Energy Efficiency Analysis and Optimisation of HIPA Power ...
CEEH Energy System Optimisation
description
Transcript of CEEH Energy System Optimisation
![Page 1: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/1.jpg)
CEEH Energy System Optimisation
Kenneth Karlsson
Risø DTU ,
National Laboratory for Sustainable Energy
Technical University of Denmark
![Page 2: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/2.jpg)
Optimisation loop
Energy System model
EmissionsExternalities
Economic development etc.
![Page 3: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/3.jpg)
Centre for Energy, Environment and Health
Energy System Modelling – 2005 to 2050
Energy demand:
Transport energyElectricityHeatFuels
- from all sectors
Energy supply:
Power plantsBoilersEnergy storageHydrogen productionBio-fuels
Macro economic factors
Fuel pricesHardware pricesExternalities
System priceselectricitydistrict heathydrogenbiofuels
Energy demand
System optimization by minimising total system costs
Costs of health related externalities
Costs of other externalities(climate change, nature etc.)
![Page 4: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/4.jpg)
• Geography– Countries– regions– areas
• Time resolution– e.g. 5 years step simulation– 52 weeks with 5 time steps
• Endogenous investments– power/heating plants– heat storage– electrolysers, heat pumps– transmission lines …etc.
Balmorel
D K - E
D K - WS E-S
S E - M
SE -N
FI
NO -S
N O - M
N O - N
![Page 5: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/5.jpg)
• Linear optimisation model of the energy system• Minimising total yearly costs in the system
• Constraints – balance equations, like:– power balance (at any time step production has to equal demand)– heat balance– hydrogen balance etc.
and limitations, like:– resource limits (e.g. max available biomass resource)
Balmorel
![Page 6: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/6.jpg)
Electricity
District heat
Hydrogen
Bio-fuels
Energy productionCarBusTrainAirSea
TrucksVansTrainSeaAir
people
goods
Transport
Household
Industry,trade and service
AppliancesHeat lossHeat supply
AppliancesHeat lossHeat supplyProces energy
Air emissions and waste products
Fuel costs, investment costs, taxes, externalities
![Page 7: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/7.jpg)
Linear optimisation models
• Will always choose the cheapest solution• If no restrictions/constraints, there will be one dominating
technology
• Example of change in costs for power producing technologies when including externalities –
using www.recabs.org
![Page 8: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/8.jpg)
www.recabs.org
Biomass
Offshorewind
Gas CC CHP
Coal CHP
![Page 9: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/9.jpg)
www.recabs.org
Biomass
Offshorewind
Gas CC CHP
Coal CHP
![Page 10: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/10.jpg)
CO2-price = 300 DKK/t ~ 40 €/t
Some Balmorel results
Win
d and b
iom
ass
![Page 11: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/11.jpg)
CO2-price = 150 DKK/t ~ 20 €/t
Some Balmorel results
Win
d and c
oal
![Page 12: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/12.jpg)
Some Balmorel results
![Page 13: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/13.jpg)
Tank you for your attention
![Page 14: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/14.jpg)
Seeking Collaboration Partners
Global energy andemission scenarios
Global/regionalair pollutionmodelling
Regional/local air pollutionmodelling
Effects in Denmark
regional energy/emission
scenarios
Within CEEHOutside CEEH
“Optimal” future energy system
![Page 15: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/15.jpg)
D K - E
D K - WS E-S
S E - M
SE -N
FI
NO -S
N O - M
N O - N
Balmorel (www.balmorel.com)
Global scenariosIPCC
Boundaryconditions
![Page 16: CEEH Energy System Optimisation](https://reader035.fdocuments.in/reader035/viewer/2022062409/56814f51550346895dbcf4df/html5/thumbnails/16.jpg)