HPGCL Centre/Presentation/General...7 Turbine Box Up 15-July-09 15-Oct-09 8 Boiler Light-Up...
Transcript of HPGCL Centre/Presentation/General...7 Turbine Box Up 15-July-09 15-Oct-09 8 Boiler Light-Up...
HPGCL
HPGCL
• HPGCL was incorporated as a company on
17th March, 1997.
• The business of Generation of Power of erstwhile
HSEB was transferred to HPGCL on 14.08.98
pursuant to Power Reforms in Haryana.
Objectives : -
To generate power from its existing Generating
Stations in the most efficient manner on commercial
lines and to sell the same to distribution companies.
To set up new Power Generation Projects.
HPGCL
PRESENT INSTALLED CAPACITY OF HPGCL IN THE STATE
Sr.
No
Name of Power Station Capacity (MW) &
Unit No.
Date of
commissioning
1 Faridabad Thermal Power Station 165
MW (3x55 MW)
55 MW Unit-1
55 MW Unit-2
55 MW Unit-3
22.11.74
06.03.76
01.04.81
2 Panipat Thermal Power Station, Panipat
1360 MW (4x110 MW+2x210+2X250 MW
MW).
110 MW Unit-1
110 MW Unit-2
110 MW Unit-3
110 MW Unit-4
210 MW Unit-5
210 MW Unit-6
250 MW Unit-7
250 MW Unit-8
01.11.79
27.03.80
01.11.85
11.01.87
28.03.89
31.03.01
28.09.04
28.01.05
3 Deen Bandhu Chhotu Ram Thermal
Power Project 600 MW (2x300 MW)
300 MW Unit-1
300 MW Unit-2
13.11.07
29.03.08
4 WYC Hydro Electric Station, Yamuna
Nagar 62.7 MW (6x8+2X7.2 MW+0.3
MW)
2x8 MW PH-A
2x8 MW PH-B
2x8 MW PH-C
2x7.2 MW PH-D
1986
1987
1988-89
2004
Total Installed Capacity 2187.7 MW
HPGCL
CAPACITY ADDITION - POST REFORMS
• BEFORE UNBUNDLING, THE INSTALLEDGENERATION CAPACITY IN THE STATE WAS 863MW.
• A GENERATION CAPACITY OF 1324.4 MW HASBEEN ADDED IN THE STATE AFTER CREATION OFHPGCL WHICH IS AN INCREASE OF MORE THAN150%.
• THE PRESENT INSTALLED CAPACITY IN THESTATE IS 2187.7 MW
HPGCL
HARYANA’S SHARE IN CENTRAL SECTOR & OTHER PROJECTS.
PROJECTS PROJECT CAPACITY
(MW)
HARYANA’S SHARE
(MW)
BBMB 2876.00 875.00
NHPC 2972.70 329.90
NTPC : Shared Projects 6592.27 472.10
:Dedicated Project
(Faridabad gas power project)
432.00 432.00
FARAKKA (Thermal Power in lieu of
Hydro power from TALA HEP)
1600.00 29.76
KEHALGAON (-do-) 840.00 66.91
TALA HYDRO 1020.00 14.99
NUCLEAR POWER CORP. 880.00 76.10
INDRAPRASTH TPS 187.50 62.50
NATHPA JHAKRI POWER CORP. 1500.00 65.00
TEHRI HYDRO 1000.00 43.00
MAGNUM 25.00 25.00
TOTAL 19925.47 2492.99
HPGCL
IMPROVEMENT IN PERFORMANCE OF HPGCL SINCE ITS CREATION
Particulars 1998-99 2007-08 Achievements
Installed Capacity
(MW)
863.30 2187.70 An addition of more than 150%.
Generation (MUs) 3784 10845 An increase of 186% achieved with
increase in generation capacity of 150%.
PLF (%) 49.24 78.94 An increase of around 60%. PLF in 2007-08
was highest since formation of HPGCL.
Auxiliary
Consumption (%)
12.04 9.93 A reduction of 17.5% resulting into lower
cost of generation.
Coal Consumption
(Gms/kwh)
838 735 A reduction of more than 12% resulting
into lower cost of generation and reduced
emissions.
Specific Oil
Consumption
(ml/kwh)
12.70 1.66 A reduction of 87% resulting into lower
cost of generation. Sp. Oil Consumption in
2007-08 was lowest since formation of
HPGCL.
HPGCL Monthly Coal Linkage of HPGCL Generating Stations for the
quarter October 08 to December 08
Coal Company Type of Coal Metric Tonne Rakes
1. PTPS, Panipat
CCL ROM Coal 210000 58
BCCL Beneficiated Coal 60000
ROM Coal 195000
Total 255000 71
WCL ROM Coal 75000 21
NCL Beneficiated Coal 75000 21
SECL Korba 25000 7
Imported Coal (through MMTC) 60000 17
Total PTPS 700000 195
2. DCRTPP, Yamuna Nagar
CCL ROM Coal 265000 74
3. FTPS, Faridabad
CCL ROM Coal 75000 21
Grand Total 1040000 290
HPGCL
CAPACITY ADDITION DURING THE 11TH
FIVE YEAR PLAN
HPGCL
POWER SCENARIOCAPACITY ADDITION PROGRAMME OF HARYANA
• In the 17th Electric Power Survey carried out by the Central ElectricityAuthority (CEA), New Delhi, peak demand of 6839 MW has beenprojected for Haryana during the year 2011-12.
• However, on the basis of actual load growth pattern, Haryana has madeliberal projections of 15% per annum increase in growth of peak demandwhich is expected to reach 7335 MW during 2008-09 and 11155 MW bythe year 2011-12.
• Haryana has accordingly embarked on an aggressive programme forcapacity addition to the tune of 5000 MW during the 11th Plan period.
HPGCL
CAPACITY ADDITION SCENARIO DURING 11TH PLAN PERIOD AND
BEYOND
Sources of installed capacity 2008-09 2009-10 2010-11 2011-12 2012-13
State Owned Projects 1587.40 1587.40 1587.40 1587.40 1587.40
Central Sector Share 1554.76 1554.76 1554.76 1554.76 1554.76
Shared Projects - BBMB & IP 937.50 937.50 937.50 937.50 937.50
DCRTPP Yamuna Nagar 600.00 600.00 600.00 600.00 600.00
Hisar TPS (600X2) Mega Plant
Status1080.00 1080.00 1080.00 1080.00
Jhajjar Case- II 1320 MW 594.00 1188.00
Aravali STPS,Jhajjar (500*3)
{Haryana:Delhi - 50:50}750.00 750.00 750.00
Additional availability through
PPA with IPPs/CPSU 110.83 668.33 996.33 2181.33 6041.33
Yamuna Nagar Extention 300.00
Faridabad Gas 432.00
Total Available Capacity (MW) 4790.49 6427.99 7505.91 9292.99 14470.91
Projected Demand with 15%
growth (MW)7335 8435 9700 11155 12828
HPGCLDEMAND, PROPOSED CAPACITY & AVAILABLE
CAPACITY GROWTH (MW)
7335
8435
9700
1115512828
4790
6428
7506
9293
14471
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
2008-09 2009-10 2010-11 2011-12 2012-13
Year
Demand with 15% Growth
Proposed Capacity
Year 2008-09 2009-10 2010-11 2011-12 2012-13
Demand with 15% Growth 7335 8435 9700 11155 12828
Proposed Capacity 4790 6428 7506 9293 14471
HPGCL
GENERATION CAPACITY ADDITION
PROJECTS IN PIPELINE
HPGCLGENERATION CAPACITY ADDITION PROGRAMME IN
THE STATE DURING 11th PLAN (2007-12)
Sr.
No.
Name of Project Capacity in
MW
Commissioning
Schedule
1. Deenbandhu Chhotu
Ram Thermal Power
Station, Yamuna Nagar.
2x300 MW =
600 MW
Commissioned on
14.04.08 & 24.06.08.
2. Rajiv Gandhi Thermal
Power Project, Hisar
2x600 MW =
1200 MW
Unit-I : Dec. 2009
Unit-II : March 2010
3. Indira Gandhi Super
Thermal Power Project,
Jhajjar (JV between
NTPC, Delhi & Haryana)
3x500 MW
(Haryana’s
Share 750
MW)
Unit-I : Apr 2010
Unit-II : July 2010
Unit-III : Oct 2010
4. Jhajjar Thermal Power
Project (Case-2)
2x660 MW
=1320 MW
Unit-I : Dec. 2011
Unit-II : May 2012
HPGCL 2X300 MW DEENBANDHU CHHOTU RAM THERMAL
POWER PROJECT, YAMUNA NAGAR
INSTALLED CAPACITY : 2X300 MW
TOTAL ESTIMATED COST : Rs. 2400 CRORE
TOTAL LAND : 1107 ACRES.
EPC CONTRACTOR : RELIANCE ENERGY LTD.
EPC COST : Rs. 3.49 CRORE/MW
COAL LINKAGE : 2.77 MTPA FROM CCL.
COMMISSIONED ON : UNIT-I : 14.04.2008
UNIT-II : 24.06.2008
POWER AVAILABILITY : AROUND 144 LAC UNITS
PER DAY WHEN OPERATING AT
RATED CAPACITY.
PROJECT HIGHLIGHTS :
HPGCL
Unique features of the Project:
First Power Project in the State to be awarded to Private
Developer i.e. M/s Reliance Energy Ltd.
First Project in the Country where BTG equipment was
supplied by M/s Shanghai Electric Corp. China.
Very low per MW EPC cost - Rs. 3.49 Crore per MW.
First Unit was commissioned in a record period of 27 months
which is the lowest for any coal based green field project in
the Country.
2 x 300 MW DEENBANDHU CHHOTU RAM
THERMAL POWER PROJECT, YAMUNA NAGAR
HPGCL
A. PROJECT FINANCING:
Debt Equity ratio: 20% State Govt. equity and 80% loan.
Loan of Rs. 1920.00 crore from M/s PFC.
B. TARIFF:
First year tariff : Rs. 2.70
Levelized tariff for 25 years : Rs. 3.08
Levelized tariff for 30 years : Rs. 3.15
2 x 300 MW DEENBANDHU CHHOTU RAM
THERMAL POWER PROJECT, YAMUNA NAGAR
HPGCL
2 x 600 MW RAJIV GANDHI
THERMAL POWER PLANT, KHEDAR, HISAR
PROJECT HIGHLIGHTS :
INSTALLED CAPACITY : 2X600 MW
TOTAL ESTIMATED COST : Rs. 4297 CRORE
STATUS OF CLEARANCES : ALL CLEARANCES AVAILABLE
COAL LINKAGE : 5.83 MILLION TONNE PER ANNUM FROM
MAHANADI COALFIELDS LTD (MCL)
ORISSA
WATER AVAILABILITY : 50 CUSECS ALLOCATED FROM BARWALA
BRANCH OF BHAKRA CANAL
COMMISSIONING : UNIT-I : 28.12.2009 (35 Months)*
SCHEDULE UNIT-II : 28.03.2010 (38 Months)*
POWER AVAILABILITY : 288 LAC UNITS PER DAY
BEST EFFORT SCHEDULE : Unit-I : 28.11.2009 (34 Months)
Unit-II : 28.01.2010 (36 Months)
PROGRESS : Around 45% overall Progress achieved.
HPGCL
Unique features of the Project:
First Mega Power Project in the Northern Region.
600 MW – Largest single Unit capacity in the Northern
Region.
Lowest per MW cost in the Country - Rs. 3.14 Crore per MW.
Most aggressive commissioning schedule of 35 and 38
months.
Best effort schedule of 34 and 36 months being targeted.
2 x 600 MW RAJIV GANDHI
THERMAL POWER PLANT, KHEDAR, HISAR
HPGCL
A. PROJECT FINANCING:
Debt Equity ratio: 20% State Govt. equity and 80% loan.
Loan of Rs. 1453.00 crore from M/s PFC.
Rs. 1536.03 crore from M/s REC
Rs. 500.00 crore from NCR Planning Board.
B. TARIFF:
First year tariff : Rs. 2.80
Levelized tariff for 25 years : Rs. 3.54
Levelized tariff for 30 years : Rs. 3.65
2 x 600 MW RAJIV GANDHI
THERMAL POWER PLANT, KHEDAR, HISAR
HPGCL
2 x 600 MW RAJIV GANDHI
THERMAL POWER PLANT, KHEDAR, HISAR
SL MilestonesU-1 :
Plan
U-1 :
Actual
U-2 :
Plan
U-2 :
Actual
1 Piling Commencement 16-Jul-07 19-May-07 16-Oct-07 22-Jul-07
3 Boiler Erection - Start 01-Feb-08 04 Dec 07 01-May-08 31-Dec-07
4 Boiler Drum Lifting 28-Aug-08 10-Sep-09 28-Nov-08
5 TG Erection – Start 01-Nov-08 01-Feb-09
6 Boiler Hydro-Test 28-Mar-09 28-Jun-09
7 Turbine Box Up 15-July-09 15-Oct-09
8 Boiler Light-Up 01-Aug-09 01-Nov-09
9 TG on barring Gear 16-Sept-09 16-Dec-09
10 Synchronization 28-Sept-09 28-Dec-09
11 Provisional Taking Over 28-Dec-09 28-Mar-10
MILESTONES
HPGCL
3X500 MW ARAVALI SUPER THERMAL POWER PROJECT,
JHAJJAR
1500 MW coal based Power Plant being executed at Jhajjar by Aravali Power Company Pvt.
Ltd., a joint venture of Haryana with NTPC and NCT of Delhi.
Haryana’s Share 750 MW (Generation from the project is scheduled to
commence during 2010-11).
Total estimated cost Rs 7892.42 crore
a) Land Requirement 2231 acre
b) Water availability 75 cusecs from Jawahar Lal Nehru canal.
c) NOC from Haryana State Pollution
Control Board (HSPCB)
Received in August, 2007.
d) MoE&F clearance Received on 08.08.07.
e) Coal linkage Coal linkage of 6.94 Million Tonne Per Annum
allocated from Mahanadi Coalfields Ltd. by Ministry
of Coal, Govt. of India.
Equity contribution NTPC-50%, Haryana-25%, Delhi-25%.
Date of LOI 06.07.07 (boiler), 14.07.07 (turbine)
Power Availability 180 Lac Units Per day for Haryana.
HPGCL
1320 MW COAL BASED PROJECT IN JHAJJAR
CASE-II
• TARIFF BASED COMPETITIVE BIDS WERE INVITED FOR SETTING
UP A 1320 MW COAL BASED PROJECT AT JHAJJAR.
• 11 BIDDERS QUALIFIED.
• LOI ISSUED TO M/S CLP POWER INDIA PVT. LTD. ON 23.07.08.
• COAL LINKAGE FOR THE PROJECT - 5.21 MTPA RECEIVED
FROM CCL
• WATER AVAILABILITY OF 50 CUSECS ALLOWED BY HARYANA
IRRIGATION DEPTT. FROM JAWAHAR LAL NEHRU CANAL.
• PPA SIGNED BY UHBVNL & DHBVNL ON 07.08.08.
• POWER LIKELY TO BE AVAILABLE FROM DEC., 2011.
HPGCL
PROCUREMENT OF UPTO 2000 MW POWER ON LONG
TERM BASIS THROUGH TARIFF BASED COMPETITIVE
BIDDING- CASE 1
• ARRANGEMENTS FINALIZED FOR PROCUREMENT OF
2113 MW POWER THROUGH TARIFF BASED
COMPETITIVE BIDDING UNDER CASE-I.
• PPA ALREADY SIGNED WITH M/S ADANI FOR
1424 MW AND M/S PTC FOR 300 MW.
• POWER LIKELY TO BE AVAILABLE FROM DEC, 2011
ONWARDS.
HPGCL
FUTURE GENERATION PROJECTS / INITIATIVES
BEING PLANNED IN THE STATE
1050 MW Gas based Project at Faridabad by phasing out old
Faridabad Thermal Power Station.
300 MW capacity Thermal Unit at Yamuna Nagar as an
extension of 2x300 MW DCRTPP, Yamuna Nagar.
2800 MW (4x700 MW) Nuclear Power Plant near Fatehabad –
Site stands identified by Nuclear Power Corporation of India.
Coal block at Mara-II Mahan in MP with estimated coal
reserves of 956 Million Tonnes allocated jointly to HPGCL
and Delhi Govt. Required steps being taken for development
of coal block.
HPGCL
11TH FIVE YEAR PLAN INVESTMENTS OF
HARYANA POWER SECTOR
Amount
(Rs. Crores)
Generation 11367.01
Transmission 7643.00
Distribution 6514.32
Grand Total (Generation + Transmission + Distribution) 25524.33
Govt. of Haryana will provide equity support of Rs. 4942 crores
HPGCLCHALLENGES BEFORE HPGCL
INCREASING PLF FROM PRESENT 78-80% TO 90% ON A SUSTAINED BASIS IN THE
NEXT TWO YEARS
ISO 9000 AND 1SO 14000 CERTIFICATION FOR OUR POWER PLANTS.
IT ENABLEMENT OF ALL PROCESSES AND SYSTEMS AT PLANTS AND OFFICES.
CAPACITY ADDITION OF 200 -300 MW EVERY YEAR TO KEEP UP WITH THE DEMAND.
DEDICATED COAL SOURCES FOR ENERGY SECURITY.
PITHEAD POWER PLANT NEAR ALLOCATED COAL BLOCK-POWER DEDICATED FOR
HARYANA.
TO DEVELOP ALTERNATE SOURCES OF GENERATION-GAS, HYDRO THROUGH JV
ETC.
EXPEDITING THE NUCLEAR POWER PLANT AT FATEHABAD, IN VIEW OF THE INDO-US
NUCLEAR DEAL.
DEVELOPMENT OF A SYSTEM FOR SELLING SURPLUS POWER TO OTHER STATES.
FULFILLING CORPORATE SOCIAL RESPONSIBILITY IN THE AREAS AROUND
PROJECTS AND CONTRIBUTE TOWARDS NATION BUILDING.
HPGCL