CENTRE FOR INDUSTRIAL LIAISON AND PLACEMENTthapar.edu/images/naacmainperforma/PLACEMENT DATA...
Transcript of CENTRE FOR INDUSTRIAL LIAISON AND PLACEMENTthapar.edu/images/naacmainperforma/PLACEMENT DATA...
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
1 Thorogood
Associates (I) Pvt.
Ltd.
- - - - - - - - 1 - - - 0 - 1 - - - - - - - - 0 - - - - 2
2 Shapoorji Pallonji &
Co. Ltd.
- 8 - - - - - - - - - - - - - - - - - - - - - - - - - - 8
3 LG Electronics India
Pvt. Ltd.
- - - - - - - - - 0 - 3 - - - - 0 0 - - 0 - - - - - 2 - 5
4 Winshuttle Inc. - - - 2 - 0 - - - - - - - - - - - - - - - - - - - - - - 2
5 EXL Service India
Ltd.
0 0 0 2 0 1 1 0 - - - - - - - - - - - - - - - - - - - - 4
6 Maruti Suzuki (I) Ltd. - 2 - 3 - - - 9 - - - - - - - - - - - - - - - - - - - - 14
7 Juniper Networks
(I)Pvt. Ltd.
- - - 1+3 - - - - - - - - - - - - - - - - - - - - - - - - 1+3
8 MakeMyTrip India (P)
Ltd.
- - - 2 - - - - - - - - 0 - 0 - - - - - - - - - - - - - 2
9 Grail Research 0 0 2 1 0 3 0 0 - - - - - - - - - - - - - - - - - - - - 6
10 Texas Instruments (I)
Pvt. Ltd.
- - - 0 0 3 0 - - 0 0 - 0 - 0 0 0 - - - - - - - - - - - 3
11 Nagarro Software (P)
Ltd.
- - - 6 - 0 0 - 3 - - - 1 - 0 - - - - - - - - 0 - - - - 10
12 Infogain India - - - 11 - - - - 21 - - - - - - - - - - - - - - - - - - - 32
13 Evalueserve 1 0 1 3 1 1 2 1 0 1 0 0 0 0 1 0 0 0 0 0 0 - - - - - - - 12
14 Punj Lloyd Ltd. - 5 - - 2 - - 7 - - - - - - - - - - - - - - - - - - - - 14
CENTRE FOR INDUSTRIAL LIAISON AND PLACEMENT
OrganisationS.
No.
No. of students offered campus placement
B.E/B.Tech.
List of Organisations who have visited our Institute for Campus Recruitment till 31st December, 2011 alongwith placement data ( 2010-11 ) Dated: 05/01/2012
MBAM.E/M.Tech. M.Sc.
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
15 Caparo India - - - - - - - 4 - - - - - - - - - - - - - - - - - - - - 4
16 D.E. Shaw (I)
Software (P) Ltd.
0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - - - - - - - 2
17 John deere
Equipment Ltd.
- - - - - - - 10 - - - - - - - - - - - - - - - - - - - - 10
18 Future First Info
Service (P) Ltd.
0 0 0 1 0 3 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 - - - - - - - 5
19 ABB Ltd. - - - 2 3 0 0 2 - - - - - - - - - - - - - - - - - - - - 7
20 Whirlpool of India
Ltd.
- - - - - 1 1 2 - - - - - - - - - - - - - - - - - - - - 4
21 ZS Associates India
(P) Ltd.
0 0 0+1 3+1 1 1+1 0 0 - - - - - - - - - - - - - - - - - - - - 5+3
22 Aricent - 0 0 20 1 11 5 0 28 0 0 0 8 0 3 0 0 0 - 0 0 0 - 0 - - - - 76
23 Mahindra & Mahindra
Ltd.
- - - - 5 - - 7+2 - - - - - - - - - - - - - - - - - - - - 12+2
24 Goldman Saches
Service (P) Ltd.
- - - 2 0 0 0 - 0 - - - - - - - - - - - - - - - - - - - 2
25 Philips Electronics
India Ltd.
- - - - - 2 1 - - - - - - - - - - - - - - - - - - - - - 3
26 Gensol Consultants
Pvt. Ltd.
- - - - - - - - - - - - - - - - 3 - 1 - - - - - - - - 2 6
27 GS Engineering &
Const. India Pvt. Ltd.
- 1 1 - 1 - 1 2 - - - - - - - - - - - - - - - - - - - - 6
28 Informatica Business
Solutions Pvt. Ltd.
- - - 0+1
Tg-2
- - - - 0+1 - - - 0 - 0 - - - - - - - - - - - - - 0+2
29 UOP India Pvt. Ltd. - - 1+1 - - - - - - - - - - - - - - - - - - - - - - - - - 1+1
Organisation
M.E/M.Tech. M.Sc.
No. of students offered campus placement
MBAB.E/B.Tech.
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
30 Sapient India - - - 4+3 - 0+1 0+1 - 11+1 - - - 0+2 - - - - - - - - - - - - - - - 15+8
31 Tata Motors Limited - - - - - - - 6+1 - - - - - - - - - - - - - - - - - - - - 6+1
32 Simplex
Infrastructures Ltd.
- 4 - - - - - - - - - - - 1 - - - - - - - - - - - - - - 5
33 AuthorGEN
Technologies Ltd.
- - - 1 - - - - 6 - - - - - - - - - - - - - - - - - - - 7
34 Oracle Corporation - - - 4+9 - - - - - - - - - - - - - - - - - - - - - - - - 4+9
35 Murugappa Group - - - - - - - 1 - - - - - - - - - - - - - - - - - - - - 1
36 Hero Honda Motors
Ltd.
- - - - - - - 3+1 - - - - - - - - - - - - - - - - - - - - 3+1
37 CoCubes.com - - - - - - - - Tg
2
- - - - - - - - - - - - - - - - - - - -
38 JSW Steel Ltd. - - 7 - 4 - 2 8 - - - - - - - - - - - - - - - - - - - - 21
39 Techtronics
Education
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
40 Ace Though
Technologies
- - - 0+1 - 0 - - - 0 - - 0 - 0 - - - - - - - - - - - - - 0+1
41 Gammon India - 8+2 - - - - - - - - - - - - - - - - - - - - - - - - - - 8+2
42 NIIT Tech.Ltd. - - - - - - - - 2 - - - - - - - - - - - - - - - - - - - 2
43 Talwar & Talwar
Consultants
2+1 - - 1 0 5+1 1 0 - - - - - - - - - - - - - - - - - - - - 9+2
44 Freescale
Semiconductor India
Pvt. Ltd.
- - - - 0+2 - 0+2 - - - - - - - - - - - - - - - - - - - - - 0+4
45 Amazon.com - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - 0
No. of students offered campus placement
M.E/M.Tech. MBAB.E/B.Tech. M.Sc.
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
46 ST Microelectronics - - - 2 Tg
1
- 2 - - - - - - - - - - - - - - - - - - - - - 4
47 American Express - - - 0+5
+1*
- - - - 0+1
+1*
- - - - - - - - - - - - - - - - - - - 0+6+2*
48 Hewlett Packard
India
- - - 7 0 4 5 - 2 0 0 - 0 - 0 0 0 - - - - - - - - - - - 18
49 Larsen & Tourbo Ltd.-
ECC
- 8+3 - - 5 - 0 6+4 - - 0 0 - 0 - - - - - - 0 - - - - - - - 15+7
50 Fidelity India - - - 2+1 - 1 1 - 0 - - - - - - - - - - - - - - - - - - - 4+1
51 Honda Motorcycle
and Scooter India
Pvt. Ltd.
- - 0 - 0 - - 1+1 - - - - - - - - - - - - - - - - - - - - 1+1
52 Samsung India
Electronics Pvt. Ltd.
- - - 6+7 - - - - 1+1 - - - 0 - 0+1 - - - - - - - - - - - - - 7+9
53 Interra Systems - - - 4 0 0 0 - - - - - - - - - - - - - - - - - - - - 4
54 National Engg.
Industries ltd.
- - - - - - - 5 - - - - - - - - - - - - - - - - - - 2 - 7
55 Dataguise Infotech. - - - Tg
3
- - - - Tg
1
- - - - - - - - - - - - - - - - - - - -
56 Hbeon labs - - - Tg
1
- - - - - - - - - - - - - - - - - - - - - - - - -
57 Uprack.com - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
58 Stryker India 0 - - 0 - 1 0+1 0+1 - 1 0 - 0 - 0 0 - - - - - - - - - - - - 2+2
59 Adobe Systems India
Pvt. Ltd.
- - - 2 - 1 0 - - - - - - - - - - - - - - - - - - - - - 3
60 Bry Air (Asia) Pvt.
Ltd.
- - - - - - - - - - - - - - - - - - - - - - - - - - 0 - 0
61 Jonson & Jonson
India Ltd.
- - - - - 1 2 1 - - - - - - - - - - - - - - - - - - - - 4
62 Reckitt Benckiser Ltd - - - - - - - 0+1 - - - - - - - - - - - - - - - - - - - - 0+1
63 Nestle India Ltd. - - - - - - - 3 - - - - - - - - - - - - - - - - - - - - 3
64 Asia Motor Works
Ltd.
- - - - - - - 4 - - - - - - - - - - - - - - - - - - - - 4
B.E/B.Tech. M.E/M.Tech. MBA
No. of students offered campus placement
M.Sc.
Organisation
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
65 GATI Ltd. - - - - - - - - - - - - - - - - - - - - - - - - - - 3 - 3
66 Idea Cellular Ltd. - - - - - 4+2 - - - - - - - - - - - - - - - - - - - - - - 4+2
67 Deloitte Consulting - - - 2+4 1+2 11+
3
2+1 - 0 - - - 0 - 1+1 - - - - - - - - - - - - - 17+11
68 Nomura Services - - - 0+1 0 2 0 - - - - - - - - - - - - - - - - - - - - - 2+1
69 Cosmos
Technologies
- - - 0 0 1 0 - - - - - 0 - 0 - - - - - - - - - - - - - 1
70 Google India - - - 0 - - - - - - - - 0 - 0 - - - - - - - - - - - - - 0
71 Tata Consultancy
Services
2 0 2 2 2 15 10 0 2 1 2 0 0 0 3 1 0 - - 0 0 - - - - - - - 42
72 Ballarpur Industries
Ltd.
- - - - - - 1 - - - - - - - - - - - - - - - - - - 3 2 - 6
73 Suzuki Powertrain
India Ltd.
- - - - - - - 2+4 - - - - - - - - - - - - - - - - - - - - 2+4
74 Zscaler India - - - 0+2 - - - - - - - - 0+1 - 0 - - - - - - - - - - 0 - - 0+3
75 Apticraft Systems
Pvt. Ltd.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
76 Beroe Consulting 2 0 1 0 0 0 0 0 - - - - - - - - - - - - - - - - 0 0 0 0 3
77 Reliance Industries
Ltd.
- - 4+2 - 2+2 1+3 0+3 - - - - - - - - - - - - - - - - - - - - - 7+10
78 Samtel Group - - - - - 0 0 2 - - - - - - - - - - - - - - - - - - - - 2
79 Wipro Technologies 9 0 1 1 0 7 2 0 2 1 4+1 2 2 0 7 3 1 0 0 0 0 - - - - - - - 42+1
80 Trident Group - 0
+1
2 0 0 0+1 1+1 0+1 0 0 0 - 0+1 - 0+2 - - - - - - - - - - - 1 - 4+7
81 Matix Fertilisers - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - 0
82 Microsoft India - - - 0+2 - - - - - - - - 0+0
+1*
- - - - - - - - - - - - - - - 0+2+1*
83 HCL Technoloies - - - 3 3 8 - - 8 1 - - 4 - 6 3 - - - - - - - - - - - - 36
M.E/M.Tech. M.Sc.
Organisation No. of students offered campus placement
B.E/B.Tech. MBA
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
84 India Bulls Real
Estate Ltd.
- 0 - - 1 - - 2 - - - - - - - - - - - - - - - - - - - - 3
85 Escorts Agri
Machinery Group
- - - - - - - 0 - - - - - - - - - - - - - - - - - - - - 0
86 Amdocs India - - - 6+2 - 2+1 - - 0+2 - - - 0 - 0+1 - - - - - - - - - - - - - 8+6
87 AVTEC India - - - - - - - 3+1 - - - - - - - - - - - - - - - - - - - - 3+1
88 Associated Cement
Co. Ltd.
- - 5 - 1 - - 1 - - - - - - - - - - - - - - - - - - - - 7
89 HCL Infosystems Ltd. 2 0 0 0 0 0 0 0 - - - - - - - - - - - - - - - - - - - - 2
90 Fiserv India - - - 0 - 1 - - 0 - - - - - - - - - - - - - - - - - - - 1
91 Usha International
Ltd.
- - - - 0+1 - - 0+2 - - - - - - - - - - - - - - - - - - - - 0+3
92 B & S Engg.
Consultants
- 0+1 - - - - - - - - - - - 1 - - - - - - - - - - - - - - 1+1
93 India Yamaha Motors
Pvt. Ltd
- - - - - - 0 2+3 - - 0 - - - - - - - - - - - - - - - - - 2+3
94 Anand Automotive
Ltd.
- - - - 0 - - 3 - - - - - - - - - - - - - - - - - - - - 3
95 HCL Comnet Ltd. - - - - - - - - - - - - - - - - - - - - - - - - - 4 3 0 7
96 SPML Infra Ltd. - 1 - - 2 - 1 3 - - - - - 1 - - - - - - - - - - - - - - 8
97 Headstrong India - - - 0 0 3+2 0 - 0 - - - 0+2 - 0+2 - - - - - - - - - - - - - 3+6
98 Agnity India - - - 0 - 0 0 - 0 0 0 - 1 - 1 - - - - - - - - - - - - - 2
99 Kohno Jushi Kogyo
Co. Ltd.
- - - - - - - 0 - - - - - - - - - - - - - - - - - - - - 0
100 IBM India Pvt. Ltd. 5+5 0 3 2 2 4 1 1+1 2+7 2 3 2 1+2 0 1+1 3+2 3+1 0 1 0 2 - - - - - - - 38+19
101 Lakshya Institute - - 1 - - - - - - - - - - - - - - - - - - - 1 - - 0 0 0 2
No. of students offered campus placement
B.E/B.Tech. M.E/M.Tech. M.Sc. MBA
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
102 KK Birla Group 0 0 0+1 - 1 0 0 1 - - - - - - - - - - - - - - - - - - - - 2+1
103 Mawana Sugar Ltd. - - - - 1 - - 1 - - - - - - - - - - - - - - - - - - - - 2
104 ISGEC - - - - - - - 1 - - - - - - - - - - - - - - - - - - - - 1
105 D S Construction - 5+1 - - - - - 1 - - - - - 0 - - - - - - - - - - - - - - 6+1
106 GATES India - - - - - - - - - - - - - - - - - - - - - - - - - 2 0 0 2
107 V E Commercial
Vehicles Ltd.
- - - - - - - 0 - - - - - - - - - - - - - - - - - - - - 0
108 LNJ Bhilwara Group - 2 - - 0 - - 1 - - - - - 0 - - 1 - - - - - - - - - - - 4
109 Yahoo R&D - - - 2+2 - - - - 0 - - - - - - - - - - - - - - - - - - - 2+2
110 Mankind Pharma 0 - - - - - - - - - - - - - - - - - - - - - - - 0 - - - 0
111 Nectar Life Sciences
Ltd.
- 1 4 - 2 2 0 2 - - - - - - - - - - - - - - - - - - - - 11
112 Ericsson India - - - - - 1+4 - - - - - - - - - - - - - - - - - - - - - - 1+4
113 Four Soft Ltd. - - - - - - - - - - - - - - - - - - - - - - - - - 0 3 - 3
114 Alstrom Projects
India
- - - - 0 - 0+1 0+3 - - - - - - - - - - - - - - - - - - - - 0+4
115 Samsung Engg. Ltd. - 0+1 0 - 0 - 0+1 0 - - - - - - - - - - - - - - - - - - - - 0+2
116 Transcorp
Inernational Ltd.
- - - - - - - - - - - - - - - - - - - - - - - - - 0 1 0 1
117 ST Ericsson Ltd. - - - 0+2 - 0+1 0 - - 0 0 - 0 - 0 0 - - - - - - - - - - - - 0+3
118 Sharda University - - - - - - - - - 3 1 0 0 1+1 2 1+2 1 1 - - 2+1 - - - - - - - 12+4
119 Akash Institute 4 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 - - - 10
Organisation No. of students offered campus placement
B.E/B.Tech. M.E/M.Tech. M.Sc. MBA
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
120 Hermes Institute - - - - - - - - - 2 - - - 1 - 1 - - - - - - - - - - - - 4
121 Indus International
University
- - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
122 Lovely Professional
Universtity
- - - - - - - - - 2+3 1 5 0 2 0+3 2+2 1 - - - 1 - - - - - - - 14+8
123 ABC Ltd. - - - - - - - - - - - - - - - - - - - - - - - - - 0 2 0 2
124 Azure Power - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
125 Siemens Ltd. - 2+1 - - 0+4 - 0+1 0+1 - - 0+1 - - 0 - - 0 - - - - - - - - - - - 2+8
126 Linxmart
Technlolgies
- - - - - - - - - - - - - - - - - - - - - - - - - 0 1 0 1
127 Value Chain Solution
India Ltd.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
128 WAPCOS Ltd. - 0+1 - - - - - - - - - - - 0+1 - - - - - - - - - - - - - - 0+2
129 Samsung India
Software Operations
- - - 0+6 - 0+9 0+2 - 0 0 0 - 0 - 0+3 0 - - - - - - - 0 - - - - 0+20
130 Vira Auto
Components
- - - - - - - - - - - - - - - - - - - - - - - - - 0 2 0 2
131 Mewar University - - - - - - - - - - 0 - - - - 0 0 - 0 1 0 - - - - - - - 1
132 BL Kashyap & Sons - 4+1 - - - - - - - - - - - - - - - - - - - - - - - - - - 4+1
133 Comviva - - - 1 - 0 0 - 0 - - - - - - - - - - - - - - - - - - - 1
134 Chitkara University - - - - - - - - - 0+1 0 0+1 0 0 0+2 0 0 - 0 - - - - - - - - - 0+4
135 Groupsoft
Technologies
0 0 0+1 0 0+1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 - - - - - - - 1+2
136 Mittal Energy Ltd. - - 1+1 - - - - - - - - - - - - - - - - - - - - - - - - - 1+1
137 Amber Enterprises - - - - 0 - - 1 - - - - - - - - - - - - - - - - - - - - 1
138 Rayat Bahra Group - - - - - - - - - 2 0 0+1 1+3 0 0 0+1 - - 0 - 2 - - - - - - - 5+5
139 Honda Siel Cars - - - - 1 - - 0+2 - - - - - - - - - - - - - - - - - - - - 1+2
140 Careco Services - - - - - - - - - - - - - - - - - - - - - - - - - 0 2 2 4
141 Frick India Ltd. - - - - - - - - - - - - - - - - 0+1 - - - - - - - - - - - 0+1
142 MU-Sigma Ltd. - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
Organisation No. of students offered campus placement
B.E/B.Tech. M.E/M.Tech. M.Sc. MBA
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
143 Sterlite Technologies - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
144 National Council for
Cement & Building
Materials
- 0+2 - - - - - - - - - - - 1 - - - - - - - - - - - - - - 1+2
145 Surya
Pharmaceutical
- - - - - - - - - - - - - - - - - - - - - - 0 - - - - - 0
146 Vardhman Precision
Ltd.
- 2 - - - - - - - - - - - - - - - - - - - - - - - - - - 2
147 Ahuja Consultants - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 1
148 Shoolini University - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
149 Impinge Solutions - - - 1 - 2 - - 3 - - - - - - - - - - - - - - - - - - - 6
150 ITM University - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
151 Anchor India - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - 2
152 JHS Svendgaard Lab - 2 - - 1 1 2 2 - - - - - - - - - - - - - - - - - - - - 8
153 Future Generali India - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 - 3
154 Triune Engineering
Service
- 2 3 - 1 - 2 2 - - - - - - - - - - - - - - - - - - - - 10
155 BIG FM, Patiala - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - 2
156 Wipro Energy - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
157 Taurus Agile Corp. - - - - - - - - 2 - - - - - - - - - - - - - - - - - - - 2
158 Sagacious Research - - - 1 - 1 - - - - - - - - - - - - - - - - - - - - - - 2
159 Stellarix Consultancy - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 1
160 Venus Garments - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - 2
161 AECOM Ltd. - 2 - - - - - - - - - - - 1 - - - - - - - - - - - - - - 3
M.E/M.Tech. M.Sc. MBA
Organisation No. of students offered campus placement
B.E/B.Tech.
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
162 hCentive India - - - 2 - - - - 3 - - - - - - - - - - - - - - - - - - - 5
163 CISCO - - - 0+2 - - - - - - - - - - - - - - - - - - - - - - - - 0+2
164 Imperial Life Science 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - 3
165 Attribo Technologies - - - 0+2 - - - - - - - - - - - - - - - - - - - - - - - - 0+2
166 Tribal Fusion - - - 0+4 - - - - - - - - - - - - - - - - - - - - - - - - 0+4
167 Bridgecon Infra
Consultants
- 0+2 - - - - - - - - - - - - - - - - - - - - - - - - - - 0+2
168 Minda Group - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
169 ICARE Services - - - - - - - - - - - - - - - - - - - - - - - - - 2 2 - 4
170 Emergent Ventures - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
171 AFCONS - 2 - - - - - - - - - - - - - - - - - - - - - - - - - - 2
172 Apticraft Systems - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
173 Pyramid Consulting - - - 1 2 2 2 - 2 - - - - - - - - - - - - - - - - - - - 9
174 Cell works 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - 2
175 IREO Management - - - - - - - - - - - - - - - - - - - - - - - - - - - - RA
176 DSCL Ltd. - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 3
Total 26+6 46
+16
35+
7
66+
52+1
*
36+
10
86
+22
36+1
2
87+29 85+12
+1*
12+
4
9+2 10+2 7+1
0+1
*
7+2 13+
13
7+7 8+2 1 2 1 6 0 1 0 5 19 27 4 642+
208
+3* 32 62 42 119 46 108 48 116 98 16 11 12 18 9 26 14 10 1 2 1 6 0 1 0 5 19 27 4 853
Note: In total, first figures(642)shows the number of students having one placement, second figure(208)shows the students having two placements, third figure (03)
shows the students having three placements, Hence number of students placed are 853.
Organisation No. of students offered campus placement
B.E/B.Tech. M.E/M.Tech. M.Sc. MBA
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
40 78 72 142 62 130 65 134 119 22 25 23 24 17 26 24 25 15 14 9 34 20 21 20 27 97 79 8
35 66 61 128 52 119 55 122 114 17 19 15 20 12 26 18 18 10 7 4 18 18 20 18 24 78 68 8
29 53 48 116 46 108 46 100 103 16 19 15 20 12 26 18 16 10 7 3 17 18 16 14 22 78 66 8
28 51 42 114 44 106 44 98 98 16 11 12 18 9 26 14 10 1 2 1 5 0 1 0 5 19 27 4
96 96 87 98 95 98 95 98 95 100 58 80 90 75 100 78 63 10 29 33 30 0 6 0 23 24 41 50
6 13 13 12 6 11 9 22 11 1 0 0 0 0 0 0 2 0 0 1 1 0 4 4 2 0 2 0
4 11 0 5 2 2 4 18 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
66 84 0 41 33 18 44 81 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0
91 94 69 93 88 90 87 95 86 94 58 80 90 75 100 78 55 10 29 25 33 0 5 0 21 24 39 50
% age of students placed
having CGPA < 6.00
Total % age of Placement
No. of students placed
having CGPA < 6.00
MBAB.E/B.Tech. M.E/M.Tech. M.Sc.
Total no. of students
No. of students passed till
date
No. of students having
CGPA > 6.00
No. of students placed
having CGPA > 6.00
No. of students having
CGPA < 6.00
% age of students placed
having CGPA > 6.00
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
Organisation No. of students offered campus placement
B.E/B.Tech. M.E/M.Tech. M.Sc. MBA
BT CE CH CS EE EC EIC MEH MCA EC EIC CAD CS STR S/W VLSI POW MAT.
Sc
Env Che Prod. Phy Ch. Math Bio IT Opr Eng TOTAL
Organisation No. of students offered campus placement
B.E/B.Tech. M.E/M.Tech. M.Sc. MBA