CERN - IT Department CH-1211 Genève 23 Switzerland t Vidyo Pilot – Results and Plans Video...

8
RN - IT Department CH-1211 Genève 23 Switzerland www.cern.ch/it Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith Thomas Baron, João Correia Fernandes

Transcript of CERN - IT Department CH-1211 Genève 23 Switzerland t Vidyo Pilot – Results and Plans Video...

Page 1: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it

Vidyo Pilot – Results and Plans Video Conferencing Service

9th August 2010

Tim Smith

Thomas Baron, João Correia Fernandes

Page 2: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 2

Background

• 2006– CERN room refurbishments

• RCTF (Remote Collaboration Task Force)

• 2007– EVO no longer free (DoE budget cuts)

• 2008– ATLAS and CMS significant contributions

• EVO Oversight Board

• 2009– LCEB (LHC Collaborative Environment Board)

• Service provision responsibility transferred to CERN-IT• (EVO commercial offering; one amongst others)

– Selection of product• Q1: Establish LHC Experiment requirements• Q2: Market assessment; 20 potential, 4 retained

Page 3: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 3

Vidyo

• Business– Venture capital startup (2008)– Google; Gmail video chat– Cisco, Hitachi, Teleris– Apr 2010 HP announced strategic partnership with Vidyo– Numerous awards; “the next big thing”

• Technology– Developed H.264/SVC video compression standard– Granted patent “System and Method for a Conference

Server Architecture for Low Delay and Distributed Conferencing Applications”

• Avoids centralised MCU (multipoint control unit)• Low latency, increased quality, network error tolerance• Automatic scalable bit rate adaption• Automatic scalable resolution adaption

Page 4: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 4

Vidyo Pilot: phase I

• 2009 Aug– Vidyo Pilot purchased; 50 ports & 50 licences

• 2010 Apr– LHC experiments agreed to test Vidyo– LCEB defines 2 month pilot (May-June)– Experiments to answer on 1st July

• “Does Vidyo meet your needs?”

• Vidyo Pilot setup extended– 100 ports & 400 licences– Audio bridge– Beta release Linux client provided

Page 5: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 5

Vidyo Pilot: results

• Technical issues– Login/download problems

• CERN certificate handling issue

– Linux client problems– No chat functionality– Wide scale test (>50) not performed

• ALICE: “accepts Vidyo can serve their needs”• LHCb: “testing positive”• ATLAS

– “feedback positive, quality higher than EVO”– Linux client and chat mean cant conclude yet

• CMS– “When users connect, audio & video better than EVO”– Is promising but not ready yet for LHC production

• LCEB: extend pilot, run systems in parallel

Page 6: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 6

Vidyo Pilot: plan

• Extend pilot with goal:– Linux client at same level as other platforms– Meet maximum scale (500 connections)– IT to test as well as experiments

• Setup– 100 ports, 650 licences– MCU bridge to allow EVO and Vidyo clients– Audio bridge

• Timescales– Linux client GA in September– Router cascading GA in November– Experiments to express result... End of year?

Page 7: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 7

Backup slides

Page 8: CERN - IT Department CH-1211 Genève 23 Switzerland  t Vidyo Pilot – Results and Plans Video Conferencing Service 9 th August 2010 Tim Smith.

CERN - IT DepartmentCH-1211 Genève 23

Switzerlandwww.cern.ch/it Vidyo Pilot - GLM [Aug 2010] - 8

Vidyo indicative costs