Cepsa wind farm project in Jerez

Transcript of Cepsa wind farm project in Jerez...Jerez de la Frontera Cepsa | Wind power farm project 3 Cepsa wind...

  • Cepsa wind farm project in Jerez

  • 2

    Renewables will be the fastest growing energy source in coming years – 12% annually until 2030. However, fossil sources will still dominate the market in 2030

    World renewable energy

    2030 primary energy mix

    Oil

    Gas

    Coal

    Nuclear

    Wind and solar

    Other renewable

    Oil 29%

    Gas 25%

    Coal 24%

    Nuclear

    5%

    Wind and solar

    3%

    Other renewable

    13%

    *Includes hydro, biomass and other renewables

    Fossil fuels

    78%

    0,7%

    2,4%

    0,0%

    2,5%

    11,7%

    1,5%

    GrowthCAGR 2015-30

    Cepsa | Wind power farm project in Jerez

  • 3

    Cepsa´s acquisition of

    Suresa Retama SL, promoter of Alijar II, a wind

    power farm located in Jerez

    de la Frontera

    Why renewables?

    • Cepsa is Andalusia’s largest industrial company where the wind power farm is located

    • Wind energy is a complementary technology of CCGT already in operation in the company’s industrial center in Andalusia

    • Renewables complement Cepsa´s existing fossil energy portfolio and its strategy based on total energy integration

    • Cepsa is concerned about protecting our environment and works hard to lower emissions. The plant will save 32,000 tons a year of CO2

    The project

    Site San Roque

    Site Palos

    Cepsa | Proyecto CORUS

    Jerez de la Frontera

    Cepsa | Wind power farm project3

    Cepsa wind power farm in JerezCepsa starts its activity in renewables with the development of a 29 MW wind power farm in Jerez de la Frontera, close to thecompany’s main industrial centers in Andalusia

  • 4

    Number of turbines 11

    Turbine capacity production (MW)

    2.6

    Installed capacity (MW)

    29

    Evacuation line (kV)

    66

    Capex

    Turbines54%

    Civil works15%

    Evacuation line8%

    Licenses & others

    22%

    CAPEX

    35.7M€

    Cepsa | Wind power farm project 4

    Wind turbine assessment & Capex estimation

    Cepsa has invested €35.7 million in this project which has 11 turbines with a capacity of 29 MW

    248m

    150m