CEDCP017 CIVIL ENGINEERING DIVISION Revision 00 January 2013 Page 1 of 12 Client’s procedure for Mobilization NOC 1.0 Purpose: The purpose allow client to prepare site prior construction. This procedure is required to ensure that the proposed fencing is within the plot limit, signboard details are as per TrakheesCED Guidelines and Building Regulations. 2.0 Scope: All Clients/Business Units operating within the Trakhees jurisdiction area. 3.0 Responsibility: Trakhees/CED engineers’reviews submitted document and drawings with no legal responsibility and / or liability is imposed on the authority. The consultant/ The Main Contractor shall remain entirely responsible for any legal obligations which may occur due to invalid / tampered documents being submitted along with Consultant Registration Process. 4.0 References: Submission Requirements and Document Checklist as attached and Client’s may refer to the TrakheesCED procedure for Mobilization NOC 5.0 Definitions: AuthorityTrakhees CEDCivil Engineering Division NOCNo objection Certificate SVRSite Visit Report BUBusiness Unit BRDG Building Regulations and Design Guidelines issued by CED COC – Certificate of conformity EHS – Environment, Health and Safety Department 6.0 Procedure: There are two types Mobilization Procedures: New application and resubmission of application to comply with TrakheesCED concern. TrakheesCED is committed to complete the review process within ten working days, but does strive to try to complete it within 5 working days. Delays can occur due to the following: Missing some technical information, so engineer will inform consultant by email. • Arrange meeting with project’s consultant or client for clarification about some details.

Transcript of CED CP 017trakhees.ae/en/ced/Client Procedures/Permit Services/CED...CED‐CP‐017 CIVIL...

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 1 of 12 

Client’s procedure for Mobilization NOC 

1.0 Purpose: The purpose allow client to prepare site prior construction. This procedure is required to ensure  that  the proposed  fencing  is within  the plot  limit,  signboard details are as per Trakhees‐CED Guidelines and Building Regulations.  

2.0 Scope: All Clients/Business Units operating within the Trakhees jurisdiction area. 

 3.0 Responsibility: 

Trakhees/CED  engineers’reviews  submitted  document  and  drawings  with  no  legal responsibility and  / or  liability  is  imposed on  the authority. The  consultant/ The Main Contractor  shall  remain entirely  responsible  for any  legal obligations which may occur due  to  invalid  /  tampered  documents  being  submitted  along  with  Consultant Registration Process. 

4.0 References: Submission Requirements and Document Checklist as attached and Client’s may refer to the Trakhees‐CED procedure for Mobilization NOC  

5.0 Definitions: Authority‐Trakhees CED‐Civil Engineering Division NOC‐ No objection Certificate SVR‐Site Visit Report BU‐Business Unit BRDG ‐ Building Regulations and Design Guidelines issued by CED COC – Certificate of conformity  EHS – Environment, Health and Safety Department  

6.0 Procedure: 

There  are  two  types Mobilization  Procedures:  New  application  and  resubmission  of application to comply with Trakhees‐CED concern.  

Trakhees‐CED is committed to complete the review process within ten working days, but does  strive  to  try  to  complete  it within  5 working  days. Delays  can occur due  to  the following: 

• Missing some technical information, so engineer will inform consultant by e‐mail. • Arrange meeting with project’s consultant or client for clarification about some details. 

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 2 of 12 

 

7.0 Front Desk Registration & Acknowledgement Process:  

7.1 The Trakhees‐CED Front Desk receives the application indicating the submission type (i.e. new or resubmission) 

7.2 The CED Front Desk has the right to accept/reject the submission if the CD is not complete as per checklist requirement.  

7.3 If  the  submission  is  complete  the CED  Front Desk  shall accept  the  submission and  forward  a  mail  notification  with  the  submission  serial  number  to  the consultant within maximum one working day 

7.4 Incomplete submissions are rejected and are to be resubmitted.  

8.0 Distribution of Documentation to Structural Engineer. 

8.1 Submissions are assigned to  individual Structural Engineers by the Engineer  In‐charge  with  define  period.  The  Structural  Engineer  undertakes  review submission  according  to  BRDG,  Trakhees  Circular  58146/2009/MAS  and standards. 

 9.0 Feedback & Compile Summary 

9.1 Upon  completion  the  submission  review,  the  Structural  Engineer  prepares Feedback Summary Report to be sent to the consultant.  

9.2 In  the  event where  any major  problems  have  been  identified,  the  Structural Engineer prepares accumulative report and send  it to permit admin to send an official reply via e‐mail to the Client’s Consultant and request them to collect CD with the returned documents/drawings to be corrected prior of resubmission of Mobilization NOC.  

10.0 Sign Drawings and Prepare Mobilization NOC  10.1 If  the  submission  is  complete  and  complies with  all  the  Regulations  and 

Guidelines  set  by  CED,  the  Structural  Engineer  sent  the  accumulated  reply  to permit admin to prepare the NOC with the payment advice as per finance code. Conditions are to be attached to the NOC if any  

10.2 The  Structural  Engineer  also  includes  Stamped  Mobilization  drawings  / Commented (minor) with Mobilization NOC Approval  

11.0 Notify Consultant 

Once the NOC has been signed by the Structural Manager, the permit admin shall send signed NOC to the CED document controller who is in charge to notify the consultant by email to settle the fee payments and collect the CD containing the NOC.  

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 3 of 12 

12.0 Issuance of the amended BP/NOC Once the fees amount have been settled to Trakhees Cashier at Dragon Mart (1st floor), CD  containing  Cover  Letter  and  Mobilization  NOC  will  be  handed  over  to  the Client/Consultant/Contactor Representative only.  

13.0 Records 

     

     

No  Record description  Retention Time 

7.1  Consultant / Client application form   2 years 

  Mobilization NOC  Permanent 

  Stamped Drawings  Permanent 

  Consultant/Main Contractor’s License    2 years 

  Documentation Package  2 years 

  Correspondence  2 years 

  Consultant / Contactor Appointment Letter  10 years 

 

14.0 Attachments 14.1 Client Work Flow 14.2 Application Form 14.3 Mobilization NOC Template  14.4 Mobilization NOC Checklist  

 

           

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 4 of 12 

       

14.1   Client Work Flow 

 

          

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 5 of 12 

          

14.2   Application Form 

CED‐CP‐0

 

Revi 

17 

sion 00     

    

 

CIVIL EN

  

  

GINEERING 

January 2013

DIVISION 

3

 

Page 6 

  

of 12

 

CED‐CP‐0

 

Revi 

17 

sion 00     

     

                

‐T

‐a

‐A

rade license 

ppointment 

Affection plan

CIVIL EN

of contracto

letter of con

n/Lease draw

  

  

GINEERING 

January 2013

or and consu

nsultant 

wing 

DIVISION 

3

ultant 

Page 7 

  

of 12

 

 

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 8 of 12 

    

14.3   Mobilization NOC Template  Our Ref: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx           Date: xxxxxxxxxxxxx   M/s. xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx  P.O. Box xxxxxxx Dubai, UAE  Attention: xxxxxxxxx       E‐Mail: xxxxxxxxxxxxxxxxxxxxx         Dear Sir,  Reference:  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx  Subject:  N.O.C. for Contractor's Mobilization  Contractor:  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx   We  refer  to  your  letter  ref.  xxxxxxxxxxxxxxxxxxxxxxxx  submitted  on  xxxxxxxxxxxxxxx,  and have “NO OBJECTION” to permit the contractor to mobilize and establish all temporary site facilities  as  per  contractor’s  EHS  Form  I  (copy  attached)  prior  to  commencement  of  any permanent  works.   Our  approval  for  mobilization  is  subject  to  the  compliance  of  the following:  1. The consultant shall submit "Demarcation Certificate" approved by Nakheel  2. Only  temporary  works,  like  hoarding,  site  offices,  amenities  for  labor  etc.  shall 

commence. (NO EXCAVATION WORK IS PERMITTED). 3. Upon  completion of  site  facilities,  the nominated  contractor  shall pay  a  refundable 

deposit of Dhs. xxxxx/‐ (Dirhams xxxxx Thousand only) to our cash counter. The copy of the deposit receipt along with the contractor’s EHS Form 1 to be submitted to EHS department.  

4. The EHS department will visit the site and then issue the Certificate of Conformity.  5. Also the contractor shall obtain Certificate of Conformity from EHS Department prior 

to  commencement  of  any  higher  elevation  work  four  meters  and  above  by submission of duly filled contractor’s EHS‐form‐2 (copy attached).  

6. We strongly recommend that all site offices and contractor’s site temporary facilities shall be located within the plot limits. 

7. BU reserves the right to instruct the contractor to clear the service corridor at a short notice for any development as service installation and will not be responsible for any abortive costs. 

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 9 of 12 

8. The  deposit  will  be  refunded  upon  completion  of  project,  obtaining  Building Completion  Certificate  and  complete  clearance  of  site  including  contractor’s signboard. The deposited amount will be forfeited if it is not claimed within 3 months from the date of Building Completion Certificate. 

    Finally, you are requested to hand over a copy of this document to the appointed contractor, explain the revised procedures and advise them to cooperate with us in improving the safety standards at construction sites. We also enclose a copy of a circular reference‐ 5294/2005 outlining the revised procedure for obtaining a Building Permit.  Yours faithfully,       xxxxxxxxxxxxxxxxxxxxxx Manager –Structural Engineering  (xxxx)    Encl:   Contractor’s EHS‐Form 1, 2 & 3.    Demarcation Certificate Form.   Cc:   EHS, M‐File  

                   

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 10 of 12 

             Our Ref: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx           Date: xxxxxxxxxxxxx   M/s. xxxxxxxxxxxxxxxxxxxxxxxxxxxxx  P.O. Box xxxxxxxxxx Dubai, UAE  Attention: xxxxxxxxxxxxxx        E‐Mail: xxxxxxxxxxxxxxxxxxxxxx         Dear Sir,  Reference:  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx  Subject:    NOC for Signboard   Contractor:  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx  We  refer  to  your  letter  ref.  xxxxxxxxxxxxxxxxxxxxxx  submitted  on  xxxxxxxxxxxxxxxxx, enclosing drawings for approval.   Please  note  that  we  have  "NO  OBJECTION"  for  the  Signboard  subject  to  the  following conditions:  

1. All project signboards shall be located within the Developer’s Plot boundaries. 2. The appointed  contractor  shall maintain and keep  clean all  signboards  for  the 

duration of the project. 3. The appointed consultant may be  requested  to  relocate signboards during  the 

project time with prior notice. 4. The appointed contractor shall remove the signboards along with all foundations 

on completion of works. 5. The  appointed  contractor  shall  ensure  a  continuous  power  supply  to  the 

illuminated signboard. 6. Each  floor  and  on  each  elevation  of  buildings  greater  than  3  stories  shall  be 

numbered with characters no less than 800 mm high.  

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 11 of 12 

Yours faithfully,       xxxxxxxxxxxxxxx Manager – Structural Engineering  (xxxx)  Cc: M‐File  

 

 

9.5 Mobilization NOC Checklist

Internal Checklist MOBILIZATION NOC

CHECKLIST FOR MOBILIZATION NOC YES NO N/A

Signboard as per CED Circular 58146 - for Sign Board Floor Numbering _All Kinds

Affection plan locating the signboard

Temporary Fence layout and details

Site Offices, mobilization and hording layout and details

“The Project ID. - (E-permit)

Letter of the appointment for both the main consultant and contractor.

Trade license for both main consultant and main contractor

Ref No.( JP/Plot No /SNO) Date

(DD/MM/YYYY)

Consultant Reference

CED‐CP‐017        

  

CIVIL ENGINEERING DIVISION  

Revision 00      January 2013 Page 12 of 12 

Design calculation sheets for the signboard and footing