q

Electric Points Heating Systems CommissionD.E.4.2T

Electric Points Heating Systems DisposeD.E.4.2U

Electric Points Heating Systems MaintainD.E.4.2V

Electric Points Heating Systems OverhaulD.E.4.2W

Electric Points Heating Systems InstallD.E.4.2X

Electric Points Heating Systems ModifyD.E.4.2Y

Electric Points Heating Systems DecommissionD.E.4.2Z

Conductor Rail Heating Systems DesignD.E.4.3Q

Conductor Rail Heating Systems CommissionD.E.4.3T

Conductor Rail Heating Systems DisposeD.E.4.3U

Conductor Rail Heating Systems MaintainD.E.4.3V

Conductor Rail Heating Systems OverhaulD.E.4.3W

Conductor Rail Heating Systems InstallD.E.4.3X

Conductor Rail Heating Systems ModifyD.E.4.3Y

Conductor Rail Heating Systems DecommissionD.E.4.3Z

Pump Control Systems DesignD.E.6.2Q

Pump Control Systems CommissionD.E.6.2T

Pump Control Systems DisposeD.E.6.2U

Pump Control Systems InstallD.E.6.2X

Pump Control Systems ModifyD.E.6.2Y

Pump Control Systems DecommissionD.E.6.2Z

Moving Bridge Control Systems DesignD.E.6.4Q

Moving Bridge Control Systems CommissionD.E.6.4T

Moving Bridge Control Systems DisposeD.E.6.4U

Moving Bridge Control Systems InstallD.E.6.4X

Moving Bridge Control Systems ModifyD.E.6.4Y

Moving Bridge Control Systems DecommissionD.E.6.4Z

Track Dosing Systems DesignD.E.6.5Q

Track Dosing Systems CommissionD.E.6.5T

Track Dosing Systems DisposeD.E.6.5U

Track Dosing Systems InstallD.E.6.5X

Track Dosing Systems ModifyD.E.6.5Y

Track Dosing Systems DecommissionD.E.6.5Z

Compressed Air Systems DesignD.E.6.6Q

Compressed Air Systems CommissionD.E.6.6T

Compressed Air Systems DisposeD.E.6.6U

Compressed Air Systems InstallD.E.6.6X

Compressed Air Systems ModifyD.E.6.6Y

Compressed Air Systems DecommissionD.E.6.6Z

Buffer Stops (Mechanical) DesignD.E.6.8Q

Buffer Stops (Mechanical) CommissionD.E.6.8T

Buffer Stops (Mechanical) DisposeD.E.6.8U

Buffer Stops (Mechanical) InstallD.E.6.8X

Buffer Stops (Mechanical) ModifyD.E.6.8Y

Buffer Stops (Mechanical) DecommissionD.E.6.8Z

Chargers for Signalling Equipment DesignD.E.7.1Q

Chargers for Signalling Equipment CommissionD.E.7.1T

Chargers for Signalling Equipment DisposeD.E.7.1U

Chargers for Signalling Equipment InstallD.E.7.1X

Page 21: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

21

Product Code Product Name Result

Chargers for Signalling Equipment ModifyD.E.7.1Y

Chargers for Signalling Equipment DecommissionD.E.7.1Z

Transformers & Transformer Rectifiers DesignD.E.7.2Q

Transformers & Transformer Rectifiers CommissionD.E.7.2T

Transformers & Transformer Rectifiers DisposeD.E.7.2U

Transformers & Transformer Rectifiers InstallD.E.7.2X

Transformers & Transformer Rectifiers ModifyD.E.7.2Y

Transformers & Transformer Rectifiers DecommissionD.E.7.2Z

Point T/J (Transformer Rectifiers) DesignD.E.7.3Q

Point T/J (Transformer Rectifiers) CommissionD.E.7.3T

Point T/J (Transformer Rectifiers) DisposeD.E.7.3U

Point T/J (Transformer Rectifiers) InstallD.E.7.3X

Point T/J (Transformer Rectifiers) ModifyD.E.7.3Y

Point T/J (Transformer Rectifiers) DecommissionD.E.7.3Z

Earth Leakage Detectors DesignD.E.7.4Q

Earth Leakage Detectors CommissionD.E.7.4T

Earth Leakage Detectors DisposeD.E.7.4U

Earth Leakage Detectors InstallD.E.7.4X

Earth Leakage Detectors ModifyD.E.7.4Y

Earth Leakage Detectors DecommissionD.E.7.4Z

Batteries DesignD.E.7.5Q

Batteries CommissionD.E.7.5T

Batteries DisposeD.E.7.5U

Batteries InstallD.E.7.5X

Batteries ModifyD.E.7.5Y

Batteries DecommissionD.E.7.5Z

U.P.S. DesignD.E.7.6Q

U.P.S. CommissionD.E.7.6T

U.P.S. DisposeD.E.7.6U

U.P.S. InstallD.E.7.6X

U.P.S. ModifyD.E.7.6Y

U.P.S. DecommissionD.E.7.6Z

Shore Supplies & Battery Chargers DesignD.F.7Q

Shore Supplies & Battery Chargers CommissionD.F.7T

Shore Supplies & Battery Chargers DisposeD.F.7U

Shore Supplies & Battery Chargers MaintainD.F.7V

Shore Supplies & Battery Chargers OverhaulD.F.7W

Shore Supplies & Battery Chargers InstallD.F.7X

Shore Supplies & Battery Chargers ModifyD.F.7Y

Shore Supplies & Battery Chargers DecommissionD.F.7Z

Main Steelwork DesignF.C.1.1Q

Main Steelwork CommissionF.C.1.1T

Main Steelwork DisposeF.C.1.1U

Main Steelwork MaintainF.C.1.1V

Main Steelwork OverhaulF.C.1.1W

Main Steelwork InstallF.C.1.1X

Main Steelwork ModifyF.C.1.1Y

Main Steelwork DecommissionF.C.1.1Z

Small Part Steelwork DesignF.C.1.2Q

Small Part Steelwork CommissionF.C.1.2T

Page 22: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

22

Product Code Product Name Result

Small Part Steelwork DisposeF.C.1.2U

Small Part Steelwork MaintainF.C.1.2V

Small Part Steelwork InstallF.C.1.2X

Small Part Steelwork ModifyF.C.1.2Y

Small Part Steelwork DecommissionF.C.1.2Z

Foundations DesignF.C.1.3Q

Foundations DisposeF.C.1.3U

Foundations InstallF.C.1.3X

Foundations ModifyF.C.1.3Y

Wiring DesignF.C.1.5Q

Wiring CommissionF.C.1.5T

Wiring DisposeF.C.1.5U

Wiring InstallF.C.1.5X

Wiring ModifyF.C.1.5Y

Wiring DecommissionF.C.1.5Z

Earthing & Bonding DesignF.C.1.6Q

Earthing & Bonding CommissionF.C.1.6T

Earthing & Bonding DisposeF.C.1.6U

Earthing & Bonding InstallF.C.1.6X

Earthing & Bonding ModifyF.C.1.6Y

Earthing & Bonding DecommissionF.C.1.6Z

Switching DesignF.C.1.7Q

Switching CommissionF.C.1.7T

Switching DisposeF.C.1.7U

Switching MaintainF.C.1.7V

Switching OverhaulF.C.1.7W

Switching InstallF.C.1.7X

Switching ModifyF.C.1.7Y

Switching DecommissionF.C.1.7Z

ETE Conductor Rail & Associated Cabling DesignF.C.2.1Q

ETE Conductor Rail & Associated Cabling CommissionF.C.2.1T

ETE Conductor Rail & Associated Cabling DisposeF.C.2.1U

ETE Conductor Rail & Associated Cabling MaintainF.C.2.1V

ETE Conductor Rail & Associated Cabling OverhaulF.C.2.1W

ETE Conductor Rail & Associated Cabling InstallF.C.2.1X

ETE Conductor Rail & Associated Cabling ModifyF.C.2.1Y

ETE Conductor Rail & Associated Cabling DecommissionF.C.2.1Z

Depot Conductor Systems DesignF.C.2.2Q

Depot Conductor Systems CommissionF.C.2.2T

Depot Conductor Systems DisposeF.C.2.2U

Depot Conductor Systems MaintainF.C.2.2V

Depot Conductor Systems OverhaulF.C.2.2W

Depot Conductor Systems InstallF.C.2.2X

Depot Conductor Systems ModifyF.C.2.2Y

Depot Conductor Systems DecommissionF.C.2.2Z

ETE Negative Bonding DesignF.C.2.3Q

ETE Negative Bonding CommissionF.C.2.3T

ETE Negative Bonding DisposeF.C.2.3U

ETE Negative Bonding MaintainF.C.2.3V

ETE Negative Bonding InstallF.C.2.3X

Page 23: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

23

Product Code Product Name Result

ETE Negative Bonding ModifyF.C.2.3Y

ETE Negative Bonding DecommissionF.C.2.3Z

Substations/Switching Stations DesignF.C.3.1Q

Substations/Switching Stations CommissionF.C.3.1T

Substations/Switching Stations DisposeF.C.3.1U

Substations/Switching Stations MaintainF.C.3.1V

Substations/Switching Stations OverhaulF.C.3.1W

Substations/Switching Stations InstallF.C.3.1X

Substations/Switching Stations ModifyF.C.3.1Y

Substations/Switching Stations DecommissionF.C.3.1Z

HV Cabling DesignF.C.3.2Q

HV Cabling CommissionF.C.3.2T

HV Cabling DisposeF.C.3.2U

HV Cabling MaintainF.C.3.2V

HV Cabling InstallF.C.3.2X

HV Cabling ModifyF.C.3.2Y

HV Cabling DecommissionF.C.3.2Z

Trackside Equipment DesignF.C.3.3Q

Trackside Equipment CommissionF.C.3.3T

Trackside Equipment DisposeF.C.3.3U

Trackside Equipment MaintainF.C.3.3V

Trackside Equipment OverhaulF.C.3.3W

Trackside Equipment InstallF.C.3.3X

Trackside Equipment ModifyF.C.3.3Y

Trackside Equipment DecommissionF.C.3.3Z

Substations/Switching Stations/Track Paralleling Huts DesignF.C.4.1Q

Substations/Switching Stations/Track Paralleling Huts CommissionF.C.4.1T

Substations/Switching Stations/Track Paralleling Huts DisposeF.C.4.1U

Substations/Switching Stations/Track Paralleling Huts MaintainF.C.4.1V

Substations/Switching Stations/Track Paralleling Huts OverhaulF.C.4.1W

Substations/Switching Stations/Track Paralleling Huts InstallF.C.4.1X

Substations/Switching Stations/Track Paralleling Huts ModifyF.C.4.1Y

Substations/Switching Stations/Track Paralleling Huts DecommissionF.C.4.1Z

DC Cabling DesignF.C.4.2Q

DC Cabling CommissionF.C.4.2T

DC Cabling DisposeF.C.4.2U

DC Cabling MaintainF.C.4.2V

DC Cabling InstallF.C.4.2X

DC Cabling ModifyF.C.4.2Y

DC Cabling DecommissionF.C.4.2Z

Trackside Equipment DesignF.C.4.3Q

Trackside Equipment CommissionF.C.4.3T

Trackside Equipment DisposeF.C.4.3U

Trackside Equipment MaintainF.C.4.3V

Trackside Equipment OverhaulF.C.4.3W

Trackside Equipment InstallF.C.4.3X

Trackside Equipment ModifyF.C.4.3Y

Trackside Equipment DecommissionF.C.4.3Z

Traction SCADA DesignH.E.11.1Q

Traction SCADA CommissionH.E.11.1T

Page 24: Certificate of Audit - Amaro Rail · 2020. 2. 11. · RISQS Scheme Manager Certificate of Audit The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: info@rssb.co.uk

The Helicon, 1 South Place, London, EC2M 2RB T: +44 (0) 20 3142 5300 | E: [email protected] | www.rssb.co.uk

24

Product Code Product Name Result

Traction SCADA DisposeH.E.11.1U

Traction SCADA InstallH.E.11.1X

Traction SCADA ModifyH.E.11.1Y

Traction SCADA DecommissionH.E.11.1Z

Non-Traction SCADA DesignH.E.11.2Q

Non-Traction SCADA CommissionH.E.11.2T

Non-Traction SCADA DisposeH.E.11.2U

Non-Traction SCADA MaintainH.E.11.2V

Non-Traction SCADA OverhaulH.E.11.2W

Non-Traction SCADA InstallH.E.11.2X

Non-Traction SCADA ModifyH.E.11.2Y

Non-Traction SCADA DecommissionH.E.11.2Z

Isolations Management Service ServiceC.C.3.4.9N

Lookout Operated Warning Systems (LOWS), (LOWS LKT), (LOWS CTR) & Semi Automatic Train Warning Systems (SATWS) ServiceA.A.9.6N

Safe System of Work Planning ServiceC.C.3.4.2.7N

Troughing Services ServiceC.B.4.2N