    CAN Master planby

    OMA+

    Gomez

    + Castro

  • 7/24/2019 centro administrativo nacional

    2/36

    LOCALIZATION

  • 7/24/2019 centro administrativo nacional

    3/36

    BACKGROUND

    The Administrative Center-CAN-National occupiesabout 60 hectares, developed from the year 1,956,buildings for the exclusive use of government offices.

    EVB S.A.S. In order to make the renewal of

    CAN, Virgilio Barco Company SAScreates in 2012

  • 7/24/2019 centro administrativo nacional

    4/36

    Concept

    The CAN masterplan will be thelargest built institutional masterplanin Latin America after OscarNeimeyer's Brasilia, built in the1960s.

    scale comp

  • 7/24/2019 centro administrativo nacional

    5/36

    DeterminantsSimonBolivarpark

    Puerta Peatonal

  • 7/24/2019 centro administrativo nacional

    6/36

    Aesthetics and Architectural Compo

    Divide the area into three districts: the office area thatconnects the district with a financial, institutional andgovernmental area that will be linked to existing parks andcultural spaces, and connected to the existing campuscollege education

  • 7/24/2019 centro administrativo nacional

    7/36

    Public space - intervention

    a green corridor of 30 hectare

  • 7/24/2019 centro administrativo nacional

    8/36

  • 7/24/2019 centro administrativo nacional

    9/36

  • 7/24/2019 centro administrativo nacional

    10/36

    REVIEW ARCHITECTS

    The national administrative center (CAN) is a new civiccenter has a main shaft that connects the airport to thecenter of Bogot

    This new axis is divided into three major factors1 offices2 institutional area3 campus

  • 7/24/2019 centro administrativo nacional

    11/36

    requirements

  • 7/24/2019 centro administrativo nacional

    12/36

    Required occupancy

    index 3,2

    3 floor=100%

    11 floor=39%

    maximumheight = 19%

    Density Studies

  • 7/24/2019 centro administrativo nacional

    13/36

  • 7/24/2019 centro administrativo nacional

    14/36schedule

  • 7/24/2019 centro administrativo nacional

    15/36

    A

    B C

    D E

    F

    -120 buildings were constructed-to 70 entities

    -40 are Government

    Ministry of Defence, to be built nearthe Simn Bolvarparkand have a new Plaza of the Fallen

  • 7/24/2019 centro administrativo nacional

    16/36

    AC

    Uni

    Cc

  • 7/24/2019 centro administrativo nacional

    17/36

  • 7/24/2019 centro administrativo nacional

    18/36

    trade

  • 7/24/2019 centro administrativo nacional

    19/36

    Resid11,000

  • 7/24/2019 centro administrativo nacional

    20/36

    Condicion

    The process will take about 25 years

  • 7/24/2019 centro administrativo nacional

    21/36

  • 7/24/2019 centro administrativo nacional

    22/36

  • 7/24/2019 centro administrativo nacional

    23/36

  • 7/24/2019 centro administrativo nacional

    24/36

  • 7/24/2019 centro administrativo nacional

    25/36

  • 7/24/2019 centro administrativo nacional

    26/36

    FURNITURE

    MAP OF REGIONAL TRANSITSITP

    bridge and tunnel aboveand below the 26

  • 7/24/2019 centro administrativo nacional

    27/36

    SITP

    The existingrailway line isreplaced by aline of SITP

  • 7/24/2019 centro administrativo nacional

    28/36

    FURNITURE OMA

    Road Network

    Location of vehicular bridges

    Transmilenio routes

    pedestrian r

  • 7/24/2019 centro administrativo nacional

    29/36

    SOILS

    Interact with greenery 26thStreet

    Allow intersurroundin

    SoftSoft

    Hard

  • 7/24/2019 centro administrativo nacional

    30/36

    location of parks

    location central courtyards

    IMPORTANT GREEN AREAS

  • 7/24/2019 centro administrativo nacional

    31/36

    PARKLAND

    Ciudad versusNaturaleza

  • 7/24/2019 centro administrativo nacional

    32/36

    OMA,

    Rem Koolhaas

    Shohei Shigematsu

    NEW York,Director oficce

    professionals involved in

    the project

  • 7/24/2019 centro administrativo nacional

    33/36

    We always work with local teams to projects abroad. For the CA

    essential to integrate the experience and knowledge of Julio Ces

    and Lorenzo Castro (architects), Carlos Moncada (mobility cons

    Oscar Borrero (financial consultant) and Esteban Martinez (sus

  • 7/24/2019 centro administrativo nacional

    34/36

    rchitect julio Cesar Gmez San

    Doctor Architect degree from the School of A"Polytechnic University of Catalonia" (BarcelonaDoctoral entitled "Fragment urban residential buBarcelonesa "qualified" Excellent Cum LaudeJoaqun Sabate, Dr. Arch

    Master in Urban and Regional Planning deUniversitario Architecttura di di Venezia - IUAV

    Thesis entitled"Urban requalification of Gethsemane district oDirector: ProfessorGiorgio Lombardi.

    Architect degree from the "Universidad Nac(Bogot - Colombia

  • 7/24/2019 centro administrativo nacional

    35/36

    Lorenzo Castro

    Universidad Javeriana, Bogot,

    1988. As director of the

    Professional Workshop Public

    Space in 1998-2001, accompanied

    Mayor Enrique Pealosa in

    developing urban project in a

    more balanced and equitable for

    the citizens city. Contribute to

    the formulation of the plan of

    parks, in plotting 120km network

    of malls and 400 kilometers of

    bicycle paths. This process, in

    which the team of Professional

    Workshop Public Space District

    participates with other

    institutions,

  • 7/24/2019 centro administrativo nacional

    36/36

    https://www.youtube.com/watch?v=6k5k2icb6WU

    http://www.empresavirgiliobarco.gov.co/proyectos/Paginas/renovacion-ca

    http://eru.gov.co/documentos/Respuestas.pdf

    http://www.jaclaesmeralda.org.co/site_01/docs/renovacion/comunicadopr2.pdf

    http://www.eltiempo.com/colombia/bogota/ARTICULO-WEB-NEW_NOTA_INT13152195.html

    http://www.eltiempo.com/colombia/bogota/renovacion-urbana-del-centroadministrativo-nacional-can_13011882-4

    https://www.youtube.com/watch?v=6k5k2icb6WUhttps://www.youtube.com/watch?v=6k5k2icb6WUhttps://www.youtube.com/watch?v=6k5k2icb6WUhttp://www.empresavirgiliobarco.gov.co/proyectos/Paginas/renovacion-can.aspxhttp://www.empresavirgiliobarco.gov.co/proyectos/Paginas/renovacion-can.aspxhttp://www.empresavirgiliobarco.gov.co/proyectos/Paginas/renovacion-can.aspxhttp://eru.gov.co/documentos/Respuestas.pdfhttp://eru.gov.co/documentos/Respuestas.pdfhttp://eru.gov.co/documentos/Respuestas.pdfhttp://www.jaclaesmeralda.org.co/site_01/docs/renovacion/comunicadoprensa09112012.pdfhttp://www.jaclaesmeralda.org.co/site_01/docs/renovacion/comunicadoprensa09112012.pdfhttp://www.jaclaesmeralda.org.co/site_01/docs/renovacion/comunicadoprensa09112012.pdfhttp://www.jaclaesmeralda.org.co/site_01/docs/renovacion/comunicadoprensa09112012.pdfhttp://www.eltiempo.com/colombia/bogota/ARTICULO-WEB-NEW_NOTA_INTERIOR-13152195.htmlhttp://www.eltiempo.com/colombia/bogota/ARTICULO-WEB-NEW_NOTA_INTERIOR-13152195.htmlhttp://www.eltiempo.com/colombia/bogota/ARTICULO-WEB-NEW_NOTA_INTERIOR-13152195.htmlhttp://www.eltiempo.com/colombia/bogota/ARTICULO-WEB-NEW_NOTA_INTERIOR-13152195.htmlhttp://www.eltiempo.com/colombia/bogota/ARTICULO-WEB-NEW_NOTA_INTERIOR-13152195.htmlhttp://www.jaclaesmeralda.org.co/site_01/docs/renovacion/comunicadoprensa09112012.pdfhttp://eru.gov.co/documentos/Respuestas.pdfhttp://www.empresavirgiliobarco.gov.co/proyectos/Paginas/renovacion-can.aspxhttps://www.youtube.com/watch?v=6k5k2icb6WU