![Page 1: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/1.jpg)
CERN Single Phase PrototypeInitial Discussion on Power/Space Requirements
Terri Shaw
Neutrino Platform
July 30, 2015
![Page 2: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/2.jpg)
Outline
• 35T Power
• “Simple” scale of power to CERN single phase prototype (may be room for optimization)
7/30/2015 T. Shaw | Neutrino Platform Meeting2
![Page 3: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/3.jpg)
Early Block Diagram of 35T – slightly out of date
7/30/2015 T. Shaw | Neutrino Platform Meeting3
Purity Monitor
Drift HV
Camera
Trig_Scint
TPC_PD
DAQ(2)
![Page 4: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/4.jpg)
35T test lab at Fermilab
7/30/2015 T. Shaw | Neutrino Platform Meeting4
35T Test lab at Fermilab
![Page 5: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/5.jpg)
Present Rack Configuration (excludes Drift HV)
7/30/2015 T. Shaw | Neutrino Platform Meeting5
![Page 6: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/6.jpg)
Rack Services – Rack Protection System (D. Huffman)
Consists of two parts—chassis and smoke sensor (SS 2W-B)
•Economical solution (~$650)
•Design includes:
–System Sensor photoelectric smoke sensor.
–EPO (Emergency Power Off for UPS).
–+12V Voltage output interlock.
–Two sets of NO/NC interlock contacts, AUX1 and AUX2.
–Audible alarm.
–Front panel reset button.
–Status bit to Slow Controls.
T. Shaw | Neutrino Platform Meeting6
![Page 7: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/7.jpg)
Rack Services: AC Distribution Options used at 35T
• SurgeX: SX-1120-RT• 120V/20A• 6 switched outlets• 2 un-switched outlets• 1 FP courtesy outlet• Interlock
• Eaton: PW309BA0U409• 208/3f/30A • Requires AC Switch Box• L21-30P, 5-20R
D. Huffman
T. Shaw | Neutrino Platform Meeting7
![Page 8: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/8.jpg)
35T HV Drift Rack
7/30/2015 T. Shaw | Neutrino Platform Meeting8
RACK Powered from one 120V/20A SurgeX: SX-1120-RT
Same equipment can be used for CERN Prototype Installation
![Page 9: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/9.jpg)
35T Trig_Scint Rack
7/30/2015 T. Shaw | Neutrino Platform Meeting9
RACK Powered from one 120V/20A SurgeX: SX-1120-RT
Questions: Do we have sufficient coverage with present 35T counters for CERN prototype?Will present equipment be reliable for CERN Proto and do we have spares?
![Page 10: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/10.jpg)
35T TPC_PD Rack
7/30/2015 T. Shaw | Neutrino Platform Meeting10
RACK Powered from two 120V/20A SurgeX: SX-1120-RT
For CERN Prototype we anticipate upgrades:Photon Detectors plan will gang SiPM readout (groups of 3) and require:
qty(15) 16-channel SSP (Silicon Photo-multiplier Signal Processor) Readout Modules (present SSPs are 12-channel)
Required Pulser/Calibration units for CERN Prototype:qty (2) Pulsers for Photon Detectors – similar to SSP unitsqty (8) Pulsers for FE modules
Weiner MPOD Crate for HV Wire Bias Will be very similar to 35T
Weiner MPOD Crate for FE LVRight now a full 10 slot MPOD crate is being used to supply 5
independent voltage channels to each FE card. If we stay with this design, we will need 9 MPOD crates to supply LV for 6 APA’s FE modules.
![Page 11: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/11.jpg)
35T Purity Monitor Rack
7/30/2015 T. Shaw | Neutrino Platform Meeting11
RACK Powered from two 120V/20A SurgeX: SX-1120-RT
For CERN Prototype, some type of purity monitor will be required.In the process of checking with cryostat team.
![Page 12: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/12.jpg)
35T Camera Rack
7/30/2015 T. Shaw | Neutrino Platform Meeting12
RACK Powered from one 120V/20A SurgeX: SX-1120-RT
35T has a set of 9 Cameras inside cryostat.
![Page 13: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/13.jpg)
35T DAQ Racks (2)
Each rack powered by one Eaton:PW309BA0U409 208/3φ/30Aand one 120V/20A SurgeX: SX-1120-RT
Mostly similar equipment list, but we will need to have two ATCA shelves to support a quantity of 15 COB readout boards.
DAQ racks to be enclosed air conditioned racks.
7/30/2015 T. Shaw | Neutrino Platform Meeting13
![Page 14: CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.](https://reader035.fdocuments.in/reader035/viewer/2022062519/5697bfc71a28abf838ca7bf3/html5/thumbnails/14.jpg)
Summary Table - Draft
7/30/2015 T. Shaw | Neutrino Platform Meeting14