CENTRO CONTROLLO

download CENTRO CONTROLLO

of 7

  • date post

    29-Mar-2016
  • Category

    Documents

  • view

    215
  • download

    0

Embed Size (px)

description

Recupero aree residuali_Centro di controllo rete viaria

Transcript of CENTRO CONTROLLO

  • ROAD CONTROL CENTERValencia

    PROYECTOS IV - Taller HProf. Jos Manuel Barrera Puigdollers - Ana Maria Lozano

    ETSAV 07 | 08

  • * GENERAL FRAMEWORK

    CV 31

    PATERNA

    VALENCIA

    PATERNA

    VALENCIA

    alfafar

    mislata

    burjassot

    godella

    alboraya

    m

    The project objective is to recover a residual space, consisting in two empty areas resulting from the road infrastructural system.The considered area consists in two spaces included between the urban border of Paterna and the CV31, and bounded to the south by the railway elevated passage.By the realization of a building for the road network control, the intention is to activate the two separated areas and transform them from empty space to a space of relation and a link between two urban parts.The functional program of the control center is then supported by a wider scale program, that coulf connent the two city parts, building a new urban front and becoming a place of relation with the existing infrastructure.A new cycle and pedestrian way overpasses the road and reconnects the urban areas, organizing a new accesibility to the sport facilities, the bikeway and the existing metro stops.A path that gradually regains the encountered marginal spaces and organizes them into a sequence of new public spaces, from the simple shaded restplace to the new public park with the square, caf and auditorium.

    ROAD NETWORK CONTROL CENTERValencia

    01 \ architecture

    road

    railway

    water

    road bridge

    pedestrian bridge

  • * ACCESSIBILITY

    suburban pedestrian connection

    urban border

    city / infrastructureN / E N / O

    highway

    urban

    metro

    section O / E

  • N / E N / O

    * STRATEGY AND PROJECT

    CITY

    PARK

    CONTROL CENTER

    SPORT

    m

    m

    URBAN SYSTEM

    ELEMENTS

    city

    building

    tunnel

    metro

    bridge

    citizens

    personal

    park

    +

    +

    +

    +

    +

    +

    =

    masterplan

  • garage / workrooms

    offices

    common spaces

    1

    3

    2

    4

    5

    6

    7

    8

    * CONTROL CENTER

    section A

    section B

    section C

    section D

    pedestrian bridge vehicular accesspedestrian way / center entrance

    B

    A

    C

    1. patio2. dormitory3. gym4. garage5. lockers6. workrooms7. stores8. plants

  • 1. plants2. offices3. director4. control room5. meeting room6. dining room7. kitchen8. cafeteria9. living

    1

    2

    3

    4

    5

    6

    7

    8

    9

    9

    offices terrace southeast view night view

    front O

    D

    living

    patio

    dormitory / gym

    garage

    workrooms

    vehicular area

    outdoor spaces

    offices

    common spaces

    public route

  • Btablones de madera de pino 200/30 mm mortero por formacion de pendientemembrana impermeable bituminosa aislamiento termico en poliestireno 80 mmbarrera de vaporhormigon 80 mm sobre chapa grecadaperfil de acero IPE 400paneles de carton-yeso blanco 20 mm

    1

    paneles de carton-yeso blanco 100 mmbarrera de vaporaislante termico en poliestireno 80 mm paneles hormigon prefabricado 150 mm

    hormigon 100 mm superficie acabado con pavimento de arena de quarzolamina aislanteplatea de cimentacion en hormigon armado 400 mmestrato aislante en bentonite 50 mmestrato de hormigon 100 mm

    2

    2

    3

    1

    3

    4

    capa de grava blanca 50 mmmembrana impermeable bituminosa

    aislamiento termico en poliestireno 80 mmbarrera de vapor

    hormigon 80 mm sobre chapa grecadaperfil de acero IPE 400

    paneles carton-yeso blanco 20 mm

    4

    5

    paneles hormigon prefabricado 150 mmaislamiento termico en poliestireno 80 mmbarrera de vaporperfil de acero HEB 300 paneles carton-yeso 100 mmrecubrimiento en paneles madera 20mm

    5

    capa vegetal

    capa drenaje

    fieltro geotextil antiraiz

    lamina impermeabilizante

    aislante termico

    mortero

    chapa grecada

    perfil acero

    panel hormigon

    AC

    detail TERRACEdetail SKYLIGHTdetail INTERIORS

    ABC

    * DETAILS