[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 1
CCS: silver bullet ?or broken bridge?
www.geos.ed.ac.uk/sccs/
ContextCaptureStorage
Problems
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 2
4 pillars of UK energy policy :Efficiency, Renewables, Nuclear, CCS
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 3
What is CCS ?
90% CO2 reduction on site75% along whole chain
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 4
Fluid deeper than 800m, rapid expansion may cool to ice
CO2 physical states
geotherm
alhydrate
Lo pressure Hi
surface
transport
storage
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 5
CO2 calculated emissions
6 yr trend Faster than the worst IPCC projection
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 6
Ocean is measurably more acid
Half of fossil CO2 emitted isdissolved in the ocean
CO2 + H2O = H+ + HCO3-
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 7
Climate and /or fossil fuel?
Not hereNoHereNOW
World plants by 2020at 450ppm = 54 x 2.4 GW
Do nothing CO2
Sustainable
Fossil fuels will still providemost of world energy to 2050
New plants from 202020/yr coal, 22/yr gas
450 ppm
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 8
Capture
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 9
Twin track approach
CarbonDioxide
Reduction
Increased efficiency,biomass cofiring ,
capture ready powerplant
Carbon Captureand Storage(CCS)
- -
Possible Now
Long Term TimeMedium Term
2012 2020
-23%
Baseline
- 40%
- 95% TRACK 2
TRACK 1
Drivers:
Improve efficiency initially 30 ==> 47% coal (may need boiler refit)
Add Capture by one of three methods - 2009 all equal cost
25% energypenalty ??
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 10
Post-Combustion
boiler
airfuel
CO2
source: Vattenfall
Post-combustion capture
Coal or gas + air ==> CO2 + H2O +N2
Proven at 10% size, not in power plant. Solvent scrub flue gas 2-12%CO2 (amine or ammonia). Needs new boiler & large site, retrofit
possible
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 11
Oxyfuel process
source: Vattenfall
Coal or gas + O2 + flue gas ==> CO2 + H2O
Oxyfuel combustion
N2
ASU
boiler
fuel
CO2
air O2
5 MWe experimental burners; Purify oxygen from air; retrofitburners and upper boiler; water removal => 100% CO2
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 12
Pre-combustion capture (IGCC)Pre-Combustion
CO2
gasifier
ASU
N2
air
GT
source: Vattenfall
Coal or gas + steam ==> CO + H2 ==> CO2 +H2
Experience at 30% scale; Gasify coal, or split methane, can be twosites; Pre-combustion gas cleanup; cheaper separation 32% CO2;
solvent dimethyl ether/methanol SELEXOL (future membrane ?);integrated process ==> hydrogen; large expensive plant
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 13
Capture penaltyNow 4 x 800 MWe3.2 GW for use
With CCS 5 x 800 MWe3.2 GW for use
Capture penalty25% 200912% by 2020 ?
If penalty 25%, 77% reduction
if penalty 12%, 80% reduction
16 Mt CO2 emitted +1.6 Mt 4 Mt CO2 emitted 3.6 Mt CO2 emitted
PC, 90% capture,10% emitted upstream
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 14
Storage
Annual UK power emissions 200 Mt CO2 wouldcover Edinburgh to 60m as gas, to 150mm as liquid
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 15
Regions of storagearound the UK
Scotland power 18 Mt CO2/yrUK power 200 Mt CO2/yr
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 16
Reservoir sandstones
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 17
Storage
CO2 fills microscopicpores in sandstone
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 18
Injection: buoyant, then lateral
Injection
Top seal mudrock
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 19
1 Mt CO2 / yr
Sleipner CO2 re-injection:demonstration size
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 20
Monitoring: seismic reflection
20
0m
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 21
Transport and Europe
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 22
Transport : pipes
USA more than3000 miles onshore
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 23
UK storage very large
mid-range valuesfrom EU FP6GeoCapacity
Uncertainty large: ± 10 x. Need large-scale testing
NorthEU 1.0Gt/yr
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 24
4 UKclusters
CCS clusters & offshore pipesOxyfire test : Renfrew
Test capture ANDstorage, develop chain
?
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 25
Fewlarge, or
manysmall
stores ?
Continentalpipes tooffshore$8 Bn/yrincome?
Haszeldine 2009 Science
MAJOR RISK
Needs REALTESTS
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 26
Acceleration of R&D&D&D
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 27
Prepare now, for large CCS
CCS is not first option, but longrun is cheaperPrepare CCS NOW, for 2020, reduces cost from $800 to $200
CCS by storage ingasfields, aquifers
or EOR
Prepare now, for here
CCS
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 28
World experiments getting bigger
UK first plant by 2014
UK plant 2,3, 4 by 2018
UK commercialplant from 2020
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 29
Funding: Pilot, Rollout
Cost decreaseswith experience
EU-A price increases
EU-ETS not sufficient. Need levy price, or Feed-in, or Mandate, or “ROC” [email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 30
Extra cost to public
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 31
So far, so good,but
missing steps in the CCS bridge..
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 32
UK Legal and Regulation• International conventions OSPAR !
• International conventions LONDON !
• Owning the porespace, seabed…. !
• European CCS Directive to UK law !
• Onshore H & S , pipes, plant rules !
• Licensing of storage !
• Environmental impacts !
• CCS coal mandate & CCS-Ready !
• Levy for coal AND gas CCS !
• EPS (UK, EU) ?
Needs ratified
underway
underway
underway
Needs ratified
Claim agreed
Transferred
Enacted 300MW
coal output
Payment on coal
(and gas)
Debate
Focus on coal, offshore, ownership and licensing
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 33
Short project, long CO2 storage2010 2020Demo
Accurate baseline ==> firm predictions x 300 duration
7575
Storagepermit
(MemberState
and EC)
Baseline
Explorationpermit
(MemberState)
Monitoring (MemberState) yearly report
Monitoringpost-close
30 year! Bond
Effort in 100yr commitment
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 34
Learn and deploy rates
CCS is projected to be un-precedented rapid growthRequires circulation of information
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 35
EPS and CCS on gas plant
coal
gas
Illustrativetracks
Gas capture needed for transition to low [email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 36
Public understanding
Public objection to coal &storage - needs more work
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 37
The Aim: Reduce CO2 emissions
IEA: 100 commercial sized power projects by 2020Same again for CCS in industry (cement steel, refine..)
27 Gt /yr
CCS
Now
Scotland power 18 Mt CO2/yr UK power 183 Mt CO2/yr
1 G
t =
1,0
00
,00
0,0
00
to
nn
e
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 38
Projected CCS sites EUSix funded byEERecoveryPackage
Another sixbefore 2015?
Chosen forreadyness
andemploymentNeed to infillto 12 with
othertechnologies
[email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 39
Gaps still un-solvedPaying: World incentives / policy / price ?CO2 price MUCH too low, needs a base guaranteeConvincing China, (and India), USA
Speed: Learning and Deployment rates are extremely fast
Capture: Reduce capture penalty from 25%, to 10% or 5%
Storage: Volumes, integrity, handover period and liability
Guarantee: Fitting to established and new coal and gas plant
Operation: With variable renewables,
Diversion: Lock-in, Capture by BaU coal or oil lobby
Effectiveness: <75% overall CO2 reduction just a transition
Ensuring that EU, USA, Aus are a start, not a [email protected] King Coal, Royal Soc Chemistry, London 24 March 2010 40
Summary
BaU CO2
by 20302030 CCS +renewables
• Fossil fuel use !"climate
• CCS needed to reduce CO2
• New chain, elements known
• Demonstrations active
• World activity too slow
• CCS is LARGE option
• UK well placed - 2014
• Not yet a global business
• Rapid scale-up “challenging”