Central Maine Power Central Maine Power Company Local System Plan Presentation Presentation Planning Advisor y Committee Meeting October 23, 2014 1 1

Transcript of Central Maine Power Company - iso-ne.com · PDF fileCentral Maine Power Company 83 Edison...

Central Maine Power Central Maine Power Company

Local System PlanPresentationPresentation

Planning Advisory Committee Meetingg y g

October 23, 2014

11

Purpose of Local System Plan

Per Attachment K Local this LSP presentationPer Attachment K – Local, this LSP presentation:• Describes projected improvements to non-PTF

that are needed to maintain reliable customerthat are needed to maintain reliable customer service.

• Reflects:• Reflects:– LSP Needs Assessments– Corresponding transmission system planning studiesCorresponding transmission system planning studies

22

LSP Communication

• LSP is communicated to the PAC at an ISO-NE PAC RSP meeting once a year.

Separate meetings can be arranged if needed– Separate meetings can be arranged if needed• PAC, Transmission Customers, and other Stakeholders

have 30 days to provide written comments for consideration to CMPconsideration to CMP

– CMP’s contact:Curtis BeveridgegManager System PlanningCentral Maine Power Company83 Edison DriveAugusta, Maine 04336 (email: [email protected])

33

LSP Communication cont.

• Each PTO is individually responsible for publicly posting and updating the status of its p y p g p grespective LSP and the transmission projects list on a website in a format similar to the RSP project list

• The ISO-NE RSP project list contains links to each individual PTO’s transmission project list and is located at:htt //i• http://iso-ne.com/committees/comm_wkgrps/prtcpnts_comm/topac/mtrls/index.html

• CMP’s LSP project list and Planning ManualCMP s LSP project list and Planning Manual are located at:http://www.cmpco.com/SuppliersAndPartners/TransmissionServices/CMPTransmissionSvc/lsp.html

44

CMP LSP Project List

• Central Maine Power will update the LSP project list at least annually.

• A presentation of the LSP will be made annually.

• LSP Project List is a cumulative listing of proposed transmission solutions intended to meet identified needs.

• Similar to PTF projects in the RSP, the LSP project list contains a status of each non-PTF project:

Concept- Project is under consideration as a possible solution to a need, but little or noConcept Project is under consideration as a possible solution to a need, but little or no analysis is available

Proposed- CMP has determined that the project is an appropriate solution to a need, but has not yet obtained internal budget approval, or final regulatory approval

Planned- Budgetary and regulatory approval has been obtainedPlanned Budgetary and regulatory approval has been obtained

Under Construction-

Project is approved and is under design/construction

In-Service- Project is complete

55

CMP’s Local System Planning Process

• All CMP system upgrades are determined in accordance with Ib d l USA El i S Pl i M l

Process

Iberdrola USA Electric System Planning Manual.• Planning studies can result from:

– Periodic Assessment of CMP’s 14 Local Planning Areas– Load Growth– Retail or Wholesale Customer Request – Generator Interconnection Request– System-Wide Contingency Analysis

• Studies may utilize both ISO-NE Library Base Cases and/or Local CMP Base Cases.

• Generator Interconnections on the non-PTF Transmission System are guided by the CMP Transmission & Distribution Interconnection Requirements for Generation.

66

Augusta Area

Study Area

88

LSP Projects – Augusta Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

DateStatus

Augusta Area Reliability

Coopers Mills Substation

Add 115/12.47 kV transformer at Coopers Mills (Maxcy's)

Voltage violations following loss of Maxcys 115/34.5 kV transformer

2015 Under-Construction

U d i ti Existing 115/34 5 kVReliability Study

Substation Upgrade existing 115/34.5 kV transformerCoordinate w/MPRP

Existing 115/34.5 kV transformer overloaded under single element contingency conditions

2015 Under-Construction

99

Berwick/Lebanon Area

1010

LSP Projects – Berwick/Lebanon Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service Date

Status

Berwick Substation

New 34/12 kV Berwick Substation and 34.5 kV transmission line to Bassett (Section 116)

Load growth, inadequate 34/12 kV capacity, overloaded distribution circuits

2016 Under construction

Berwick -Lebanon

Bassett (Section 116) distribution circuits

New Lebanon Substation

Add new Lebanon Substation and 34.5 kV transmission line to Butler’s Corner (S ti 185A)

Load growth in Lebanon area will exceed area capacity

2014 Under construction

Area ReliabilityStudy

(Section 185A) capacity

Sanford Complete rebuild of

Expansion required to accommodate additional transmission line. Sanford

Switch Substation

Complete rebuild of Sanford Switch Substation

There are also concerns regarding aging facility, maintenance, reliability, and safety

2014 Under Construction

1111

safety

LSP Projects – Berwick/Lebanon Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service Date

Status

Berwick -LebanonArea ReliabilityStudy (cont.)

South Sanford Substation

Complete rebuild of South Sanford Substation

Load growth, inadequate 34/12 kV capacity, overloaded distribution circuits

2015 Planned

distribution circuits

1212

Brunswick/Topsham Area

1313

LSP Projects – Brunswick/Topsham Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Line work Re-rate 34.5 kV Section 76

Overloaded under single element contingency conditions

2016 Planned

Brunswick -Topsham Area Study

Brunswick Hydro Substation

Upgrade Brunswick Hydro T2 34/12 kV transformer

Overloaded under normal operating conditions

2016 Planned

Upgrade Overloaded underWoolwich Substation

Upgrade Woolwich T1 34/12 kV transformer

Overloaded under normal operating conditions 2017 Proposed

Topsham Upgrade Topsham T2 34/12 kV

Overloaded under l ti 2020 P dp

Substation T2 34/12 kV transformer

normal operating conditions

2020 Proposed

1414

LSP Projects – Brunswick/Topsham Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

DateStatus

Date

Brunswick -Topsham Area

T h 115

Rebuild the Topsham Substation to a 115 kV six breaker i b

Overloaded under i l l tStudy

(Cont)

Topsham 115 kV Substation

ring bus configuration. Upgrade Topsham 115 kV T1 and T3 115/34.5 kV transformers

single element contingency conditions

2020 Concept

transformers

Distribution Betterment

Cooks Corner Substation

Rebuild the existing Cooks Corner Substation to a new green field location

N-1 violations of Distribution Planning Criteria

2018 Concept

field location.

1515

Lakes Region Area

1616

LSP Projects – Lakes Region Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

DateNew (9.5 mile) 34.5 kV line from Bridgton to Kimball Road (S ti 98)

Voltage violations

2017 Planned

Lakes Region AreaR li bilit

Northern Sub-Area

(Section 98)g

under contingent system conditionsInstall a 115/34.5

kV 30/56 MVA transformer at Kimball Road

2017 Planned

Reliability Study

UpgradesRebuild 34.5 kV line Section 94

Thermal violation under contingent system conditions

2017 Planned

Remove voltage Back feeding NH Remove voltage supervision for the reverse power relaying on Lovell T1

under post-contingent conditions creates voltage and thermal violations

2016 Planned

1717

LSP Projects – Lakes Region Area

Project Origin

Major Project Project Description Needs

AssessmentProjected In-Service Date

Status

New 115/34 kV S/S at New Gloucester with a four breaker ring bus and 115/34 kV transformer and (8 mile) 115 kV

Voltage and thermal violations under contingent

t diti

2020 Concept

Lakes Region Area Eastern

Sub Area

and (8 mile) 115 kV transmission line to Surowiec (Section 282)

system conditions

Relocate Raymond 34 kV S/S and rename to Webbs Mills S/S install Room needed for 2020 Proposed

Reliability Study(Cont)

Sub-Area Upgrades

Webbs Mills S/S, install two 5.4 MVAR capacitor banks

expansion 2020 Proposed

New (4.5 mile) 34.5 kV line from Raymond 115

Voltage and thermal violations under contingent 2020 Canceledy

kV to Webbs Mills under contingent system conditions

New (8 mile) 34.5 kV line from New Gloucester to Webbs Mills

Voltage and thermal violations under contingent

t diti

2020Proposed

1818

ebbs s system conditions

LSP Projects – Lakes Region Area

Project Origin

Major Project Project Description Needs

AssessmentProjected In-Service Date Status

Lakes Region AreaReliability

Eastern Sub-Area Upgrades

Shaw Mills Substation Upgrades; two 5.4 MVAR capacitor banks and three 34.5 kV breakers

Voltage violations under contingent system conditions

2017 Planned

T 34 5 kV b kStudy(Cont)

Western Sub-Area Upgrades

Two 34.5 kV breakers, two 5.4 MVAR capacitor banks at the North Limington Substation

Voltage violations under contingent system conditions

2016 Planned

Section 78 needs

Maintenance -Reliability Inspection

New Waterford

Add new Waterford Substation and 34.5 kV transmission line to

to be rebuilt due to its asset condition. However, due to the high cost of a rebuild, it was decided to retire 2018 ConceptInspection

Substation transmission line to Papoose Pond

decided to retire Section 78 and feed Papoose Pond from a new Waterford Substation.

p

1919

Subs a o

Lewiston/Auburn Area

2020

LSP Projects – Lewiston/Auburn Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Line workChange protection settings on Section 72

34.5 kV line overload post-contingency

2015 Planned

Replace Section 34 5 kV liLewiston -Auburn AreaReliability Study

Great Falls Substation

ep ace Sect o148 cable into Great Falls Substation

34.5 kV line overload post-contingency

2015 Planned

Upgrade GulfTransformer overloaded with loadGulf Island

Substation

Upgrade Gulf Island 115/34.5 kV T4 transformer

overloaded with load growth, coordinate with MPRP reinforcements

2020 Planned

2121

Midcoast Area NTA

Study Area

2222

LSP Projects – Midcoast Area NTA

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

DateStatus

Date

Midcoast Area NTA Analysis(the Camden -Rockland

Park St Substation

Add 3.6 MVAR 34.5 kV capacitor bank

Low voltage 2015 Under-Construction

Add 1 mile 34 5 kV Voltage and thermalRocklandArea ReliabilityStudy)

Line Work

Add 1 mile 34.5 kV line to separate Section 51 (Warren – Waldoboro)

Voltage and thermal violations under contingent system conditions

2016Proposed –

pending NTA analysis

Additi lLoad growth, i d t 34/12 kV

Distribution Betterment

Meadow Rd Substation

Additional distribution circuit, upgrade 34/12 kV transformer and install a new control house

inadequate 34/12 kV capacity, overloaded distribution circuits, existing S/S needed expansion to accommodate

2015 Proposed

house accommodate upgrades

2323

LSP Projects – Midcoast Area NTA

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Boothbay Upgrades

Add a 2.7 MVAR capacitor bank at Boothbay

Low voltage 2016 Planned

Power Factor

Midcoast Area NTA Analysis (Cont)

Upgrades o e actoCorrection at Boothbay Harbor 12 kV

Low voltage 2015 Canceled

MasonRelay Modifications on

34.5 kV line overload post-(Cont) Mason

UpgradesModifications on Section 25 at Mason

overload postcontingency 2015 Planned

Line Work Rebuild 34.5 kV S i 23

Voltage violations under contingent 2016

Proposed –pending NTA

l iLine Work Section 23 under contingent system conditions

2016 analysis

2424

LSP Projects – Midcoast Area NTA

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

DateStatus

Date

Midcoast Area NTA Analysis (Cont)

Newcastle Substation

Construct a 4-breaker 115 kV ring bus and install a 34.5 kV b ti b k

Voltage collapse under contingent 2017 Planned(Cont) Substat o

Upgrades bus-tie breaker. Also relocate Section 18 onto bus 3

u de co t ge tsystem conditions

0 a ed

Maintenance - BristolUpgrade Bristol Overloaded under

Reliability Inspection

Bristol Substation

T1 normal operating conditions

2015 Under Construction

2525

Portland Area NTA

Study Area

2626

LSP Projects – Portland Area NTA

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Raven Farm E i

New 115 kV bus with four breaker, breaker-and-a-half configuration. Al i t ll

Voltage and thermal violations under contingent system

2018 Concept– pending

Portland Area NTA

Expansion (115/34.5 kV)

Also, install a 115/34 kV transformer and 34.5 kV line to Elm Street

conditions 2018 Co cept pe d gNTA analysis

Area NTA Analysis

Line work

Rebuild 34.5 kV Section 181

Overloaded under single element contingency conditions

2018 Concept– pending NTA analysis

Rebuild a portion of 34.5 kV Section 180

Overloaded under single element contingency conditions

2016 Concept

2727

LSP Projects – Portland Area NTA

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

DatePortland Area NTA Analysis(Cont)

Red BrookUpgrade Red Brook 115/34.5 kV T1 to a 30/56 MVA

Transformer overloaded under contingent system conditions

2018 Concept– pending NTA analysis

( ) conditions

2828

Portland North Area

Study Area

2929

LSP Projects – Portland North Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Line workRe-rate/rebuild portions of 34kV line Section 180A

Thermal violations under normal operating and contingent system

diti

2018 Concept – pending NTA analysis

Portland NorthArea Reliability

conditions

Freeport Substation

Add two 2.7 MVAR capacitor banks

Voltage violations under contingent system conditions

2016 Concept –pending NTA analysis

Bi h St t Voltage violationsea e ab yStudy

Bishop StreetSubstation

Add a 5.4 MVAR capacitor bank

Voltage violations under contingent system conditions

2016 Planned

Elm Street Bring S164 in/out of

Thermal violations under contingent system conditions Concept pendingElm Street

Substation

gElm St, re-rate S164A

system conditions(Not needed if Raven Farms 115 kV is built)

2016 Concept –pending NTA analysis

3030

LSP Projects – Portland North Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Line work Rebuild Section 103

Overloaded under normal operating and/or single element contingency conditions

2018

Proposed – pending Lakes Region Area

Reliability Study results

Portland NorthArea ReliabilityStudy

Falmouth Substation

Add two 34.5 kV breakers

Voltage and 25 MW loss of load criteria violations under contingent system

2018 Concept –pending NTA analysis

Proposed – pendingS udy(Cont) Swett Rd.

SubstationAdd two 34.5 kV breakers

Low Voltages in the local area under single element contingencies

2018

Proposed pending Lakes Region Area

Reliability Study results

East Deering115-34 kV substation with Additional source

Concept – pending East Deering Substation

substation with 115 kV line from Raven Farm.

Additional source needed in the area 2018 NTA analysis

3131

LSP Projects – Portland North Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

North Yarmouth S b t ti

New 115/34kV S/S tapped from Sect 166, and 14.8 mi 34.5 kV li t G &

Voltage violations under contingent system conditions 2020 Concept – pending

NTA analysis

Portland NorthArea ReliabilityStudy(Cont)

Substation line to Gray & Freeport with breakers

a a ys s

Swett Road Add 5.4 MVAR Voltage violations under contingent 2018

Proposed – pending Lakes Region Area ( )

Substation capacitor bank under contingent system conditions

2018 Reliability Study results

Prides CornerSubstation

Add an additional 5.4 MVAR capacitor bank

Voltage violations under contingent system conditions

2018 Concept – pending NTA analysis

3232

Skowhegan Area

Study Area

3333

LSP Projects – Skowhegan Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

SkowheganArea ReliabilityStudy

Lakewood Substation Expansion

Loop Section 241 into a new 115 kV ring bus with 2nd

115/34 5 kV

Voltage collapse under contingent system conditions

2015 PlannedStudy Expansion 115/34.5 kV

transformersystem conditions

3434

Waterville/Winslow Area

Study Area

3535

LSP Projects – Waterville/Winslow Area

Project Origin

Major Project

Project Description

Needs Assessment

In-Service Date

Status

Line workRe-rate portions of 34.5 kV line Section 38.

Overloaded under single element contingency conditions

2015 Under-Construction

O l d d dWaterville -Winslow Area Reliability Study

Line workRe-rate portions of 34.5 kV line Section 13.

Overloaded under single element contingency conditions

2014 Canceled

Re-rate 34.5 KV Overloaded under

Line Workoverhead portion of Section 38B

single element contingency conditions

2015 Under-Construction

Li kRe-conductor a

ti f 34 5 kV

Overloaded under single element 2017 Pl dLine work portion of 34.5 kV

line Section 56.

single element contingency conditions

2017 Planned

3636

LSP Projects – Waterville/Winslow Area

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

DateStatus

DateBring Section 241 in/out of new County Road S/S by constructing 7

il f 115Waterville -Winslow Area Reliability Study (cont.)

County Road Substation

miles of new 115 kV Transmission. Construct a 4-breaker ring bus with a second 115/34 kV

Voltage and thermal violations under contingent system conditions

2018 Proposed

115/34 kV transformer. The existing Rice Rips Substation will be replaced.

MaintenanceMaintenance -Reliability Inspection

South China Substation

Upgrade South China T1

Overloaded under normal operating conditions

2015 Under Construction

3737

LSP Projects – Other

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Line workSection 54 maintenance upgrades

These 34.5 kV line

2015 Under Construction

Li k Rebuild Section 2016 U d C t tiMaintenance -Reliability Inspection

sections are in very poor condition and need to be rebuilt to improve reliability.

Line work ebu d Sect o172 2016 Under Construction

Line workRebuild Section 187 2015 Under Construction

Rebuild SectionLine work

Rebuild Section 5A 2014 Under Construction

Upper Kennebec Area Reliability

Moxie Falls Substation

New Moxie Falls 115/34.5 kV

Inadequate voltage regulation, low voltage violations 2018 ConceptArea Reliability

StudySubstation Substation during all lines in

conditions

3838

LSP Projects – Substation Modernization

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Butlers Corner Substation

Construction of a new Butlers Corner Substation at a new location

Asset condition, several safety concerns

2020 Concept

Substation

CarrabassettSubstation

Retire Carrabassett Substation and feed existing load from North Anson

Asset condition with very low customer count

2020 Concept

Substation Modernization

Substation

Deer Rips Substation

Complete Rebuild of Deer Rips Substation

Asset condition, problems with joint ownership of facilities within hydro

2020 Concept

station

Dunstan Substation

Construction of a new Dunstan Substation at a new location

Asset condition, several safety concerns

2020 Concept

3939

LSP Projects – Substation Modernization

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

East Wilton Substation

Construction of a new East Wilton Substation at a new location

Asset condition, reliability and safety concerns

2021 Concept

Substation Modernization

Fryeburg Substation

Construction of a new Fryeburg Substation at a new location

Asset condition, reliability concerns 2021 Concept

Asset conditionGreat Falls Substation

Complete Rebuild of Great Falls Substation

Asset condition, reliability and maintenance concerns

2021 Concept

North AnsonConstruction of a new North Anson Asset condition, North Anson

Substationnew North Anson Substation at a new location

several safety concerns

2022 Concept

4040

LSP Projects – Substation Modernization

Project Origin

Major Project

Project Description

Needs Assessment

Projected In-Service

Date

Status

Date

Substation

South Berwick Substation

Construction of a new South Berwick Substation at a

l ti

Asset condition, reliability and safety concerns

2022 Concept

Substation Modernization

new location

Warren Substation

Construction of a new Warren Substation at a new location

Asset condition, maintenance, reliability, and safety concerns

2022 Concept

4141

In-Service LSP Projects

Project Origin

Major Project

Project Description

Needs Assessment

In-Service Date Status

Customer Load Study & W t ill

Belgrade Source /

Install a 115/34 kV transformer and two 115 kV breakers at North

Reliability and voltage concerns on a very long 34.5 kV distribution circuit out of Rice Rips; need to 2014 I S iWaterville -

Winslow Area Reliability Study

Source / Hospital Feed

breakers at North Augusta with a new 34.5 kV distribution circuit into the Belgrade area.

of Rice Rips; need to bring in a new source to shift load. The addition of a new hospital is also driving these upgrades.

2014 In-Service

Portland NorthArea ReliabilityStudy

Line workRebuild portions of 34.5 kV line Section 188

Thermal violations under normal operating and contingent system conditions

2014 In-Service

These 34 5 kV lineMaintenance -Reliability Inspection

Line work Rebuild Section 48

These 34.5 kV line sections are in very poor condition and need to be rebuilt to improve reliability.

2014 In-Service