Model CC-Link IE Field Network Compatible
Title CC-Link IE Field Network
Intelligent Device Station Conformance Test Specifications
Management number: BAP-C0401-037-B
CC-Link Partner Association
(2/33)
Revisions
Sub-number Revision contents Issued
month/year
* First edition Jan. 2010
A Transient communication tests divided into Transient1 and Transient2, and for
Transient2, whether the functions are installed or not can be entered.
Apr. 2011
B Made changes to support transient link scan unit limitation mode and node
unit transmission limitation mode.
Made changes to support the motion function.
Nov. 2011
(3/33)
Table of contents
Overview .................................................................................................................................................................4
1. Hardware test...................................................................................................................................................8
1.1. Simulator noise (common mode) test .......................................................................................................8
1.2. Cable (bundle type) noise test ..................................................................................................................9
1.3. Cable maximum length test ....................................................................................................................10
1.4. Network link up confirmation test ............................................................................................................11
1.5. LED confirmation test..............................................................................................................................13
1.6. 1000BASE-T compliance test .................................................................................................................14
1.7. Confirmation test for parts used..............................................................................................................16
2. Software test ..................................................................................................................................................17
2.1. Host station information ..........................................................................................................................17
2.2. Basic function .........................................................................................................................................18
2.3. Control ....................................................................................................................................................21
2.4. Topology .................................................................................................................................................24
2.5. Error processing .....................................................................................................................................26
2.6. Synchronization function.........................................................................................................................30
3. Aging..............................................................................................................................................................32
Appendix 1 Wave examples of noise simulator output ..........................................................................................33
(4/33)
Overview
This specification document contains information about test items for the connectivity (conformance) of the
CC-Link IE Field network-compatible intelligent device station.
Conformance tests are classified into 2 groups: the tests conducted by device manufacturers and the tests
conducted by CC-Link Partner Association (CLPA). Test target modules need to pass (PASS) all the
conformance tests, which are described in this document, to be evaluated as a connectable module to the
CC-Link IE Field Network.
Fill in the result columns for each test item: When a module passes the test, the tester needs to fill in "PASS" to
the column, and if a module fails the test, the tester needs to fill in "FAIL" to the column. Enter “-“ in the column
when there is no corresponding function. Also, measurement value etc. should be entered, if necessary.
(1) Test configuration and precautions
• If not otherwise specified, the test should be conducted in the basic test configuration of Figure 1 and Figure 2.
• If not otherwise specified, cables (Type name/SC-E5EW-S□M: □ indicates a cable length in meters) with
Manufacturer: Mitsubishi Electric System & Service Co., Ltd. plugs should be used. The same cable needs to be
used for the test at CLPA.
• If not otherwise specified, Mitsubishi Electric-manufactured master/local modules and head units should be
used for the master station, the local station and the intelligent device station. Configurations of each station are
shown in Table 1.
Test target stationQnUQJ71GF11-T2Station No. 0Master station
QnUQJ71GF11-T2Station No. 1
Figure 1 Basic test configuration (hardware test)
Figure 2 Basic test configuration (software test)
Table 1 Usable programmable controller CPU, master station and slave station for test Type Test equipment name
Programmable controller CPU QnU series Master station QJ71GF11-T2
CC-Link IE Field Network master/local module Local station QJ71GF11-T2
CC-Link IE Field Network master/local module Slave station
Intelligent device station
LJ72GF15-T2 CC-Link IE Field Network head module
(5/33)
(2) Test item list
Test item list is shown in Table 2.
Table 2 Test item list
: Executed, : Not executed, : The result must be checked by CLPA. Executed/Not executed Classification Test item Manufacturer CLPA
(1) Simulator noise (common mode) test (2) Cable (bundle type) noise test (3) Cable maximum length test (4) Network link up confirmation test (5) Monitor indicator confirmation test (6) 1000BASE-T compliance test
1. Hardware test
(7) Confirmation test for parts used
2-1. Host station information
(1) Confirmation of host station information 2-2. Basic function (1) Cyclic communication (2) Transient communication 2-3. Control (1) Cyclic start/stop indicated by master station (2) Cyclic start/stop to host station (3) Reserved station 2-4. Topology (1) Line connection (2) Star connection (3) Ring connection 2-5. Error processing (1) Station No. duplication (2) Station No. setting mismatch (3) Network No. setting mismatch (4) Station type mismatch 2-6. Synchronization function
2. Software test
(1) Synchronization slave station 3. Aging test (1) Aging test
(6/33)
(3) Link special register and link special relay
A list of link special register, link special relay and buffer memory of master station, which are checked in this test,
is shown in Table 3, 4 and 5.
Table 3 Link special register list No. Name Details
SW0000 Indicated contents of data link start/stop
Indicates the conditions to start and stop the data link. 00h: Host station 01h: All stations 02h: Specified station 80h: Host station forcing (valid for start only) 81h: All station forcing (valid for start only) 82h: Specified station forcing (valid for start only)
SW0001 to SW0008
Station specification of data link start/stop
Indicates the station No. to start and stop the data link of each station (SW0000=02h and 82h) 0: No indication to start/stop 1: Indication to start/stop
SW00B0 to SW00B7
Data link status of each station
Indicates the data link status of each station (valid for connected modules only). 0: Normal 1: Error
SW00C0 to SW00C7
Reserved station specification
Indicates the reserved station set by parameter in bit (valid for connected modules only). In addition, the station which was canceled temporarily is considered no indication of reserved station at the reserved station setting. 0: No reserved station specification 1: Reserved station specification
(7/33)
Table 4 Link special relay No. Name Details
SB0002 Data link start of the entire system
Indicates the data link (cyclic transmission) start of the entire system. Follow the contents of SW0001 to SW0008, and start. 0: No start indication 1: Start indication (valid for rise time)
SB0003 Data link stop of the entire system
Indicates the data link (cyclic transmission) stop of the entire system. Follow the contents of SW0001 to SW0008, and stop. 0: No stop indication 1: Stop indication (valid for rise time)
SB006A Link up status of host station port 1 side
Indicates the link up status of host station port 1 side. 0: Link up operating 1: During link down
SB006B Link up status of host station port 2 side
Indicates the link up status of host station port 2 side. 0: Link up operating 1: During link down
Table 5 Error counter of master station No.
(buffer memory) Name Details
4A33H, 4A32H Master → Slave (station No. 1)MyStatus unreceived counter
Indicates the frequency that Slave (station No. 1) cannot receive MyStatus from Master during 1 link scan.
4A35H, 4A34H Master → Slave (station No. 1)Cyclic unreceived counter
Indicates the frequency that Slave (station No. 1) cannot receive cyclic data from Master during 1 link scan.
4A3BH, 4A3AH Slave (station No. 1) → MasterMyStatus unreceived counter
Indicates the frequency that Master cannot receive MyStatus from Slave (station No. 1) during 1 link scan.
4A3DH, 4A3CH
Slave (station No. 1) → MasterCyclic unreceived counter
Indicates the frequency that Master cannot receive cyclic data from Slave (station No. 1) during 1 link scan.
4A43H, 4A42H Master → Slave (station No. 2)MyStatus unreceived counter
Indicates the frequency that Slave (station No. 2) cannot receive MyStatus from Master during 1 link scan.
4A45H, 4A44H
Master → Slave (station No. 2)Cyclic unreceived counter
Indicates the frequency that Slave (station No. 2) cannot receive cyclic data from Master during 1 link scan.
4A4BH,, 4A4AH
Slave (station No. 2) → MasterMyStatus unreceived counter
Indicates the frequency that Master cannot receive MyStatus from Slave (station No. 2) during 1 link scan.
4A4DH, 4A4CH
Slave (station No. 2) → MasterCyclic unreceived counter
Indicates the frequency that Master cannot receive cyclic data from Slave (station No. 2) during 1 link scan.
Note) This area is confidential. Please do not disclose the area information to customers etc.
(8/33)
1. Hardware test
1.1. Simulator noise (common mode) test
Classification 1. Hardware test
Test item (1) Simulator noise (common mode) test
Purpose To confirm whether the test target has the noise immunity to endure the FA usage, under the application of noise to the power supply.
Test method
Conduct the test in the following configuration.
Noise simulator device
Port1 Port2
Master station (QJ71GF11-T2, Station No. 0)
Slave station (QJ71GF11-T2, Station No. 1)
AC/DC power supply
Space cables from the test
bench 16cm or more.
Cable: 5m
Test target station (slave station, station
No. 2)
Cable: 5m
Coil cables 5 times in 15cm in diameter.
1m
Test panel FG
LGLG
FGLG
1m
FG
Supply the power of all equipment from the insulation transformer.
Note 1) Test panel should be grounded to FG. Note 2) Programmable controller and test panel should be brought together. Note 3) FG should be single point ground. FG should be dropped on the gland. Note 4) Test should be conducted with transmission: 2 times and token transmission: 4 times. Note 5) Noise simulator should meet the following "Simulator setting condition". Note 6) Refer to Appendix 1 for the wave samples of the noise simulator. Simulator setting condition
Grounding wire (FG) Equipments used (reference)
Pulse width
1μs Wiring length
Within 50cm
Noise simulator NoiseKen INS-4020
Rise time 1nS Wire diameter
2 mm2 Insulation transformer
NoiseKen NCT-160
Frequency 45Hz
Test conditions
Judgment criteria
The test target should communicate properly at the following specified noise voltage, for 2 hours or more. All the error counters (refer to Table 5) of master station should be 0. AC power: ± 2000V, DC power: ± 900V
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(9/33)
1.2. Cable (bundle type) noise test
Classification 1. Hardware test
Test item (2) Cable (bundle type) noise test
Purpose To confirm whether the test target has the noise immunity to endure the FA usage, under the application of noise to the cable.
Test method
Conduct the test in the following configuration. This configuration is different than the basic configuration.
Port2Port1
Noise simulator
1m
Master station (QJ71GF11-T2, Station No. 0)
Slave station (QJ71GF11-T2, Station No. 1)
Cable: 5m
Coil cables 5 times in 15cm in diameter.
Space cables from the test bench 16cm
or more.Co
upling ad
aptor
Test target station (slave station, station No. 2)
1m
1m
Test panel
LG
FG
LG
FG
LG
FG
Supply the power of all equipment from the insulation transformer.
Note 1) Test panel should be grounded to FG. Note 2) Programmable controller and test panel should be brought together. Note 3) FG should be single point ground. FG should be dropped on the gland. Note 4) Test should be conducted with transmission: 2 times and token transmission: 4 times. Note 5) Noise simulator should meet the following "Simulator setting condition". Note 6) Refer to Appendix 1 for the wave samples of the noise simulator.
Simulator setting condition
Grounding wire (FG) The equipments used (Reference)
Pulse width
1μs Wiring length
Within 50cm
Noise simulator NoiseKen INS-4020
Rise time 1nS Wire diameter
2 mm2 Insulation transformer
NoiseKen NCT-160
Frequency 45Hz Coupling adaptor NoiseKen CA-805B
Test conditions
Judgment criteria
The test target should communicate properly at the following specified noise voltage, for 10 minutes or more. All the error counters (refer to Table 5) of master station should be 0. With a motion function compatible node: ±2000 V With a motion function non-compatible node: ±1000 V
Result Manufacturer (required) CLPA (required)
CC-Link Partner Association
(10/33)
1.3. Cable maximum length test
Classification 1. Hardware test
Test item (3) Cable maximum length test
Purpose To confirm whether a test target can operate normally at the maximum length of 100m.
Test method
Operate for 12 hours in the following configuration. Conduct the test at room temperature.
Test target station (slave station, station No. 2)
Cable: 100m
Port1 Port2
Master station (QJ71GF11-T2, Station No. 0)
Slave station (QJ71GF11-T2, Station No. 1)
Diameter: 40cm
Approx. 1m
Approx. 2m
Test panel
LG
FGLG
FG
Diameter: 40cm
Approx. 1m
Approx. 2m
Space cables from the test bench 16cm or more.
LG
FG
Note 1) Test panel should be grounded to FG. Note 2) Programmable controller and test panel should be brought together. Note 3) FG should be single point ground. FG should be grounded. Note 4) Test should be conducted with transmission: 2 times and token transmission: 4 times.
Equipments used
Test conditions
• Use 4 pairs balanced-type shielded cables, compliant with ANSI/TIA/EIA-568 (Category 5e).
• Conduct the test at room temperature, and with the cable length of 100m.
Judgment criteria
All the error counters (refer to Table 5) of the master station should be 0.
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(11/33)
1.4. Network link up confirmation test
Classification 1. Hardware test
Test item (4) Network link up confirmation test
Purpose To confirm whether a test target operates link up and data link when the power turns ON/OFF and when the cable is removed and inserted.
Test method
Test target station (slave station, station No. 2)
Cable: 5mCable: 5m
Port1 Port2
Master station (QJ71GF11-T2, Station No. 0)
Slave station (QJ71GF11-T2, Station No. 1)
Port1
The test should be conducted by the following procedure. Master station uses port 1. 1. Check the link up function when the power turns ON/OFF. 1-1): Turn on master station (station No. 0) and slave station (station No. 1). 1-2): Turn on a test target station (station No. 2) to be the normal operation status (cyclic
communication status). 1-3): Check the value of SB006A: the link special relay, and b0 and b1 of SW00B0 (data
link status of other stations). 1-4): Turn off the test target station. 1-5): Check the value of SB006A: the link special relay, and b0 and b1 of SW00B0 (data
link status of other stations). 1-6): Repeat operations 2) to 5) 10 times. 2. Check the link up function when the cable is inserted and removed. <When the cable of port 1 is inserted> 2-1): Turn on all the stations to be the normal operation status (cyclic communication status). 2-2): Check the value of SB006A: the link special relay, and b0 and b1 of SW00B0 (data
link status of other stations). 2-3): Remove the port 1 side cable from the test target station. 2-4): Check the value of SB006A: the link special relay, and b0 and b1 of SW00B0 (data
link status of other stations). 2-5): Insert the port 1 side cable into the test target station. 2-6): Check the value of SB006A: the link special relay, and b0 and b1 of SW00B0 (data
link status of other stations). 2-7): Repeat operations 3) to 6) 10 times. <When the cable of port 2 is inserted> The test should be conducted to port 2 in the same method as port 1.
Equipments used
Test conditions
None
(12/33)
Judgment criteria
Follow the table below. Link special relay/register (check with the master station)
NO.
Connection status
Master station SW00B0 b0
Master station SW00B0 b1
Master station SB006A
1-3) Test target station: power ON 0 0 0 1. Check the link up function when the power turns ON/OFF.
1-5) Test target station: power OFF 1 1 1
2-2), 2-6)
Port 1: Cable connected Port 2: Cable connected
0 0 0
2-4) Port 1: Cable unconnected Port 2: Cable connected
1 1 1
2. Check the link up function when the cable is removed and inserted. 2-4) Port 1: Cable connected
Port 2: Cable unconnected 1 0 0
Result Manufacturer (required) CLPA (required)
CC-Link Partner Association
(13/33)
1.5. LED confirmation test
Classification 1. Hardware test
Test item (5) Monitor indicator confirmation test
Purpose To confirm that monitor indicators operate in accordance with the implementation conventions of the CC-Link IE Field Network.
Test method Test target station (slave station, station No. 2)
Cable: 5m Cable: 5mPort1 Port2
Master station (QJ71GF11-T2, Station No. 0)
Slave station (QJ71GF11-T2, Station No. 1)
Figure 1: Test configuration
Check the monitor indicators of the tested station under the four conditions below, based on the configuration shown in Figure 1. Condition 1): Cyclic communication status (Figure 1 configuration) Condition 2): When the port 1 cable is removed (remove the port 1 side cable in the Figure
1 configuration Condition 3): When the port 2 cable is removed (remove the port 2 side cable in the Figure
1 configuration Condition 4): When the port 1 and 2 cables are removed (remove the port 1 and 2 cables
in the Figure 1 configuration) Note 1) It is unnecessary to check unmounted monitor indicators.
Equipments used Test conditions
None
Judgment criteria
Verify that the monitor indicators operate as indicated in the table below. On: , Flicker:
, Off: .
Status
PW
RU
N
ER
R
D LIN
K
L.ER
R
SD
RD
LINK
L.ER
LINK
L.ER
LED of
communication port 1
LED of communication
port 2
Condition 1)
Condition 2)
Condition 3)
Condition 4)
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(14/33)
1.6. 1000BASE-T compliance test
Classification 1. Hardware test
Test item (6) 1000BASE-T compliance test
Purpose To check the waveform of the transmission path based on the IEEE802.3 specification.
Test method
The waveform tests are conducted based on the IEEE802.3 specification. The tests to be conducted are as follows:
No. Test name Test mode Corresponding page in IEEE802.3 Remarks
1 Template Test mode 1 40.6.1.2.3 Differential output templates -
2 Peak voltage Test mode 1 40.6.1.2.1 Peak differential output voltage and level accuracy
-
3 Droop Test mode 1 40.6.1.2.2 Maximum output droop -
4 Distortion Test mode 4 40.6.1.2.4 Transmitter distortion -
5 Return loss Test mode 4 40.8.3.1 MDI return loss -
6 Common mode voltage
Test mode 4 40.8.3.3 MDI common-mode output voltage
-
7 Jitter Test mode 2 and 3 40.6.1.2.5 Transmitter timing jitter
If PHY device does not correspond to the test method which IEEE802.3 describes, iol-recommended test method (*) can be conducted.
*: Refer to Appendix 40.B of the test specifications: “GIGABIT ETHERNET CONSORTIUM Clause 40
Physical Medium Attachment (PMA) Test Suite Version 2.4” published by iol (Inter Operability Laboratory) for further information.
Note 1) Select equipments which can be conducted by the 1000BASE-T compliance test.
Equipments used (reference)
Oscilloscope Tectronix TDS7254B
Signal generator Tectronix AWG5012B
Differential probe Tectronix P6247
Compliance test fixture
Tectronix TF-GBE-ATP
Test conditions
One example of test device configurations is shown in the following page.
Software for compliance test
Tectronix TDSET3
Judgment criteria
The result should satisfy the judgment value written on IEEE802.3ab. Manufacturers need to provide the test result, which the test equipment outputs, to CLPA.
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(15/33)
<1000BASE-T compliance test configuration example>
Test mode1,4
OscilloscopeSignal generator
Test target station
Cable
Oscilloscope
Test target station
Cable
Compliance test fixture
Test mode2,3
Test fixture substrate
Differential probe
Differential probe
Software for compliance test
Install on oscilloscope.
Software for compliance test
Install on oscilloscope.
(16/33)
1.7. Confirmation test for parts used
Classification 1. Hardware test
Test item (7) Confirmation test for parts used
Purpose To check if the interface parts, which are used in the communication, satisfy the implement specifications.
Test method
The parts should be checked if they correspond to the following table. Part name Check item Check
(When parts correspond to the items, enter in the blanks below.)
Jack should be compliant with ANSI/TIA/EIA-568 (Category 5e).
Connector (RJ45 jack)
Jack should be shielded-type. Pulse transformer should correspond to Auto MDI MDI-X.
Pulse transformer
Pulse transformer should correspond to 1000BASE-T.
PHY should correspond to Auto MDI MDI-X.
PHY cannot be set as master or slave by manual. * * The value of MASTER-SLAVE Mannual Config Enable bit (bit12) of MASTER-SLAVE Control register (Register 9) must be set to “0=Disable”.
PHY
PHY should correspond to 1000BASE-T.
Equipments used (reference)
Test conditions
None
Judgment criteria
The parts should satisfy the check items.
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(17/33)
2. Software test
2.1. Host station information
Classification 2. Software test
Test item 2-1. Host station information (1) Confirmation of host station information
Test method Confirm the station information of the test target by the master station.
Judgment criteria
Check the value of the buffer memory of the master station.
Buffer memory address (word)
Name Monitor value Data (*1)
5020h + 20h Station No.
Vendor code Vender code (hexadecimal) supplied by CLPA
[ ]
5021h + 20h Station No.
Device type Device type (hexadecimal) supplied by CLPA
[ ]
5022h + 20h Station No.
Model name code Optional However, the code should be uniquely managed in the same vendor code.
[ ]
5023h + 20h Station No.
Version Optional [ ]
Note) This area is confidential. Please do not disclose the area information to customers etc.
Remarks *1 Fill in the data to compare in the CLPA test. *2 Data need to follow the specifications presented by manufacturers.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(18/33)
2.2. Basic function
Classification 2. Software test
Test item 2-2. Basic function (1) Cyclic communication
Test method
Execute the cyclic communication in the test target station. Configuration needs to follow the basic test configuration. The setting of each station is as follows:
Name Station type Station No.
Slave station No. 1 Local station 1
Test target station Intelligent device station 2
Slave station No. 2 Intelligent device station 3
Judgment criteria
Check the followings. *1
No. Judgment criteria Result (When the following items are satisfied, enter in the blanks.)
(1) Special register SW00B0 (b1) of the master station is turned off. (This means that the data link of station No. 2 is normal.)
(2) Data link of the test target station becomes normal. (3) The master station can receive RX sent by the test target station. (4) The master station can receive RWr sent by the test target station. (5) The local station can receive RX sent by the test target station. (6) The local station can receive RWr sent by the test target station. (7) RY of the test target station can receive RY sent by the master
station.
(8) RWw of the test target station can receive RWw sent by the master station.
Remarks *1 Manufacturers need to provide the method that checked data link status, RX, RY,
RWr and RWw of the test target station to CLPA.
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(19/33)
Classification 2. Software test
Test item 2-2. Basic function (2) Transient communication (a) Transient1
Test method
Execute the transient communication in the test target station. Configuration needs to follow the basic test configuration. The settings of each station is as follows:
Name Station type Station No.
Slave station No. 1 Local station 1
Test target station Intelligent device station 2
Slave station No. 2 Intelligent device station 3
# Test target command: nodeInfoDetailGetRequest/ nodeInfoDetailGetResponse
Judgment criteria
When the testing station performs transmission in link scan unit limitation mode Check the values of buffer memory of the master station.
Buffer memory address (word)
Name Monitor value Data (*1)
5068h Controller information valid or invalid flag
1 Fixed [ ]
5069h Vendor code Vender code (hexadecimal) supplied by CLPA [ ] 506Ah Device type Device type (hexadecimal) specified by CLPA [ ] 506Bh Model name code Optional
However, the code should be uniquely managed in the same vendor code.
[ ]
506Ch Version Optional [ ] 506Dh Model name string Optional [ ] 5077h Vender unique
equipment information
Optional [ ]
When the testing station performs transmission in node unit limitation mode
Check the value of the buffer memory of the master station.
Buffer memory address (word)
Name Monitor value Data (*1)
5068h Controller information valid or invalid flag
1 Fixed [ ]
5069h Vendor code Vender code (hexadecimal) supplied by CLPA [ ] 506Ah Device type Device type (hexadecimal) specified by CLPA [ ] 506Bh Model name code Optional
However, the code should be uniquely managed in the same vendor code.
[ ]
506Ch Version Optional [ ] 506Dh Model name string Optional [ ] 5077h Vender unique
equipment information
Optional [ ]
Note) This buffer memory is a confidential area. Please do not disclose the area
information to customers etc.
Remarks
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(20/33)
Classification 2. Software test
Test item 2-2. Basic function (2) Transient communication (b) Transient2
Test method
Execute the transient communication in the test target station. Master station is to be the communication target. Configuration needs to follow the basic test configuration. The setting of each station needs to be the same as "Basic function (Cyclic communication)". Only the corresponding command types need to be tested, and transient types are as follows: (1) Retrieve memory access information. (2) RUN (3) STOP (4) Read from memory. (5) Write to memory.
Judgment criteria
Check the followings. *1 Transient server function: (1) The test target station should return a correct transient ACK.
If the test target station does not give the transient ACK, error will occur in the master station. (Error code=D0A3h)
(2) The test target station should return a correct response. If the response does not return, error will occur in the master station. (Error code=D253h)
Transient client function: (3) The test target station can send a transient request. (4) The test target can receive a correct transient response. When the testing station performs transmission in link scan unit limitation mode
Mounting Status [*1] Item Test result When the process is completed properly, enter in the blanks below.
(1) Memory access information retrieval
CT=04h (2) (1) RUN CT=08h (2) (1) STOP CT=09h (2) (1) Read from memory CT=10h (2) (1)
Transient server function
Write to memory CT=12h (2)
[*1] Enter a checkmark if the item is mounted. When the testing station performs transmission in node unit limitation mode
Mounting Status [*1] Item Test result When the process is completed properly, enter in the blanks below.
(1) Memory access information retrieval
CT=04h (2) (1) RUN CT=08h (2) (1) STOP CT=09h (2) (1) Read from memory CT=10h (2) (1)
Transient server function
Write to memory CT=12h (2)
[*1] Enter a checkmark if the item is mounted.
Remarks *1 Manufacturers need to provide the response operation of the transient communication
to CLPA.
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(21/33)
2.3. Control
Classification 2. Software test
Test item 2-3. Control (1) Cyclic start/stop indicated by master station
Test method
Confirm that the test target station corresponds to the cyclic start/stop of the master station by executing the cyclic communication. Configuration needs to follow the basic test configuration. The setting of each station needs to be the same as "Basic function (Cyclic communication)". The method of starting cyclic is as follows: (1) Turn on the special register SW0001 (b2) of the master station. (2) Turn on the special relay SB0002 of the master station. The method of stopping cyclic is as follows: (1) Turn on the special register SW0001 (b2) of the master station. (2) Turn on the special relay SB0003 of the master station.
Judgment criteria
Check the followings. *1 To the cyclic stop indication: (1) Special register SW00B0 (b1) of the master station is turned on. (This means that
the data link of station No. 2 is abnormal.) (2) Data link of the test target station needs to stop, and the data must not be
communicated. To the cyclic start indication: (3) Special register SW00B0 (b1) of the master station is turned off. (This means that
the data link of station No. 2 is normal.) (4) Data link of the test target station needs to start, and the data must be
communicated.
Item Result When the process is completed properly, enter in the blanks below.
(1) (2) (3) (4)
Remarks *1 Manufacturers need to provide the method that checked data link status and the data
communication of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(22/33)
Classification 2. Software test
Test item 2-3. Control (2) Cyclic start/stop to host station
Test method
Confirm that the test target station corresponds to the cyclic start/stop of the host station by executing the cyclic communication in case that the host station can execute the cyclic start/stop. Configuration needs to follow the basic test configuration. The setting of each station needs to be the same as "Basic function (Cyclic communication)". The method of the cyclic start/stop needs to follow the specifications presented by manufacturers. In case that there is some function that executes cyclic start/stop due to application errors, confirm that the cyclic communication is started/stopped by those error.
Judgment criteria
Check the followings. To the cyclic stop indication of the test target station: (1) Special register SW00B0 (bit1) of the master station is turned on. (This means that
the data link of station No. 2 is abnormal.) (2) Data link of the test target station needs to stop, and the data must not be
communicated. To the cyclic start indication of the test target station: (3) Special register SW00B0 (bit1) of the master station is turned off. (This means that
the data link of station No. 2 is normal.) (4) Data link of the test target station needs to start again, and the data must be
communicated.
Item Result When the process is completed properly, enter in the blanks below.
(1) (2) (3) (4)
Remarks *1 Manufacturers need to provide the method that checked data link status and the data
communication of the test target station to CLPA.
Manufacturer (required) CLPA (confirmation) Result
CC-Link Partner Association
(23/33)
Classification 2. Software test
Test item 2-3. Control (3) Reserved station
Test method
Confirm that the reserved station corresponds to its setting. Configuration needs to follow the basic test configuration. The setting of each station needs to be the same as "Basic function (Cyclic communication)". The number of data communication point is optional, and the setting of each station is as follows:
Station No.
Station type Reserved station setting
1 Local station No 2 Intelligent device station Yes 3 Intelligent device station No
Judgment criteria
Check the followings. *1 (1) Special register SW00C0 (b1) of the master station is turned on. (This means the
reserved station of station No. 2.) (2) Cyclic stops.
Item Result When the process is completed properly, enter in the blanks below.
(1) (2)
Remarks *1 Manufacturers need to provide the method that checked the data link status of the
test target to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(24/33)
2.4. Topology
Classification 2. Software test
Test item 2-4. Topology (1) Line connection
Test method
Execute the cyclic communication in the following 3 kinds of the line communication. Configuration 1
Configuration 2
Configuration 3
The setting of each station needs to be the same as "Basic function (Cyclic communication)".
Judgment criteria
Check the followings in Configuration 1 to 3. *1 (1) Special register SW00B0 (b1) of the master station is turned off. (This means that the
data link of station No. 2 is normal.) (2) Data link of the test target station becomes normal. (3) The master station can receive RX sent by the test target station. (4) The master station can receive RWr sent by the test target station. (5) The local station can receive RX sent by the test target station. (6) The local station can receive RWr sent by the test target station. (7) RY of the test target station can receive RY sent by the master station. (8) RWw of the test target station can receive RWw sent by the master station.
Result When the process is completed properly, enter in the blanks below.
Configuration
(1) (2) (3) (4) (5) (6) (7) (8) 1 2 3
Remarks *1 Manufacturers need to provide the method that checked data link status, RX, RY, RWr
and RWw of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(25/33)
Classification 2. Software test
Test item 2-4. Topology (2) Star connection
Test method
Execute the cyclic communication by the star connection. Configuration 1
The setting of each station needs to be the same as "Basic function (Cyclic communication)".
Judgment criteria
Confirm the followings in Configuration 1: *1 (1) Special register SW00B0 (b1) of the master station is turned off. (This means that the
data link of station No. 2 is normal.) (2) Data link of the test target station becomes normal. (3) The master station can receive RX sent by the test target station. (4) The master station can receive RWr sent by the test target station. (5) The local station can receive RX sent by the test target station. (6) The local station can receive RWr sent by the test target station. (7) RY of the test target station can receive RY sent by the master station. (8) RWw of the test target station can receive RWw sent by the master station.
Result When the process is completed properly, enter in the blanks below.
Configuration
(1) (2) (3) (4) (5) (6) (7) (8) 1
Remarks *1 Manufacturers need to provide the method that checked data link status, RX, RY, RWr
and RWw of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(26/33)
Classification 2. Software test
Test item 2-4. Topology (3) Ring connection
Test method
Execute the cyclic communication by the ring connection. Configuration 1
Test target stationNetwork No. 1Station No. 2
QnU(D)Master stationNetwork No. 1Station No. 0
QnU(D)Local station
Network No. 1Station No. 1
Intelligent device stationNetwork No. 1Station No. 3
Configuration 2
Test target stationNetwork No. 1Station No. 2
QnU(D)Master stationNetwork No. 1Station No. 0
QnU(D)Local station
Network No. 1Station No. 1
Intelligent device stationNetwork No. 1Station No. 3
The setting of each station needs to be the same as "Basic function (Cyclic communication)".
Judgment criteria
Check the followings in Configuration 1 and 2. *1 (1) Special register SW00B0 (b1) of the master station is turned off. (This means that the
data link of station No. 2 is normal.) (2) Data link of the test target station becomes normal. (3) The master station can receive RX sent by the test target station. (4) The master station can receive RWr sent by the test target station. (5) The local station can receive RX sent by the test target station. (6) The local station can receive RWr sent by the test target station. (7) RY of the test target station can receive RY sent by the master station. (8) RWw of the test target station can receive RWw sent by the master station.
Result When the process is completed properly, enter in the blanks below.
Configuration
(1) (2) (3) (4) (5) (6) (7) (8) 1 2
Remarks *1 Manufacturers need to provide the method that checked data link status, RX, RY, RWr
and RWw of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
2.5. Error processing
(27/33)
Classification 2. Software test
Test item 2-5. Error processing (1) Station No. duplication
Test method
When adding the test target station to the cyclic-running network, the station No. might overlap the existing station No. This test confirms that the cyclic does not start when the station No. overlaps the existing station No. Configuration needs be the following.
The setting of each station is as follows:
Station No. Slave station No. 1 Test target station Slave station No. 2
Item
Local station Intelligent device station Intelligent device station (a) 1 1 3 (b) 1 3 3
Judgment criteria
Check the followings. *1 (1) Special register SW00B0 (b1) of the master station is turned on. (This means that
the data link of station No. 2 is abnormal.) (2) Data link of the test target station does not start, and the data must not be
communicated. (3) Output of the test target station matches the specifications presented by
manufacturers.
Result When the process is completed properly, enter in the blanks below.
Item
(1) (2) (3) (a) (b)
Remarks *1 Manufacturers need to provide the method that checked data link status and the data
communication of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
Classification 2. Software test
(28/33)
Test item 2-5. Error processing (2) Station No. setting mismatch
Test method
Confirm that the cyclic does not start when the value, which is not in the parameter value set by the master station, is specified to the station No. of the test target station. Configuration needs to follow the basic test configuration. The setting of each station is as follows:
Setting of each station Station No. Slave station No. 1 Test target station Slave station No. 2
Item
Local station Intelligent device station Intelligent device stationParameter of master station 1 2 3 (a) 1 4 3
Judgment criteria
Check the followings. *1 (1) Special register SW00B0 (b1) of the master station is turned on. (This means that
the data link of station No. 2 is abnormal.) (2) Data link of the test target station does not start, and the data must not be
communicated. (3) Output of the test target station matches the specifications presented by
manufacturers.
Result When the process is completed properly, enter in the blanks below.
Item
(1) (2) (3) (a)
Remarks *1 Manufacturers need to provide the method that checked data link status and the data
communication of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
Classification 2. Software test
(29/33)
Test item 2-5. Error processing (3) Network No. setting mismatch
Test method
Confirm that the cyclic does not start when the value, which is not in the parameter value set by the master station, is specified to the network No. of the test target station. Configuration needs to follow the basic test configuration. The setting of each station is as follows:
Setting of each station
Network No.
Item
Test target station Other than test target station
(a) 2 1
Judgment criteria
Check the followings. *1 (1) Special register SW00B0 (b1) of the master station is turned on. (This means that
the data link of station No. 2 is abnormal.) (2) Data link of the test target station does not start, and the data must not be
communicated. (3) Output of the test target station matches the specifications presented by
manufacturers.
Result When the process is completed properly, enter in the blanks below.
Item
(1) (2) (3) (a)
Remarks *1 Manufacturers need to provide the method that checked data link status and the data
communication of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
Classification 2. Software test
(30/33)
Test item 2-5. Error processing (4) Station type mismatch
Test method
Confirm that the cyclic does not start when the test target station and the parameter do not have a matched station type. Configuration needs to follow the basic test configuration. The setting of each station needs to be the same as "Basic function (Cyclic communication)". The number of communication point is optional, and the setting of each station is as follows:
Setting of each station Station type
Item
Slave station No. 1 Test target station Slave station No. 2
(a) Local station Local station Intelligent device station
Judgment criteria
Check the followings. *1 (1) Special register SW00B0 (b1) of the master station is turned on. (This means that
the data link of station No. 2 is abnormal.) (2) Data link of the test target station does not start, and the data must not be
communicated. (3) Output of the test target station matches the specifications presented by
manufacturers.
Result When the process is completed properly, enter in the blanks below.
Item
(1) (2) (3) (a)
Remarks *1 Manufacturers need to provide the method that checked data link status and the data
communication of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
2.6. Synchronization function
Classification 2. Software test
(31/33)
Test item 2-6. Synchronization function (1) Synchronization slave station
Test method
Confirm that the tested station receives MyStatus frames periodically sent by the synchronization master station and becomes synchronized. The cycle (T) of the MyStatus frames sent by the master station is 888 µs or 1 ms. Present the value prior to testing. The test period is 1,000 cycles.
QnU(D)Master stationNetwork No. 1Station No. 0
Tested stationStation No. 1
Slave stationStation No. 2
Measuring device
Oscilloscope
Judgment criteria
Observe the synchronized output of the tested station using the oscilloscope. Verify that the cycle is T and that the amount of error is ±T or less. The tested station should have an external output based on timing generated by the synchronization function. The station should have a function that identifies the continuous timing by executing inversion at the time of each synchronization process, for example. This may be achieved using a jumper wire temporarily withdrawn from the interior.
Remarks The measuring device shall be a device capable of identifying MyStatus frames and measuring the periodic interval.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(32/33)
3. Aging
Classification 3. Aging test
Test item (1) Aging test
Test method
Conduct this test continuously for 12 hours. Confirm that the product operates without any problem during the 12-hour continuous execution of the test. Configuration needs to follow the basic test configuration. Set the RY/RX/RWw/RWr assignment of the cyclic transmission to the maximum points. The settings of each station is as follows:
Name Station type Station No.
Slave station No. 1 Local station 1
Test target station Intelligent device station 2
Slave station No. 2 Intelligent device station 3
(1) Cyclic communication function When the test target station supports the loop-back function in the link device: The master station should execute the loop-back verification of the cyclic data continuously to station No. 1 to 3 (including test target stations).
When the test target station does not support the loop-back function in the link device: The master station should execute the loop-back verification of the cyclic data continuously to station No. 1 and 3. It also should send/receive the cyclic data to/from the test target station continuously.
(2) Transient communication function When the target station supports the transient function for user application: Continuously execute the transient communication (Transient2) to the test target station from the master station.
When the target station does not support the transient function for user application: Continuously execute the transient communication (Transient2) to station No. 1 and 3 from the master station.
Judgment criteria
Confirm that the devices can operate continuously for 12 hours or more. (1) Able to execute the cyclic communication. (2) Able to execute the transient communication.
Item Result When the process is completed properly, enter in the blanks below.
(1) (2)
Remarks *1 Manufacturers need to provide the method that checked the cyclic and transient communication of the test target station to CLPA.
Manufacturer (required) CLPA (required) Result
CC-Link Partner Association
(33/33)
Appendix 1 Wave examples of noise simulator output
Actual output voltage should follow the each test item.