CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident...

35

Transcript of CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident...

Page 1: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.
Page 2: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

CE 437 – Timber Design

Page 3: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

CE 437 – Timber Design

Project: Playground

Dave Maruskin (el capitan)

Jason Huck (resident architect)

Jeff Leake (interior design)

Bryan Dhume (special joint designer)

Jason Manson (chief carpenter)

Zach Bazell (CAD technician)

Page 4: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Timber Design Project

Objective: To design and analyze a timber playset using Load and

Resistance Factor Design

Page 5: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.
Page 6: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.
Page 7: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.
Page 8: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

CE 437 – Timber Design

Project: Playground

Dave Maruskin (el capitan)

Jason Huck (resident architect)

Jeff Leake (interior design)

Bryan Dhume (special joint designer)

Jason Manson (chief carpenter)

Zach Bazell (CAD technician)

Page 9: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Specifications

- Access to shelter by ladder and railing for safety

- All members used are pressure treated Southern yellow pine

- Two structures connected by a bridge: housed and platform portions

- Each portion is 8 x 8 ft. and 8 ft. high

- 4 ft. walkway around shelter

- Roof covers an area of 16 x 16 ft. with a pitch of 12 on 12

Page 10: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Loads Applied (unfactored)

Dead Load (self-weight): 50 lb./ft.3

Live Load (roof): 12 lb./ft.2

Live Load (deck): 50 lb./ft.2

Snow Load (roof): 21.2 lb./ft.2

Snow Load (deck): 30 lb./ft.2

Wind Load (leeward side): 3.9 lb./ft.2

Wind Load (windward side): 6.25 lb./ft.2

Wind Load (roof lateral): 5.47 lb./ft.2

Shingles: 3 lb./ft.2

Page 11: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Major Vertical Members

- 4 x 4 posts at 12 feet long posts supporting platform

- 6 x 6 at 16 feet long for housed portion

- 4 x 4 king posts supporting roof truss

Page 12: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Elevation View

Page 13: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Elevation View – Bent 3

Page 14: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Elevation View – Bent 4

Page 15: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Major Horizontal Members

- 4 x 8 ridge beam at 16 feet long

- 4 x 6 fascia beams at 16 feet long

- 4 x 4 for truss rafters, chords

- 2 x 8 girts and joists on platform

- 2 x 8 joists in housed portion

Page 16: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Plan View – Bottom of Truss

Page 17: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Plan View – Deck

Page 18: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Other Materials

- 1” plywood sheathing

- 2 x 6 tongue-in-groove decking

- 2 x 4 kneebraces

- 2 x 6 bridge girts

- 4 x 4 verticals and 2 x 4 horizontals for railing

- 2 x 6 patio joists

Page 19: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Connections- Posts secured to concrete with anchors

- Girt connections utilize housed mortise and tenon

- Extensive use of joint hangars

- Truss constructed with fabricated gusset plate

Page 20: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Detail – Post Anchor

Page 21: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Detail – Mortise & Tenon Joint/Joist Hangars

Page 22: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Detail – Truss Gusset Plate

Page 23: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

SAP 2000 – Finite Element Analysis

- Structure treated as frame (connections transfer moment)

- Support connections assumed pinned

- Load factors applied:

Dead Load - 1.2

Live Load - 1.6

Snow Load - 0.5

Wind Load - 0.7

Page 24: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Axial Forces

Maximum Factored Loads:Maximum Factored Loads:

Rafters: 1.5 kips (tension)Rafters: 1.5 kips (tension)

Bottom Chords of Truss: 1.4 kips (compression)Bottom Chords of Truss: 1.4 kips (compression)

Kneebraces: 1.0 kips (compression)Kneebraces: 1.0 kips (compression)

L.R.F.D. Design Values:L.R.F.D. Design Values:

Rafters (4 x 4): 17.5 kips (tension)Rafters (4 x 4): 17.5 kips (tension)

Bottom Chords of Truss (4 x 4) , 6’ unbraced: 10.2 kips Bottom Chords of Truss (4 x 4) , 6’ unbraced: 10.2 kips (compression)(compression)

Kneebraces (2 x 4): 7.1 kips (compression)Kneebraces (2 x 4): 7.1 kips (compression)

4 x 44 x 4

4 x 4 4 x 4

2 x 4

Page 25: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Moment 2-2

Maximum Factored Loads:Maximum Factored Loads:

Columns: 4.0 in.-kipsColumns: 4.0 in.-kips

L.R.F.D. Design Values:L.R.F.D. Design Values:

Columns (6 x 6) : 40.7 in.-kipsColumns (6 x 6) : 40.7 in.-kips

6 x

6

6 x

6

6 x

6

Page 26: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Axial Forces

Maximum Factored Loads:Maximum Factored Loads:

King Post: 5.0 kips (compression)King Post: 5.0 kips (compression)

Columns: 5.5 kips (compression)Columns: 5.5 kips (compression)

L.R.F.D. Design Values:L.R.F.D. Design Values:

King Post (4 x 4) , 8’ unbraced: 10.2 kipsKing Post (4 x 4) , 8’ unbraced: 10.2 kips

Columns (6 x 6) , 8’ unbraced: 23.4 kips (compression)Columns (6 x 6) , 8’ unbraced: 23.4 kips (compression)

6 x

66

x 6

6 x

66

x 6

4 x

4

4 x

4

Page 27: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Moment 3-3

Maximum Factored Loads:Maximum Factored Loads:

Ridge Beam: 53.0 in.-kipsRidge Beam: 53.0 in.-kips

L.R.F.D. Design Values:L.R.F.D. Design Values:

Ridge Beam (4 x 10) : 99.7 in.-kipsRidge Beam (4 x 10) : 99.7 in.-kips

4 x 8

Page 28: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Shear 2-2Shear 2-2

Maximum Factored Load:Maximum Factored Load:

Ridge Beam: 2.8 kipsRidge Beam: 2.8 kips

L.R.F.D. Design Values:L.R.F.D. Design Values:

Ridge Beam (4 x10) : 3.37 kipsRidge Beam (4 x10) : 3.37 kips

4 x 8

Page 29: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Axial Forces

Maximum Factored Loads:Maximum Factored Loads:

Columns: 3.9 kipsColumns: 3.9 kips

Posts: 1.8 kipsPosts: 1.8 kips

L.R.F.D. Design Values:L.R.F.D. Design Values:

Columns (6 x 6) , 6’ unbraced: 25.4 kipsColumns (6 x 6) , 6’ unbraced: 25.4 kips

Posts (4 x 4) , 8’ unbraced length: 10.2 kips Posts (4 x 4) , 8’ unbraced length: 10.2 kips

6 x

6

6 x

6

6 x

6

4 x

4

4 x

4

Page 30: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Moment 2-2Moment 2-2

Maximum Factored Loads:Maximum Factored Loads:

Fascia Beam: 9.8 in.-kipsFascia Beam: 9.8 in.-kips

Fasica Beam , Moment 3-3: 23.0 in.-kipsFasica Beam , Moment 3-3: 23.0 in.-kips

L.R.F.D. Design Values:L.R.F.D. Design Values:

Fascia Beam (4 x 6) : 24.3 in.-kipsFascia Beam (4 x 6) : 24.3 in.-kips

Fascia Beam (4 x 6) , Moment 3-3 : 38.2 in.-kipsFascia Beam (4 x 6) , Moment 3-3 : 38.2 in.-kips

4 x 6

4 x 6

Page 31: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Deformation due to Dead Load

Deformation due to Live Load

Deformation due to Snow Load

Deformation due to Wind Load

Page 32: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Quantities of Material Used

List of Members for Playground ProjectMember's

Lenghts Quantitytype: 2*2

3ft 33type: 2*4

2.5ft 22.8ft 203.0ft 153.2ft 24.5ft 2

type: 2*62ft 44ft 288ft 4

type: 2*83ft 14ft 128ft 10

type: 4*43ft 94ft 21

5.7ft 288ft 710ft 211.3ft 1812ft 616ft 2

type: 6*616ft 8

type: 4*10 16ft 1

type: 2*6 floor8ft 2816ft 32

type: 4*8 CDX plywood 20type: wood shingles 6

Page 33: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Cost of Materials Cost Information for Playground Project (timber)

Member Type Qty. price/member cost8ft (2" x 2") 33 1.99$ 65.67$ 8ft (2" x 4") 21 2.11$ 44.31$ 8ft (2" x 6") 37 2.80$ 103.60$ 8ft (2" x 8") 17 4.16$ 70.72$ 8ft (4" x 4") 33 5.66$ 186.78$

16ft (4" x 4") 28 14.13$ 395.64$ 16ft (6" x 6") 8 34.87$ 278.96$ 16ft (4" x 8") 1 250.00$ 250.00$

8ft floor (2" x 6") 28 3.79$ 106.12$ 16ft floor (2" x 6") 32 9.99$ 319.68$

4' x 8' CDX plywood 20 14.24$ 284.80$ wood shingles 6 34.00$ 204.00$

connectors (nail prices included where applicable) 545.40$ 2,855.68$

Page 34: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

Connector Cost Breakdown

C o s t In fo rm a tio n fo r C o n n e c to rsc o nne c to r typ e Q ty. p r i c e /m e m b e r c o s t

jo is t ha ng e rs (2 " x (6 & 8 )" ) 6 0 0 .9 0$ 5 4 .0 0$ jo i s t ha ng e rs (4 " x 4 " ) 4 8 1 .1 0$ 5 2 .8 0$ ra fte r ha ng e r (4 " x 4 " ) 1 8 1 .2 0$ 2 1 .6 0$ p o s t a nc ho r (4 " x 4 " ) 4 1 0 .0 0$ 4 0 .0 0$ p o s t a nc ho r (6 " x 6 " ) 8 1 5 .0 0$ 1 2 0 .0 0$

ra fte r tie s 1 8 0 .3 0$ 5 .4 0$ g us s e t p la te 1 0 2 0 .0 0$ 2 0 0 .0 0$

la g s c re w s (1 /2 " x 5 " ) 2 4 0 .9 5$ 2 2 .8 0$ la g b o lts (5 /8 " x 4 " ) 8 1 .0 0$ 8 .0 0$ la g b o lts (5 /8 " x 6 " ) 1 6 1 .3 0$ 2 0 .8 0$

5 4 5 .4 0$

Page 35: CE 437 – Timber Design Project: Playground Dave Maruskin (el capitan) Jason Huck (resident architect) Jeff Leake (interior design) Bryan Dhume (special.

The End