Central Plant - SWCCDcentral plant building consists of a cooling tower yard, boiler room, chiller...

1
Project Timeline 2014 2015 2016 Project Phase Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Design Phase DSA Approval Construction Closeout Project Description: Construction of an approximate 6,000 square foot central plant adjacent to the field house. The central plant building consists of a cooling tower yard, boiler room, chiller room, and ticketing room. The project scope includes the construction of a campus distribution loop and primary laterals to the existing campus core buildings and to the future corner lot project for central plant utilities. The distribution includes the piping of hot and chilled water to areas across the campus. Project Features: Chilling Capacity of 1,500 tons and electrical service of 4,000 amps Reduces District HVAC Maintenance Cost 6,000 Gross Square Feet 2 Chillers, 2 Cooling Towers, 4 Boilers and 13 Pumps Central Plant Construction $15.3M Design $1.5M T&I $300K FF&E $1.5M Other Soft Costs $500K Project Budget: $20M Construction Design Testing and Inspection Furniture, Fixtures & Equipment Other Soft Costs

Transcript of Central Plant - SWCCDcentral plant building consists of a cooling tower yard, boiler room, chiller...

Page 1: Central Plant - SWCCDcentral plant building consists of a cooling tower yard, boiler room, chiller room, and ticketing room. The project scope includes the construction of a campus

Project Timeline

2014 2015 2016

Project Phase Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Design Phase DSA Approval Construction Closeout

Project Description: Construction of an approximate 6,000 square

foot central plant adjacent to the field house. The central plant building consists of a cooling tower yard, boiler room, chiller room, and ticketing room. The project scope includes the construction of a campus distribution loop and primary laterals to the existing campus core buildings and to the future corner lot project for central plant utilities. The distribution includes the piping of hot and chilled water to areas across the campus.

Project Features: • Chilling Capacity of 1,500 tons and electrical

service of 4,000 amps • Reduces District HVAC Maintenance Cost • 6,000 Gross Square Feet • 2 Chillers, 2 Cooling Towers, 4 Boilers and 13

Pumps

Central Plant

Construction $15.3M

Design $1.5M

T&I $300K

FF&E $1.5M Other Soft Costs

$500K

Project Budget: $20M

Construction

Design

Testing and Inspection

Furniture, Fixtures &EquipmentOther Soft Costs