CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27 - 2016-08-03 Recipients [email protected] Sheets Showing all 9 sheets Categories Showing all 16 categories Users Showing all 1 users 07.21.2016 Inspection. Punch List. R1 pg. 1

Transcript of CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch...

Page 1: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

CEA Bermudez - Punch List

07.21.2016 Inspection. Punch List.R1Created: 2016-08-03Author: Miguel Lopez (@ML)Status: OpenDates: 2016-07-27 - 2016-08-03

Recipients

[email protected]

Sheets

Showing all 9 sheets

Categories

Showing all 16 categories

Users

Showing all 1 users

07.21.2016 Inspection. Punch List. R1 pg. 1

Page 2: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#3 - Toilet joint yet to be grouted

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:19

Miguel Lopez01 Aug 19:19

Toilet joint yet to be grouted

#1 - Inconsistente Joint width. It is more evident in reflection.

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1 |#UticaProposed.

Task messages (time in PDT)

Miguel Lopez01 Aug 19:13

Miguel Lopez01 Aug 19:14

Inconsistente Joint width. It is more evident in reflection.

07.21.2016 Inspection. Punch List. R1 pg. 2

Page 3: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:14

Miguel Lopez01 Aug 19:16

#UticaProposed. Painting the top joint black.

Miguel Lopez01 Aug 19:23

#5 - Clear silicone used at perimeter joint between mirror anadjacent surfaces.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:27

Clear silicone used at perimeter joint between mirror anadjacent surfaces.

07.21.2016 Inspection. Punch List. R1 pg. 3

Page 4: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:28

#4 - Sink and faucet yet to be installed

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1 |#UticaProposed.

Task messages (time in PDT)

Miguel Lopez01 Aug 19:20

Sink and faucet yet to be installed

Miguel Lopez01 Aug 19:22

Miguel Lopez01 Aug 19:23

#UticaProposed. Installing faucet offset closer to tub inlieu of door.

07.21.2016 Inspection. Punch List. R1 pg. 4

Page 5: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#2 - Inconsistent finish at opening. Plaster had been chipped toallow for lack of tolerance of radiator cover.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:17

Inconsistent finish at opening. Plaster had been chipped toallow for lack of tolerance of radiator cover.

Miguel Lopez01 Aug 19:18

Spall at wall finish from removal of cover

Miguel Lopez01 Aug 19:18

#52 - Robe hooks installed over tile are glued in lieu of drilled.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO A | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:27

Robe hooks installed over tile are glued in lieu of drilled.

Miguel Lopez03 Aug 08:27

07.21.2016 Inspection. Punch List. R1 pg. 5

Page 6: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#46 - Silicone seal around drain

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO B | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:00

Silicone seal around drain pending.

#25 - Inconsistent finishes at perimeter tub mirror.

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 20:01

Miguel Lopez01 Aug 20:01

Miguel Lopez03 Aug 07:51

Inconsistent finishes at perimeter tub mirror.

Miguel Lopez03 Aug 07:52

#typical

Miguel Lopez03 Aug 07:52

Joint btw toilet and floor yet to be grouted

07.21.2016 Inspection. Punch List. R1 pg. 6

Page 7: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#28 - Inconsistent silicone finish? Between marble sills, mirror andfinished wall.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 20:03

Miguel Lopez03 Aug 07:49

Miguel Lopez03 Aug 07:49

Inconsistent silicone finish? Between marble sills, mirrorand finished wall.

Miguel Lopez03 Aug 07:50

#consider. White polyurethane silicone fillet bead aroundentire perimeter of mirror..?

07.21.2016 Inspection. Punch List. R1 pg. 7

Page 8: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#29 - Seal all through tile penetrations

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 20:03

Miguel Lopez01 Aug 20:04

Seal all through tile penetrations

#49 - FyI Robe hooks installed in lieu of shower curtain are gluednot drilled.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:06

Robe hooks installed in lieu of shower curtain are gluednot drilled.

Miguel Lopez03 Aug 08:07

#typical

Miguel Lopez03 Aug 08:07

07.21.2016 Inspection. Punch List. R1 pg. 8

Page 9: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez03 Aug 08:07

#clarify. Can be removed if requested.

#51 - Light fixture yet to be installed.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | BAÑO C | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:25

Light fixture yet to be installed.

Miguel Lopez03 Aug 08:26

#15 - Original baseboard at curved corner. Voids btw cuts needsto be refinished

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | COMEDOR | CeaBermudez primero 2-ANEXO 2R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:45

07.21.2016 Inspection. Punch List. R1 pg. 9

Page 10: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez03 Aug 07:45

Original baseboard at curved corner. Voids btw cuts needsto be refinished

#14 - Radiator cover installed.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | COMEDOR | CeaBermudez primero 2-ANEXO 2R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:44

Miguel Lopez03 Aug 07:45

Radiator cover installed.

Miguel Lopez03 Aug 07:45

Color does not match other wood.?

#8 - Wood finishes pending

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:31

Wood finishes pending

07.21.2016 Inspection. Punch List. R1 pg. 10

Page 11: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:32

#10 - Hardware pendiente to be instales.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:40

Miguel Lopez01 Aug 19:41

07.21.2016 Inspection. Punch List. R1 pg. 11

Page 12: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:41

Miguel Lopez03 Aug 07:39

Hardware pending to be installed.

Miguel Lopez03 Aug 07:39

#UticaClaims finishes are done

Miguel Lopez03 Aug 07:39

Perimeter trim needs refinishing

#50 - Chandelier chain pending to be shorten

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:24

Chandelier chain pending to be shorten

#53 - FYI

CeaBermudez primero 2-ANEXO 2 R1

Priority 3 | Miguel Lopez | DORMITORIO A | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:28

Fyi

07.21.2016 Inspection. Punch List. R1 pg. 12

Page 13: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez03 Aug 08:29

#21 - Spalls at trim anchors.

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:58

Miguel Lopez01 Aug 19:58

Spalls at trim anchors.

Miguel Lopez01 Aug 19:58

Pegs are not adjusted and "wiggle"

07.21.2016 Inspection. Punch List. R1 pg. 13

Page 14: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#45 - Detail at window

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 07:48

Detail at window

Miguel Lopez03 Aug 07:48

#24 - Door trim yet to be installed

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 20:00

07.21.2016 Inspection. Punch List. R1 pg. 14

Page 15: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#23 - 42cm btw pegs. Inconsistent with opposite wall.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 20:00

Miguel Lopez03 Aug 07:46

42cm btw pegs. Inconsistent with opposite wall.

#22 - Detail at door frame trim.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | DORMITORIO C | CeaBermudez primero 2-ANEXO2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:59

07.21.2016 Inspection. Punch List. R1 pg. 15

Page 16: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:59

Miguel Lopez03 Aug 07:47

Detail at door frame trim.

Miguel Lopez03 Aug 07:47

Note 52cm distance btwegs

Miguel Lopez03 Aug 07:47

Door trim yet to be finished

#47 - FYI

CeaBermudez primero 2-ANEXO 2 R1

Priority 3 | Miguel Lopez | PASILLO B | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez03 Aug 08:01

Fyi

Miguel Lopez03 Aug 08:02

07.21.2016 Inspection. Punch List. R1 pg. 16

Page 17: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#19 - Spalls at removed radiator cover anchors.

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:55

Spalls at removed radiator cover anchors.

Miguel Lopez01 Aug 19:56

Miguel Lopez03 Aug 07:53

#typical

Miguel Lopez03 Aug 07:53

#UticaProposed. Replacing anchors with Velcro?...

Miguel Lopez03 Aug 07:54

I have misgiving regarding Velcro and the wall finish..l

Miguel Lopez03 Aug 07:54

#consider.consider subframe.

#11 - Hardware pending to be installed.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:43

07.21.2016 Inspection. Punch List. R1 pg. 17

Page 18: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez03 Aug 07:44

Hardware pending to be installed.

#12 - Chimney original finish is visible once dust is cleared.#

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:43

Miguel Lopez03 Aug 07:42

Chimney original finish is visible once dust is cleared.#

Miguel Lopez03 Aug 07:42

#clarify if more thorough cleaning is required.

#13 - FYI

CeaBermudez primero 2-ANEXO 2 R1

Priority 3 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:44

07.21.2016 Inspection. Punch List. R1 pg. 18

Page 19: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez03 Aug 08:23

FYI

#20 - Inconsistent silicone finish? Between marble sills, windowand finished wall.

CeaBermudez primero 2-ANEXO 2 R1

Priority 3 | Miguel Lopez | SALON | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:56

Miguel Lopez01 Aug 19:57

Inconsistent silicone finish?

#17 - Exterior sill. Yet to be painted

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | Typical | CeaBermudez primero 2-ANEXO 2 R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:54

07.21.2016 Inspection. Punch List. R1 pg. 19

Page 20: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:54

Exterior sill. Yet to be painted

#9 - Entrance door. All tasks pending.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | VESTIBULO | CeaBermudez primero 2-ANEXO 2R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:32

Miguel Lopez03 Aug 07:44

Entrance door. All tasks pending.

#18 - Voids and poorly patched areas at cabinet sour round.

CeaBermudez primero 2-ANEXO 2 R1

Priority 1 | Miguel Lopez | VESTIDOR A | CeaBermudez primero 2-ANEXO 2R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:54

07.21.2016 Inspection. Punch List. R1 pg. 20

Page 21: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez03 Aug 07:57

Voids and poorly patched areas at cabinet sour round.

Miguel Lopez03 Aug 07:58

#7 - Radiator cover installed.

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | VESTIDOR A | CeaBermudez primero 2-ANEXO 2R1 | #consider.

Task messages (time in PDT)

Miguel Lopez01 Aug 19:30

Radiator cover installed.

Miguel Lopez01 Aug 19:30

Miguel Lopez01 Aug 19:31

#consider. Stronger hooks for engaging cover?

07.21.2016 Inspection. Punch List. R1 pg. 21

Page 22: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 19:47

#6 - Wood finishes pending

CeaBermudez primero 2-ANEXO 2 R1

Priority 2 | Miguel Lopez | VESTIDOR A | CeaBermudez primero 2-ANEXO 2R1

Task messages (time in PDT)

Miguel Lopez01 Aug 19:29

Wood finishes pending

Miguel Lopez01 Aug 19:29

Miguel Lopez01 Aug 19:29

07.21.2016 Inspection. Punch List. R1 pg. 22

Page 23: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#40 - Fish mouths btw base board and wAll.

cb sk21

Priority 2 | Miguel Lopez | ZN BASE BOARD | cb sk21 | #consider.

Task messages (time in PDT)

Miguel Lopez02 Aug 10:16

Miguel Lopez02 Aug 10:19

Fish mouths btw base board and wAll.

Miguel Lopez02 Aug 10:19

#consider. Sealing top with fillet bead.

#41 - Base board detail at bottom of trim.

cb sk21

Priority 2 | Miguel Lopez | ZN BASE BOARD | cb sk21 | #pending.

Task messages (time in PDT)

Miguel Lopez02 Aug 10:17

Base board detail at bottom of trim. #pending.

Miguel Lopez02 Aug 10:17

07.21.2016 Inspection. Punch List. R1 pg. 23

Page 24: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#42 - Base tile at bathroom doors.

cb sk21

Priority 2 | Miguel Lopez | ZN BASE BOARD | cb sk21 | #pending

Task messages (time in PDT)

Miguel Lopez02 Aug 10:18

Base tile at bathroom doors. #pending

Miguel Lopez02 Aug 10:18

#32 - Inconsistent finishes at perimeter trim.

cb sk21

Priority 2 | Miguel Lopez | ZN CABINETRY | cb sk21 | #UticaClaims

Task messages (time in PDT)

Miguel Lopez01 Aug 20:15

Miguel Lopez02 Aug 06:37

Inconsistent finishes at perimeter trim.

Miguel Lopez02 Aug 06:37

Finish color not uniform.

Miguel Lopez02 Aug 06:38

#UticaClaims it was not uniform originally.??

07.21.2016 Inspection. Punch List. R1 pg. 24

Page 25: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez02 Aug 06:39

Finish should be uniform and match all other wood withinsight.

#35 - Poor tooling at joint btw stones

cb sk21

Priority 1 | Miguel Lopez | ZN COCINA | cb sk21

Task messages (time in PDT)

Miguel Lopez02 Aug 08:26

Poor tooling at joint btw stones

Miguel Lopez02 Aug 08:26

#36 - Cabinet infill above dish washer pending

cb sk21

Priority 1 | Miguel Lopez | ZN COCINA | cb sk21

Task messages (time in PDT)

Miguel Lopez02 Aug 08:27

Cabinet infill above dish washer pending

07.21.2016 Inspection. Punch List. R1 pg. 25

Page 26: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#31 - Inconsistente Joint width between cabinet side and wall.

cb sk21

Priority 1 | Miguel Lopez | ZN COCINA | cb sk21 | #consider.

Task messages (time in PDT)

Miguel Lopez01 Aug 20:15

Miguel Lopez01 Aug 20:15

Miguel Lopez02 Aug 06:36

Inconsistente Joint width between cabinet side and wall.

Miguel Lopez02 Aug 06:36

#consider. Sealing or providing trim?

#37 - Joints btw exhaust hood and wall are pending...Priority 2 | Miguel Lopez | ZN COCINA | cb sk21

Task messages (time in PDT)

Miguel Lopez02 Aug 08:29

Joints btw exhaust hood and wall are open,...

Miguel Lopez02 Aug 08:29

Pending directions on tiling

07.21.2016 Inspection. Punch List. R1 pg. 26

Page 27: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez02 Aug 08:30

#38 - Exterior trim replacement pending

cb sk21

Priority 2 | Miguel Lopez | ZN COCINA | cb sk21

Task messages (time in PDT)

Miguel Lopez02 Aug 08:30

Exterior trim replacement pending

Miguel Lopez02 Aug 08:30

07.21.2016 Inspection. Punch List. R1 pg. 27

Page 28: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#34 - Head board installed.

cb sk21

Priority 1 | Miguel Lopez | ZN DORMITORIO | cb sk21

Task messages (time in PDT)

Miguel Lopez02 Aug 06:33

Head board installed.

Miguel Lopez02 Aug 06:33

Miguel Lopez02 Aug 06:33

Insufficient support at center.

Miguel Lopez02 Aug 06:34

Miguel Lopez02 Aug 06:34

Note fish mouth in joint with wall

Miguel Lopez02 Aug 06:35

07.21.2016 Inspection. Punch List. R1 pg. 28

Page 29: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez02 Aug 06:35

Additional anchors/hooks required.

#43 - Radiator cover yet to be re installed.

cb sk21

Priority 2 | Miguel Lopez | ZN DORMITORIO | cb sk21

Task messages (time in PDT)

Miguel Lopez02 Aug 10:22

Miguel Lopez02 Aug 10:23

Radiator cover yet to be re installed.

Miguel Lopez02 Aug 10:23

Note SPALLS at anchors due to insufficient edge distance

#30 - Base board around "gabinete" yet to be finished.

cb sk21

Priority 2 | Miguel Lopez | ZN DORMITORIO | cb sk21

Task messages (time in PDT)

Miguel Lopez01 Aug 20:13

07.21.2016 Inspection. Punch List. R1 pg. 29

Page 30: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez01 Aug 20:14

Miguel Lopez03 Aug 07:34

Base board around "gabinete" yet to be finished.

Miguel Lopez03 Aug 07:35

Fish mouth between baseboard and flooring.

#44 - Lack of tape at seams of plastic covers over furniture.

cb sk21

Priority 1 | Miguel Lopez | ZN SALON | cb sk21 | #UticaProposed.

Task messages (time in PDT)

Miguel Lopez02 Aug 10:24

07.21.2016 Inspection. Punch List. R1 pg. 30

Page 32: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

Miguel Lopez02 Aug 10:25

Miguel Lopez02 Aug 10:40

Lack of tape at seams of plastic covers over furniture.

Miguel Lopez02 Aug 10:41

Plastic film thickness seemed insufficient.

Miguel Lopez02 Aug 10:41

#UticaProposed. Wrapping them in film.

#33 - Marble top yet to be installed.

cb sk21

Priority 2 | Miguel Lopez | ZN SALON | cb sk21

Task messages (time in PDT)

Miguel Lopez01 Aug 20:16

Miguel Lopez02 Aug 06:32

Marble top yet to be installed.

07.21.2016 Inspection. Punch List. R1 pg. 32

Page 33: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

#39 - Height 180.

cb sk21

Priority 3 | Miguel Lopez | ZN SALON | cb sk21 | #ck

Task messages (time in PDT)

Miguel Lopez02 Aug 08:31

Height 180. #ck

Miguel Lopez02 Aug 08:31

07.21.2016 Inspection. Punch List. R1 pg. 33

Page 34: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

cb sk21

07.21.2016 Inspection. Punch List. R1 pg. 34

Page 35: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

31

5

4

252

46

25

28

2949

51

15

14

8

10

50

53

21

4524

23

22

471911

12

13

20

17

9

187

6

Page 36: CEA Bermudez - Punch List...2016/08/03  · CEA Bermudez - Punch List 07.21.2016 Inspection. Punch List. R1 Created: 2016-08-03 Author: Miguel Lopez (@ML) Status: Open Dates: 2016-07-27

4041

42

32

35

36

31

37

38

34

43

30

44

33

39