CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement...

15
Institute of Combustion and Power Plant Technology Prof. Dr. techn. G. Scheffknecht Matthias Hornberger, Reinhold Spörl, Günter Scheffknecht CCS in cement industry – Application of the Calcium Looping Technology

Transcript of CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement...

Page 1: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

Institute of Combustion and Power Plant Technology Prof. Dr. techn. G. Scheffknecht

Matthias Hornberger, Reinhold Spörl, Günter Scheffknecht

CCS in cement industry – Applicationof the Calcium Looping Technology

Page 2: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

2University of Stuttgart - Institute of Combustion and Power Plant Technology -

• Cement production constitute ~5 % of global anthropogenic CO2 emissions

• CO2 emissions:

• 60 % by raw materials

• 40 % by fuel

• Reduction of CO2 emissions:

• 56 % CCS

• 44 % by increase of energy efficiency, alternative fuels, reduction of clinker share

Clinker manufacturing

M. Sc. Matthias Hornberger

Raw meal

Cyclonepreheater

Flue gas

Calciner

Tertiary air duct

Cooler exhaust gas

Fuel/air

Fuel

Cooling air

Rotary kiln 2000 °C

300 - 350 °C

700 - 1000 °C

200 °C - 350 °C

850 °C

700 - 1000 °C

Clinker

CaCO3,SiO2,Al2O3, Fe2O3

20 - 34 % CO2

Page 3: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

Calcium – Looping

Page 4: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

4University of Stuttgart - Institute of Combustion and Power Plant Technology -

• CO2 capture by cyclic calcination and carbonation of Calciumcarbonat (CaCO3)

• High energy efficiency due to high temperature level

Calcium Looping – General Process Description

M. Sc. Matthias Hornberger

Temperature in °C600 650 700 750 800 850 900 950 1000

0.001

0.01

0.1

1

10

CaO + CO2 CaCO3

CaCO3 CaO + CO2

Page 5: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

5University of Stuttgart - Institute of Combustion and Power Plant Technology -

Integrated CaLCalcium Looping – Cement Plant Integration

M. Sc. Matthias Hornberger

• Cement plants’ raw meal completely calcined by CaL process

• High make-up ratio realizable

• Higher energy efficiency and higher complexity compared to tail-end

• Entrained flow reactors or CFB reactors with additional milling step if necessary

Clinkercooler

Cal

cine

r

Rawmeal

fuelO2

Car

bona

tor

CO2 depleted flue gas

CO2 to CPU

clinker

Page 6: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

6University of Stuttgart - Institute of Combustion and Power Plant Technology -

• Part of raw meal calcined in CaL process

• CO2 flue gas concentration ~ 20 - 35 %

• Easy integration

• Reduced energy efficiency

Tail-end CaLCalcium Looping – Cement Plant Integration

M. Sc. Matthias Hornberger

clinker

Cal

cine

rCaCO3

fuelO2

Car

bona

tor

CO2 depleted flue gas

CO2 to CPU

CEMENT plant

Rawmeal

CaOFlue gas

Page 7: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

Results

Page 8: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

8University of Stuttgart - Institute of Combustion and Power Plant Technology -

Experimental results – Experimental facility

M. Sc. Matthias Hornberger

200 – 230 kWth pilot scale facility (3 reactors)

Bubbling bed reactor (1x)

• diameter: 330 mm

• height: 6 m

Circulating fluidized bed reactor (2x)

• diameter: 200 mm

• height: 10 m

Possible reactor configuration: CFB-CFB, BFB-CFB

No electrical heating (heated by combustion)

Gas analysis (H2, CO, CH4, O2, CO2, CxHy, SO2, NOX)

Page 9: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

9University of Stuttgart - Institute of Combustion and Power Plant Technology -

Time, min0 2 4 6 8 10 12 14 16 18

0

0.05

0.1

0.15

0.2

0.25high make-uplow make-up

Experimental results – CO2 capture

M. Sc. Matthias Hornberger

Temperature, °C600 620 640 660 680 700

50

60

70

80

90

100

ECO2,eq

TFB-CFBCFB-CFB

• CO2 capture was limited by the equilibrium CO2 capture

• High CO2 capture rate above 90 % reached

• High sorbent activity due to high make-up flows

Page 10: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

10University of Stuttgart - Institute of Combustion and Power Plant Technology -

Simulation results*

M. Sc. Matthias Hornberger

Reference cement plant w/o CO2

capture

tail-end CaLconfiguration

integrated CaLconfiguration

Integration level [%] -- 20 100F0/FCO2 -- 0.16 4.1FCa/FCO2 -- 4.8 4.0Carbonator CO2 capture efficiency [%] -- 88.8 80.0Total fuel consumption [MJLHV/tclk] 3223 8672 4740Rotary kiln burner fuel consumption [MJLHV/tclk] 1224 1210 1180

Pre-calciner fuel consumption [MJLHV/tclk] 1999 15423560

CaL calciner fuel consumption [MJLHV/tclk] -- 5920Electric balance [kWhel/ tclk]

Gross electricity production -- 579 163ASU consumption -- -117 -73CO2 compression -- -146 -111Carbonator and calciner fans -- -25 -11Cement plant auxiliaries -132 -132 -132Net electric production -132 159 -164

*Spinelli et al. Integration of Ca-Looping systems for CO2 capture in cement plants, Energy Proceedia (GHGT-13)

Page 11: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

11University of Stuttgart - Institute of Combustion and Power Plant Technology -

Simulation results*

M. Sc. Matthias Hornberger

Reference cement plant w/o CO2

capture

tail-end CaLconfiguration

integrated CaLconfiguration

Direct CO2 emissions [kgCO2/tclk] 863.1 143.2 71.4Indirect CO2 emissions [kgCO2/tclk] 105.2 -123.5 128.7

Equivalent CO2 emissions [kgCO2/tclk] 968.3 19.7 200.1

Equivalent CO2 avoided [%] -- 98.0 79.3SPECCA [MJLHV/kgCO2] -- 3.26 2.32

equivalentCOrefequivalentCO

refequivalentequivalent

eeqq

SPECCA,2,,2

,

*Spinelli et al. Integration of Ca-Looping systems for CO2 capture in cement plants, Energy Proceedia (GHGT-13)

Page 12: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

Conclusion

Page 13: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

13University of Stuttgart - Institute of Combustion and Power Plant Technology -

Conclusion and Outlook

M. Sc. Matthias Hornberger

CaL CO2 capture:

• Beneficial Calcium Looping operation conditions due to reutilization of sorbent in cement plant

• High CO2 capture rate >90 % CO2 capture achieved over a wide range of parameters

Tail-end CaL configuration:• easy to integrated• CFB reactors minor technical

uncertainties• Significant increase of fuel input

(+270 %)• Electric power export and very low

equivalent emissions

Integrated CaL configuration:• Complex integration • Moderate increase of fuel input (+47 %)• Electric consumption similar to

reference cement plant• Research upon raw meal sorbent

performance and entrained flow carbonator sizing

Page 14: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

Acknowledgement

This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement no 641185

www.sintef.no/cemcap

Twitter: @CEMCAP_CO2

Thank you for your attention!

Page 15: CCS in cement industry – Application of the Calcium Looping … · 2017-07-04 · CCS in cement industry – Application ... Institute of Combustion and Power Plant Technology -

e-mailphone +49 711 685-fax +49 711 685-

University of Stuttgart

Thank you!

Pfaffenwaldring 23 70569 Stuttgart GermanyInstitute of Combustion and Power Plant Technology

[email protected]@ifk.uni-stuttgart.de

Matthias Hornberger

67801